Complete Streets. Complete Streets and other City Initiatives. City & County Initiatives. Honolulu Complete Streets Program

Similar documents
RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

City of Novi Non-Motorized Master Plan 2011 Executive Summary

Beyond First First Last Last Mile Strategies. APA National Conference April 3, 2016 Chelsea Richer, AICP Fehr & Peers

Total Project Cost Federal Funds Local Match

City of Charlottesville Bicycle and Pedestrian Master Plan Update

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

ACTIA Programs Annual Compliance Report Reporting Year Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

9/25/2018. Multi-Modal Level of Service (MMLOS) Bianca Popescu, Transportation Planner

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

Paoli Road Improvement Feasibility Study

Community Task Force July 25, 2017

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

MAKE YOUR PLACE IN CHANNELSIDE

Road Diets: Reconfiguring Streets for Multi-Modal Travel

Washington Metropolitan Area Transit Authority Board Action/Information Summary. MEAD Number:

Living Streets Policy

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

A Complete Streets Policy for Saratoga Springs. Presented By: Shared Access Saratoga

What Is a Complete Street?

INDOT Complete Streets Guideline & Policy

El Centro Mobility Hub

STEERING COMMITTEE MEETING June 17, Streetscape Overview Burlington Comprehensive Master Plan

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Introduction. North 12 th Complete Street Project Overview

Arlington s Master Transportation Plan

CONNECTING PEOPLE TO PLACES

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

Appendix C 3. Bicycle / Pedestrian Planning

AMATS Complete Streets Policy

12/4/2016 VIA . RE: Grocery Outlet Del Paso (DR16-328)

Community Transportation Plan Acknowledgements

City of Wilsonville 5 th Street to Kinsman Road Extension Project

C C C

Walking & Bicycling Questionnaire for Candidates

Priority 1: Ala Wai Pedestrian and Bicycle Safety and Mobility Project

Active Transportation Access to Transit

Executive Summary Route 30 Corridor Master Plan

Complete Streets: Policy to Pavement

TRANSPORTATION TRAINING TOPICS. April 6, 2010

Perryville TOD and Greenway Plan

ACTIA Programs Annual Compliance Report Reporting Year Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

ACTIVE TRANSPORTATION

Pedestrian, Bicycle and Traffic Calming Strategic Implementation Plan. January 18, 2011

Mayor s Bicycle Advisory Council. Wednesday, December 13 th, 2017

Technical Working Group November 15, 2017

Bicycle Facilities Planning

Walkable Communities: National Best Practices and Applications in Memphis, TN

11/28/2016 VIA

KEARNY MESA COMMUNITY PLAN UPDATE

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Hale iwa Improvement District Project

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

2.0 Existing Conditions

Community Task Force November 15, 2017

JOINT PARTNERSHIPS: Working Together To Support Light Rail in Santa Monica

Off-road Trails. Guidance

USDOT Bicycle and Pedestrian Safety Initiative: Safer People and Safer Streets. Barbara McCann, USDOT Office of Policy

Ballston Station Multimodal Study WMATA and Arlington County. Meeting Minutes

Hamilton Transportation Master Plan Public Consultation. Public Information Centre One Summary

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

Table of Contents Introduction. 2 Purpose of the Plan...2 The Benefits of Walking and Bicycling...3 Vision and Goals of the Plan...

Complete Streets. Designing Streets for Everyone. Sarnia

COMPLETE STREETS A STEP FORWARD ITE District 10/FSITE Annual Meeting November 3, 2015

Multimodal Connectivity: Walking & Wheeling to Transit

ACTIA Programs Annual Compliance Report Reporting Year Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments

7/23/2017 VIA . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811

Corridor Advisory Group and Task Force Meeting #10. July 27, 2011

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

CITY OF PORTSMOUTH PLANNING DEPARTMENT

Safe Streets. City of Lake Forest Park. March 21, 2017

Planning Regionally With Transit

Welcome! Public Open House on UBC s Transportation Plan

complete streets design and construction standards public primer City of Edmonton

