Glove Box Installation Manual

Similar documents
Equipment Operating Procedure Glove Box

Glove Box with Gas Purification System and Digital Control VGB-6. MTI Corporation

MB-SP Series Solvent Purification System

Standard Operating Procedure

School of Chemistry SOP For Operation Of Glove Boxes

Instructions for Assembly, Installation, and Operation of the Gas Addition Kit Accessory with the CEM Discover Systems

SRI Model H2-40 Hydrogen Generator Operation and Maintenance Nov 2006

University of Minnesota Nano Center Standard Operating Procedure

B. Assemble the Method-25 sample train with a heated probe/filter.

OPERATION MANUAL NTF-15

PROPORTIONING VALVE. Model 150 INSTRUCTION MANUAL. March 2017 IMS Company Stafford Road

COLD WELD COPPER TUBE SAMPLING EQUIPMENT AND PROCEDURES

MAGNA-CHEM AUTOMATIC CHLORINATOR - MODEL: CSA-2P MAGNA ORP Chlorine Pump

Manual Solvent Purification System. Innovative Technology, Inc.

SUMMITTM 400 & 600. Natural Gas Barbecues. Step-By-Step Guide

Superconducting Susceptometer (MPMS-5S) Quantum Design Room 296 (MPMS)

OPERATION MANUAL RTI RHS650 RTI TECHNOLOGIES, INC East Market Street York, PA Manual P/N

with O 2 Controller Instruction Manual

MANUAL BE SERIES Test Benches

Pressure Differential Automatic Manifold For LPG. PDH1000 Series. LPG Installation & Operations Instructions

OPERATION MANUAL NTF-60 Plus

Installing ASI Umbilical Delivery Systems

SomnoSuite FAQ. Setup. Calibration 4. What are the calibration requirements for the SomnoSuite? Settings

Cover Page for Lab Report Group Portion. Head Losses in Pipes

Trion PECVD SOP IMPORTANT: NO PLASTIC, TAPE, RESISTS, OR THERMAL PASTE ARE ALLOWED IN THE CHAMBER

Operation Manual - PN A MENSOR MODEL 73 SHOP AIR BOOSTER

Model 130M Pneumatic Controller

Halsey Taylor Owners Manual STOP!

Welker Sampler. Model GSS-1. Installation, Operation, and Maintenance Manual

INSTRUCTION MANUAL. January 23, 2003, Revision 0

Mass Spec will not pump down

Inert Air (N2) Systems Manual

UNITY 2. Uni-DAAMS Manual. Version 1.3 (Changes to Section 1.1) March 2010

Installation, Operation & Maintenance Manual for Flo-Max Coupler Bracket Model FM150

ELECTRONIC PLC SERIES Test Benches

NTF-515. Operation Manual

COMPACT TRIPLE WALL OUTLET STATION MODEL INSTALLATION AND OPERATING INSTRUCTIONS

INSTRUCTION MANUAL FOR MODEL 7360V VERTICAL CURING CHAMBER Revision E May

Booster Pump PB4-60 Replacement Kits

Agilent 1220 Infinity II LC Mobile Upgrade Kit

VAC-U DRIVE Swinging float arm for Acrobat like agility 36 Fin disk with DEEP VEE Scoop

Halsey Taylor Owners Manual 4410 Freeze Resistant Tubular Fountain STOP!

FOR INSTALLING CO 2 BLENDER KIT (P/N IN BEER SYSTEM

Installation Operating Instructions for Simple Duplex Manual Manifolds PX-TSD Series

WIND CLIPPER KTS ILLUM SCALE INC DEC CLIPPER WIND SYSTEM

RAM 4021 Operation Manual

Agilent 1290 Infinity Pump Head Maintenance

OPERATING INSTRUCTIONS MANUAL FOR QACV PNEUMATIC DOSING PUMP

KJ4000 Operating Instructions & Parts Manual NSN

Model PSI Compressor with 3-Gallon Air Tank 12VDC

Paddle Bar Replacement

Freedom8 ShoeBox Compressor Manual

NTF-230 OPERATION MANUAL

TANK MANAGER FOR TWO TANKS OPERATING MANUAL. 10/31/11 C-More T6C L color touch panel

