: Electric Power Generation, Transmission, and Distribution. Region IV - OSHA

Similar documents
ELECTRICAL (COMPREHENSIVE) SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29 CFR CFR , ,

Original Date of Issue: 04/09

Health & Safety Policy and Procedures Manual SECTION 6 ELECTRICAL SAFETY / CONTROL OF HAZARDOUS ENERGY

Responsibilities: Effective Date: November Revision Date: May 1, VP, Facilities and Construction Management. Issuing Authority:

Electrical Safety Work Practices

Electrical Safety Program

2. The purpose of this program is to achieve the following objectives:

11/2/2017. Course Objectives. Overview

SUBJECT: SAFE WORK PRACTICES CHECKLIST FOR LOW VOLTAGE ELECTRICIANS REVISION September 15, Area Checklist Items 2600SEG131 Check ( or NA)

Management Plan for Electrical Safety ISD #535

KMU SUBSTATION WORKSHOP

Lockout/Tagout - Energy Control Program

Lockout/Energy Control

Definitions found in several locations:

LOCK-OUT/TAG-OUT (LO/TO) SAFETY PROGRAM

ELECTRIC OPERATING PROCEDURES Date: 11/01/06

Elements of a Lockout/Tagout Program OSHA

DUQUESNE UNIVERSITY LOCKOUT/TAGOUT PROGRAM

PART Q CONTROL OF HAZARDOUS ENERGY (LOCKOUT-TAGOUT)

LO/TO LOCKOUT/TAGOUT PROGRAM

Page: 7/15/2009. Energy control procedures Use of lockout/tagout equipment to ensure safe work practices.

LOCKOUT/TAGOUT PROGRAM

Responsibilities / Accountability

MISSOURI UNIVERSITY OF SCIENCE & TECHNOLOGY Procedure: 3.6

LOCKOUT/TAGOUT PLAN August 2015

Electrical Safety Program

CITY AND COUNTY OF DENVER CR&CF RISK UNIT Electrical Safety Standard

Electrical Safety. Unqualified Worker

UNIVERSITY OF TOLEDO

Gettysburg College. Energy Control Program

Lockout / Tag out Program

Control of Hazardous Energy Lockout / Tagout Program

University of Arkansas Office of Environmental Health and Safety

Lockout / Tagout Safety Program

SECTION 51 NFPA 70E POLICY. Health & Safety Policy and Procedures Manual

PAGE 1 OF 7 HEALTH, SAFETY & ENVIROMENTAL MANUAL PROCEDURE: S230 Lock-Out Tag-Out (LOTO) Program REV 4.0 8/13/2012

LOCKOUT/TAGOUT PROGRAM

THE UNIVERSITY OF NORTH CAROLINA

PRESCOTT SCHOOL DISTRICT NO South A Street Prescott, WA The Control of Hazardous Energy (Lockout/Tagout)

Energy Control Procedures Lockout/Tagout 29 CFR

Electrical Safety Program

TVPPA Lineman Apprenticeship Program

Preparer: Owner: Approver: EHS Team Member TES Manager Site Manager

DRAFT LOCKOUT/TAG OUT PROGRAM (CONTROL OF HAZARDOUS ENERGY)

H. Control of Hazardous Energy: Lockout/Tag Out

ELECTRICAL SAFETY PROCEDURE

OSHA Federal Standards October 1, 2016 September 30, 2017

Electrical. OSHA Office of Training and Education 1

D Square Construction LLC

Lockout Tagout Program

Electrical Safety PPT-SM-ELECTSFTY V.A.0.0

Electrical Safety Program

ELECTRICAL SAFETY. Unsafe work practices near electricity can kill you! You are responsible for protecting yourself from electrical shock.

