SAFETY AND HEALTH INDUSTRIAL HYGIENE Hazard Communication Program Effective Date: 08/07/14 Standard: 10.1 Document Number: KUSHIH0008 Rev: 01

Similar documents
Title: Hazard Communication Right to Know Program Effective Date: 5/88 Revision: 12/14 Number of Pages: 7

Occupational Safety Next Review Date: 12/30/18. Scope: University Wide Original Creation Date: 1998

Hazard Communication Program

HAZARD COMMUNICATION PROGRAM

Hazard Communication Plan (HCP) 29 CFR

Hazard Communication Program

Section: Property WRITTEN HAZARD COMMUNICATION PROGRAM AND ADMINISTRATION Date Created: September, 2006 Date Edited: September, 2006

B&B Gas Well Services, LLC HEALTH, SAFETY AND ENVRONMENTAL MANUAL HAZARD COMMUNICATION PROGRAM

Hazard Communications Program

HAZARD COMMUNICATION Plan Globally Harmonized System

TEMPLE UNIVERSITY ENVIRONMENTAL HEALTH AND RADIATION SAFETY

HAZARD COMMUNICATION STANDARD (HCS) GLOBALLY HARMONIZED SYSTEM (GHS)

SECTION 7 HAZARD COMMUNICATION PROGRAM

HAZARD COMMUNICATION PROGRAM

Hazardous Materials Management. Presented by. James E. Roughton, MS, CSP, CRSP, CHMM.

Escondido Union High School District. Hazard Communication Plan

SAFETY AND HEALTH STANDARD CONFINED SPACE ENTRY REQUIREMENTS Effective Date: 06/10/10 Standard: 16.2 Document Number: KUCSH0038 Rev: 07

Concordia College Moorhead, Minn.

1.2.7 Hazard Communication

Hazard Communication 29 CFR

Delaware State University

WEBINARS. Hazard Communication

Doc #: 1000-AD Revision: - GLOBALLY HARMONIZED SYSTEM (GHS) SOP. Author(s): T. Lavoie/ M. Saucedo/ J. Dunlop/ Supervisor

NORTHEAST COMMUNITY COLLEGE

CITY OF LOS ANGELES PERSONNEL DEPARTMENT HAZARD COMMUNICATION PROGRAM

Confined Space Entry Program

Recommended Facilitator Notes: (read the following text out-loud to participants while showing this slide)

Globally Harmonized System Hazard Communication

Scope: This plan applies to all personnel, including contractors, who enter or work in confined spaces, or supervise such activities.

Purpose Written Program Hazard Classifications (GHS) SDS Sheets (GHS) Labels (GHS) Employee Training Chemical Safety Questions


TEMPLE UNIVERSITY ENVIRONMENTAL HEALTH AND RADIATION SAFETY

Asbestos Operations and Maintenance Plan

CONFINED SPACE WRITTEN PROGRAM

Permit-Required Confined Space Entry Program

Hazard Communications Program Policy

BP U.S. Pipelines & Logistics (USPL) Safety Manual Page 1 of 8

HAZARD COMMUNICATION PLAN. Clemson University

CONTROL OF HAZARDOUS ENERGY IN THE WORKPLACE

Written Programs Listing

SAFETY POLICY AND PROCEDURE MANUAL All Euramax Subsidiaries. Number K-3.0 Welding Safety Procedures

Town of Brunswick. Hazard Communication and Global Harmonization System (GHS) Plan

UNIVERSITY OF ROCHESTER

Title: Benzene Awareness Effective Date: 11/14/2014 Control Number: THG_0037 Revision Number: 1 Date: 10/22/2015 Annual Review Completed: 5/13/2015

TEXAS TECH UNIVERSITY HEALTH SCIENCES CENTER EL PASO

Cal Poly - San Luis Obispo. Hazard Communication Program

NPGA White Paper. OSHA Hazard Communication Standard

Once Printed This Document May No Longer Be Current

HAZARD COMMUNICATION SELF INSPECTION CHECKLIST

Lock Out/Tag Out Control of Hazardous Energy

CONFINED SPACES. Procedures for Permit-required ALTERNATIVE TO A FULL PERMIT ENTRY. Written Programs

MENDON GOLF CLUB GROUNDS DEPARTMENT HAZARDOUS MATERIAL STANDARD OPERATING PROCEEDURES (SOP)

A. Evaluation of the written program

SAFETY DIRECTIVE 2.0 DEPARTMENTS AFFECTED. This Administrative Directive shall apply to all Town of Marana departments and employees.

