Derby Street. Project Updates. Salem, Massachusetts

Similar documents
Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

WHITE STREET/ ENGLISH PLAZA STREETSCAPE IMPROVEMENT PROJECT

Option W: N. Washington Street Project

Polk Streetscape Project

Traffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

NJDOT Complete Streets Checklist

Environment and Public Works Committee Presentation

Complete Streets Funding Program Project Prioritization Plan

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

F L E T C H E R A V E N U E

DISTRICT BICYCLE PROGRAM

CITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

Meade Street Bridge Design Alternative Study

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

Steps to Conducting a Complete Streets Assessment

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

Complete Streets. Designing Streets for Everyone. Sarnia

Building Great Neighbourhoods STRATHEARN

ADA Training Accessible Pedestrian Signal (APS) 2018 MnDOT

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Complete Streets Successes, Opportunities, and Challenges

Incorporating Sidewalks into Transportation Asset Management. Presentation by Alan S. Kercher, P.E. Kercher Engineering, Inc.

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project

122 Avenue: 107 Street to Fort Road

Tonight is for you. Learn everything you can. Share all your ideas.

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER

COMPLETE STREETS DURING CONSTRUCTION

e. 173rd/AVALON bicycle boulevard Shaker Heights Review Meeting - May 9, 2013

Observations and Ideas: Toomer s Corner Streetscape Improvements

PUBLIC REALM MASTER PLAN

Building Great Neighbourhoods BONNIE DOON

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

PEDESTRIAN CIRCULATION & STREETSCAPE DESIGN

Palou Complete Street Project Barneveld Avenue to Crisp Road Project overview and concept design Community Meeting #2 May 13, 2015

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY

Fulton Market Streetscape

Designing Complete Streets: What you need to know

Building Great Neighbourhoods QUEEN ALEXANDRA

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

ARLINGTON COUNTY, VIRGINIA

Town of Ashland. Downtown Planning Initiative 2 nd Community Workshop. March 29, Presented by:

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

Safe Routes to School Action Plan Aberdeen, Idaho

Water Street Promenade Engineering and Design Services

Chapter 4: Funding and Implementation

PEDESTRIAN CROSSING TREATMENTS

Omaha s Complete Streets Policy

ADA TRANSITION PLAN 2013

COMPLETE STREETS PLANNER S PORTFOLIO

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Right-of-Way Standards

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

MPO Staff Report Technical Advisory Committee: May 10, 2017 MPO Executive Board: May 17, 2017

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Route 47 (North Main Street) Reconstruction

FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION

Chicago Safe Routes to High School (SRHS) Kelly High School Recommended Improvements

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

Fifth & Kirkham Traffic-Calming Project. 5 th Avenue and Kirkham Street Presented at the UCSF Quarterly Parnassus Community Meeting May 3, 2018

Right-of-Way Standards

Final Sidewalk Feasibility Study

Pre-Construction Meeting

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

R A M P U P! - City of Tacoma's Curb Ramp Installation Matrix

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

10.0 CURB EXTENSIONS GUIDELINE

Ballston Station Multimodal Study WMATA and Arlington County. Meeting Minutes

Living Streets Policy

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

S. Broadway Improvements Council has made a total of $533,000 available to fund streetscape improvements, mainly to the 3400 block of S Broadway

Rolling Out New Bike Facilities Within the North Bethesda & White Flint Area

/ ARLINGTON COUNTY, VIRGINIA

THE ALAMEDA CONCEPT DESIGN COMMUNITY MEETING 3. A Plan for The Beautiful Way JANUARY 28, 2010

Task 4 Wayfinding Elements, Placement and Technical Guidance 4.1 Wayfinding Elements

Water Street Promenade. Engineering and Design Services. Public Information Meeting No. 2. Education / Infrastructure / Innovation. Maplewood Avenue &

City Avenue Projects

SRTS IMPLEMENTATION COSTS

Public Works Committee Meeting Richard E. Mastrangelo Council Chamber November 20, 2017

PRESS RELEASE San Joaquin Council of Governments

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

Designing for Pedestrian Safety in Washington, DC

Southview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm

Building Great Neighbourhoods LANSDOWNE

WELCOME. City of Eden Prairie West 70 th Street

Lessons Learned from Cycle Tracks (Class IV Bikeways) Design Practice

PEDESTRIAN SAFETY ASSESSMENT SR 934/NORMANDY DRIVE AND 71 Street

RIVERSIDE, Newton MA BH NORMANDY RIVERSIDE LLC. Riverside Station. A green, transit-oriented community

