Customer Responsibilities. Important Customer Information. Cary 4000/5000/6000i UV-Vis spectrophotometer Site Preparation Checklist

Similar documents
490 Micro GC Site Preparation Checklist

Customer Responsibilities

Customer Responsibilities. Important Customer Information. Agilent 6400 Series Triple Quad LC/MS Site Preparation Checklist

Customer Responsibilities

Customer Responsibilities. Important Customer Information Series Q-TOF LC/MS Systems Site Preparation Checklist

490 Micro GC Site Preparation Checklist

Customer Responsibilities

Customer Responsibilities. Important Customer Information. Agilent Infinity II Preparative HPLC System Site Preparation Checklist

Customer Responsibilities

Customer Responsibilities

6890 GC Site Preparation

For additional information about our solutions, please visit our web site at US/Pages/HomePage.

DD2 Site Preparation Checklist Hardware Site Preparation Specification

Site Preparation Specification for GCMS system. Dimensions and Weight. Agilent 7820MSD Series G3175A (G7020A), G3176A (G7021A)

Discovery SDT 650. Site Preparation Guide. Revision G Issued December Page 1

Customer Responsibilities. Important Customer Information GCMS QQQ Site Preparation Checklist

7820A GC Site Preparation Checklist

Cary 100/300/4000/ 5000/6000i Spectrometer. Site Preparation Guide

User Manual. Quantos Automated Dosing Liquid Module

Discovery HP-TGA 75/750. Site Preparation Guide

Avio 500 ICP-OES. ICP-Optical Emission Spectroscopy PREPARING YOUR LAB. Preparation Checklist. Suitable Working Area

Agilent 7890 / 220 Ion Trap GCMS Site Preparation Checklist

NovelBright LED Illuminator

Site Preparation Specification for GCMS system. Dimensions and Weight. Agilent 5975C MSD Series G3170A, G3171A, G3172A, G3174A

Technical Information

Workhorse 8 Oxygen System Model No 5665, 5673, 5679

Oxford Instruments Plasma Technology. PlasmaPro NGP80. Installation Data Sheet. Original Instructions.

Columbus Instruments

OC4000 USER'S GUIDE I O OXYGEN CONCENTRATOR FOR VETERINARY USE ONLY. by Supera Anesthesia Innovations GLOSSARY OF SYMBOLS. : ON (power switched on)

AC1810 / AC1810-A TECHNICAL SPECIFICATIONS. Operating Pressure psi ( kgs/cm²) [AC1810] Displacement. Net Weight

Preparing Your Laboratory for the Optima 7300 V and 8300 ICP-OES Spectrometers

Discovery TGA 55, TGA 550, TGA Site Preparation Guide

Please refer to the Hydrogen Safety Guide which is shipped with the Instrument. 5977B Series GC/MS Systems Site Preparation Checklist

Your local gas generation partner. Precision series Modular gas generation solution for GC.

Workhorse-15 Oxygen Generator

User Manual. Quantos Automated Dosing Liquid Module

Installation, Operation, and Maintenance Manual Parker Balston Model N2-04 Nitrogen Generator

Agilent 5100 and 5110 ICP-OES. Site Preparation Guide

TECHNICAL INFORMATION

Varian 325-MS LC/MS Quadrupole Mass Spectrometer Pre-installation Instructions

UltraLo 1800 Alpha Particle Counter

(AS AT 31 st MARCH, 2002)

SAFETY MANUAL FOR FLAMMABLE PRODUCT TRANSFER

Agilent Auxiliary Gas Module AGM 2. User s Guide

Series Environmental Chambers

Dual Solenoid Gas Valve Installation

28 Site Preparation. Supplying valve actuator air

Detector Carrier Gas Comments Detector anode purge or reference gas. Electron Capture Nitrogen Maximum sensitivity Nitrogen Argon/Methane

Markes Thermal Desorption Systems Site Preparation Page 1 of 8

AIR COMPRESSOR OPERATING INSTRUCTION AND PARTS LIST

Oxygen Concentrator Instruction

Technical Information Conducal CLY421

Agilent 7820A GC. Site Preparation Guide. Agilent Technologies

PURPOSE OF THE POLICY

Varian 240-MS GC/MS Ion Trap Mass Spectrometer Pre-installation Instructions

ENGLISH Datasheet IEC PTFE Exposed Welded Tip Thermocouples with Miniature Thermocouple Plug