Lockout/Tagout Manual

Lockout/Tagout Program Occupation Safety & Health Standards for General Industry 29 CFR

Hazardous Energy Control (Lockout-Tagout)

UNIVERSITY OF NOTRE DAME CONFINED SPACE ENTRY POLICY

Lockout/Tagout Program

CONTROL OF HAZARDOUS ENERGY LOCKOUT/TAGOUT PROGRAM

POWER DELIVERY. Contractor Health & Safety General Terms and Conditions. Appendix B Personal Protective Equipment

SAINT MARY S COLLEGE OF CALIFORNIA STANDARD HAZARDOUS ENERGY CONTROL PROGRAM INCLUDING LOCKOUT/TAGOUT. Prepared by

CONTROL OF HAZARDOUS ENERGY/ LOCKOUT/TAGOUT PROGRAM

Lockout/Tagout Program

Fall Protection and Elevated Work

Lockout/Tagout - Control of Hazardous Energy Program

LOCKOUT/TAGOUT PROGRAM

Lockout Tagout Program

Aerial Lift Safety Program

UCHC Lockout/Tagout Policy (4/09)

7 Hazard assessment 8 Worker participation 9 Hazard elimination and control

DuPage County Environmental, Safety, Health & Property Loss Control Program Hazardous Energy Control (Lockout/Tagout)

SUNY OSWEGO ENVIRONMENTAL HEALTH AND SAFETY

Safe Schools: A Health and Safety Check

OSHA s Electric Power Standards

Electrical Safety Program February 2, 2016

Walking-Working Surfaces and Fall Protection Standards Update. OSHA General Industry

This training session covers electrical safety for unqualified persons. Unqualified persons are machine operators, operators of powered industrial

MARIPOSA COUNTY LOCKOUT/TAGOUT PROGRAM

Why Update. OSHA updated Walking Working Standard. Who & What it Covers. Housekeeping (a) 6/25/ nd Leading cause of Workplace fatalities

OSHA s new walking working surfaces standards

Lockout Tagout Policy

LOCKOUT / TAGOUT PROGRAM

Chapter 7 - Electrical Safety

Risk Management Resources

230-LOCKOUT/TAGOUT PROGRAM

Electrical Safety For Managers Updated For E. ElectricalTrainingPro.com

APPENDIX A. Appendix A: Fall Hazards Lesson Test Instructor Copy (answers bold/italic), Student copy to distribute follows

NFPA 70E Policies and Best Practices

Lockout / Tagout Program OSHA 29 CFR

Vehicle-mounted elevating and rotating work platforms.

Portland Community College Facilities Management Services ENERGIZED ELECTRICAL WORK PERMIT AND WORK PLAN

Pannier Corporation Health and Safety Handbook Marking System Group Aerial Lifts Original Date: Section: Revision date: Page: 12/5/ of 11

University of Vermont Department of Physical Plant Burlington, Vermont

University of Tennessee Safety Program

Lockout/Tagout Program

100 Questions on Electrical Safety Study Guide

Leader s Guide ERI Safety Videos

SAMPLE WRITTEN PROGRAM for Control of Hazardous Energy LOCKOUT TAGOUT

HIGH-IMPACT SAFETY TRAINING FOR QUALIFIED ELECTRICAL WORKERS

Applications and Considerations Section 11

Transcription:

1910.269: Electric Power Generation, Transmission, and Distribution Region IV - OSHA

Scope This standard covers the operation and maintenance of electric power generation, control, transformation transmission, an distribution lines and equipment.

Construction VS Maintenance Construction: The erection of new electric lines and equipment. The alteration, conversion, and improvement of existing lines and equipment.

1910.269(a)(2): Training All employees: Safety practices of 1910.269 Emergency procedures Other necessary safety practices

Training in Emergency Procedures

1910.269(a)(2): Training Qualified employees: Ability to distinguish live parts Ability to determine voltage Knowledge of minimum approach distances Ability to use protective equipment

1910.269(a)(2): Training Regular supervision and annual inspection to determine compliance Follow-up training and retraining: New work procedures Tasks performed infrequently Certification

1910.269(b)(1): CPR & First Aid Training Performing work on or associated with: Exposed lines, or Equipment energized at 50 volts or more

1910.269(b)(1): CPR & First Aid Training Field work - crews of two or more employees: Two trained persons, or All new hires trained within 3 months Fixed work locations: Trained person available within 4 minutes, or All employees are trained

1910.269(b)(2): First Aid Supplies First aid supplies in a weatherproof container on a service truck.

