THE PANAMA CANAL 31. Army Engineers Installed. And so, either through accident or design, the Canal Com-

ENDS OF THE CANAL 83. much as $70,000 a year to keep each one in commission, and the rough places a plain."

New Locks Alignment at the Pacific Side. Alignment PMD

Condition of Improvements 30 December 2014 Wrangell Harbors, Alaska (CWIS No , )

1-22. KETCHIKAN, ALASKA (Thomas and Bar Point Basins) (CWIS NOS & 87071) Condition of Improvement 30 September 2007

Ketchikan Harbors Thomas Basin and Bar Point Harbor

CORPS FACTS. Harbor Dredging U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG

1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, 12270, & 10422) Condition of Improvement 30 September 2012

Canal traffic performance Grain cargo through the Panama Canal Panama Canal Expansion program Conclusion

1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, & 10422) Condition of Improvement 30 September 2009

Canal Traffic performance Grain cargo through the Panama Canal Panama Canal Expansion program Conclusion

1-44. SITKA HARBOR, ALASKA (Western Channel, Crescent Bay Basin, Channel Rock Breakwaters) (CWIS NOS , 16840, 10322, 55030, 13787)

VIDEO AUDIO Slide 1. Slide 2 Old timey 18 th century map of east coast

Cordova Harbor Page 2 of 9

Nome Harbor Page 2 of 12

Juneau Douglas Harbor

USA PCC MISSION World expectation on Panama s capacity to manage and operate the Panama Canal. Main Differences in Business Models.

C C S Technical Information

R. Randall Center for Dredging Studies Texas A&M University

County of Santa Barbara Permit Option Analysis Goleta Beach JULY 13, 2017

BookletChart. Intracoastal Waterway Matecumbe to Grassy Key NOAA Chart A reduced-scale NOAA nautical chart for small boaters

Ninilchik Harbor Page 2 of 11

Comparison of Predicted and Measured Shoaling at Morro Bay Harbor Entrance, California

PANAMA CANAL AUTHORITY

CALCASIEU SALINITY STRUCTURES. HYDRODYNAMIC MODELING (To Support Design of Salinity Barriers)

LOCAL NOTICE TO MARINERS

EIGHTH GRADE. REVIEW FOR JANUARY.

Feasibility Study for Restoration of Titlow Lagoon Fish Passage. South Puget Sound Salmon Enhancement Group

Dredging Keeping Our Underwater Highways Open

Shoalwater Bay Shorline Erosion Dredging

APPENDIX C. Fluvial and Tidal Hydraulics Report

Mr. Barry Dragon, March 16, 2015 Commander, Seventh Coast Guard District (dob) Brickell Plaza 909 S.E. 1st Ave. Miami, FL

Wexford Harbour. Yachting Guide. Navigation

VESSEL TRANSIT SCHEDULING AT THE PANAMA CANAL NUMBER AND ORDER OF VESSELS IN THE SCHEDULE

Louisiana CPRA SJB Group, Baton Rouge Coastal Engineering Consultants U.S. Army Corps of Engineers Federal and State PDT Members

APPENDIX D REAL ESTATE PLAN

Bear Cove Coastline Reestablishment

SECTION TRAFFIC REGULATIONS

ST. LOUIS SECTION PROJECT OF THE YEAR AWARD

Exercise (3): Open Channel Flow Rapidly Varied Flow

Grand Haven Charter Township. Facts and Trends Affecting Grand Haven Charter Township January 2017

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b)

APPENDIX B1. CROSS-REFERENCE GUIDE TO THE OHIO REVISED CODE

Permit and Inspection Requirements for Swimming Pools

La Quinta Channel Extension Port of Corpus Christi Ingleside, Texas. Mark Coyle

Exercise (4): Open Channel Flow - Gradually Varied Flow

Building The Golden Gate Bridge You Choose Engineering Marvels

Coastal Harbors and Waterways, NC (Shallow Draft Navigation) (O&M)

Forth Ports Limited. Ruling Depths & Under Keel Clearances

Geology 15 Activity 5 A Tsunami

LIST OF CORRECTIONS. 14 / July /052(T) - 07/125(T) - 08/136(T) - 08/137(T) - 12/177(T) - 15/212(T) - 18/232-22/285(T)

PODFW Fish Passage Rules and Statutes Frequently Asked Questions

The proper location of the mouth of the Salinas River is a very difficult problem. - U.S. Surveyor General for California (1879)

Okeechobee Waterway Speed Restrictions

Impact of Dredging the Lower Narrow River on Circulation and Flushing

DRAFT. October 17, 2014 File No Mr. Brendhan Zubricki Town Administrator Essex Town Hall 30 Martin Street Essex, MA.

Norwalk Harbor: The Jewel of Long Island Sound. A Presentation by the Norwalk Harbor Management Commission

1.1 This by-law shall be known as "the pool by-law"; In this by law;

Update on Canadian Research Vessels Ship Procurement Projects

THE CONCIIUDA DAM AND WASTEWAY 415

New Hampshire Live Free or Die Jul 10, 2013 ( ) Jerry D. Petersen

NATIVE FISH CONSERVATION PLAN FOR THE SPRING CHINOOK SALMON ROGUE SPECIES MANAGEMENT UNIT

I would like to welcome Parish President VJ St. Pierre, Councilwoman Carolyn Schexnaydre and Councilman Terry Authement who are here.

