Ratnagiri Gas & Power Pvt. Ltd. C&M Department. Ref.: RGPPL/C&M/CS-2335/Pre-Bid queries Date: 24/09/2016. Clarifications to bidder

Similar documents
PRE BID QUERIES FOR CNG & CITY GAS DISTRIBUTION FOR HYDERABAD. Clause No. Description in tender documents Clarifications / Request for change

ARAI/TA(4G)/HORIBA/MEXA 584L/ Dated 19 th Jun 2008 CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES

For Department of CSSD

NIT LIMITED NO. NC-105-P-SCS-NOCB CYLINDERS & REGULATORS

NIT LIMITED NO. NC-185-SCS-P-NOCB ARGON & NITROGEN CYLINDER WITH REGULATOR

OIL INDIA LIMITED (A Government of India Enterprises) 4, India Exchange Place Kolkata -1 INVITATION TO E-BID UNDER COMPOSITE BID SYSTEM

CSIR-NATIONAL GEOPHYSICAL RESEARCH INSTITUTE (COUNCIL OF SCIENTIFIC & INDUSTRIAL RESEARCH) Uppal Road, Hyderabad (Telangana.

BOXING FEDERATION OF INDIA

GUIDELINES. Systems. Pressure. Guidelines Acceptance of equipment, establishment of safe operating limits and fitness for service

ASSE International Product (Seal) Listing Program

EXPRESSION OF INTEREST

MAHARASHTRA NATURAL GAS LIMITED

NIT LIMITED NO. RD-NC-40-SPS-PH

NATIONAL INSTITUTE OF ANIMAL BIOTECHNOLOGY (NIAB)

Presented to the IAPMO Standards Review Committee on March 7, 2016

NORMAL OPERATING PROCEDURES Operating Parameter Information

THE MAHARASHTRA STATE CO-OPERATIVE BANK LTD

DEPARTMENT OF CHEMICAL ENGINEERING INDIAN INSTITUTE OF TECHNOLOGY MADRAS CHENNAI , INDIA

Installation Guide - C01202 & C01203 Thermostatic Mixing Valve TMV2

Below this line not for printing

TENDER FOR THE SUPPLY OF MEDICAL OXYGEN AND NITROUS OXIDE GASES CYLINDERS FOR ONE YEAR.

M-06 Nitrogen Generator (Nitrogen Making Machine)

Bid Document/Request for Proposal. For

All technical data may be changed MADE IN ITALY BY NARDI COMPRESSORI

ASME and PED Requirements for Drum Level Instrumentation. Presented by: Amir Hedayatnia Clark-Reliance Corp.

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

BHAGYANAGAR GAS LIMITED (A JOINT VENTURE OF HPCL & GAIL)

1 Exam Prep NFPA 99 Health Care Facilities Questions and Answers (Plumbing Contractor)

Specification for Medical Gas Pipeline s

Calera Fire Department Breathing Air System Technical Specifications

Working in Gas Hazard Areas

Pressure on Demand. Air Pressure Amplifiers

INVITATION FOR QUOTATION. TEQIP-III/2019/mmug/Shopping/51

Installation, Operation, and Maintenance Manual Parker Balston Model N2-04 Nitrogen Generator

STANDARD HIGH PRESSURE COMPRESSORS COMPACT PACKAGE FOR DEMANDING APPLICATIONS

ISO INTERNATIONAL STANDARD. Hydraulic fluid power Filter elements Determination of resistance to flow fatigue using high viscosity fluid

Distribution Connection Forms

SERVICE PROVIDERS FOR GAMES PROMOTION

Application of Double Vs Tandem Dry gas seal Advantages.

