TRAFFIC IMPACT ANALYSIS OF PROPOSED CHESTNUT HILL COLLEGE MASTER PLAN DEVELOPMENT

Similar documents
Traffic Study North Shore School District 112

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc.

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

TRAFFIC IMPACT ANALYSIS

Harrah s Station Square Casino

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017

Gateway Transportation Study

Waterford Lakes Small Area Study

Figure 1: East West Connector Alignment Alternatives Concept Drawing

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation

Shockoe Bottom Preliminary Traffic and Parking Analysis

3 TRAFFIC CONTROL SIGNAL TIMING AND SYNCHRONIZATION

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

BLOSSOM AT PICKENS SIGNALIZED INTERSECTION IMPROVEMENT STUDY

VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Henderson Avenue Mixed-Use Development

Figure 1: Vicinity Map of the Study Area

Road Conversion Study Plumas Street

Wesbrook Place Traffic Analysis of Redistributed Dwelling Units

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:

Traffic Analysis and Design Report. NW Bethany Boulevard. NW Bronson Road to NW West Union Road. Washington County, Oregon

Glenn Avenue Corridor Traffic Operational Evaluation

Operational Comparison of Transit Signal Priority Strategies

MEMORANDUM. Trip Generation and Distribution. CyRide / ISU Intermodal Facility Steering Committee. Date: August 31, 2009

Capital Region Council of Governments

THIS PAGE LEFT BLANK INTENTIONALLY

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017

TRAFFIC ASSESSMENT River Edge Colorado

EUCLID AVENUE PARKING STUDY CITY OF SYRACUSE, ONONDAGA COUNTY, NEW YORK

Table of Contents FIGURES TABLES APPENDICES. Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

Donahue Drive Corridor Traffic Operational Evaluation

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW.

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

Date: April 4, Project #: Re: A Street/Binford Street Traffic/Intersection Assessment

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

Highway 111 Corridor Study

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

Marina Loft (DRC 51-R-12)

DIMARCO CANANDAIGUA PROPERTIES HOUSING PROJECT CANANDAIGUA, ONTARIO COUNTY, NEW YORK

D.13 Transportation and Traffic

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

March 11, Lynnfield Board of Selectmen Town of Lynnfield 55 Summer Street Lynnfield, MA Walnut Street Traffic Assessment

MEMORANDUM. Charlotte Fleetwood, Transportation Planner

REPORT CONCURRENCE. City Manager. The General Manager concurs with the recommendation of this report.

Chapter 16: Traffic and Parking A. INTRODUCTION

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

10.0 CURB EXTENSIONS GUIDELINE

Transportation Impact Study for Abington Terrace

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota

PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina

EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA

Approximately 360 trail users cross during a typical summer weekday and 420 cross during a typical summer

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:

TECHNICAL MEMORANDUM. Kevin Even, P.E. Village Engineer and Public Works Director Village of Waunakee. From: Kevin Wehner, P.E. KL Engineering, Inc.

Date: September 7, Project #: Re: Spaulding Youth Center Northfield, NH Property. Traffic Impact Study

Truck Climbing Lane Traffic Justification Report

FORM A PASCO COUNTY ACCESS CONNECTION PERMIT APPLICATION

DUNBOW ROAD FUNCTIONAL PLANNING

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Lake Whitney Elementary School

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

Walton Acres at Riverwood Athletic Club Clayton, North Carolina

TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT

3. Central Park Avenue Northbound and South Drive (Site Driveway)

ALLEY 24 TRAFFIC STUDY

Draft North Industrial Area-Wide Traffic Plan

Clackamas County Comprehensive Plan

Focused Traffic Analysis for the 200 Nellen Avenue Project

3.9 - Transportation and Traffic

2.0 LANE WIDTHS GUIDELINE

Meadowlake Ranch Traffic Impact Analysis (LSC #184600) August 27, 2018

Employment 8,881 17,975 9,094. Households 18,990 31,936 12,946

Traffic Impact Study for Rolling Ridge Redevelopment

INTRODUCTION THOROUGHFARE SYSTEM CLASSIFICATIONS

TRANSPORTATION IMPACT STUDY

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY

TRAFFIC IMPACT STUDY CRITERIA

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections...

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

Lincoln Avenue Road Diet Trial

Mission Street Medical Office Development

Reference: Laguna Canyon Road Traffic Conditions Data Collection Summary

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9

TAKOMA METRO STATION

TRAFFIC STUDY GUIDELINES Clarksville Street Department

Public Involvement Meeting Tuesday, June 13, Albany Shaker Road Corridor Study

Recommended Roadway Plan Section 2 - Land Development and Roadway Access

SELECTED ROADWAY CAPACITY ANALYSIS

THE LANDMARK AT TALBOT PARK

TRAFFIC MANAGEMENT PLAN

Transcription:

TRAFFIC IMPACT ANALYSIS OF PROPOSED CHESTNUT HILL COLLEGE MASTER PLAN DEVELOPMENT Prepared by Orth-Rodgers & Associates, Inc. December 14, 2009 Updated November 9, 2010 230 South Broad Street Philadelphia PA 19102 Phone 215.35.1932 Fax 215.35.5954