1910.269(c): Job Briefing Subjects: Hazards and personal protective equipment Work procedures and special precautions Energy source control

Job Briefing

1910.269(c): Job Briefing Number of briefings: Before start of each day or shift Additional job briefings if significant changes occur Based on nature and complexity of work Job planning for one-person crews

1910.269(d): Hazardous Energy Control Procedures Deenergize and lock or tag Additional protective measures for tags Protection equivalent to locks

1910.269(d)(2)(ii)(B): Use of Tagout System Only Demonstrate full employee protection Safety equivalent to lockout

Application of Lockout Tags rather than locks are commonly used in electric utilities

1910.269(d)(2)(ii)(B): Use of Tagout System Only Examples of demonstration of employee protection: Removal of a fuse Removal of an isolating circuit element Blocking mechanism on switch Opening of additional switches on main circuit, on control circuit

1910.269(e): Enclosed Spaces Entered under normal operating conditions: Manholes, Vaults Applies to routine entry in lieu of 1910.146(d) to (k) 1910.269(e) & (t) apply to entry only

1910.269(e): Enclosed Spaces 1910.146(c) still applies: Identify permit spaces Keep unqualified persons out Coordinate with contractors If hazardous conditions develop, use 1910.146

1910.269(e): Enclosed Spaces Enclosed Spaces (Specific) Training: Entrants, attendants Rescue equipment provided Evaluate hazards: Use of attendants Test, ventilate, monitor

Manhole Atmospheric Testing prior to Entry

Manhole Vault with Protective Barrier

Rescue training Vault Entry

Vault Entry Rescue Equipment

Testing Equipment

1910.269(g): Personal Protective Equipment Follow Part 1910, Subpart I: Eye and face Respiratory Head, foot Electrical protective devices

Lineman with Protective Gear

Supplied Air Respirator

Air-Purifying Respirator Negative-pressure fit check

Air-Purifying Respirator Positive-pressure fit check

1910.269(g)(2): Fall Protection When required: Heights greater than 4 feet Poles, towers, and similar structures

Pole Climbing

Body Belt

Pole Climbing Strap

Tower Climbing Tower Climbing with proper person protective equipment

Tower Climbing Tower Climbing with proper person protective equipment

1910.269(g)(2): Fall Protection Not required by qualified employee: Climbing Changing location Must be free from unsafe conditions: Ice, high winds, contamination on structure Must have hands free for climbing

1910.269(g)(2): Fall Protection Does not address working on: Portions of buildings Electric equipment (transformers, capacitors) Aerial lifts

1910.269(h): Ladders, Platforms, Step Bolts, & Manhole Steps Part 1910, Subpart D applies Special ladders and platforms: Exempt from pitch & footing requirements Must be secured in position May not be overloaded

Special Ladder Special ladder secured in position

1910.269(h): Ladders, Platforms, Step Bolts, & Manhole Steps Special ladders and platforms Cont d: Must be designed for use Must have a safety factor of at least 2.5 times the maximum Intended load

1910.269(i): Hand and Portable Power Tools Cord - and plug connected equipment: Part 1910, Subpart S applies Grounded, double - insulated, or connected through an isolated transformer with an ungrounded secondary Portable and vehicle - mounted generators Hydraulic and pneumatic tools

1910.269(j): Live - Line Tools Design: 100 kv/ft for fiberglass reinforced plastic (FRP) 75 kv/ft for wood Condition of tools: Daily inspection before use; inspection every two years Tests after repair and after inspection for hollow FRP and wood tools

Live Line Tools

Live Line Tools

1910.269(k): Materials Handling and Storage Part 1910, Subpart N applies Storage in areas restricted to qualified persons: Materials must be outside working space See 1910.269(u)(1) and (v)(3) Storage in unrestricted areas: Materials must be 10 ft away Add 4 inches for every kv over 50 kv

1910.269(l)(1): Qualified employees only At least two persons for: Work with exposure at more than 600 V Work with equivalent hazards Two persons not required for: Live - line tool work Routine switching Emergency repairs

1910.269(l)(2): Minimum Approach Distances Minimum approach distances (Tables R-6 through R-10) Exceptions: Insulate the employee Insulate the live part Employee is insulated from other exposed conductive object, As during live-line bare-hand work

Safety Equipment Inspection

Installation of Rubber Blankets

1910.269(l)(6): Apparel Conductive Clothing: Prohibited unless no increased hazard of electrical contact Flammable Clothing: Train employees in hazards Clothing may not increase extent of possible injury

100% Cotton Shirt

100% Cotton Shirt

Synthetic Shirt

Clothing Issue What method are you using to protect employees from electric arcs and flames? Flame Retardant. Treated. 100% Cotton. Appropriate weight. Documentation.

