BEAR CREEK PARK AND RIDE

Similar documents
PROJECT OVERVIEW. Auburn Station Access Improvements Project

7 NE 145TH STREET STATION TOD POTENTIAL

Transportation Trends, Conditions and Issues. Regional Transportation Plan 2030

Aurora Corridor to E Line

3.0 Future Conditions

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc.

Rail Station Fact Sheet University of Dallas Station

ORDINANCE NO

Chapter 5 Future Transportation

APPENDIX E Needs Assessment

SETTINGS AND OPPORTUNITIES MOBILITY & ACCESS

Eliminate on-street parking where it will allow for a dedicated bus only lane %

METRO Light Rail: Changing Transit Markets in the Phoenix Metropolitan Area

Speed Limits Study and Proposal. Public Input Session: 8/14/13

Interim Transit Ridership Forecast Results Technical Memorandum

Active Transportation on the Rise

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW.

C C C

Employment 8,881 17,975 9,094. Households 18,990 31,936 12,946

BUILDING THE CASE FOR TRAVEL OPTIONS IN WASHING TON COUNTY. Image: Steve Morgan. Image: Steve Morgan

Everett Transit Action Plan. Community Open House November 16, 2015

Topics To Be Covered. Summarize Tier 2 Council Direction Discuss Mill and Ash Alternatives Next Steps

Rail Station Fact Sheet DFW Airport North Station* (*station under construction with anticipated start of service in late 2018)

SOUND TRANSIT AT A GLANCE

Transportation Impact Study for Abington Terrace

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

Title VI Fare Change Equity Analysis

Comments EXECUTIVE SUMMARY

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

Bellevue Transportation: Challenges, Opportunities and Priorities Bellevue Downtown Association September 20, 2018

Transit Ridership - Why the Decline and How to Increase. Hosted by the. Virginia Transit Association

complete streets design and construction standards public primer City of Edmonton

Dear City Council Members,

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions

Plant City Walk-Bike Plan

Rail Station Fact Sheet Downtown Carrollton Station

Methodology for Determining Pedestrian Activity Factors

RZC Appendix 8A Marymoor Subarea Street Requirements

Measuring and Communicating Mobility:

State Highway 44/State Street High Capacity Corridor

Bike/Multipurpose Trail Study for Glynn County, Georgia MAY 16, 2016

CENTRAL AND EAST CORRIDORS

1999 On-Board Sacramento Regional Transit District Survey

95 th Street Corridor Transportation Plan. Steering Committee Meeting

Bellevue Downtown Association Downtown Bike Series

EXECUTIVE SUMMARY: TRANSIT-ORIENTED DEVELOPMENT IN SMITHS FALLS, ONTARIO; A COMPARISON BETWEEN TWO SITES

APPENDIX H EXISTING TRAFFIC CONDITIONS ANALYSIS

3.0 PROJECT DESCRIPTION

EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW Study Scope Study Area Study Objectives

Waterford Lakes Small Area Study

Metropolitan Council Transportation Committee

Summary of Feedback Received during Speak Up Broward s 22 Speakers Bureau Engagements from December 10, 2013 through April 2, 2014

Rail Station Fact Sheet UNT Dallas Station

Guidelines for Providing Access to Public Transportation Stations APPENDIX C TRANSIT STATION ACCESS PLANNING TOOL INSTRUCTIONS

Access BART: TOD and Improved Connections. October 29, 2008

NACTO Designing Cities 2014 Dongho Chang, City Traffic Engineer October 23, 2014

CONNECTING PEOPLE TO PLACES

Transit. Transit Ridership in Decatur. 9 Transit CHAPTER 9

US 41 COMPLETE STREETS CORRIDOR PLANNING STUDY from University Parkway to Whitfield Avenue

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

CURBSIDE ACTIVITY DESIGN

5/7/2013 VIA . RE: University Village Safeway Expansion (P13-019)

Land Use and Urban Design

CHAPTER 3. Transportation and Circulation

Project Narrative. Albuquerque, NM. July 31, 2015

TRANSPORTATION ASSESSMENT

Alaskan Way, Promenade, and Overlook Walk Final EIS

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Transportation 2040 Update: Travel Trends. Transportation Policy Board June 9, 2016

5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY

Traffic Impact Memorandum. May 22, 2018

Sustainable Transportation Planning in the Portland Region

M Street SW-Southeast Federal Center

Community Task Force March 14, 2018

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

SANTA CLARA COUNTYWIDE BICYCLE PLAN August 2008

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

City of Seattle Edward B. Murray, Mayor

Rail Station Fact Sheet CityLine/Bush Station

Philadelphia Bus Network Choices Report

CONTEXT SENSITIVE STREETS STANDARDS COMMITTEE

1. Operate along freeways, either in regular traffic lanes, in high-occupancy vehicle (HOV) lanes, or along the shoulders.