TABLE OF CONTENTS Page No. Introduction..1 Existing Conditions....2 Existing Roadway Conditions....2 Existing Traffic Volumes...3 Existing Transit Service. 3 Existing Levels of Service...4 Characteristics of Chestnut Hill College Traffic Existing College Campus and Population.. Existing College Daily Traffic Patterns..8 Existing College Traffic Volumes during Commuter Peak Hours...9 Projected Future Campus and Population...9 Methodology for Projecting Future College Traffic. 10 Future College Peak Hour Traffic Volumes.11 Future Traffic Conditions..12 Sugarloaf Hill Campus Driveway Access.12 Future Peak Hour Traffic Volumes...13 Future Peak Hour Levels of Service..14 Conclusion....15

Introduction Chestnut Hill College (CHC) is located in the Chestnut Hill section, at the northwestern edge of City of Philadelphia, Pennsylvania. CHC currently has two campuses. The Main Campus is bounded by Germantown Avenue, Northwestern Avenue and the Wissahickon Creek. The Sugarloaf Hill Campus, used as a conference center by Temple University prior to its acquisition by CHC in 2006, is located south of and across Germantown Avenue from the Main Campus. The Chestnut Hill College Master Plan 2008 was developed based on the College s ambitious strategic plan. Highlights of the proposed Master Plan include: 1. Increase student enrollment headcount from 2,300 to 2,900. The majority of the increase will be made up of undergraduate students. 2. Increase full time staff (including faculty) headcount from 240 to 433. 3. Increase the number of student housing beds from 560 to 1,200. 4. Redevelop the newly acquired Sugarloaf Hill Campus, increasing the gross square foot area from 46,523 to 344,829 (not including parking structure). 5. Provide new facilities at the Main Campus. increasing the gross square foot area from 61,688 to 839,60 (not including parking structure). 6. Construct new parking structures to increase the number the parking spaces from 616 to approximately 1,200. Orth-Rodgers & Associates (ORA) was retained by CHC to study the potential traffic impact of the proposed Master Plan expansion. This plan will take years to implement, and it will go through several different development phases. However, this study only examines the future traffic conditions assuming the completion of all the Master Plan development. Accordingly, ORA s staff conducted the following tasks: 1. Conducted field views and observations to note physical roadway conditions, traffic controls and regulations, and peak period traffic conditions. 2. Conducted manual turning movement counts from :00 9:00 am and from 4:00 6:00 pm at the following locations: o Germantown Avenue and Northwestern Avenue o Germantown Avenue and Rogers Drive o Germantown Avenue and Hillcrest Avenue o Germantown Avenue and Bells Mill Road o Northwestern Avenue and CHC Service Driveway/Lincoln Woods Apartment o Northwestern Avenue and CHC Driveway 3. Placed tube traffic counters across Rogers Road and other campus driveways to obtain hourly entry and exit volumes and establish daily traffic patterns and times of peak campus traffic activity. 4. Estimated the new morning and evening peak hour traffic volumes generated by the expanded population and activity on both campuses. Chestnut Hill College Master Plan Expansion Page 1

5. Assigned college traffic to the Master Plan campus site access driveways in accordance with the future parking locations and supply, and determined future morning and evening peak hour traffic volumes at the studied intersections. 6. Conducted analysis to determine future intersection levels of service.. Provided recommendations for design of site access. The remainder of this report details these efforts and the findings of the analysis. Existing Conditions An analysis of existing conditions in the vicinity of the CHC campuses was conducted in order to provide a base condition for an assessment of the traffic impact of the proposed college expansion. This included field investigations of the surrounding roadways and intersections, and collection of traffic volume data. Existing Roadway Conditions Germantown Avenue Germantown Avenue is a community arterial that runs approximately north-south through the study area. Germantown Avenue provides one travel lane in each direction except for the segment between Hillcrest Avenue and Bells Mill Road where there are three lanes: two southbound lanes with one of them a dedicated right turn lane at the intersection of Bells Mill Road, and a single northbound lane. Germantown Avenue also has channelized left turn lanes at some of the signalized intersections: northbound and southbound at Northwestern Avenue, southbound at Hillcrest Avenue, and northbound at Bells Mill Road. There are striped bicycle lanes on both sides of Germantown Avenue but only in the area of the Wissahickon Creek Bridge. The bike lanes do not extend all the way to Northwestern Avenue or to Hillcrest Avenue because left turn lanes are striped at those intersections within the same pavement width. The speed limit on Germantown Avenue is 30 mph with no on-street parking permitted on either side of the roadway. Northwestern Avenue Northwestern Avenue is a collector roadway that runs east-west. To the west it ends in Fairmount Park; to the east it connects to Stenton Avenue and continues as Wissahickon Avenue into Flourtown. The main campus of CHC is located on the south side of this street. Northwestern Avenue carries one travel lane at each direction and the speed limit is 35 mph. The intersection of Northwestern Avenue and Germantown Avenue is controlled by a two-phase traffic signal. Rogers Drive is the main access to Chestnut Hill College. It provides one entry and one exit lane. The intersection with Germantown Avenue is controlled with a two-phase signal. There is no left turn lane on Germantown Avenue at Rogers Drive. When a vehicle is stopped on southbound Germantown Avenue waiting to turn left, other vehicles sometimes bypass using the bike lane area depending on where the left turn vehicle has stopped. Hillcrest Avenue Hillcrest Avenue is a local collector roadway that runs east-west and connects Germantown Avenue with Stenton Avenue and Bethlehem Pike. It has one travel lane Chestnut Hill College Master Plan Expansion Page 2

plus a striped shoulder in each direction and the speed limit is 30 mph. The T-intersection of Hillcrest Avenue and Germantown Avenue is controlled by a two-phase signal. Hillcrest Avenue provides separate left and right turn lanes at the signal. