Boise Whitewater Park Ph II

Similar documents
J.A. and Kathryn Albertson Family Foundation Boise Whitewater Park Ph II User Group Meeting 01/23/2018 Presented by: John Tensen P.E.

JAP Additional Information Sheet

J.A. and Kathryn Albertson Family Foundation Boise Whitewater Park Phase II Final Environmental Review Figure 5. Temporary Construction Measures McMil

INTERSECTION IMPROVEMENTS

Inspection Modifications Recommend increasing the culvert size to a 48" squashed pipe. Discussion Board Decision

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: ,

Purple Line Extension Community Meeting

Welcome to the Open House

Current Travel Needs and Operating Conditions (See pages 4 9 of the Discussion Guide)


Kootenai River Habitat Restoration Program. Kootenai Tribe of Idaho - January 27, 2014 Presentation for Kootenai Valley Resource Initiative

Unless otherwise noted, images throughout the presentation are by FWC.

CFH Boise City Parks and Recreation

Traffic and Flood Control Improvements in the Transit Oriented Development District Project Updates Tuesday, November 29, 2016 Meriden Public Library

ENERGY SECTOR COORDINATION

Creston Golf Club Development Plan

Meeting Date 10/18/2005 Type Internal Team Progress Other Date of Issuance 10/25/05. Coordination See attached sign-in sheet

Technical Advisory Committee (TAC)

SC 41/Joe Rouse Intersection Improvements

Tonight is for you. Learn everything you can. Share all your ideas.

Tempe Streetcar Public Meeting

Conceptual Design Report for the Fabri Dam Modifications Project

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

122 Avenue: 107 Street to Fort Road

2015 Data review. Capturing Ready Lane NEXUS vehicles

Graeme Wilson Vice President, Whitewater NZ & Vice President, Whitewater Canoe Club

BAYOU BYLINE. Calendar of Events. November Kent Rogers will do a power point presentation on the I-49 Route thru Allendale, from I-20 to I-220.

DEPARTMENT OF ENVIRONMENTAL PROTECTION Office of Oil and Gas Management

Delaware Basin Stream Management Program

Welcome to the Sellwood Bridge Project Open House!

TABLE OF CONTENTS LEGAL NOTICE

TABLE OF CONTENTS LEGAL NOTICE

Project Overview. Rolling Road Widening Fairfax County. Get Involved. Design Public Hearing. Contact Information

Environmental Review Binder Documentation McGilchrist Street SE: 12th Street SE to 25th Street SE Project City of Salem, Marion County, Oregon

Bexar County Environmental Services 233 North Pecos La Trinidad, Suite 420, San Antonio, Texas (210) Office (210) Fax

NEIGHBORHOOD TRAFFIC CALMING PROGRAM. Policy and Procedure. Roswell Department of Transportation (770)

City of Fairfax, Virginia City Council Work Session

Does DFO Need to Review My Project?

Run of the Charles Boston s Premier Paddling Race

Conceptual Design Report for the Hamilton Dam Modifications Project. Flint, Michigan. Prepared For: City of Flint P.O. Box 99 Flint, MI

Section 7 Complete Green Street Guidelines DRAFT

WELCOME PTH 59N - PTH 101 INTERCHANGE FUNCTIONAL DESIGN STUDY PUBLIC INFORMATION SESSION MONDAY, JUNE 13, :00 P.M. - 8:00 P.M.

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

Capital Metro Downtown Multimodal Station

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Drought Situations and Management Policy in Vietnam

ENGINEERING AND PUBLIC WORKS. Transportation Improvements: Santa s Village Road (MR15) Public Meeting

Fairfax County Parkway Widening Fairfax County

Project Fact Sheet July, 2018

FOREST SERVICE HANDBOOK NATIONAL HEADQUARTERS (WO) WASHINGTON, DC

Development Services Department

Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)

Detroit River International Crossing Study Local Advisory Council/Local Agency Group Meeting September 24, 2008, 7:00 p.m. Southwestern High School

Dry Creek Project. The Dry Creek Habitat Enhancement Project provides a. Slowing velocity, creating refuge are key to habitat project

Cypress Lake Country Club Board of Directors Meeting Minutes

Advanced Construction Techniques. Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)

Yakima/Klickitat Fisheries Project

PE17.1 REPORT FOR ACTION

Community Open House December 13, A project of the Green Infrastructure Center, supported by Skeo Solutions

Following are our comments and findings based on the site visit and review of the complete Traffic Impact Study:

Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements Advertisement for Construction - Progress Report


LaSalle Park Marina Wave Break

RECOMMENDATION. POLICY The Park Board approves all use of lands under its jurisdiction.

Guidance Note. Hydropower Guidance Note: HGN 8 Fish Passage. When do you need to install a fish pass?

June 13, 2016 Tom Garigen Re: Myrtle Beach Golf and Yacht Club Drainage assessment

UTAH RECLAMATION MITIGATION AND CONSERVATION COMMISSION [RC0ZCUPCA0, 155R0680R1, RR ]

LESLIE BARNS & CONNECTION TRACK. Construction Liaison Group Meeting #2

Request for Authorization to Open Public Comment Period

Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements 100% Engineering Design - Progress Report

Hospital Link Project Project Update September 2017

Committed to Service. Development Services. February 21, ACHD Commission. Mindy Wallace, AICP

PROJECT FACT SHEET March 21, 2018

San Antonio Creek Spreading Grounds Rehabilitation Project Ojai Valley, CA

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)

Follow this and additional works at:

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017

Bluffdale/ UDOT South High-T Intersection Project Type Operations

PEABODY SQUARE RECONSTRUCTION PROJECT

Twinning Hwy 11/17 Thunder Bay to Nipigon

League City Parkway at Brittany Lakes/Fennigan Intersection Evaluation/ Traffic Study. Second Public Meeting February 6, 2018

Douglas Park Playground Replacement

COUNTY OF SAN MATEO Parks Department

to the Public Information Centre for the Downtown Traffic Study

Johnwoods Street Closure Summary Response

Public Information Meeting

Stoke Mandeville Parish Council 17 April 2018

DRAFT. System Components. Greenway Trails. Introduction. Trail Types. Zebulon Greenway Master Plan

Focus. Cumberland Whitewater Park. Cumberland Whitewater Park. Read 20 point Comic Sans MS from rear of room. A free flowing natural artificial course

Belvedere Heights Streetlights & Sidewalks Improvements Project

FDOT Treasure Coast Traffic Impact Report

DRAFT. Malibu Bluffs Park Skate Park Facility Site Assessment. Prepared For: The City of Malibu Parks and Recreation Department

FOUR CORNERS POWER PLANT CLOSURE PLAN (b) UPPER RETENTION SUMP FC_ClosPlan_011_

Project Team. Refined Pedestrian Crossing Toolbox. Problem Statement. Aerial of Study Corridor. Crossing Accommodations and Pedestrian Fatalities

With Unmatched Amenities

BUILDING DEPARTMENT VALUATION AND FEES MONTHLY REPORT

CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES

Fairview and Main Local Streets Improvement Plan

Transportation Alternatives Set-Aside Program. June 28, 2017

Interlake Tunnel WRA Board Workshop. August 25, 2014

Transcription:

Boise Whitewater Park Ph II Public Information Meeting 11/2/2016 Presented by: John Tensen P.E., City Engineer Morton McMillen, P.E., McMillen Jacobs Scott Shipley, P.E., S2O Design Walker Christensen- DHM Design Thomas Governale, Parks Superintendent

Presentation Topics Introductions Esther Simplot Park/Boise Whitewater Park Phase IIA Update - John Tensen Boise Whitewater Park Phase IIB Concept Plan Whitewater Park Complex Anticipated Use Tom Governale/Scott Shipley ESP/Whitewater Park/Management Concepts Thomas Governale Major Events Use monitoring Comments Boise Whitewater Park Phase IIB Next Steps/ Construction Schedule/ Approach - Mort McMillen

