CERTIFYING DRAINLAYER

Similar documents
TRADESMAN DRAINLAYER

REGISTRATION EXAMINATION, JUNE 2017 CERTIFYING PLUMBER ANSWER SCHEDULE

REGISTRATION EXAMINATION, JUNE 2015 CERTIFYING PLUMBER ANSWER SCHEDULE

REGISTRATION EXAMINATION, NOVEMBER 2015 LICENSED PLUMBER ANSWER SCHEDULE

AcornVac Vacuum Plumbing Systems - Trouble Shooting Guide

TABLE OF CONTENTS PART 2 - CONFINED SPACES

Working Environment Safety Assessment

GUIDELINES FOR SLUG DISCHARGE MANAGEMENT PLAN (Abstract from EPA Guidance Manual)

Lecture 10 : Sewer Appurtenances

SPILL CONTINGENCY AND EMERGENCY RESPONSE PLAN

MAGB HEALTH and SAFETY GROUP Working In Confined Spaces

CERTIFYING GASFITTER

CERTIFYING GASFITTER

CERTIFYING GASFITTER

1.0 Scope and Application. 2.0 Definitions. Cal Poly Risk Management Confined Space Program Page 1

Working in Confined & Enclosed Space Policy

U.S. CONCRETE, INC. SAFETY POLICY and PROCEDURE MANUAL

Safe work in confined spaces

Confined Space July 2014

Estates and Facilities Management Policy for Working in Confined Spaces

Newport News Shipbuilding Contractor Environmental, Health and Safety Resource Manual Sewage

22. Specialty Valves.

Confined Space Entry Written Program

Confined Space Hazard Identification & Risk Assessment Form


CERTIFYING GASFITTER

Environmental Services Buller District Council 4-6 Brougham Street PO Box 21, Westport 7866 Telephone

5.0 Store. safely IN THIS SECTION: 5.1 Decanting or transferring

STANDARD OPERATING PROCEDURE

ROCKDALE COUNTY NEW SWIMMING POOL PLAN REVIEW

Safe Work Instructions For Oxygen Acetylene Equipment

CLEANING, INSPECTION, AND TESTING OF SEWERS

This written Compressed Gas Plan is kept at the corporate office and in the written Safety & Health Program.

TYPICAL TOXIC GAS SYSTEM INSPECTION VIOLATIONS

Safe Work Practices / Procedures / Instruction CONFINED SPACE

Excavations and Trenches

SWMS No 009 Samark North Qld Pty Ltd ABN : Electrical Contractors License C37121 Page 2 of 4

REGISTRATION EXAMINATION, NOVEMBER 2017 TRADESMAN GASFITTER QUESTION AND ANSWER BOOKLET. Time allowed THREE hours

Digester Processes. 1. Raw Sludge Pumping System

Ir HN Lam BSc(Eng), MSc(Eng), CEng, MIMechE, MCIBSE, MASHRAE, MASME, MHKIE. Test Report on Non-Return Valve for Water Closets

WHS CONTRACTOR INFORMATION PACKAGE

Swimming Pool Requirements Packet

IMO PROMOTION OF IMPLEMENTATION AND ENFORCEMENT OF MARPOL 73/78 AND RELATED INSTRUMENTS

SAFETY TRAINING LEAFLET 06 CARBON DIOXIDE

GWINNETT COUNTY SWIMMING POOL PLAN REVIEW CHECKLIST

Confined Space Entry - Permits

When you complete this module you will be able to: Describe procedures needed to enter into, or work safely in confined spaces.

DF1 and DF2 Diffusers

Safety Tips from the WorkSafe People. Building a Safety Program for Your Organization

In an emergency the safety of all personnel and the public is of priority.

CITY OF SALEM DEPARTMENT OF PUBLIC WORKS STANDARD DRAWINGS TABLE OF CONTENTS

Appendix 4C - Sample SWMS Trenching

POTENTIAL HEALTH & SAFETY HAZARDS

TEMPLE UNIVERSITY ENVIRONMENTAL HEALTH AND RADIATION SAFETY

GAP Tool Box Talk: Confined Spaces

CLASS D - SENSITIVE LEAK TEST GAS AND BUBBLE METHOD. 1.1 To provide definitive requirements for PNEUMATIC pressure testing of piping systems.

EQUIPMENT AND MATERIALS

Jacuzzi. J-CQ420 Cartridge Filter Installation and Operating Instructions

CRAFTSMAN EXAMINATION, NOVEMBER 2007 GASFITTING ANSWER SCHEDULE

Confined Space Entry Program 8 CCR 5157

Construction OS&H Working at or below ground level

Confined Space Entry

Restricting Access to Your Swimming / Small Heated Pool Information / Checklist

A Health and Safety Tip Sheet for School Maintenance Staff. Did you know? Step 1. Identify job hazards. Step 2. Work towards solutions

PROPERTY & ESTATES GROUP

Idaho Fire Service Technology Fire Fighter II

Note: Implementing a permit-required confined space program in accordance with section 5157 shall meet the requirements of this section.