Volume and Shoreline Changes along Pinellas County Beaches during Tropical Storm Debby

Tidal Energy. Definition of Tidal Energy. Tidal energy is energy derived from the movement of the ocean tides.

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b)

The St. Lawrence Seaway--To Mid-Continent by Ocean Vessel

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

Harbor Operations. PANAMA CANAL AUTHORITY (ACP) Executive Vice Presidency for Operations Building 729, Balboa-Ancon Panama, Panama

TRANSITING THE PANAMA CANAL, WITHOUT AN AGENT

PNWA Conference Update

SHOOTING ISLAND RESTORATION: LIVING SHORELINE AND HABITAT CONSTRUCTION

Colusa Basin Drain Watershed Fish Stranding Tour Concept Paper Mike Hendrick and Brycen Swart NMFS

Components of a Barrage

1. What is the top priority when working on Canadian Pacific (CP) property? 2. When working on CP property what must all Contractors comply with?

Geology 10 Activity 8 A Tsunami

APPENDIX M DREDGED MATERIAL MANAGEMENT PLAN (DMMP) FINAL INTEGRATED FEASIBILITY REPORT AND ENVIRONMENTAL ASSESSMENT

5/7/2013 VIA . RE: University Village Safeway Expansion (P13-019)

STRUCTURE S-65 PURPOSE SPILLWAY OPERATION

Adapting and Developing Hands Free Mooring for Navigation Locks Speaker: Benoit Nolet

Request Number IR1-12: Flow Passage. Information Request

Ocean Structures and Material Prof. Dr. Srinivasan Chandrasekaran Department of Ocean Engineering Indian Institute of Technology, Madras

Chapter 6: Santander case

WINDING HOLES towards a specification for the ideal turning place

Pacific Ocean Division. Navigation Program Overview. Association of Pacific Ports 2016 Winter Conference Waikaloa, Hawaii.

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL

12/4/2016 VIA . RE: Grocery Outlet Del Paso (DR16-328)

UPPER BEACH REPLENISHMENT PROJECT RELATED

JO SEPH PENNELL S PICT'RES O F T H E P A N A M A C A N A L FOURTH EDlTION

The Panama Canal and Public Health

General Notes. Project No /15/2018 Page 1 of 1

Orange County MPA Watch A n n u a l R e p o r t

STRATEGIC PLANNING FOR DEVELOPMENT OF THE OREGON SHORT LINE TERMINUS HISTORIC DISTRICT

JAP Additional Information Sheet

Shorelines Earth - Chapter 20 Stan Hatfield Southwestern Illinois College

Design of Spillway Upgrades

DREDGING. with particular emphasis on Oil and Gas activities in Canada

Union Pacific Railroad

Beach Nourishment Impact on Beach Safety and Surfing in the North Reach of Brevard County, Florida

STANDARD OPERATING PROCEDURES

Transcription:

F 1563 ROOK COMPANY PANAMA CANAL BANCROFT LIBRARY

University of California Berkeley

TTTe PANAMA CANAL I The Land Divided Fin The World Unvted

' A Pidtorial Review of its Construction together with Statistical Information COPYRIGHT 1912 BY JAMES H. ROOK COMPANY. CHICAGO

ZONE POLICE These men are a semi-military organization very like the Canadian Mounted Police. They are a splendid body of men and have brought law and order into the Zone. The majority of the men are Spanish War Veterans

The Panama Canal VERY American citizen justly takes pride in this great national undertaking, and interest deepens as its completion draws near. We have therefore gathered the authentic views contained in this book, and present them to our friends and patrons so they may see the actual construction of this great Canal, which "divides the land and unites the world." COPYRIGHT BY UNDERWOOD i UNDERWOOD COLONEL GEO. W. GOETHALS Chief Engineer of the Panama Canal, in his Office at Panama The greatest living engineer in charge of the biggest engineering undertaking in the wprld not only an engineer but a highly efficient business executive who has "made the dirt fly" to such a good purpose that the great ditch will be completed before the schedule time, and within the cost provided by the Government. In addition to the views, we present valuable statistics compiled direct from official Government reports, giving in concise form a good idea of the magnitude of this Thus the book possesses historical interest enterprise. and educational value, especially for the rising generation, which will be even greater after the Canal is completed, as it will then be impossible to obtain these views.

