This memo summarizes the traffic observations around the 2016 WayHome event and offers recommendations for improvements for future events.

Similar documents
Traffic Control Inspection Checklist Segment:

Iowa State Fair Special Events Management Strategic Plan

Reference: Laguna Canyon Road Traffic Conditions Data Collection Summary

Memorandum. Sunday, July 13, Saturday, July 19, 2014

Presentation to Media. February 27, 2008

A number of inferences have been drawn from the observations, each of which is discussed below.

TRAFFIC MANAGEMENT PLAN

QUEEN ELIZABETH WAY / MARTINDALE ROAD BRIDGE DEMOLITION DETOUR ANALYSIS

Draft North Industrial Area-Wide Traffic Plan

List of Display Boards

Cycle Track Design Best Practices Cycle Track Sections

DEFINITIONS Activity Area - Advance Warning Area Advance Warning Sign Spacing Advisory Speed Approach Sight Distance Attended Work Space

Weston Downs Traffic Study City of Vaughan. Appendix B. Public Consultation Materials. Page 1

Lake Whitney Elementary School

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

Off-road Trails. Guidance

City of Prince Albert Statement of POLICY and PROCEDURE. Department: Public Works Policy No. 66. Section: Transportation Issued: July 14, 2014

Pearl Street / Prospect Street / Colchester Avenue Intersection Scoping Study. April 11, 2013 Steering Committee Meeting #3

Windy Ridge Elementary School

Transportation Impact Assessment

Arlington Public Schools Thomas Jefferson Site Evaluation Transportation Networks. Thomas Jefferson Working Group Meeting #6 November 10, 2014

CURBSIDE ACTIVITY DESIGN

Bicycle Facilities Planning

DUNBOW ROAD FUNCTIONAL PLANNING

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd.

8 PROPOSED ROUNDABOUT DUFFERIN STREET AND KING VAUGHAN ROAD INTERSECTION CITY OF VAUGHAN

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD

CHAPTER 2G. PREFERENTIAL AND MANAGED LANE SIGNS

Printed copies of this document may not be current. Refer to SafetyNet (Domino.Doc) for the official, controlled version.

Appendix B. Environmental Resource Technical Memorandum. Assessment on Travel Pattern and Access Impacts

Swamp Road Residents Study

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Access Location, Spacing, Turn Lanes, and Medians

SCHOOL TRAFFIC ASSESSMENT

Chapter 2: Standards for Access, Non-Motorized, and Transit

ROUTE 22 CORRIDOR STUDY: CORRIDOR MANAGEMENT PLAN APPENDIX A A-12

Glenn Avenue Corridor Traffic Operational Evaluation

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:

March 11, Lynnfield Board of Selectmen Town of Lynnfield 55 Summer Street Lynnfield, MA Walnut Street Traffic Assessment

VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY

Readington Road (C.R. 637) Construction

PERFORMANCE ACTIVITY 401 MOWING WORK DESCRIPTION 5

EUCLID AVENUE PARKING STUDY CITY OF SYRACUSE, ONONDAGA COUNTY, NEW YORK

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

180 Grand Avenue, Suite x117 Dowling Associates, Inc.

Hidden Oaks Elementary School

TRAFFIC IMPACT ANALYSIS OF PROPOSED CHESTNUT HILL COLLEGE MASTER PLAN DEVELOPMENT

4.0 TRANSPORTATION SYSTEMS

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

The five potential solutions and some of their benefits and costs are listed in the following table: Ferry Patron Bike Parking Alternatives

SECTION 3 STREET DESIGN

Recommended Roadway Plan Section 2 - Land Development and Roadway Access

SECTION TRAFFIC REGULATIONS

Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for:

AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT

Orange County Rail-Highway Grade Crossing Safety Enhancement Program. City of San Juan Capistrano April 17, 2012

Access Management in the Vicinity of Intersections

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Driveway Design Criteria

Woodward Hill Elementary School School Safety and Operation Review

10.0 CURB EXTENSIONS GUIDELINE

Forest Hills Improvement Initiative

Service Development 1600 Franklin Street, Oakland CA 94612

Albany Shaker Road Corridor Study Public Meeting # 2

INTER- AND INTRA-CONNECTIVITY INTERPRETIVE GUIDELINES

MoPac South: Impact on Cesar Chavez Street and the Downtown Network

Access Management Standards

TRAFFIC CONTROL DEVICES ON EDGEWATER BOULEVARD AT PORT ROYAL AVENUE (NORTH)

WELCOME Public Information Centre

CIRCULAR NO. O-13. Recommended Practices for Manual Protection of Highway/Railway Grade Crossings

ITEM # 29 DATE: COUNCIL ACTION FORM ROAD CLOSURES FOR RAGBRAI ROUTE BACKGROUND:

INTERSECTIONS AT GRADE INTERSECTIONS

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017

Harrah s Station Square Casino

Welcome! San Jose Avenue Open House August 25, 2015

King Soopers #116 Thornton, Colorado

INDEX. Geometric Design Guide for Canadian Roads INDEX

72 Avenue Four Laning (BNSF Overpass to 120 Street) WELCOME. Public Information Meeting

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

Meadow Woods Elementary School

Reference number /VP. Lafayette Downtown Congestion Study - Additional Traffic Analysis

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

June 29, Dear Mr. Walter:

Roundabout Evaluations in Virginia: US 15/US 50 Gilberts Corner, VA SR 106/SR 634 Prince George County, VA

Richmond-Adelaide Cycle Tracks

3 TRAFFIC CONTROL SIGNAL TIMING AND SYNCHRONIZATION

FDOT Treasure Coast Traffic Impact Report

Balancing Operation & Safety for Motorized and Non-Motorized Traffic

Exhibit 964B Traffic Management Pianj. (no change) Daily Start/End Schedule Grades K-5th: Grades K-5th: >Start: 7:55 AM

Coquitlam Cross-town Bike Route Improving Bicycle Facilities in a Mature Suburban Environment

Transportation Planning Division

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

Bistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748

Brian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project

MEMORANDUM. Our project study area included the following locations:

Transcription:

Date: To: From: CC: Ryan Howes Burls Creek/Republic Live Kenneth Wersted MTO, OPP, Oro Medonte, Simcoe County Re: ; CM Project No. 115 340 This memo summarizes the traffic observations around the 2016 WayHome event and offers recommendations for improvements for future events. 1. Summary Overall, transportation during the second year of this event went well based on the implementation of the plan and the results. Relative to patron traffic, it was slow to arrive to the area, as it did in 2015. On Thursday evening, OPP converted Line 7 between the Hwy 11 overpass and Gate 7C to southbound only utilizing two lanes. All highway traffic was diverted to Line 9 temporarily, and by 11:00 pm, all queuing on the roads had dissipated. On Friday, traffic generally flowed freely into the site. Congestion heading north from the GTA was observed, but cottage traffic did not affect the roadways around the event. Cycle Simcoe had an increased amount of bicycle traffic in comparison to 2015. Between one and two dozen bicycles were observed at their tent at Gate 7C. Pedestrian traffic was observed again in 2016, with the heaviest use observed on Saturday morning. OPP requested messaging on Line 7 northbound instructing pedestrians to use the overpass to cross the highway, which was implemented Saturday afternoon. The egress for the event went smoothly. Cottage traffic congestion extended from Barrie back to Line 6 but was not affected by event traffic. Exiting event traffic was relatively light through Sunday afternoon and evening, picking up substantially by 10:00 pm. Line 7 queued up from the highway into the site but continued to move, albeit slowly. The egress that night generally ended around 12:30 am. The egress continued Monday morning with little or no queuing on Line 7 and Line 9 approaching the highway. The implementation of a coned lane on Line 8 (photo right) separating production traffic from golf cart traffic worked very well and the location of staff and media camping, with access through Gate 8B cut down conflicting traffic on Line 8 significantly. The provision of on site sales of day parking during the event reduced the number of off site parking and the number of pedestrians walking into the event. 2. Recommendations The following recommendations are provided for consideration at future events: 1. Initiate Line 8 RESTRICTED ACCESS messaging on Wednesday Access to Line 8 was restricted beginning Wednesday morning. The temporary signs placed at Line 8 addressed the drivers of the 2 Winners Circle Page 1 of 6 518.446.0396 Albany, NY 12205 www.cmellp.com