RAM Operation Manual. Worldwide Manufacturer of Gas Detection Solutions

Operating Instructions Models and Hydrostatic Test Pumps

Installation of Your SprayMaster System

CS Controlled Dissolved Gas assembly with optional CS Air Aspirator assembly. Installation and Operation information

Gerber Sabre 404 and 408 Installation Instructions

Budget Range Operators Handbook

G92 Series BASOTROL Automatic Pilot Gas Valve

CAPITAL CONTROLS SERIES NXT3000

RAM 4021-PR. Operation Manual. Worldwide Manufacturer of Gas Detection Solutions

OPERATOR S MANUAL Ar-Gone Weld Gas Analyzer

MASK INTEGRITY TEST ACCESSORY (MITA) MODEL 8120

GETZ EQUIPMENT INNOVATORS RECOVERY SYSTEM CLEAN AGENT FE-36 / HALOTRON 1 PART NO. 4G59751 OPERATIONS MANUAL

HPIC D Hydrostatic Test Pump PRODUCT INFORMATION AND OPERATING INSTRUCTIONS

NB/NBR NITROGEN BOOSTER FOR AVIATION SERVICE

Installation Operating Instructions for Duplex Manual Manifolds PX-TMD Series

LRS(H)4 Pressure-Reducing Regulator User Manual

Installation Instructions

POOL ROVER ST POOL CLEANER Installation Instructions

PANACEA P200 STAINLESS STEEL USER MANUAL

Protector Controlled Atmosphere Glove Box

SPECIFICATIONS ATTENTION

GAS CONVERSION KIT Installation Instructions Range/Rangetop

2 in. 18 Gauge Brad Nailer. User manual

Hazards associated with the gas system and how to mitigate them

ABRASIVE SYSTEM ABRASIVE REGULATOR II 800# BULK ABRASIVE DELIVERY POT Abrasive Regulator II and 800# Pot Manual

User s Guide. Vacuum Controller for liquid delivery systems

Apollo Safety Features

Tri-Tech Medical Inc.

Design Change Notification

Pegas 4000 MF Gas Mixer InstructionManual Columbus Instruments

Basic & Controlled Atmosphere Glove Boxes

Tire Inflation Cage Kit For servicing only single piece automotive, and most light truck tire/wheel assemblies

GAS BBQ 4 burner. instructions for. model no: BBQ10

ABRASIVE REGULATOR II

User's Manual. MixRite TF 10. Edition 05.08

PRESSURE TANKS HANDLING & INSTALLATION INSTRUCTIONS INSTALLATION MANUAL CONTROL VALVES

Oxygen Contamination

RARS5000 AIR BODY SAW OWNER S OPERATING MANUAL

Maintenance and Repair. AirHawk II Air Mask. Second Stage Regulator. Order No.: /02 Prnt. Spec (I) MSAsafety.

WSN: XXXXXX 101 ROME COURT FORT COLLINS, CO, PHONE #: (970) FAX #: (970) TO-Clean Manual

444C DUAL PERFORMANCE VALUE PACK

PRS(TC)4,8 USER MANUAL. Read the complete manual before installing and using the regulator.

Compact Triple Cabinet Outlet Station Model Installation and Operating Instructions

PILOT OPERATED PRESSURE VACUUM RELIEF VALVE MODEL 1660

200 PSI COMPRESSORS - MODEL NUMBERS

ABRASIVE REGULATOR II

Transcription:

Glove Box Installation Manual 1998 by M. Braun Company File: GB-UNI-INS.DOC! Edition 08-00 by M. Boutin! Subject to be changed without notice

Glovebox Installation Your Glove box has been fully assembled, operated and tested at our production facility. A Glove box Function Test sheet should accompany the system. On it, you will see that the operation of system components has been checked and the glove box and antechamber(s) have been tested for leaks under positive and negative pressure. Also, to ensure that the glovebox purifier performs optimally, the vacuum level during regeneration has been tested. The glove box is ready to be hooked up and to begin working for you. If you have any questions about these instructions or anything regarding the glove box installation, please call 1-603-773-9333 and ask for Customer Service, send your fax inquiry to 1-603-773-0008, or E-mail a message to service@mbraunusa.com. Step 1 Getting the Glovebox Off the Pallet - The glovebox is secured to the shipping pallet by wood braces. You will need to remove the braces with a crow bar. The glovebox is equipped with wheels for ease of movement and leveling feet for lab installation or shipping. Lower the glovebox onto the wheels by screwing the leveling feet up into the glovebox stand. You will need a wrench to get them started and then turn the leveling feet by hand. Once the feet are up, the glovebox will roll freely on the wheels. You will need a few strong individuals to perform the next step lowering the box to the ground. Roll the end of the glovebox opposite the large antechamber to the edge of the pallet. Lower the wheels to the floor. There is no substitute for strength in this step. Now, roll the glovebox off of the pallet carefully, supporting the weight as the remaining set of wheels meet the floor. The glovebox purifier cart is also equipped with wheels. The cart will roll forward and back. You may lower it off the pallet in the same manner as the glovebox or lift it off. Step 2 Connecting the Glovebox - Once the glovebox has been moved into place for operation, lower the leveling feet until the box no longer rolls. Roll the purifier cart into position beneath the antechamber. See picture 1. There are components packed in the antechamber that you will need to set up the glovebox. Remove them and lay them out on a bench top. You should find: Picture 1 File: GB-UNI-INS.DOC! Edition 08-00 by M. Boutin! Subject to be changed without notice

1 pair butyl gloves, 4 large o-rings Hardware kit containing clamps, o-rings, and electronics cabinet key Short KF40 to KF25 copper pipe Electrical feedthrough Power strip Technical manual Glove box Function test sheet Tygon braided hose, for optional water cooling On the purifier cart, along with the electrical cabinet, blower, vacuum pump and purifier column, you will see: two lengths of coiled Tygon braided hose; a coiled, gray, Festo gas line with a stainless steel 6mm nut on the end; a power cable with a square electrical connector at the end; a box containing the glove box foot pedals for pressure control; and a coiled electrical wire with the main power plug for your glovebox system at the end. Take the foot pedals out of the box and place them on the floor in front of the lower shelf of the glovebox stand bring them out from under the stand to keep the wire out of the way. The oil mist trap to your vacuum pump has been unclamped to prevent damage in shipping. Using a KF25 clamp and o-ring from the hardware kit, clamp the mist trap into place. See picture 2 & 3.. Picture 2 Coming off of the electrical cabinet you will see a gray plastic bellows hose connected to the Siemens OP7 touch pad. This is the user interface for the Programmable Logic Controller (PLC) that runs your glovebox. The gray bellows hose allows you slack to install the black bracket on the OP7 to the two bolts on the end panel in front of the large antechamber. The OP7 should swivel from front to back once installed. See picture 4. Next, from the rear of the purifier cart take the gray Festo line and attach the 6mm nut to the fitting located beneath the glovebox, in the rear right corner. This line will allow the PLC to read internal glovebox pressure. Use 2 wrenches, one on the nut and one on the Swagelok feedthrough, to tighten this fitting securely. From this position beneath the box, you will see the green and yellow ground wire coming from the rear, left corner of the purifier cart. The ground wire should be connected to the glovebox stand, as seen in picture 5. Picture 3

Festo Line w / 6mm Nut Ground Wire Picture 4 While beneath the glove box, connect the heat exchanger to the stainless steel bellows hose coming off of the blower. See picture 6. Next, connect the KF25 to KF40 copper pipe to the hand valve beneath the antechamber. Use a clamp and o-ring, as shown in picture 7. The lower end of this pipe connects to the stainless steel bellows hose coming from the vacuum pump. The pipe fitting on the side of the pipe connects with the black flexible vacuum line extendingoff of the valve block. See picture 8. Picture 5 Connect the flexible stainless steel hose from the vacuum pump to the copper antechamber pipe with a clamp and o-ring. Connect the copper pipe running beneath the glovebox to the stainless steel flex hose, as shown in picture 9. Heat Exchanger Picture 6 Connect piping to hand valve here. Connect piping to flex hose here. Picture 7 Picture 8