CITY OF CASSELBERRY WINTER PARK DRIVE IMPROVEMENT STUDY

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018

Transcription:

Derby Street Project Updates Salem, Massachusetts September 13, 2017

Project Limits

Derby Street Project Objectives 1. Improve complete streets elements on Derby Street 2. Improve sidewalks on finger streets off Derby Street 3. Improve shared use path connections

Derby Street Meeting June 26, 2017 Comments/Concerns Sidewalk surface materials cement concrete vs. brick Parking Sidestreet vehicle access Roadway Dimensions Raised Crosswalks/Speed Tables Bump Outs Signage Landscaping/ streetscape Utilities

Site Walk July 2017 Clear signage Bump outs Sidewalk materials Sense of place Traffic table at Customs House Sidestreet vehicle access Proper sightlines Illegal parking Pedestrian ramps

Stakeholders meeting August 8, 2017 Brick versus concrete Maintenance Historic character Existing brick on side streets Bump outs and possible plantings Who is responsible for maintenance Bikes on one-way Derby Street Possible treatments for wrong way riders Historic Recognition of Derby Street Resident meetings to talk about work along properties

Sitewalk September 2017 City met with residents on Kosciusko St, Daniels St, Hardy St, Turner St and Carlton Street Feedback on brick header along installed 4 ft sidewalks Roadway paving this year on K St., Daniels and Hardy St. Other design details noted and will be addressed by the City

Derby Street upgrades Roadway Improvements New pavement and markings Phase 1: New Derby Street to Orange Street Phase 2: Orange Street to Fort Avenue Installed interim directional signage Visibility evaluation Remove sign clutter Traffic Wayfinding Increased illegal parking enforcement

Derby Street upgrades Sidewalk Improvements Update pedestrian ramps Install tactile warning panels Refresh cross walk locations Repairs Widen to 4 ft minimum using bump outs and removing select trees/ obstacles Reduce severe cross slopes to work towards ADA compliance

Finger Street Sidewalks Reconstruction Widen to 4 feet, when appropriate Side Streets-on one side only Kosciuszko Street, Bentley Street, Becket Avenue Remove obstacles in sidewalks Evaluate trees Replace sidewalks in place Cement concrete Install brick headers on sidewalks Keep brick sidewalk locations Adjust curbs, as needed Drainage evaluation Address illegal driveway curb cuts

Finger Street Sidewalks Reconstruction Locations/ Streets: Adjust Curbs Replace Sidewalk Orange Street X X Palfrey Court X X Widen Sidewalk Kosciuszko Street X X X Remove Obstacles Daniels Street X X X Bentley Street X X X Hardy Street X X Turner Street X X X Carlton Street X X X White Street X X Blaney Street X X Becket Avenue X X X English Street X X X Webb Street X X

Sidewalk material options

Sidewalk Material Costs Cement Concrete Sidewalks: $9.50/sf Cement Concrete with brick: $15.00/sf Full brick: $30.00/sf Based on bid prices from 2017 City sidewalk contractor Approximate sf areas for comparison purposes only.

Sidewalk Bump outs Custom House Daniels Street Hardy Street White Street Blaney Street Locations determined based on Derby Street width, crosswalk locations and vehicles turning onto side streets Custom House

Sidewalk bump outs - Daniels and Hardy St

Sidewalk bump outs - White St and Blaney St

Sidewalk Improvements

Sidewalk Improvements

Sidewalk Improvements

Custom House view

Carlton at White Street

White Street

Historic Recognition of Derby Street Medallions added to sidewalk surface Similar to McIntire District Symbol to be designed in collaboration between NPS/City/Neighborhood

Bicycle Accommodations On Road Improvements Bike lanes will be provided on Derby Street from Washington Street to Orange Street Share the lane will be proposed from Orange Street to Fort Avenue Enhanced crossings (RRFB) proposed on Derby Street, Fort Ave, and Szetela Lane (2 locations)

On-road bike accommodations Contraflow Derby Street minimum width: 25 ft Reduce parking stall width to 7 feet Reduce travel lane to 11 ft Reduce bike lane to 5 ft Clear width for emergency access: 16 ft Contraflow lane flush to travel lane

Bicycle Accommodations Off-Road Improvements From Derby Street through David J. Beattie Park connecting to existing Peter Tracy shared use path Off road shared use path along Footprint property frontage Reconstruct Peter Tracy path along Collins Cove from Webb Street to Bentley School

Enhanced Roadway Crossing Locations