Overall Project Configuration (McMillen Jacobs 2014) Two Projects ESP Whitewater Park Ph 2 Project Goals Irrigation Delivery (FUDC/BVID) Flood Mitigation River Safety Recreation Active Passive Greenbelt Functionality Habitat Improvement

Esther Simplot Park Funding J.R. Simplot Foundation Design Builder- McMillen Jacobs Park Opened November 2, 2016 Cost > $16M

Whitewater Park Ph IIA Farmers Union Intake Structure Highlights McMillen Jacobs Design- Build Contract with Boise City Construction: October 2015 thru February 2016 8 high x 26 wide x 380 long Concrete Box Culvert Funding City of Boise: Approx. $1.8M

Whitewater Park Ph IIA Farmers Union Intake Structure

Boise Whitewater Park Phase IIB Concept Plan

Whitewater Park Phase IIB Design and Construction Highlights McMillen Jacobs Design-Builder S2O Design DHM Design Phase IIB General Information Funding City of Boise and Albertsons Foundation Estimated Cost $7.0M Design and Permitting May 2016 thru Sept 2017 Construction October 2017 thru May 2019 (two nonirrigation seasons)

Boise Whitewater Park Phase IIB Overall Project Configuration Reach 1 Reach 2 Reach 3 Whitewater Park Phase II ESP

Whitewater Park Complex Expected Use Whitewater Park Programming/Use Concepts Phase I (Thurman Mill) targeted for surfers and experienced kayakers. Can be adjusted for various river flows/use Phase II Reach 1 and 3 Kayakers, Canoeists and SUPs Phase II (Drop Structures) Targeted for all levels of kayakers and SUPs Drop Structure 1- Intermediate/Expert Kayaker. Seasonally adjustable for flows/use Drop Structures 2&3 Novice/Intermediate Kayakers/SUPs Drop Structure 1 use will be monitored over time and adjusted accordingly

Draft Programming Schedule

Boise Whitewater Park Phase IIB Overall Project Configuration Reach 1 Reach 2 Reach 3 Whitewater Park Phase II ESP

Reach 1 Features Wading Area

Reach 1 Features

Reach 2 Updated Concept Plan

Reach 2 Updated Concept Plan River Bank Restoration/Spectator Seating

Reach 2 Updated Concept Plan Drop Structure 1

Reach 2 Updated Concept Plan Drop Structure 1

Reach 2 Updated Concept Plan Drop Structure 1

Reach 2 Updated Concept Plan Drop Structures 2 and 3

Hawea NZ

Whitewater Park Programming/ Management Concepts General Whitewater Park Access from Boise City Side of River Maintain HOA Privacy Parking Concerns Conservation Easement Compliance Major Events Require Permits Access control Parking Traffic management/shuttle service Trash cleanup Security Insurance/Bonding

Next Steps Meet with Stakeholders, Confirm Concept Plan Waterfront HOA Committee (every month) General Public 11/02/16 Permit Agencies (kickoff week of 11/14/16) Farmers Union Ditch Company (monthly) Develop 60% Plans Garden City Approval Waterfront HOA Easement Right-of-Way Agreement Permits (404, Boise River Permit) FUDC Approval

Construction Schedule/Approach Reach 1 Reach 2 Reach 3 Whitewater Park Phase II ESP Reaches 2 and 3: 2017-2018 Start Construction October 2017 Divert river into canal Remove debris from FUDC and place in Veterans Pond for greenbelt Construct drop structures and bank improvements Be out of river by end of February Feb.-Sept. Complete upland improvements (greenbelt, bank improvements, landscaping)

Construction Schedule/Approach Reach 1 Reach 2 Reach 3 Whitewater Park Phase II ESP Reach 1: 2018-2019 Start Construction October 2018 (could be Feb. 2018 if river conditions favorable) Be out of river by end of February 2019 at latest

Construction Schedule/Approach Normal Work Hours 7 a.m. to 7 p.m. Access from Boise City Side of River (except Reach 1) Lighting Control Fish Salvage Greenbelt Closure

Boise Whitewater Park Phase IIB Comments? Comment Cards Questions? Concerns? Concurrence?