Flexible Metal Hose Products

GUJARAT STATE ELECTRICITY CORPORATION LIMITED

Brief history in the Biogas sector. Compressor features. Applications. Product range. Experience

System Pressure Manager Standard & System Pressure Manager Plus

BOXING FEDERATION OF INDIA

T E N D E R Tender # T SCOTT SCBA AIR PACKS AND ACCESSORIES SAINT JOHN FIRE DEPARTMENT

Guideline No.M-05(201510) M-05 AIR COMPRESSOR. Issued date: 20 October China Classification Society

The Compact, Portable, Efficient and Economical Solution to boost Shop Compressed Air Pressure by 2 or 3 times

Technical Information

CENTRE OF BIOMEDICAL RESEARCH

BHEL/Trichy-14 CCDP SYSTEM DESCRIPTION FOR DOME VALVE:

Liquid ring vacuum pumps in compact design

Summary of the MRA LPG Codes of Practice

COMMERCIAL CORRIGENDUM#1 TO BIDDING DOCUMENT

/ /

Model Series 62 Constant Differential Relay

BOXING FEDERATION OF INDIA REQUEST FOR PROPOSAL (RFP) FOR ENGAGING SERVICE PROVIDERS FOR UNIFORMS FOR

Installation, Operation and Maintenance Instructions for Pacific PA Non-Storage Heat Exchanger

SAPAG. Safety valves, type 5700 Storage, Use, Operation and Maintenance Instructions. IMPORTANT NOTICE

Sr. No. General points CPCB Comments 1. Print option, acknowledgement of submission for CPCB OCEMS Protocol

AIRMASTER SERIES RF AUTOMATIC DEWATERING VALVES. For the purging of water from compressed air systems WHERE DO YOU NEED AUTOMATIC DEWATERING VALVES

HANDBOOK SAFETY DEVICES. Ed SAFETY DEVICES DS-ED 01/ ENG 1

GUJARAT STATE ELECTRICITY CORPORATION LIMITED

Case study. Rotating Equipment Engineer Qatargas Operating Company. Sr. Rotating Equipment Engineer

Customer Responsibilities. Important Customer Information. Cary 4000/5000/6000i UV-Vis spectrophotometer Site Preparation Checklist

Becker* Products Below Ground Ball Valve Regulators

FIELD TROUBLESHOOTING COMMON MECHANICAL SEAL PIPING PLANS. Michael Huebner Principal Engineer Flowserve Corporation Pasadena, TX USA

Safety Selector Valves Dual Pressure Relief Device System

ADDENDUM NO. 1 Tender for Procurement of Catalyst Testing Pilot Plant for Corporate R & D Centre, Greater Noida

Guide for Evaluating Your Hose Assembly Supplier

VPPL VARIABLE DISPLACEMENT AXIAL-PISTON PUMPS FOR INTERMEDIATE PRESSURE SERIES 10

The routine maintenance and inspection of local exhaust ventilation (LEV)

TECHNICAL INFORMATION

Pressure Systems Safety Regulation

Natural Gas Connection Policy and Procedures

REFRIGERATION SYSTEM COMPONENTS

Indian Institute of Technology Kanpur Samtel Centre for Display Technologies

776 Cryogenic Safety Valve

WaterSense Specification for Spray Sprinkler Bodies. Version 1.0

Requirements for Reduced Supervision of Power Plants, Thermal Liquid Heating Systems, and Heating Plants

REDUNDANT PROPULSION SHIPS RULES FOR CLASSIFICATION OF NEWBUILDINGS DET NORSKE VERITAS SPECIAL EQUIPMENT AND SYSTEMS ADDITIONAL CLASS PART 6 CHAPTER 2

Frequently Asked Questions Directive 056 Facilities Technical

(AS AT 31 st MARCH, 2002)

SEPARATION SEAL UPGRADE TO OVERCOME REPETITIVE FAILURES

F.No DM(RH)U-16/19/2/ Med. Gases/2003 Dt

CLASS DH - PNEUMATIC TESTING - GREATER THAN 1 BAR (15 PSIG)