Juler Group. Presents. Hydrogen Sulfide (H 2 S) Safety. Juler Group Juler Group Incorporated

RIIWMG203D Drain and Dewater Civil Construction Site Learner Guide

Installation and maintenance of twin 45kg LPG cylinder systems

POOL FENCING A Guide to the Fencing of Swimming Pools Act 1987

Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS

Operating manual. LINDOFLAMM Acetylene special burner LF-H series.

Siting and Installation Manual

CONFINED SPACE PROGRAM

OSHA Compliance Saves Money, See How They Are Connected. Ryan S. Hellman, MS Principal EHS Consultant

Confined Space Entry. My Experience so far.

CONFINED SPACE POLICY

Total s Golden rules

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

INSTALLATION INSTRUCTIONS

Clear up confusion between the requirements for confined spaces and grain storage structures.

TABLE OF CONTENTS PART 11 - FIREFIGHTING

HEAT EXCHANGE AND TRANSFER, INC. 500 Superior Street Carnegie, PA (412) Fax: (412)

WLPGA East African Summit

Confined Space in Construction

The Corporation of the Town of Tecumseh

Operations: HSE. Health and Industrial Hygiene. Laboratory Safe Work Practice

Confined Space. Program Responsibilities

Hampstead Hill School Health and Safety Policy: Confined Spaces

Installation, Operation, & Maintenance Manual NX Seal Cooler

Private Swimming Pool Permit Application

CONFINED SPACE WRITTEN PROGRAM

Topic Sheet No. 20 Confined and restricted spaces

Confined Space Entry Appendix - Sewerage Transfer. 1. Purpose Sewerage Transfer Assets. 2. Scope. 3. Procedure

DAILY EXCAVATION CHECKLIST

SAFETY FACT SHEETS. Confined Space Entry Safety Non Negotiable. G-HS-ST Confined Space Entry. G-HS-FS Verison 1

OSHA must prove. Confined Space Entry. Do you have an effective safety and health program? Some period of time later

A little technical and safety...

TEMPLE UNIVERSITY ENVIRONMENTAL HEALTH AND RADIATION SAFETY

Transcription:

No. 9198 REGISTRATION EXAMINATION, NOVEMBER 2017 CERTIFYING DRAINLAYER ANSWER SCHEDULE Plumbers, Gasfitters and Drainlayers Board, 2017. All rights reserved. No part of this publication may be reproduced by any means without the prior permission of the Plumbers, Gasfitters and Drainlayers Board.

ANSWER 1 (i) 100 mm (1 mark) (ii) 600 mm (1 mark) (iii) 100 mm (1 mark) (iv) 300 mm (1 mark) (b) Cross at an angle not less than 45 degrees. Have a vertical separation of not less than 100 mm. Be marked along its length at least 1 m either side of the drain crossing. (3 marks) Total 7 marks ANSWER 2 Surface water Main vent Overflow relief gully Grease trap Inspection openings Economical and practical (3 marks) (1 mark) (1 mark) (2 marks) (2 marks) (3 marks) Total 12 marks ANSWER 3 150 mm Total 1 mark ANSWER 4 Any FOUR (½ mark each) Exit the digger and turn it off if safe to do so. Warn people in the area that there is a possible gas leak and a danger of fire. Ring the Fire Brigade. Ring the local gas utility operator. Close windows of the nearest buildings to prevent gas entering the buildings. Extinguish any ignition sources. (½ mark each) Total 2 marks Certifying Drainlayer 9198 Answers, November 2017 1

ANSWER 5 (b) Any TWO (1 mark each) Lack of oxygen/asphyxiation. Poisonous gases. Flammable gases. Contaminated soils (2 marks) Any FOUR (½ mark each) Obtain copies of a past and current works permit. Locate services. Isolate any electrical service apart from that necessary. Wear appropriate PPE. Carry out site inspection. Locate safety shut off valves. Complete a task analysis. (2 marks) (c) Any TWO (1 mark each) Remove sources of ignition. Wear respiratory devices. Keep area well ventilated. Erect barriers and signs. Use gas detection equipment. Isolate the area. Have spotters. (2 marks) Total 6 marks ANSWER 6 Drawing to include any EIGHT (1 mark each): Disconnection point for pump. Haunching towards pump. Air tight lid. Access ladder. Pump(s). Pump(s) submersible. Devices to turn pump(s) on and off. High level alarm sensor. Isolating valves on pump outlets at ground level. Chain/guide for removing pumps for service. Vent. Inlet/outlet. Check valves. Mechanical disconnection of pump from discharge line. (8 marks) Certifying Drainlayer 9198 Answers, November 2017 2