Physical Implications of Complete Streets Policies

RZC Appendix 8A Marymoor Subarea Street Requirements

COMPLETE STREETS POLICY Exhibit A to Ordinance

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

Chapter 9: Pedestrians and Bicyclists

8/31/2016 VIA . RE: Freeport Arco Fuel Station (P16-039)

Guidance. ATTACHMENT F: Draft Additional Pages for Bicycle Facility Design Toolkit Separated Bike Lanes: Two-Way to One-Way Transitions

Providence Downtown Transit Connector STAKEHOLDER MEETING #2. Stakeholder Meeting #1 October 24, 2016

Vision to Action Community Coalition February 14, 2014 Briefing

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Multimodal Through Corridors and Placemaking Corridors

RE: Park Plaza Walgreens (P12-016)

Board-Approved Funding Awards for Cycle 4 Active Transportation Grant Program Projects (in Order of Project Rankings) Approved on

Vision. Goals and Objectives. Walking

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Michael Parmer, Management Aide, City Manager's Office

3/10/2016 VIA th Street, Suite 203 Sacramento, CA

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

MASTER BICYCLE AND PEDESTRIAN PLAN

Prince George s County plans, policies, and projects

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

7 Complete Streets & Roadway Aesthetics

Bicycle-Pedestrian Master Plan Update

Transcription:

City & County Initiatives Complete Streets and other City Initiatives Health and the Built Environment Hawaii Public Health Conference Mark Garrity Department of Transportation Services City & County of Honolulu October 9, Complete Streets Rail Station Access Program Protected Bike Lane Network Bike Share Secure Bike Storage Honolulu Complete Streets Program Complete Streets ROH 12- Requires the City to: Employ a multi-modal approach and incorporate complete streets features in the planning, design, construction, maintenance and operation of transportation facilities and projects Goals of Complete Streets Program Improve Safety Context sensitive solutions Accessibility and mobility for all Balance the needs and comfort of all modes and users Use national best practices Provide non-motorized options Encourage physical activity Think: long-term investment Build partnerships statewide Incorporate trees and landscaping 5 Complete Streets Checklist Consistent with requirements of Ordinance 12- Based on national best practices Being used now by DPP, DTS, DFM and DDC Completed checklists being filed with DPP 6 1

Demonstration Projects Complete Streets Design Manual Updates designs for many standard details Consistent with national best practices Based on input from many stakeholders Will replace outdated, auto-centric standards Low-cost, simple materials Improve safety and provide opportunities for walking, bicycling Work with private partners where possible Moiliili Aiea 7 Kailua Implementation Study Projects Ulune Street Demonstration Project Installed in 1 Striping used to narrow street Stop for Pedestrians signage First new use of back-in angle parking on Oahu Site visits show the project performing as planned (traffic calming) 8 Before After 9 10 Site Visits/Walk Audits Analysis Existing conditions: 11 Traffic Volumes Land Use Transit Stops Bike lanes Parks, schools, etc Need for project Research on potential treatments 12 2

Kalakaua Avenue 13 North King Street Ward Avenue 1 Nuuanu Avenue 16 Rail Station Access Program Liliha Street 17 3

Rail Project Stations Rail Station Access Program 19 Focus: - Station Access - TOD opportunities Priorities: 1. Walking 2. Bicycling 3. Bus transit / Paratransit. Auto/taxi drop-off/pick-up 5. Park-and-Ride Rail Station Area Walk Audits Rail Station Area Walk Audits Five walking audits held Nov 13 to March 1 Participants were asked: Total of out of 21 station areas examined -30 participants at each event (5 events total) Multiple agencies and stakeholders represented Prior to tour: Overview of Station Area with supporting materials and discussion 21 Is the area walkable and bikeable? Does walking feel safe, comfortable and is it convenient? Does taking transit here seem easy? Is the area well-lit and would it feel safe at night? 22 Supporting Materials/Discussion Vision for Station Area Existing Conditions Future Potential TOD Future Land Use 23 Supporting Materials/Discussion Rail Station Design 30 Potential Bus Network Future Connectivity 2 Oahu Bike Plan