TENDER SPECIFICATION No: 12/ of SUPERINTENDING ENGINEER (CTI & ENQUIRIES), Dt

City of Conway Mayor s Office 1201 Oak Street Conway, AR Invitation and Bid

Image courtesy of CGG NEUMAN & ESSER SEISMIC AIR POWER SYSTEMS

CompAir provide high quality and reliable Nitrogen solutions

97C COMPRESSOR KIT 12V PART NO C COMPRESSOR KIT 24V PART NO C COMPRESSOR KIT PART NO

NATIONAL CENTER FOR COMBUSTION RESEARCH AND DEVELOPMENT (NCCRD) INDIAN INSTITUTE OF TECHNOLOGY MADRAS CHENNAI , INDIA

HOW TO NOT MEASURE GAS - ORIFICE. Dee Hummel. Targa Resources

STANDARD FOR CONTROL VALVE SEAT LEAKAGE

Committee on NFPA 85

AirSep PSA Nitrogen Systems

HYDROGEN UNIT CHAPTER-4 UTILITY SYSTEM DESCRIPTIION

SPORTS AUTHORITY OF INDIA NETAJI SUBHAS REGIONAL CENTRE, SAROJINI NAGAR, KANPUR ROAD, LUCKNOW

PROCEDURES FOR REPAIRS TO ASME NV STAMPED PRESSURE RELIEF DEVICES OF NUCLEAR SAFETY RELATED PRESSURE RELIEF VALVES

4-7 kw/ hp. Dual Output Compressors (Air/Nitrogen) Driving Nitrogen Forward

AB AMBER GRID RULES FOR NATURAL GAS TRANSMISSION SYSTEM BALANCING I. GENERAL PROVISIONS

Transcription:

Ratnagiri Gas & Power Pvt. Ltd. C&M Department Ref.: RGPPL/C&M/CS-2335/Pre-Bid queries Date: 24/09/2016 Clarifications to bidder Sr. No. 1 Clause No. of tender document Pg.12 (section- B) Prequalification Requirement/Criteria. Clause 1a-1f. Agency s Queries We have the experience of executing one contract for installation and operation of several Natural Gas Compressor packages of total capacity 3,00,000 SCMD. However, for the sake of clarity and unambiguity, we request you to modify the clause to: The bidder should have executed at least one contract for installation and operation of a natural gas compressor package (s) of capacity not less than 3,00,000 SCMD (Three lakhs Standard M3 Per Day) for a minimum period of one year. RGPPL Comments With reference to clause No. 1 (a), (b), (c), (d), (e), (f) of QR, natural gas compressor package may include multiple compressors under the package. 2 3 4 5 Pg 21, SectionC/Scope of supply/ special instruction to bidder/2.3.d supply/ special instruction to bidder/2.3.f Page 22 SectionC/Scope of supply/ special instruction to bidder/2.3.q supply/ special instruction to bidder/2.3.v The same use of Package (s), without any a before should be used uniformly in Clauses 1a, 1b, 1c, 1d,1e and 1f. We propose to supply a package conforming to international codes of design, construction and safety. Please confirm. We propose to provide all electrical apparatus, instrument items/ systems conforming to international codes/ standards. Please confirm. As a standard practice, the Tachometer sensing element will be attached to Engine flywheel. Please confirm. Please specify the statutory authorities from whom to obtain approvals. Applicable standards include international codes of Design also, hence accepted It is already mentioned that apparatus should be of National / International Standard. Hence accepted. Accepted. The contractor shall obtain necessary approvals from Statutory authorities as applicable such as PESO, MPCB, etc..