(b) A wet well installation has submersible pumps installed at the base of the chamber. A dry well installation has pumps installed above or adjacent to the liquid level with pipes extending into the liquid. (2 marks) Total 10 marks ANSWER 7 To prevent a surcharge or backflow. (1 mark) (b) Any ONE (1 mark) Answer describing a situation where surcharging from a sewer occurs and an ORG trap cannot be installed, e.g. sewage ejecting system or pumping system. In tidal areas. (2 marks) (c) Immediately downstream from the outlet of the boundary trap. (1 mark) Total 4 marks ANSWER 8 Have waste pipes sealed when they enter through the side or back of the gully dish. Have the top of the gully dish 25 mm above paved surfaces. Have the top of the gully dish 100 mm above unpaved surfaces. Total 3 marks ANSWER 9 Diagram to show: Silt collection area. (1 mark) Rodding (access) point. (1 mark) Trapping system. (1 mark) Grate. (1 mark) Total 4 marks ANSWER 10 Any FOUR (4 marks) Oxygen level. Possible toxic fumes. Possible flammable contaminants. Temperature within the chamber. Rainfall in catchment area. Tidal movements if the drain is discharging to the sea. (4 marks) (b) Any TWO (4 marks) A co-worker on lookout above. Communication method. Harness with retrieval rope, with co-workers to operate. Adequate oxygen supply. (2 marks) Total 6 marks Certifying Drainlayer 9198 Answers, November 2017 3

ANSWER 11 Ground levels correct. (3 marks) (b) Fall correct (3 marks) and depths of drain invert below datum correct (3 marks). (6 marks) (c) Depths of drain invert below ground correct and to correct scale. (3 marks) Total 12 marks ANSWER 12 Work that does not require a building consent. (1 mark) (b) (c) Any FOUR (1 mark each) Opening an existing access point to clear a blockage and resealing that access point. A kitchen benchtop is replaced and the kitchen sink is moved to an adjacent wall. The existing gully trap servicing the kitchen needs to be shifted a short distance to receive the discharge from the repositioned sink wastepipe. A toilet pan has been repositioned in an existing bathroom and it is reconnected into the existing drain at a different point. Installing a new access or rodding point for unblocking drains. A short extension to a storm-water drain to collect water from a new downpipe. Connecting a new gully trap on an existing drain to receive discharge from a redirected waste pipe. Sealing off a branch drain following the removal of sanitary fixtures from an outbuilding associated with a dwelling. Extending, for a short distance, the drain from a dwelling to connect to a new council sewer lateral installed at the boundary by the NUO due to the original lateral being damaged by tree roots (provided no new connections to a NUO system are made). (4 marks) Any FOUR (1 mark each) Certifying drainlayer. Tradesman drainlayer. Journeyman drainlayer. Trainee drainlayer. Exempted person under supervision. Provisional drainlaying licence holder. (4 marks) Total 9 marks Certifying Drainlayer 9198 Answers, November 2017 4

ANSWER 13 Any FOUR (½ mark each) Toxic gas in trench. Low oxygen levels in trench. Personal health issues of co-worker (heart attack, stroke etc). Accident e.g. fall. Electric shock. (2 marks) (b) (i) Any ONE (1 mark) Assess risk to personal safety trench stability, toxic gas levels and oxygen levels. Call for help. (1 mark) (ii) Put a backup/spotter person at the trench site. Contact emergency services. Make safety equipment, recovery system available before approaching co worker. Provide first aid. (½ mark each, 2 marks) (c) Any TWO (1 mark each) Incident form. Accident investigation form. Notification of Accident or Serious Harm form. (2 marks) Total 10 marks ANSWER 14 Sketch to show: slab over concrete (1 mark) measurements such as concrete thickness (2 marks) compacted fill. (1 mark) Total 4 marks SECTION B 1. C To supply oxygen to the bacteria within the tank. 2. D An unplanned incident in the workplace that endangers the health and safety of workers. 3 C Extra weight from soil or vehicles near the edge of the trench. 4. E WorkSafe New Zealand. 5. A 24 hours. 6. A Once in 10 years. 7. D The certifying drainlayer. 8. B 12 months. 9. A When the drain is receiving 18 mm or more fixture discharge unit. 10. D The height difference between the inlet and the outlet. 11. C Persons conducting a business or undertaking. 12. A The company. 13. D The company s directors. Total 10 marks Certifying Drainlayer 9198 Answers, November 2017 5