SC505 Sof Care Inflator. Operating Instructions and Service Manual

Pre-filter for Brushless Blower Instruction Manual

Portable Oil Lube Air Compressors

Preinstallation Checklist and Instructions for the TriStar These Preinstallation Checklist and Instructions were reviewed and approved by:

Contents. Operating instructions. Pressure switch, heavy-duty version Model PSM-520

OC4000 USER'S GUIDE I O OXYGEN CONCENTRATORS OXYGEN CONCENTRATOR FOR VETERINARY USE ONLY GLOSSARY OF SYMBOLS. : ON (power switched on)

Information Sheet. About this information sheet. Floor and wall loadings. Attachment of process module to floor. PlasmaPro Estrelas100

Datasheet IEC & ANSI Miniature or Standard Quick Wire Thermocouple Connector Plug & Socket Type K in IEC or ANSI Colour code

973-SF 6 Analyzer. Precise and Stable SF 6 Gas Analyzer REFLECTING YOUR STANDARDS

Liquid ring vacuum pumps in compact design

TECHNICAL DATA MAINTENANCE AIR COMPRESSOR MODEL G-1

Nitrogen Supply System

Your local gas generation partner. Precision series Modular gas generation solution for GC.

FX134, FX1234, FX3030 Problem and Solutions

Spirax Compact FREME Flash Recovery Energy Management Equipment

SPECIFICATIONS ATTENTION

AIR-OPERATED DOUBLE DIAPHRAGM PUMP USER S MANUAL

Operating Instructions

NGN Series nitrogen generator

03/07/2014 V

Agilent 5100 and 5110 ICP-OES. Site Preparation Guide

INSTALLATION GUIDE Gas Rangetops

Datasheet ANSI Type K & T Exposed Welded Tip Thermocouples (ANSI Colour Code)

Your local gas generation partner. Precision series Modular gas generation solution for GC.

Model 687 Mouse Ventilator User s Manual. Model 687 Mouse Ventilator

Digital Melting Point Apparatus

IEC Thermocouple Extension Leads with Miniature or Standard Thermocouple Connectors - Available in types K, J, T & N

Unlimited possibilities. Get started in no time

INSTRUCTION MANUAL FOR MODEL 7360V VERTICAL CURING CHAMBER Revision E May

Agilent 5975T LTM GC/MSD

RDK-408D2 Cold Head. Technical Manual. SHI-APD Cryogenics Inc Vultee Street Allentown, PA U.S.A. Revision A: September 2005

DF-550E PROCESS ANALYSERS APPLICATIONS FEATURES

Pressure Automated Calibration Equipment

ATEX VACUUM PUMPS AND GAUGES CHEMICALLY RESISTANT, OIL-FREE AND SAFE

ENGLISH. Datasheet L60 Thermocouple & Fine Wire Welder

TA Instruments Installation Requirements for the Thermal Discovery Series

Pressure Regulators. Operating Instructions. Instrumentation

PPC4E Pressure Controller/Calibrator Superior rangeability and reliability

TECHNICAL INFORMATION

AB SCIEX QTRAP 4500 System

GM-7000 Series CE Approved Gas Control Valve

T EK-SUB 4800C 19 mm Submersible Level Transmitter

G1/8 G1/8. Model 0 bar -0,1 bar -0,2 bar -0,3 bar -0,4 bar -0,5 bar -0,6 bar -0,7 bar -0,8 bar

BGA244 Binary Gas Analyzer

Transcription:

Thank you for purchasing an Agilent instrument. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site preparation is the key first step in ensuring that your instruments and software systems operate reliably over an extended lifetime. This document is an information guide AND checklist prepared for you that outlines the supplies, consumables, space and utility requirements for your equipment for your site. Customer Responsibilities Make sure your site meets the following prior specifications before the installation date. For details, see specific sections within this checklist, including: The necessary laboratory or bench space is available. The environmental conditions for the lab as well as laboratory gases and plumbing. The power requirements related to the product (e.g., number & location of electrical outlets). The required operating supplies necessary for the product and installation. Please consult Other Requirements section below for other product-specific information. For more details, please consult the Cary 100/300/4000/5000/6000i/7000 User's Guide, publication number 8510197200. If Agilent is delivering installation and familiarization services, users of the instrument should be present throughout these services; otherwise, they will miss important operational, maintenance and safety information. Important Customer Information 1. If you have questions or problems in providing anything described as a Customer Responsibilities above, please contact your local Agilent or partner support/service organization for assistance prior to delivery. In addition, Agilent and/or it's partners reserve the right to reschedule the installation dependent upon the readiness of your laboratory. 2. Should your site not be ready for whatever reasons, please contact Agilent as soon as possible to re-arrange any services that have been purchased. 3. Other optional services such as additional training, operational qualification (OQ) and consultation for user-specific applications may also be provided at the time of installation when ordered with the system, but should be contracted separately. 1 Page 1 of 5

Dimensions and Weight Identify the laboratory bench space before your system arrives based on the table below. Pay special attention to the total height and total weight requirements for all system components you have ordered and avoid bench space with overhanging shelves. Also pay special attention to the total weight of the modules you have ordered to ensure your laboratory bench can support this weight. 1. The workbench should be about 90 cm (36 in) high. It must be stable and strong enough to support the total weight of equipment to be used. Remember to provide space for the computer, monitor and printer. 2. Allow at least two inches of space on both sides, and six inches at the rear of the system to permit free air circulation. 3. Power cord and all other connections are located at the rear of the instrument. The Power switch is located on the front panel. 4. Allow eight inches in front of the. Some accessories attach to the front of the instrument and may overhang the workbench if adequate space is not provided. 5. Ensure the workbench is free from vibration. Any equipment generating vibration during operation must be placed on the floor rather than alongside the Cary instrument on the workbench. 6. To avoid damage through the spillage of analyzed samples, the worktops should be covered with a material that is corrosion resistant and impervious to liquids. Weight Height Depth Width Kg lbs mm in mm in mm in packed 141 310 670 26 800 31 1420 56 unpacked 91 200 380 15 710 28 1020 40 Environmental Conditions Operating your instrument within the recommended temperature ranges insures optimum instrument performance and lifetime. The instrument warranty will be made void if the equipment is operated in sub-standard conditions. 1. Performance can be affected by sources of heat & cold e.g. direct sunlight, heating/cooling from air conditioning outlets, drafts and/or vibrations. 2. For optimum performance the area should have a dust-free, low humidity atmosphere. Air conditioning is recommended. 3. The site s ambient temperature conditions must be stable for optimum performance. It is 2 Page 2 of 5

recommended that the ambient temperature of the laboratory be maintained between 20 and 25 C, and be held constant to within ±2 C throughout the entire working day. 4. The Cary instrument is designed for operation in clean air conditions. The laboratory must be free of all contaminants that could have a degrading effect on the instrument s components. 5. Dust, acid and organic vapors, such as acetone, must be expelled from the work area. The instrument warranty will be void if the equipment is operated in substandard conditions. 6. Sample preparation areas and materials storage facilities should be located in a separate room. Altitude meters (feet) Operating temp range C (F) Operating humidity range (%) Heat Dissipation (BTU) non-operating (transit) 0 to 2133 (0 to 7000) 5 to 45 (41 to 113) <90 operating within performance specifications 0 to 853 (0 to 2800) 853 to 2133 (2800 to 7000) 10 to 35 (50 to 95) 10 to 25 (50 to 77) 15 to 80 631 BTU/hr 15 to 80 Power Consumption 1. If a computer system is supplied with your instrument, be sure to account for those electrical outlets. 2. A separate power outlet receptacle should be provided for the system. 3. Good electrical grounding is essential to avoid potentially serious shock hazards. A 3-wire outlet with ground connection must be provided for the instrument. Make certain that power outlets are earth-grounded at the grounding pin. 4. All power supplies for the must be single-phase, AC voltage, three-wire system (active, neutral, earth) and should be terminated at an appropriate power outlet receptacle that is within reach of the power cord. 5. The use of extension cords or outlet adaptors is not recommended. 6. instruments are supplied with a 2 metre (6' 6") long power cord and threepin plug assembly that is compatible with common standards applicable in the local area. Avoid using power supplies from a source that may be subject to electrical or RF interference from other services (large electric motors, elevators, and welders, for example). Line Voltage & Frequency (V, Hz) Maximum Power Consumption (VA) Maximum Power Consumption (W) 100 to 240 ±10%VAC 50 to 60 Hz 300VA 185W 3 Page 3 of 5