will HE entire length of the Canal from deep water in the Atlantic to deep water in the Pacific is about 50 miles. Its length from shore-line to shore-line is about 40 miles. In passing through it from the Atlantic to the Pacific, a vessel will enter the approach channel in Limon Bay, which will have a bottom width of 500 feet and extend to Gatun, a distance of about seven miles. At Gatun, it will enter a series of three locks in flight and be lifted 85 feet to the level of Gatun Lake. It may steam at full speed through this lake, in a channel varying from 1,000 to 500 feet in width, for a distance of about 24 miles, to Bas Obispo, where it will enter the Culebra Cut. It will pass through the Cut, a distance of about nine miles, in a channel with a bottom width of 300 feet, to Pedro Miguel. There it will enter a lock and be lowered 30 1-3 feet to a small lake, at an elevation of 542-3 feet above sea level, and will pass through this for about \y 2 miles to Miraflores. There it will enter two locks in series and be lowered to sea level, passing out into the Pacific through a channel about S l / 2 miles in length, with a bottom width of 500 feet. The depth of the approach channel on the Atlantic side, where the maximum tidal oscillation is 2}^ feet, will be 41 feet at mean tide, and on the Pacific side, where the maximum oscillation is 21 feet, the depth will be 45 feet at mean tide. Throughout the first 16 miles from Gatun, the width of the Lake channel. be 1,000 feet; then for 4 miles it will be 800 feet, and for 4 miles more, to the northern entrance of Culebra Cut at Bas Obispo, it will be 500 feet. The depth will vary from

85 to 45 feet. The water level in the Cut will be that of the Lake, the depth 45 feet, and the bottom width of the channel 300 feet. Three hundred feet is the minimum bottom width of the Canal. This width begins about half a mile above Pedro Miguel locks and extends about 8 miles through Culebra Cut, with the exception that at all angles the channel is widened sufficiently to allow a thousand-foot vessel to make the turn. The Cut has eight angles, or about one to every mile. The 300-foot widths are only on tangents between the turning basins at the angles. The smallest of these angles is 7 36', and the largest 30. The Canal Zone contains about 448 square miles. It begins at a point three marine miles from mean low water mark in each ocean, and extends for five miles on each side of the center line of the route of the Canal. It includes the group of islands in the Bay of Panama named Perico, Naos, Culebra, and Flamenco. The cities of Panama and Colon are excluded from the Zone, but the United States has the right to enforce sanitary ordinances in those cities, and to maintain public order in them in case the Republic of Panama should not be able, in the judgment of the United States, to do so. Of the 448 square miles of Zone territory, the United States owns the larger portion, the exact amount of which is being determined by survey. Under the treaty with Panama, the United States has the right to acquire by purchase, of by the exercise of the right of eminent domain, any lands, buildings, water rights, or other properties necessary and convenient for the construction, maintenance, operation, sanitation, and protection of the Canal, and it can, therefore, at any time acquire the lands within the Zone boundaries which are owned by private persons.

Canal Statistics Authorized by Act of Congress, June 28, 1902 Length from deep water to deep water (miles) Length from shore-line to shore-line (miles) Bottom width of channel, maximum (feet) Bottom width of channel, minimum, 9 miles, Culebra Cut (feet) Locks, in pairs Locks, usable length (feet) Locks, usable width (feet) Gatun Lake, area (square miles) Gatun Lake, channel depth (feet)... Culebra Cut, channel depth (feet)... Excavation, estimated total (cubic yards) Excavation, amount accomplished May 1, 1911 (cubic yards) Excavation by the French (cubic yards) Excavation by French, useful to present Canal (cubic yards) 182,537,766 137,750,520 78,146,960 29,908,000 Excavation by French, estimated value to Canal $25,389,240 Value of all French property $42,799,826 Concrete, total estimated for Canal (cubic yards) 5,000,000 Time of transit through completed Canal (hours) 10 to 12 Time of passage through locks (hours) 3 Relocated Panama Railroad, estimated cost $9,000,000 Relocated Panama Railroad, length (miles) 47.1 Canal Zone, area (square miles) 448 Canal and Panama Railroad force actually at work (about) 35,000 Canal and Panama Railroad force, American (about) 5000 Cost of Canal, estimated total $375,000,000 Number of men employed, about 45,000 Work begun by Americans May 4, 1904 Official date of completion Jan. 1, 1915

Torro Point Breakwater, from the Sea. One Mile of Trestle Completed

Gatun Lower Locks, Looking South, Showing Middle and Upper Locks in the Distance

Gatun Dam, East Section, Showing Discharge from Suction Dredge, with Hydraulic Fill, Looking West

Gatun Upper Locks, View Looking North, Showing Progress of Construction of Upper Gates in the East Chamber

Point No. 4, Near Gorgona, Looking South, Showing Completed Channel, 500 Feet Wide

Culebra Cut, Looking North, Between Contractor's Hill and Gold Hill

Pedro Miguel Locks, East Chamber Looking North

Culebra Cut at Empire Suspension Bridge. Bottom of Cut to be 57 Feet Lower where the Cars Stand

Bird's Eye View of Pedro Miguel Locks, Looking South

A View Looking South from Top of Berm Crane at Pedro Miguel, Showing Stoning Trestles, Berm Crane and General View of Locks

Miraflores Upper Locks. General View, Looking North from Lower East Bank

A View of one of the Berm Cranes as they appear at Miraflores. They are used for Mixing and Conveying Concrete

Showing the Portable Concrete Mixers in Use at Miraflores Locks

Automobile Railway Bus, used by the U. S. Government at Panam

General View of Panama Bay and Ancon Hill

A