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A

Executive Summary Route 30 Corridor Master Plan

Connecting Sacramento: A Trip-Making and Accessibility Study

Item B1 November 19, 2009

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for:

4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL

ARRENTON RANSPORTATION

ATTACHMENT 4 - TDM Checklist. TDM Checklist Overview

3/10/2016 VIA th Street, Suite 203 Sacramento, CA

EUCLID AVENUE PARKING STUDY CITY OF SYRACUSE, ONONDAGA COUNTY, NEW YORK

List of Exhibits...ii

ACTIVE TRANSPORTATION/NONMOTORIZED TRANSPORTATION

Roadways. Roadways III.

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

I-105 Corridor Sustainability Study (CSS)

Transcription:

BEAR CREEK PARK AND RIDE 7760 178th Pl NE, Redmond, WA 98052 700 Average weekday transit boardings 283 Parking spaces Owned by King County Metro Served by Sound Transit and King County Metro Bear Creek Park and Ride is located in Redmond, east of downtown. It is served by five King County Metro routes and Sound Transit route 545, which provides all-day frequent service to Overlake and downtown Seattle, and departs Bear Creek Park and Ride every six minutes during the AM peak. Bear Creek Park and Ride has 283 surface parking spaces, which are typically fully utilized by 7:30 am. Figure 1: 3-Mile Context Map TRANSIT ACCESS ASSESSMENT: DRAFT BEAR CREEK PARK AND RIDE 1

Bear Creek Park and Ride was constructed in 1989, largely predating much of the development that has taken place around it, including the Microsoft Millennium campus to the northeast and the Target and Home Depot to the southwest. This and other ongoing development means there is little adjacent capacity for additional surface parking. The area around Bear Creek Park and Ride is made up of large land parcels in a superblock structure occupied by large retailers with ample surface parking, large package and freight distribution centers, as well as commercial (the Microsoft Millennium campus) and light industrial uses. Figure 2: Half-mile Context Map 2 BEAR CREEK PARK AND RIDE TRANSIT ACCESS ASSESSMENT: DRAFT

LAND USE, POPULATION, AND EMPLOYMENT The area in the immediate vicinity of Bear Creek Park and Ride is made up of commercial and industrial land uses. Residential uses are found in the northwest portion of Figure 3 below, while additional residents live just to the south. There are currently more jobs than people in a ½-mile radius of Bear Creek Park and Ride, a trend that is projected to continue through 2040. The City of Redmond projects that Southeast Redmond the district where Bear Creek Park and Ride is located will see significant job growth over the next two decades. Current Population: 4,800 Current Employment: 7,800 2040 Population: 7,300 (+52%) 2040 Employment: 10,300 (+32%) Figure 3: Existing Land Use Figure 4: Future Land Use Development in the vicinity of Bear Creek Park and Ride has continued in recent years with hotel, condominium, and mixed-use projects in the pipeline. Figure 6 shows a new mixed-use project under construction just across the street from Bear Creek Park and Ride. Mixed use Hotel Transit Operations (private) Hotel Condos Future Light Rail Station Figure 5: Future Development Figure 6: New Mixed-Use Construction Across Bear Creek Park and Ride TRANSIT ACCESS ASSESSMENT: DRAFT BEAR CREEK PARK AND RIDE 3

ROADWAY CHARACTERISTICS Bear Creek Park and Ride sits just northeast of the interchange of SR 520 and SR 202, which divides Southeast Redmond from downtown Redmond. Figure 7 below shows the traffic volumes, posted speeds, and bicycle facilities in the vicinity of Bear Creek Park and Ride. Avondale Road NE and Union Hill Road are highvolume roads connecting communities east and northeast with Redmond and to SR 520 and points west. The west portion of NE 76th Street also sees high traffic volumes, particularly as the primary access point to the large retailers just north and south of that road. Traffic volumes to the southeast of Bear Creek Park and Ride are much lower. Figure 8: Looking east on Union Hill Road There currently is only one signalized crossing for pedestrians on Union Hill Road. Figure 9: Sidewalks surrounding Bear Creek Park and Ride Bear Creek Park and Ride was constructed in 1989, just before the Americans with Disabilities Act was passed, meaning that the sidewalks are narrower and less accessible than they would be if built today. Figure 7: Roadway Characteristics 4 BEAR CREEK PARK AND RIDE TRANSIT ACCESS ASSESSMENT: DRAFT