6 7 8 9 10 11 12 Pg. 26 supply/compressors /4.11.1.n supply/compressors /4.11.1.o Pg. 27 supply/compressors /4.11.1.q Pg. 27 supply/gas engines /4.11.2.c supply/instrumentation/4.14.c Pg. 55 & 56 Section F/Compressor Process DATA Sheet Note: 2 supply/compressors /4.11.1.a As a standard practice Suction side suppressors do not include drains (as they are not effective). Discharge side suppressors will be provided with drain connection. Please confirm. The compressor package noise will be above 88 dba and noise enclosures are not typically provided for such installations. Please confirm Annexure A is not provided with RFQ document. To be clarified what documents in referenced here that is to be "duly completed". 1. Exhaust emission levels may kindly be specified. 2. Please specify approval from which statutory authorities are to be arranged. 3. Residential type exhaust silencer is different from hospital type exhaust silencer. Please specify which is required. Only single instrument is used for shutdown and alarm. Please confirm. As specified ambient air shall be used for cooling and based on practical utilization of an air-cooled fin fan heat exchanger, it s not possible to achieve ambient temperature at the exit of after cooler. Request to modify the design maximum discharge temperature at exit of the After Cooler to be 50 C (based on maximum ambient temperature of 38 C). All compressor manufacturers/packagers try to strictly conform to the ISO 13631 requirements. However their own standards are sometimes better than the requirements of ISO13631. As such deviation may result in efforts to implement constant up gradation of Accepted. Noise level upto 110 dba is acceptable. Annexure A is already provided on page no. 28 of 84 of tender documents. Exhaust emissions levels as per statutory norms on emissions/ environmental guidelines issued by Maharashtra Pollution Control Board (MPCB). Approval from MPCB is required. Residential or Hospital type exhaust silencer, both acceptable, provided it meets requirement of MPCB for noise limits & safe disposal of engine exhaust. prevails Exit temperature upto 50 0 C after Cooler is acceptable. ISO13631/national/ international standards are acceptable.

& product quality and manufacturing processes. 13 14 15 supply/gas engines /4.11.2.a Prequalification Requirement As stated on Page No. 12 of Tender Document Page No.24 - Required Capacity of compressor- Clause no-(f) Page No-25, Compressors, and Clause No-4.11.1 (c) Please confirm acceptance of such deviations if any Requirement of Tender states bidder should have selfexperience or has to enter into JV or consortium to participate in tender. Govt. Agencies & PSU like ONGC, Oil etc. generally have provision to participate in tenders by extending technical support by way of entering into technical collaboration with experienced & reputed party. In this case, Bidder while submitting the documents in support of their experience shall also submit details of experience and past performance of technical collaborator by entering into Memorandum of understanding (MoU). However, this provision is not in this tender. The omission of this particular option straightaway dissuades new players from participating and gives the few bidders an unfair advantage. Therefore, we request you to review Qualification Criteria & incorporate technical Collaborator clause based on MoU, enable RGPPL to get healthy and competitive bidding. Kindly confirm whether we want recycle control valve for capacity control valve or recycle valve for continuous operation of compressor units or capacity control valve in discharge line, since discharge pressure is dependent on back pressure available at battery limit. Since RGPPL has asked for brand new compressor packages, we get confirmation from OEM for soundness and conformance to applicable codes. Mostly TPI certificates are required for old compressor packages. Contractor is required to provide suitable pressure control system in discharge line (bypass/recycle) so that in case back pressure increases due to any restriction of gas flow in the downstream of compressor package, the discharge line pressure shall not go beyond specified outlet battery limit pressure. OEM certificate is sufficient. 16 RGPPL to confirm regarding Clarity required with this Flow of discharge gas

17 measurement of Discharge and fuel gas measurement. Kindly confirm the scope of supply Para No. 24 (P- 7 of 54) regard how measurement will be done. What is scope of supply for measuring equipment i. Please clarify the number of days that will be considered for fuel charges in price bid evaluation. ii. Please indicate the approximate price of LNG rate for including in costs for bid evaluation. iii. We understand that Flow Meter for fuel line will be provided by RGPPL. Please confirm. and inlet fuel gas will be measured by orifice meter confirming to AGA-3/international standard in common header. Supply and installation of orifice meter is in the scope of supplier. (i) Operating days of package as per Bid Document is 386 days. (ii) Approximate rate of LNG is US $ 6 / MMBTU; However, for bid evaluation LNG purchase price plus re-gasification charges at the time of technical bid opening will be considered (iii) Flow Meter for Fuel Line and Discharge Line shall be provided by Bidder. 18 Para No. 2.2 (P - 20 of 84) Please inform maximum length of hook up lines for flare, suction, discharge and utilities etc to be laid by Contractor. Length of Hook-up line shall be maximum 50 Meter each. Standard working life of a Gas Compressor package is considered by other PSUs like ONGC as 22 years. In instant tender, RGPPL is demanding brand new compressors. We propose that vintage of compressors be kept as 7 years as on date of tender 19 Para No. 2.3 (P - 21 of 84) opening as period of contract is for 2 years only. In this Tender Condition shall way RGPPL will get most competitive rates. RGPPL may ask for a certificate from chartered engineer / TPI for residual life and health of the compressor packages for ensuring performance of equipment. Similar practice is being followed by ONGC / PLL