H 2 0 Analyzer Probe (optional) Connect flex hose to pipe running beneath glove box here. Connect Here Picture 9 Picture 10 The glovebox light hood is already supplied with a light ballast and fluorescent bulb. To complete the wiring of the light hood, run the cable from the purifier cart up the wire track behind the glovebox antechamber, as shown in picture 10. Connect the plug adapter to the wire from the light hood, already on top of the glovebox. The glovebox gloves are secured to the glove ports via butyl rubber o-rings. Place the glove on the glove port so that the ridge at the shoulder of the glove is in the rear most groove on the glove port. Next, snap the o-rings into place one by one over the glove material on the glove port. There should be two o-rings on each glove port. The o-rings fit into grooves on the glove port. The glovebox should now be ready for operation. You should have one main electrical wire coming from the purifier cart to plug into your power source. Plug the wire in and turn the power knob on the electrical cabinet to the ON position. You will see on the OP7 display that the system runs through a series of tests at start up. This is normal each time power is interrupted to the system. Turn the vacuum pump on at this point by pressing the button labeled Vacuum Pump. The pump should be activated at all times while the box is switched on. Step 3 Gas in the Glovebox - The next step is to check that your glovebox has been made leak tight. With the Tygon hose from the VG valve connected to your working gas supply, supplied at 80 PSI, you will be able to add gas to the glovebox by setting the operating pressure parameters with the OP7. Make sure to use hose clamps when securing gas lines.

To set the box parameters, press the number 7 on the keypad. From this screen you will be able to set the pressure parameters in the box. To check the glovebox for any sort of leaks, set the pressure first to a positive value. For example, set the upper pressure limit to 12 mbar and the lower pressure limit to 9 mbar. The box PLC will call for gas from the cylinder by opening the VG valve where the Tygon line is tied into. Gas will be added until you are within the pressure range. The gloves will stick straight out of the box. The glovebox should be able to hold pressure for 5 minutes. If you have a leak, the pressure will fall to 9 mbar and below, and the box will add gas to try to maintain the limits you have set. If there is a leak, systematically check to see if all clamps are tight and all Swagelok connections. Typical spots to check are the pressure fitting beneath the box, the clamps on the piping, etc. You may wish to squirt a small amount of soap solution around the fittings to check for leaks (bubbles will develop if a leak is present). The glove ports may need to be tightened. Check for tightness by twisting the glove port clockwise. The glove ports are tight when they absolutely cannot be turned. If a drop in pressure persists, call Customer Service for assistance. Keep in mind that we have checked the system for leaks prior to shipment; the box should maintain pressure. Once pressure is maintained in the positive range, check for pressure maintenance in the negative range. Set the upper pressure level to 7 mbar and the lower set point to 11 mbar. Although unusual, a glovebox may show signs of pressure leak in the negative range but not in the positive range. If a leak is present, the box will creep toward atmospheric pressure and will add vacuum to maintain the parameters you have set. Again, check all of the fittings you have assembled for tightness. Step 4 Purging the Glovebox - Once it is established that the glovebox is leak tight, you may begin purging. Purging is the process of ridding the glovebox of all room air, in favor of the inert gas you will be working with. The goal is to reduce the oxygen and moisture level in the box to below 100 ppm so that the glovebox purifier can take over and bring down oxygen and moisture to below 1 ppm, respectively. The Technical Manual, also supplied with the system describes in depth the manner in which the glovebox should be purged. It also explains how much gas you will need to purge for what size system you have. In the Technical Manual, see the section on Purging. We simply recommend purging out of the antechamber and for a 1250 mm x 780 mm standard size glovebox, such as the Unilab, you will need to purge 2 and ½ cylinders of gas (based on standard US cylinders - 304 cubic feet of gas per cylinder). If purging from a bulk gas supply or house supply, purge duration will depend upon flow rate. Refer to the table at the back of this manual for information on purge gas consumption based on box volume. A chart indicating box volume is also provided. To purge out the antechamber, first set your pressure set points to an upper point of 12 mbar and a lower point of 9 mbar. Open the inside antechamber door a small amount. We will create a leak in the glovebox system so that inert gas is continually flowing in and pushing out room air. To achieve the goal of purging goal of less than 100 ppm oxygen and moisture, we must turn the volume of gas within the chamber over between 12 and 14 times. Create the leak by slowly opening the outside antechamber door. Internal gas from the box will begin leaking out and the pressure will drop to below your set working parameters. You will hear the VG valve clicking open and closed as the PLC tries to maintain the set pressure parameters. Open the door just enough so that the valve stays open and gas is continually added. In turn, gas will continually be pushed out the antechamber. As the cylinder empties, residual oxygen and moisture-laden room air is being forced out of the glovebox. Room air may pool in box corners, so it is important to stir the air by waving the gloves around within the glovebox.