Control of Hazardous Energy Lockout / Tagout Program

LO/TO LOCKOUT/TAGOUT PROGRAM

Confined Space Entry Safety Program

SOP. Working in Confined Spaces

STATE OF FLORIDA DEPARTMENT OF MILITARY AFFAIRS Office of the Adjutant General St. Francis Barracks, P.O. Box 1008 St. Augustine, Florida

WHS PROCEDURE P Confined Spaces. Approved by: Ruth Hampton Review Date: 6 th December 2015

HAZARD COMMUNICATION PROGRAM (GHS) (Global Harmonizing System)

1 Purpose. 2 Responsibilities. 3 Policy Content ENVIRONMENTAL, HEALTH AND SAFETY STANDARDS. TITLE: CONFINED SPACE ENTRY Document Number: *

e-compliance Training

The Johns Hopkins University/The Johns Hopkins Hospital Health, Safety and Environment Manual Safety Policies:

Key Technology, Inc. Confined Space Entry Program. July, 2017

MANUFACTURING TECHNICAL INSTRUCTIONS - SAFETY FALL HAZARD CONTROL REQUIREMENTS SERIES & NO. SMI - 157

HAZCOM 2012 RIGHT-TO-UNDERSTAND. Helping you comply with 29 CFR

CONFINED SPACE ENTRY WRITTEN PLAN

Health & Safety Policy and Procedures Manual SECTION 34 HYDROGEN SULFIDE (H2S) PROGRAM

(2) Review the CHP at least annually and revise the document as necessary to reflect current regulatory practice.

CHEMICAL HAZARD COMMUNICATION SAFETY PROGRAM

PERMIT-REQUIRED CONFINED SPACES PROGRAM

ABSTRACT PLANT FILES SHOULD BE REVIEWED PERIODICALLY TO ASSURE COMPLIANCE. IF A PROBLEM EXISTS, PLEASE NOTIFY THE TACA SAFETY COMMITTEE.

Risk Management and Safety (RMS) Confined Space Entry Program May 1, 2009

RESPIRATORY PROTECTION PROGRAM

Safe Work Practices / Procedures / Instruction CONFINED SPACE

Confined Space Entry

Confined Space 29 CFR !

RESPIRABLE CRYSTALLINE SILICA PROGRAM July 2018

Process Safety Management Of Highly Hazardous Chemicals OSHA 29 CFR

Confined Space Entry Program 8 CCR 5157

THE UNIVERSITY OF NORTH CAROLINA

Hazardous Materials Management Guidelines

ARKANSAS TECH UNIVERSITY FACILITIES MANAGEMENT HEALTH AND SAFETY MANUAL (LOCKOUT/TAGOUT) 30.0

Hazardous Energy Control

OKLAHOMA CITY COMMUNITY COLLEGE CONTROL OF HAZARDOUS ENERGY PROGRAM. Environmental Health and Safety. Established:

RISK ENGINEERING TECHNICAL GUIDE

1.0 Scope and Application. 2.0 Definitions. Cal Poly Risk Management Confined Space Program Page 1

HAZARDOUS WASTE OPERATIONS AND EMERGENCY RESPONSE

University of Vermont Department of Physical Plant Burlington, Vermont

Confined Space Entry

Confined Space Entry Procedure

Lockout/Tagout Plan Environmental Health & Safety Office July 2017

HEALTH AND SAFETY MANUAL

2. The purpose of this program is to achieve the following objectives:

PRINTED COPY IS NOT CONTROLLED Page 1 of 22

PERSONAL PROTECTIVE EQUIPMENT PROGRAM INTERNAL AND EXTERNAL PAGE: 1 DEPARTMENT: ALL OF: 5

Control of Hazardous Energy. Environmental Health and Safety

HAZWOPER. A planning guide for the perplexed. The Oregon Occupational Safety & Health Division

QUALITY ASSURANCE SPECIFICATION NONDESTRUCTIVE EXAMINATION PAGE 1 OF 7

Transcription:

Introduction: This Hazard Communication (HazCom) Program manual was designed to meet the requirements of OSHA 29 CFR 1910.1200, MSHA 30 CFR Part 47, and all Rio Tinto Kennecott Copper (RTKC) standards. This program is reviewed and revised periodically to reflect current practice. Specific government regulations require Rio Tinto Kennecott Copper to meet minimum criteria in the company s. This written program outlines the responsibilities of Plant Management, area supervisors, the Health and Safety department, and employees in meeting those criteria. Scope and Purpose The purpose of this program is to ensure that the hazards of all chemicals produced or imported by chemical manufacturers or importers are evaluated and that information concerning their hazards is transmitted to affected employers and employees. This program is intended to address comprehensively the issue of evaluation and communication of chemical hazards to employees. This written program addresses the procedures, actions, and plans to ensure: Labels and / or appropriate warning concerning hazardous chemicals, as required by the standard, are in place. Safety Data Sheets (SDSs, formerly MSDSs) are obtained and maintained or distributed such that they are readily available to employees working in areas where hazardous chemicals are used. Employees are informed and trained concerning hazardous chemicals and the Employees are informed concerning non-routine tasks involving hazardous chemicals. Contractor employers are informed concerning hazardous chemicals to which their employees may be exposed while working on any RTKC property. A copy of this written program, a copy of the applicable OSHA / MSHA / Rio Tinto regulations, and copies of all relevant SDSs will be available on the RTKC intranet. Page 1 of 5