for hiring of compressors. 1. We understand that RGPPL will provide leveled land of 36M x 16M x 6.0M for installation of compressors under the contract. Please confirm. 20 Para No. 4.3 (P - 24 of 84) 2. Please confirm and clarify whether compressors will be installed at the (i) Acceptable (ii) Same location existing location of installed compressors or other site will be provided by RGPPL for installation of compressors under the contract. In case of new compressor packages, Date of manufacturing of the compressor skid gas engine & associated items may not be feasible as manufacturing of 21 Para No. 4.11.1 a) (P - 25 of 84) standard items take long time and packager purchase these items from manufacturer in advance. We propose that date of packaging of compressor package could be kept after date of opening of technical bid. Since packager may be different than OEM of 22 Para No.4.11.1 b) (P - 25 of 84) Compressor, certificate of adequacy of compressors / data sheet may be accepted from OEM / Packager. 23 Para No. 4.12 a)& b) (P - 28 of 84) It is requested that plant lay out drawing showing hook up points and location of Hook-up points and location of Compressor installation area shall be shown. Layout drawings shall be

compressor installation be provided. developed contractor. by 24 Para No. 4.18 (P - 33 of 84) Please confirm that Nitrogen gas will be provided by RGPPL for purging free of cost. Acceptable for purging only. 25 Para No.4.19 f) (P - 34 of 84) Please confirm that RGPPL will pay hiring / operational charges for successful 72 hours performance run. For 72 Hours performance test run, hiring / operational Charges shall not be payable by RGPPL. In case of pre-mature 26 Note No. V) of price schedule (P - 54 of 84) termination RGPPL shall pay 50 % of standby charges for balance period of contract as compensation to contractor. It will not be possible to achieve ambient temperature as the maximum discharge temperature after cooler exit 27 Compressor Process Data sheet (P - 55 of 84) as gas is cooled through Air Coolers only and there will be a float of 7 to 10 0 C with ambient temperature. Hence, 11 above. maximum discharge temperature after cooler exit shall be kept as Ambient +10 0 C 1) Please confirm whether LNG purchase price will 28 Fuel gas consumption (Page 57 of 84) be considered for price evaluation or LNG price + regassification charges will be considered for price evaluation. 2) Please confirm that excess fuel consumption will be calculated based on actual fuel consumption in a year during monsoon period. 3) Please confirm whether (i) LNG Purchase price plus regasification charges will be considered for price evaluation. (ii) Excess fuel consumption will be calculated on monthly basis. (iii) Fuel consumption for compressor package for price evaluation will be based on OEM certified DATA Sheet. fuel consumption for the

29 30 31 32 33 34 35 Clause no 4.11.1 Rotating Equipment, Sub Clause b) Clause no 4.11.1 Rotating Equipment, Sub Clause f) Clause no 4.11.1 Rotating Equipment, Sub Clause n) Clause no 4.11.1 Rotating Equipment, Sub Clause o) Clause no 4.12 Piping, Sub Clause f) Clause no 4.14 Piping, Sub Clause c) Clause no 4.14 Piping, Sub Clause f) 36 Compressor Data Sheet 37 38 39 Clause No. 2.3 (m) Page 22 of tender document Clause No. 2.3 9q) page 22 of tender document Clause No. 3 (b) Page 23 of the tender document compressor package for price evaluation will be based on OEM s certified Data sheet or on fuel consumption specified by bidder at its discretion. Since Packager is owner of compressor package, Packager letter covering the aspects for adequacy of gas compressor will be acceptable. The assembly of finned tube exchangers with cooler being driven by gas engine shall be allowed. Threaded connection to be allowed. Please allow 110dBA for noise Whether analysis report to be submitted or not. Standard package provide only trip. Standard package do not provide device to monitor vibration, seal oil differential pressure, high bearing temperature. Max disch temp after cooler exist should ambient + 10 0 C. Please advise if a lubricated compressor package solution with a discharge Coalescer which will remove 99.98% of oil introduced into the compressor cylinders for the purpose of cylinder lubrication is acceptable or not? The standard solution used for engine driven compressor packages, therefore taking the read outs from the magnetic picks up is the most common practice for running hour registration, please advise if acceptable. Please advise if the mentioned flow should be understood as the sum of capacity of the number of units offered (eg. If 2 units offered, capacity of each compressor should be 6000 kg/hr or if 3 units are offered capacity for each compressor should be 4000 kg/hr.) Accepted Clarified as per Sr. No.07 above. Yes. To be submitted 11 above. Yes. Agreed.