Participant Survey - Access Bus Access to Rail Stations Rail Station Walk Audit Date: Rail Station name: List deficiencies and potential improvements or opportunities that would make the site more accessible and desirable for pedestrians/bikes/transit users: Name/Dept. phone#/email (Rank each item below. 1 is poor and is good) 1. Pedestrian access is safe and convenient: - Sidewalks connect to adjacent areas; - Crosswalks are well marked; - Crossing aids for pedestrians and bicyclists to cross the street safely. (e.g., crosswalks, stop light, overpass, traffic island, curb extension)? - Is area well lighted? 2. The street works for all users: - Walk signal is long enough for senior citizens; - Curb cuts and sidewalks accomodate disabled. 3. Taking transit is easy: - Bus stops and rail transit stations are easy to find; - Stops and stations are easy to get to on foot or bike; - Connecting between bus and rail will be easy 5. Bicycling is easy: 26 25 Summary of Comments (500+) Rail will present great opportunities for TOD and changing how people travel, but also many challenges Level of access to stations varies widely - some stations inaccessible without additional infrastructure Need more space for pedestrians near station entrances - some missing sidewalks and crosswalks - where present, need wider sidewalks and crosswalks Bicycle infrastructure lacking - need bike lanes or paths leading to stations - need room near stations for bike share and secure storage Some station locations are not intuitive; wayfinding will be important for visitors Will require coordination with HDOT at many stations - Bicycle parking is adequate. Summary of Recommendations More than 60 individual recommended improvements Primarily to ensure multimodal access to rail stations 27 Sample Recommended Improvement - Routes are well marked, safe and convenient; Includes new bus stops, Handi-Van loading zones, passenger loading zones, crosswalks, bike paths/lanes Some are focused on enhancing TOD opportunities Vary from small (wider crosswalks) to large (promenade along Kapalama Canal) 28 Sample Recommended Improvement Improve Hikimoe Street to more access for bus-rail connections at Waipahu TC station 29 Convert Kekaulike Street into woonerf, or shared street, from King Street to Chinatown Station entrance 30 5

Protected Bike Lane Network Protected Bike Lanes King Street Protected Bike Lane AFTER Studies and Data Gathering 88% Increase in bicycle ridership No bike lane One-way protected bike lane Two-way protected bike lane 800 700 600 500 00 300 0 100 / 6/ 3/ 6/ 2/ 6/ 7/ 6/ 9/ / 8/ / 3/ 5 / 3/ 01 2/ 11 /2 01 /2 10 2/ 27 /2 01 0 8/ at Kalākaua Avenue N um ber of People B icy cling Results for South King Street Gathering data throughout pilot period Before and After Bicycle Counts Before and After Motor Vehicle Travel Times Before and after Traffic Volume Counts 01 /2 BEFORE 26 Opened oneway December 1 Converted to two-way in 2 year pilot project 8/ Date 6

Future Protected Bike Lane Projects Where are people riding? Before No bike lane 38 bicyclists / 12 hours After Two-way protected bike lane 72 bicyclists / 12 hours 258 (67%) ride on sidewalk 126 (33%) ride in street 66 (89%) ride in bike lane 27 (%) ride in street 51 (7%) ride on sidewalk Connect to the King Street protected bike lane to create a network Many routes will also connect to future rail stations South Street, Ward Avenue, Piikoi, Pensacola, Halekauwil, McCully Install next protected bike lane by the end of or early 16 Pensacola Street Bikeway Connection from the King Street bikeway to Ala Moana Blvd To be implemented with the Department of Design and Construction s resurfacing project Design treatment is yet to be determined 7

Bikeshare Hawaii Selecting Vendor Now Set to open in 16 Bike Share Up to 00 bikes and 0 stations Secure Bicycle Storage Secure Bike Storage Using FTA funds to install secure bike storage at transit centers and future rail stations Incorporating advance security and access features Access card to be integrated with new electronic fare collection system Mahalo! 8