Figure 10 shows a 15-minute walkshed from the Bear Creek Park and Ride. The superblock structure of the blocks limits the distance people can travel on foot because of the lack of through connections, particularly north and west. NONMOTORIZED CONNECTIVITY The nonmotorized environment around Bear Creek Park and Ride has some positive features and some negative features. Utilizing the Nonmotorized Connectivity Tool developed by King County Metro and Sound Transit allows for a more precise analysis of the ease or difficulty of accessing Bear Creek Park and Ride using nonmotorized modes. Examining the City of Redmond s bicycle system plan also gives insight into the investments that the City expects to make to improve the nonmotorized environment. Figure 10: 15-Minute Walkshed Figure 11 shows the current bicycle facilities near Bear Creek Park and Ride and the future bicycle facilities per the City of Redmond s Bicycle System Plan. Major investments focus on improving the SR 520 and SR 202 interchange and connections to downtown Redmond. Figure 11: Bicycle System Plan TRANSIT ACCESS ASSESSMENT: DRAFT BEAR CREEK PARK AND RIDE 5

Figure 12 shows the existing nonmotorized connectivity index using the Nonmotorized Connectivity Tool. The long stretch of Union Hill Road just north and east of Bear Creek Park and Ride is found to have poor nonmotorized connectivity as it has few signalized crossings for nonmotorized users to safely cross this road. Other major arterials east of Bear Creek Park and Ride appear red for the same reason. Figure 12: Current Nonmotorized Connectivity Index The future projects that were analyzed with the Nonmotorized Connectivity Tool are mostly new trails and new crossings, but for the most part, aren t in the vicinity of the Bear Creek Park and Ride. Figure 13: Analyzed Future Projects As a result of the location of the future projects described above, there is not a marked improvement in the immediate vicinity of the Bear Creek Park and Ride. One reason for this is that a new signalized crossing on Union Hill Road was not part of the future projects analyzed. In reviewing these findings with City of Redmond staff, it was surmised that many of the future projects would serve to make places with good nonmotorized connectivity even better, rather than address those places with poor nonmotorized connectivity. Figure 14: Future Nonmotorized Connectivity Index 6 BEAR CREEK PARK AND RIDE TRANSIT ACCESS ASSESSMENT: DRAFT

TRANSIT SERVICE Route Service Period Peak Headway Off-Peak Headway Travel Time On-Time Performance Average Weekday Ridership (2014) Destinations Served ST 545 All-day 6 15 40-8,617 Downtown Seattle KCM 216 AM/PM Peak 30-70 82% 900 Issaquah, Downtown Seattle KCM 248 All-day 30 60 34 88% 1,200 Kirkland KCM 268 AM/PM Peak 30-40 82% 400 Downtown Seattle KCM 269 AM/PM Peak 20 60 49 75% 600 Issaquah Figure 15: Transit Travelshed Figure 16 shows that almost half of the boardings at Bear Creek Park and Ride occur in the AM peak and that Sound Transit route 545 and King County Metro route 268 account for the majority of these boardings (it should be noted that while King County Metro route 216 does begin at Bear Creek Park and Ride, it heads south through Sammamish and Issaquah before proceeding to downtown Seattle, making it less attractive than the two other routes serving downtown Seattle). Bear Creek Park and Ride is served by five King County Metro routes and one Sound Transit route. Metro route 248 is an all-day route serving the City of Kirkland and the residential area along Avondale. Metro route 269 is a peak bi-directional route connecting Issaquah, Sammamish, Southeast Redmond and Overlake. Metro routes 216 and 268 are peak-period routes serving downtown Seattle. Sound Transit route 545 is an all-day route serving downtown Seattle with peak headways of 6 minutes in the AM peak and 15 minute all-day service and is by far the most used bus route serving Bear Creek. Figure 15 shows the places a person can travel within one hour in the AM peak from Bear Creek. 500 400 300 200 100 0 PM Peak 22% ST 545 KCM 268 KCM 248 KCM 269 KCM 216 Midday 21% Figure 16: Daily Boardings by Route and Time of Day Overnight Late 4% Evening 5% Total Avg. Daily Boardings: 698 Overnight Late Evening PM Peak Midday AM Peak AM Peak 48% Figure 17 and 18 demonstrate that while transit service at Bear Creek Park and Ride does serve a downtown Seattle commuter market, Bear Creek is a destination as well, as evidenced by the number of alightings in the AM peak and in particular the number of boardings in the PM peak. 0 50 100 150 200 250 0 50 100 150 200 250 ST 545 KCM 268 KCM 248 KCM 269 210 94 ST 545 51 182 99 4 KCM 268 2 113 11 34 13 KCM 248 16 7 20 12 KCM 269 13 7 KCM 216 Boarding 1 Boarding 1 KCM 216 Alighting 4 Alighting Figure 17: Boardings and Alightings in AM Peak Period Figure 18: Boardings and Alightings in PM Peak Period TRANSIT ACCESS ASSESSMENT: DRAFT BEAR CREEK PARK AND RIDE 7