Denim Jeans

100% Cotton Sock

Flame Resistant Shirt

1910.269(m): Deenergizing Lines and Equipment for Employee Protection

Employee Protection Applies to transmission and distribution System operator controls switching - central control No central control - use employee in charge Request clearance of system from operator

Employee Protection Deenergize line: Open disconnecting means Tag disconnecting means Test for deenergized conditions Install protective grounds

Employee Protection Work on line Release clearance: Notify employees Clear employees Remove protective grounds Report to the system operator

Employee Protection Reenergize Line: Remove tags Close disconnecting means

1910.269(n): Grounding for the Protection of Employees Ground deenergized lines, unless No possibility of contact with other source hazard of induced voltage is not present Equipotential zone Test before applying grounds

Grounds

Grounds

Grounding of Lines

Checking Ground Wire

Ground Installation Proper order of connection and removal: Install ground end first Remove line or equipment end first

1910.269(o): Testing and Test Facilities Applies to high-power and highvoltage testing rather than routine line work Establish safe practices Guard test areas Grounding to be established and implemented Safety checks required

1910.269(p): Mechanical Equipment Mechanical considerations: Inspection Provisions for backing up Roll-over protective structures Outriggers Load ratings

Bucket Truck

Digger Derrick Truck

Bucket Truck Bucket truck with outriggers fully extended

1910.269(p): Mechanical Equipment Operations near energized lines (equipment) Maintain minimum approach distance: Insulated portion of aerial lift is exempt Designated observer if necessary

Warning Label on Bucket Truck

Lineman in Bucket

1910.269(p): Mechanical Equipment Additional precautions: Insulate the lines, or Insulate the mechanical equipment, or Protect employees from hazardous differences in potential

Insulating Lines

Insulating Lines

Protecting Employee form Differences in potential

Protecting Employee form Differences in potential

1910.269(q): Overhead Lines Poles, towers safe for climbing (Test methods for poles in Appendix D) Installing and removing lines: Mechanical considerations Electrical considerations Live-line bare-hand work; training required Tower and structure work

1910.269(r): Line - Clearance Tree Trimming Operations

1910.269(r)(1): Electrical Not applicable to qualified employees Always maintain minimum approach distance Work may not be performed in adverse weather conditions Special training required for work in the aftermath of a storm

Tree Limb Lodged Between Two Energized Lines

Mechanical Equipment Requirements for: Brush chippers Sprayers Stump cutters Power saws

1910.269(r)(8): Fall Protection Each employee shall be tied in with a climbing rope and safety saddle when the employee is working aloft in a tree.

1910.269(s): Communication Facilities Microwave Transmission: See 1910.97 Radiation protection guide Power Line Carrier

1910.269(t): Underground Electrical Installations Access (ladder etc.) required for depth >4 ft. Attendants for manholes: First aid and CPR training. Employee on the surface may enter briefly to assist; other than emergency. No attendant for housekeeping, taking readings, etc.

Access ladder for Underground Electrical Installation (Vault)

First Aid Training Inside a Vault

1910.269(t): Underground Electrical Installations Defective cables: Deenergize, if possible Use shield to contain fault

1910.269(u): Substations Access and working space: NESC guidelines Guarding of live parts: NESC guidelines, or Subpart S (NEC) requirements Keep draw-out-type circuit breakers in open position when removing or inserting Grounding of conductive fences

Substation Overview

Detailed View of Transformers

Insulators & Connectors

1910.269(v): Power Generation Access and working space: NESC guidelines Guarding of live parts: NESC guidelines, or Subpart S (NEC) requirements Changing generator brushes: Check for ground condition

1910.269(v): Power Generation Chemical cleaning of boilers - restrict access, post signs Chlorine systems Coal and ash handling: MSHA jurisdiction Railroad Conveyors Storage areas

1910.269(w): Special Conditions Capacitors Illumination to enable performing safe work Protection against drowning (U.S. Coast Guard approved floating devices) Employee protection in public work areas: Traffic control Barricades

Traffic Control

Warning Sign