Optional Operating Supplies by Customer 1. For information on Agilent consumables, accessories and laboratory operating supplies, please visit http://www.chem.agilent.com/en-us/products/consumables/pages/default.aspx 2. A pair of Microcell Holders and a Solid Sample Holder is supplied as standard with the Cary 4000/5000/6000i. Cells are available separately. Recommended Item Description Vendor s Part Number Quantity Quartz rectangular cuvettes 6610000800 1 pair Other Requirements Nitrogen Purging (optional) The instrument is fitted with connection points for purging the optical system with nitrogen to enhance the performance of each instrument at extremes of its range. More details are provided in the Cary User's Guide (part number 8510197200), supplied with the instrument. Nitrogen supplies are not available from Agilent but may be obtained from commercial suppliers. Liquid nitrogen (in conjunction with a heat exchanger) is recommended because it is generally less costly than compressed nitrogen and is of better quality. Where compressed nitrogen must be used, the gas must be dry, oil free and uncontaminated. Do not use compressed nitrogen from a supplier who uses oil or water in the compression process (these methods leave fine particles of oil or water suspended in the nitrogen that may be deposited on the instrument optics). Only use nitrogen from a supplier who fills containers from immersion pumps lubricated with liquid nitrogen. Operating pressure for the nitrogen purging system is 83 to 172 kpa (12 to 25 psi). Use a suitable regulator and gauge assembly to ensure that the nitrogen supply is maintained at the correct pressure. Nitrogen supply tubing should be clean, flexible plastic tubing 6 mm (1/4 ) inside diameter (Tygon PVC or equivalent). Do not use rubber tubing as this is usually treated internally with talc which will be carried into and contaminate the instrument optics. The nitrogen system should include a manifold assembly with inlet from the supply and two outlets for connection to the instrument. Manifold outlets should each be fitted with a stop valve and flow meter for control of gas flow to the instrument. Flow meters should be adjustable for flow rates of 0 to 30 litres per minute (0 to 64 cubic feet per hour). NOTE: The instrument warranty will be void if damage is caused by the use of contaminated nitrogen. Use of the system and accessories may involve materials, solvents and solutions that are flammable, corrosive, toxic or otherwise hazardous. 4 Page 4 of 5

Careless, improper, or unskilled use of such materials, solvents and solutions can create explosion hazards, fire hazards, toxicity and other hazards which can result in death, serious personal injury, and damage to equipment and property. ALWAYS ensure that laboratory safety practices governing the use, handling and disposal of such materials are strictly observed. These safety practices should include the wearing of appropriate safety clothing and safety glasses. The weighs 91 kg. To avoid injury to personnel or damage to equipment, always use two or more people when lifting or carrying the instrument. NEVER attempt to lift the instrument alone. Your Agilent spectrophotometer has been designed to comply with the requirements of the Electromagnetic Compatibility (EMC) Directive and the Low Voltage (electrical safety) Directive (commonly referred to as the LVD) of the European Union. Agilent has confirmed that each product complies with the relevant Directives by testing a prototype against the prescribed EN (European Norm) standards. Important Customer Web Links For additional information about our solutions, please visit our web site at http://www.chem.agilent.com/en-us/pages/homepage.aspx Need to get information on your product? Literature Library - http://www.agilent.com/chem/library Need to know more? Customer Education http://www.agilent.com/chem/education Need technical support, FAQs? http://www.agilent.com/chem/techsupp Need supplies? http://www.agilent.com/chem/supplies Document part number: G9825-90000 5 Page 5 of 5