temporary closure after they took the Line 8 exit. Line 8 Restricted Access Only message on PCMS 5 to be displayed with the closure at all times. 2. Use PCMS 1 for pedestrian message Install PCMS 1 with No Walking Across Hwy, Use Overpass message on Line 7 near Highway 11 intersection for pedestrian overpass direction during the festival. 3. Direct RV s to Line 9 Given the reduced number of RV s for WayHome, providing a single direction (Hwy 11 to Line 9) reduces the impact to secondary roadways. 4. Improve pick up/drop off location signage A drop off/pick up pattern at Line 7 was implemented and used successfully for WayHome (2016) and Boots and Hearts (2015/16). Solidify this plan with improved messaging and signage. 5. Route off peak passes directly to Line 7 and Line 9 As the arrival traffic decreases, update messaging to direct traffic directly to Line 7 and Line 9 from Hwy 11 to reduce the traffic on secondary routes to the festival. 6. Improve the PCMS deployment locations Most of the PCMS deployment locations had adequate access but a couple of locations would benefit from some improvements and aid in the deployment and retrieval of the PCMS. a. PCMS 3 Hwy 11 NB between Line 4 and Line 5: Located in the ditch near on an old driveway remnant, deployment and retrieval is difficult. Widening the driveway would allow the PCMS to be deployed by the tow vehicle without affecting Hwy 11. b. PCMS 5 Hwy 11 NB between Line 7 and Line 8: Located at the corner of the Burls Creek property that borders Hwy 11, the area used is only accessible from the adjacent property s driveway (3123 Hwy 11 NB). The area is generally clear of obstructions but could be leveled further to improve the PCMS deployment. c. PCMS 7 Hwy 11 SB at Heidi s RV Superstore: This PCMS deployment was adequate but the approaching view would be partially blocked anytime an RV was parked adjacent to Hwy 11 in the parking lot. Widening a culvert crossing 85 meters south of Line 10 would provide an improved deployment area. d. PCMS 9 (Exit) Line 9 S at the overpass: The PCMS deployment on the northwest corner of the intersection is difficult given the drainage ditch and sloped area. The preferred location is on the right hand side of Line 9 but the shoulder is two narrow to have the PCMS face traffic without hanging over the roadway. If the northwest corner is used, leveling the area and trimming some vegetation in the sight line will improve the visibility. 7. Considering permanent signing on Line 7 and Line 9 to warn drivers of pedestrians and pedestrians to walk on the left side of the road Although there was no promotion of a beach by the event, attendees were observed walking down Line 7 towards the Oro Beach. Pedestrian warning signs and Walk on left facing traffic should be considered during larger events. 8. Grade a turnaround at the Line 8/Gate 8A intersection to facilitate u turns The traffic control point at the Line 8/Gate 8A intersection is about 2 to 3 lanes wide and can accommodate the u turn of small vehicles. U turns by larger vehicles that did not have credentials was more difficult. Widening the shoulder on the east side of the Line 8 would provide enough room to allow police to position their vehicle in the center of the road and allow enough radius for a vehicle to make a u turn to exit back to Hwy 11. 9. Clear the vegetation around Gates 9A and 9B The vegetation around Gates 9A and 9B make exiting difficult during the egress period. OPP facilitated the exit Sunday night which allowed drivers to exit expediently, but without this facilitation, drivers must stop and edge out close to the edge of pavement in order to look left and right along Line 9. Opening up the sight triangles will improve the exiting maneuvers, but still maintain a vegetated visual buffer. Page 2 of 6

10. Improve the shoulders along Line 7 between Gates 7C and the highway overpass This shoulder improvement would allow for greater separation of traffic and pedestrians, thus improving safety and traffic flow. 11. Improve exposure to the parking decal system and notifications The parking pass system used this year simplified the signing plan but requires patrons to apply their decals before arriving and/or know what their decal means. Improving the messaging to patrons will help improve traffic flow and their arrival experience. Instead of letter P for Hydro, use H. 12. Improve Customer Care/Day Parking Operations at Line 9 With Customer Care offering sameday sales and pick up of passes, several areas of the gravel pad became temporary parking areas. A simpler operation is to park everyone in day parking, and have them return to their vehicle to either affix their day parking sticker or then get in line to enter the grounds for camping. 13. Prep and implement the egress plan for Line 7 and 9 by midafternoon Sunday Prepare and begin executing the egress plan at each tollbooth Sunday afternoon so that adjustments can be made and staff is practiced at the procedure. 14. Improve signage on Line 9 pad Provide overhead (if possible) signage directing traffic to various lanes for Customer Care, Day Parking, RV, and Camping access. 3. Traffic data The following observations were recorded based on sample data collected during the arrival period (Thursday through Friday) and over the course of the event: Vehicle Occupancy There was an average of 2.5 people per vehicle (car and RV). Arrival Distribution Chart 1 shows that the accumulated count of vehicles (excluding day parking and staff/media) arriving to the event by midnight Thursday totaled about 3,700 cars (39%), 3,950 (42%) by 7 a.m. Friday, 7,025 vehicles (74%) by 7 p.m. Friday evening. The observed arrivals were lower than estimated, indicating that the TMP assumed a more conservative overall arrival flow. Chart 2 illustrates the hourly traffic volumes processed through the gates. The chart shows that the arrivals were fairly consistent with 2015 with the exception of Thursday night. The spike in the 2015 data on Friday morning was a result of the closure of the tollbooths overnight, which did not occur in 2016, ultimately decreasing the traffic demand Friday morning. Delays Arrival delays were minimal during the day on Thursday. Arriving traffic was able to drive right up to the gate throughout most of the day. Delays increased during the evening to an estimated 30 60 minutes. The delays for the remainder of Friday varied from 10 to 30 minutes. On the exit, delays were estimated to range from 10 minutes to 2.5 hours. Campers that arrived early were parked closest to the venue and had to wait the longest to exit, while campers that arrived to the venue late were parked closest to the exit and were able to leave with the shortest delay. Traffic exiting Gate 7C was allowed to turn left (south on Line 7) when Line 7 north to the highway was queued. This decreased patrons overall delay then exiting the grounds. Page 3 of 6