I. Labeling and Warning The manufacturer, importer or distributor as required by the RTKC Hazard Communication Standard, must properly label all containers of hazardous chemicals. If any container of hazardous chemical is received that is not properly labeled, receipt of the container will be refused and the manufacturer, importer or distributor will be required to reclaim or promptly label the container as required. When original labels or warning tags on containers of hazardous chemicals become obliterated or accidentally removed during handling and use, the supervisor responsible for the work center or area will promptly re-label or attach an appropriate warning tag to the container. Willful destruction or removal of warning tags from containers of hazardous chemicals is prohibited. To do such may result in disciplinary action. Where it is not feasible to label permanently installed containers, such as stationary storage or process vessels, warning signs, placards or other appropriate warning media will be posted in the immediate area. Labels may be in any format as long as they are obvious, legible, accurate, in English, and convey the appropriate hazard information. The label must include, at a minimum: 1. Product identifier 2. Signal word 3. Hazard statement(s) 4. Pictogram(s) 5. Precautionary statement(s) 6. Name, address, and telephone number of the chemical manufacturer, importer, or other responsible party 7. Required shipping information II. Safety Data Sheets Page 2 of 5

Safety Data Sheets (SDSs) that comply with the requirements of the standard will be obtained for each hazardous chemical used in each work area. Electronic copies of SDSs will be available for each chemical in use in each work center or area. The SDSs will be readily available to all employees. The plant Supervisors and Safety and Health engineers will maintain electronic copies of each Safety Data Sheet. Any person responsible for obtaining, ordering or specifying a chemical, not presently in use, will notify the plant Safety and Health office prior to receiving the new chemical so that an SDS may be obtained and reviewed and approved. Once the SDS is approved it will be scanned into the electronic database and copy added to the area binders. III. Employee Information and Training Employees assigned to work in areas where hazardous chemicals are used, or may be released, will receive instruction about the physical and health hazards of chemicals in their work areas, the protective measures they can take against these hazards (personal protective equipment, ventilation, warning signs, etc.), and the contents of the KUC HazCom program. Information to be provided to employees will include the following: 1. A review of the requirements set forth in the Hazard Communication Standard. 2. A review of any operations involving hazardous chemicals in the work area where the employees(s) being trained may be assigned. 3. The location and availability of the RTKC Hazard Communication Standard, the RTKC written and copies of Safety Data Sheets pertaining to chemicals in assigned work areas. The employee training program will include the following: 1. A review of methods and observations used to detect the presence, or release, of hazardous chemicals in the work area. This review will include a discussion concerning personal exposure monitoring Page 3 of 5

programs conducted by the RTKC Industrial Hygiene personnel, and any continuous monitoring and alarm systems in use and other means of detection such as visual appearance or odor of hazardous chemicals. 2. A review of physical and health hazards of the chemicals in the work area to which the employee(s) being trained are assigned. 3. A review of any protective measures implemented by RTKC, including any engineering controls (such as mechanical ventilation, enclosure of process or isolation of employee / process), emergency alarm procedures, evacuation plans and proper work practices, and personal protective equipment such as respirators, face and eye protection and protective clothing. 4. A review of the RTKC including an explanation of the labeling system, the Safety Data Sheet, and how employees can obtain and use available information concerning chemical hazards. 5. A review of specific safe work practices and precautions (task training) pertaining to hazardous chemicals that the employee will be assigned to work with or around. The plant Safety and Health Department is responsible for developing the basic training program and conducting training for new employees. Line management supervisors are responsible for assuring that training is properly conducted for employees assigned to specific tasks involving hazardous chemicals. IV. Non-Routine Tasks When performing non-routine tasks such as cleaning enclosed vessels or tanks, or when working on unlabeled pipes, the following methods and procedures will be implemented prior to beginning the task. 1. As applicable, all provisions of the RTKC Safety Standards entitled Confined Space Entry and Hot Work Permit shall be followed without exception. 2. A review to determine the potential chemical hazards that may be involved will be conducted. The review should include knowledgeable individuals representing Operations and Maintenance supervision, plant metallurgical supervisor or engineer, and plant Safety and Health or Industrial Hygiene engineer. 3. If appropriate, a written work plan will be developed outlining each Page 4 of 5

step to be followed, the potential hazards involved and the personal protective equipment required. 4. The plant Safety and Health Department will conduct air monitoring before and during work where exposure to hazardous airborne materials may be encountered. 5. Portable ventilation equipment, portable eyewash and shower or hose with running water and any other emergency equipment that may be required will be provided at the job site. 6. Employee(s) assigned to the non-routine tasks will be trained using the developed work plan prior to beginning work. V. Contractor Information Prior to beginning work in RTKC plant areas where hazardous chemicals may be present, plant Safety and Health personnel, and the responsible project engineer will review the RTKC in a pre-job conference with the contractor. The contractor employer will be provided with the following information: 1. The location and availability of the RTKC written Hazard Communication Program. 2. A list of hazardous chemicals that may be in the plant area(s) where contract work will be performed. 3. The location and availability of Safety Data Sheets for hazardous chemicals that may be in the plant area(s) where contract work will be performed. The RTKC project engineer responsible for the contract work will be responsible to assure that the contractor employees comply with the RTKC. REVISION HISTORY: MOC# Description of Change Prepared By Date 25994 Creation of document. Kelli Hamilton 4/23/14 Page 5 of 5