As the cylinder empties, monitor the delivery pressure. Be sure to close the outside antechamber door before pressure drops so low that the gas cylinder is unable to maintain the pressure parameters you have set in the box. Close the outside antechamber door immediately to prevent the backflow of room air into the glovebox. The VG valve will stay open and add gas to bring the glove box to within your pressure set points. You are now ready to change cylinders. To change the cylinder, first close off the needle valve to isolate the Tygon line. The goal here is to keep room air from entering the line to the glovebox. If your regulator does not have a needle valve, back off the pressure until it is closed. Next, close the cylinder valve. You may now change the gas cylinder and continue purging. Crack the outside antechamber door until the VG valve again remains open. Remember, to bring the oxygen and moisture levels in the glovebox to a range where the purifier will be effective you must purge through 2 and ½ cylinders (304 cubic feet per cylinder) of inert gas. Step 5 Beginning Operation - Your glovebox has been regenerated prior to shipment. The purifier is sealed and is ready to begin operation. Once you have purged as previously described, you may press the circulation button on your OP7 touch pad. The blower will switch on and the electro-pneumatic valves on top of the purifier will automatically open. The purifier is now filtering out residual oxygen and moisture from the glovebox atmosphere. If the delivery pressure from the cylinder is not great enough (i.e. not 80 p.s.i.) you will receive an error message on the OP 7. It will read, Inlet/ Outlet Valves Not Open. Increase pressure to 80 p.s.i. Normally, you will only need to regenerate every 2-3 months, or as needed based upon glovebox use. Since the glovebox oxygen and moisture levels are slightly higher than normal, you should perform regeneration within a few days of start up. Step 6 Regeneration - The regeneration gas supply needs to be connected to the pipe fitting below the VRE valve. The regulator on the regeneration gas cylinder needs to be able to deliver at 5 p.s.i. To begin regeneration, switch circulation off by pressing the Circulation button. Next, press the button marked Regeneration. The screen will prompt you to Check Regeneration Gas Supply, Continue With INS Key. At this point open the pressure on the regeneration gas cylinder to 5 p.s.i. or until you hear gas coming from the short vent line, coming off of the valve block. You may need to increase the delivery pressure to 7 or 8 p.s.i., as regulators vary. A Regeneration Cycle will consume approximately ½ of a 304 cubic foot cylinder of regeneration gas. Once you hear gas flowing from the vent line, press the INS key to continue regeneration. The Regeneration Cycle is automatic. It will last 16 hours. During this time you may continue to work within the glovebox, but the purifier is isolated. We recommend performing regeneration prior to leaving work at in the evening, so that the cycle is complete in the morning and you may continue working while the box is in Circulation mode.

VRE Valves: VG - gas in VV - vacuum VRE VRV VRS VS1 - regeneration gas - regeneration vacuum - exit valve - pressure compensation / cooling out in cooling water 3-5 l/m To Box blower heat exchanger From Box VS1 filter column VG VV VRV VRS flow meter to antechamber working gas vacuum pump regeneration gas supply

Valve Block VG Working Gas In VRV VV VRS VRE Regeneration Gas In Regeneration Vent Line