40 41 42 43 Clause No. 4.11.1 (f) Page 26 of the tender document Clause No. 4.11.1 (g) Page 26 of the tender document Clause no. 4.11.1 (n) Page 26 of the tender document Clause No. 4.11.2 (c) Page 27 of the tender document 44 General 45 Page # 12 Clause 1 of Section B (Qualification Requirement for the Agency) Please confirm that one air cooled heat exchanger with water and gas section is required for each offered package? Please provide more details regarding the requirement to install the air cooled heat exchanger within the skid. Please note that due to the compressor package size (special when 2 units are considered) the main skid might get too large to accommodate the air cooler, therefore a bolt one skid solution might be preferable, please advise if acceptable. Please advise if EN13445 in lieu of ASME Sec VII Div 1 can be accepted of designing and fabrication of the pressure vessels. Please provide the value limits for the acceptable level of exhaust emission Since this is an DCB tender, kindly clarify whether bidder shall get benefits of Exemption on Excise Duties, In this regards should have to provide Project Authority Certificate (PAC), Certificate of Payment (COP), End use Certificate (EUD) and Certificate for local transportation (Inter state) of material. Kindly clarify. In all the case a, b, c, d, e and f for technical qualification criteria is limited to 150,000 SCMD or higher, but in India this particular qualification is also a limited and Due to this limitation RGPPL has to pay higher rates for the services. Further Oil and Natural Gas Corporation Limited (ONGCL) having the national highest gas production company and process the Gas Compression Hiring service tender at qualification criteria 20,000 SCMD for one year. In this contest we would like to draw your attention that Qualification experience criteria should be reasonable for the present market India. As per prevailing MPCB guidelines. Taxes are to be inclusive in the quoted rates. Only service tax extra. No certificate will be provided.

46 47 48 49 50 51 52 53 Page # 53 Clause VI of Section E, Price Schedule / BOR / SOR Page # 54 Clause VI of Section E, Price Schedule / BOR / SOR Page # 54 Clause VII of Section E, Price Schedule / BOR / SOR Page # 54 Clause X of Section E, Price Schedule / BOR / SOR Page # 27 Clause 4.11 (O ) Scope of work, Rotating Equipment Page # 55 Clause Section F, Compressor Process Data Sheet Page # 56 Clause Section F, Compressor Process Data Sheet Technical Page# 25, 4.11.1 (b) 54 Mobilization time 55 Page#55 & page # 26 We have experience of 100,000 to 120,000 SCMD Kindly review and consider our experience technical qualification criteria and amend the same in tender. Kindly confirm the any upper cap limit on quote of mobilization charges. Please confirm contract period shall be start on earlier mobilization of Gas Compressor Packages. As per OEMs Natural Gas Compressor operation life minimum 22 years with good O & M practices, similar facts accepted by ONGC for Hiring of Gas Compression Services and vintage conditions as described below for reference 1. Service Period 5 Years then 6 years old equipment shall be accepted. 2. Service Period 3 Years then 8 years. We understand technical bid evaluation shall be done on the basis of offered packages, Kindly clarify. As the Gas Engine is running on high speed rpm so kindly allow the noise level around 110 dba. Kindly accept the Compressor design with lubricating type. As BOG Compressor is required for LNG Boil of Gas (Vapors) at Atmospheric pressure, Kindly amend the both the design parameters of Temperature as Positive. In general practice Gas Compressor Package is packaged by the Packagers. OEM s of Gas Compressor and Gas Engine may be different manufacturer. Kindly accept the data sheet signed and stamped by Packager. 12 months mobilization is less as per the requirement. Inlet temp mentioned as 25 0 C. and as per page no. 26 clause f, requirement of suction cooler not required. No Confirmed Yes Evaluation will be made on complete package basis including BOQ item No. 01, 02 & 03 including fuel charges and taxes. Clarified at Sr. No. 07 above. Already stated in tender document (page # 55, line No 6) Acceptable 56 Point(o) of Engine Working Noise Level