PARKING CHARACTERISTICS Figure 20 shows the total capacity and utilization of Bear Creek Park and Ride as well as its most similar nearby equivalents, the Redmond Park and Ride in downtown Redmond and the Overlake Transit Center. All of these facilities have comparable transit service and all are fully utilized and have been over the past several years. Indeed, Bear Creek Park and Ride experienced several years significantly above capacity before increased enforcement of parking in fire lanes brought the utilization rate down to its current 98%. 110% 105% 100% 95% 90% 105% 100% 95% 105% 102% 100% 108% 108% 101% 99% Figure 20: Bear Creek, Redmond, and Overlake Utilization 104% 103% 100% 100% 2010 2011 2012 2013 2014 * Increased enforcement of parking in fire lanes 98%* Bear Creek Park and Ride (283 spaces) Redmond Park and Ride (377 spaces, 1.4 mile away from Bear Creek) Overlake Transit Center (222 spaces, 3.8 mile away from Bear Creek) Figure 19: Enforcement was increased due to parking in the aisles in Bear Creek Park and Ride 16 Vanpools using Bear Creek Park and Ride 6.25 Average vanpool occupancy In addition to fixed route transit users, 16 vanpool groups (with an average occupancy of 6.25 riders) use Bear Creek Park and Ride as a meet-up location, though it s uncertain precisely how many people park at Bear Creek to meet up with their vanpool groups. King County Metro conducted a license plate survey of Bear Creek Park and Ride users in the summer of 2014, which is depicted in Figure 21. It demonstrates that many Bear Creek users are arriving from points east. Many users are arriving from more distant areas, with 42% of vehicles registered at addresses that are 5 or miles from the Bear Creek Park and Ride. King County Legend %2 Bear Creek P&R Located Plates 1 Mile Rings (1 to 5) %2 Park and Ride Lots Freeways Major Roads 120 110 100 90 80 70 60 50 40 30 20 10 0 User Distance from Home (mi) 11 21 38 50 29 106 1 2 3 4 5 >5 Statistics # Located Plates 255 # Stalls 283 Q1 2015 Utilization 98.2% % of Stalls Located 90.1% Minimum (mi) 0.5 Maximum (mi) 40.9 Median (mi) 4.1 Mean (mi) 5.4 Std. Dev. 4.7 Distance from P&R % of Located Plates 0-1 mi 4% 1-2 mi 8% 2-3 mi 15% 3-4 mi 20% 4-5 mi 11% 5+ mi 42% Figure 21: Driver Origin Map of Bear Creek Park and Ride (2015) 8 BEAR CREEK PARK AND RIDE TRANSIT ACCESS ASSESSMENT: DRAFT

FINDINGS In consultation with City of Redmond staff and the Transit Access Working Group that oversaw and provided guidance on this Transit Access Assessment, the following findings organized by Urban Form, Transit Service, and Parking were reached regarding transit access at Bear Creek Park and Ride. Urban Form Superblock structure limits nonmotorized opportunities Union Hill Road is a treacherous crossing for pedestrians Development has happened after Bear Creek Park and Ride was built, with much of this development industrial and commercial in nature meaning Bear Creek has also become a destination for transit riders Continued employment growth expected in Southeast Redmond Transit Service Half of total boardings occur in the AM peak: Bear Creek as origin Significant number of boardings in the PM peak suggest that Bear Creek is also a destination Some transit-to-transit connections happening already, with potential opportunity to improve Uncertainty for how Bear Creek will change as East Link arrives in Southeast and downtown Redmond Parking Bear Creek has been oversubscribed for a long time If parking capacity were expanded, it would likely need to be structured parking as available land has been developed Upstream parking is underutilized Some vanpool use happens at Bear Creek TRANSIT ACCESS ASSESSMENT: DRAFT BEAR CREEK PARK AND RIDE 9