Spike due to tollbooths closing overnight (2015) Page 4 of 6

4. Timeline Wednesday (7/20) Reviewed static sign placement and made adjustments as needed. Reviewed PCMS deployment and adjusted sign alignments as needed. Confirmed communications with PCMS. Activated Line 8 Restricted Access message on PCMS #5 to assist OPP with Line 8 closure. A bus advertisement (88.5 The Jewel) was positioned at Heidi s, blocking the view of the PCMS 7. It was moved before the opening of gates. Thursday (Camping Opens, 7/21) 10:00 am: Traffic is light and early arrivals were allowed to stack on the entry pads on Line 7 and Line 9. Noon: Searches begin and traffic is queued up downstream until enough is queued to create a line to parking areas. PCMS updated to direct NB traffic to Line 7 and SB to Line 9. NB RV s directed to Line 5, while SB RV s were directed to Line 9. 3:00 pm: Traffic is light, no delays to gates, all roads flowing freely. 8:30 pm: Traffic increases substantially, OPP closes Line 7 NB at Ridge Road to double stack Line 7 SB between Hwy 11 and Gates 7B/C. PCMS redirect GA traffic (T passes) to Line 9. Queuing on Line 9 SB increases to about 1 km as vehicles stop to talk to the OPP officer at the gate. The Mobile Command Center radioed the officer to push traffic into the site. There was additional capacity on gravel pad, so inbound lanes split into two entering Gate 9A. OPP toggles between 1 and 2 lanes on Line 7 SB. 11:00 pm: Queues on Line 7 and Line 9 are maintained on site. 11:30 pm: 1 to 2 cars per tollbooth lane at the west tollbooth, about 10 cars per lane at the east tollbooth. Friday (7/22) Day: Traffic increased through the daytime but flowed steadily into the site. There were some slowdowns on Line 7 as drivers stopped to ask questions of OPP or staff. Some pedestrian traffic observed walking south on Line 7 towards the lake. A few pedestrians observed on Hwy 11 walking from Computer Elite parking. Congestion observed on Hwy 400 NB from GTA to Barrie, and on Hwy 11 NB to Line 3. Continuing north past the site, traffic flowed freely, similar to 2015. Cycle Simcoe tent at Gate 7B/C had about 1 to 2 dozen bicycles locked up by the evening. Day parking began to exit around 11:30 pm with about 50% remaining at 1:00 am, continuing to exit in spurts. There are no delays entering Hwy 11. About 950 vehicles parked in day parking on Friday @ midnight Saturday (7/23) Light traffic day expected. PCMS updated to direct NB T and S passes to Line 7; R, P, Day parking and drop offs to Line 9. Hwy 11 SB: T, R, P, Day parking and drop offs to Line 9; S passes to Line 7. 10:00 am: about 100 pedestrians observed (in a single drive by) walking towards lake on Line 7. Afternoon: OPP requested placement of PCMS #1 (Line 7/overpass) to notify peds of no crossing of highway, use overpass. Gate 9A remained open all night. Minimal traffic at gates with no delays. Hwy 11 flowing smoothly. Two signs (#27 and #30) were observed tipped up in conflict with the traffic pattern in operation. They were reset and OPP notified. Page 5 of 6

Afternoon: Observed two event signs that are used to close Line 7 and form two lanes were erected and facing traffic in conflict with the plan. These were knocked down when discovered. OPP notified. Evening: over 1 dozen bicycles using Cycle Simcoe rack. 11:00 pm: 1125 vehicles in day parking. Sunday (7/24) Day: No traffic issues on Sunday. Some congestion on Hwy 11 SB originating on Hwy 400. OPP reports an accident at Line 3. Event traffic is negligible so the congestion appears cottage related. We contact the Compass Centre and activated the events PCMS to warn motorist of slow traffic beyond Line 6. Hwy 11 congestion generally eased by early evening. PCMS pass messages turned off. 7:00 pm: About 1,085 vehicles in day parking. 10:00 pm: Exit traffic steadily increasing. The west campground begins exiting from Gate 7C. 7B used for ingress of shuttles and pick ups, exiting via 7A. Traffic NB on Line 7 backs up to site but flowing well. OPP toggles traffic to Line 7 SB to Ridge Road. As pick ups ease, the campground is allowed to exit Gate 7A. Monday (7/25) 12:30 am: The Sunday night exit peak is over. A drive through the campgrounds suggested 50% of the west campground and 80% of the east campground remaining. 10:00 am: Remaining traffic exiting as needed. Less than 10% remaining with little or no delays. 1:00 am: Line 8 reopens, all PCMS turned off. Page 6 of 6