57 58 59 60 61 62 63 64 65 4.1.1.1, pg 27 will be 110 dba at 1 mtr distance. Compressor process Compressor will be datasheet, pg 55 Lubricating type. Maximum discharge Temperature after cooler will Compressor process be : Ambient plus 11 i.e. datasheet, pg 55 50 0 C (Considering ambient temp. 38.9 0 C as mentioned on page 57 of 84). Compressor process datasheet, pg 56 Pre Qualification, Clause 1 OR 2 Special Instructions to Bidder, clause 2.3 a) Rotating Equipment: Compressors, clause 4.11.1 (f) Rotating Equipment: Compressors, clause 4.11.1 (o) Contract, clause 3.1 Contract, clause 8.1 Please confirm the necessity of (-)29/28 design temperature. Generally minimum design temperature depend on minimum ambient temperature or minimum process gas temperature. ( Min. ambient temp is 10 0 C as mentioned in page 57 of 84, whereas inlet temp 25 0 C as mentioned on page 55 of 84) 'NEA India has executed huge amount of projects in the oil refineries of India since 2002. The capacities of compressor have been upto 70,000 Nm3/Hr and hence we request you to consider NEA India without any pre qualification requirement. 'We request you extend the time period to supply, install and commission the compressor package within 15 months from the date of award of contract since the requirement is for new compressor packages. 'If the process gas is available at suction of compressor at 25 0 C, then there is no requirement of gas suction cooler. Please clarify the requirement of suction gas cooler. 'Please note that the noise level gas compressor package including the compressor + engine + air coolers is very high and hence we request you to consider the noise level as 110 dba. The price shall be reduced by 0.5% per week upto a maximum of 5% of the undelivered portion only instead of the total contract price The quoted prices will be inclusive of all taxes and duties as applicable at the 07 above. 51 above. 11 above. Carbon steel can withstand temp upto minus (-) 29 0 C. Hence mentioned as (-)29 0 C Clarified as per Sr. no. 55 above. 07 above.

66 67 68 69 70 Contract, clause 11 Contract, clause 12 Contract, clause 25 Contract, clause 30 Contract, clause 30 71 Section-B, QR time of bid submission. However, all taxes and duties shall be as applicable on the date of bill / invoice generation. Any increase in taxes and duties due to statutory regulations during contract execution shall be paid by RGPPL to the vendors. Price may vary on account of change in statutory regulations due to increase in taxes and duties applicable during the time of contract execution. 10% PBG will be submitted at the time of dispatch of material which will be valid till the contract completion date without any claim period. The down time experienced during onshore work due to adverse weather conditions shall be extended accordingly If the work / contract is suspended due to reasons not attributable to the contractor, then the work suspension charges shall be paid to the contractor. In the event the work is suspended for 4 weeks, then contractor will put the project on HOLD till further instructions from the customer. If the contract is terminated due to reasons not attributable to the contractor, the contract cancellation / termination charges shall be paid to the contractor as per the cancellation schedule attached with the offer. Technical collaboration alternative not recommended by RGPPL, we are unable to bid for this compressor project. If technical collaboration will be allowed, we can bid for this compressor project 13 above.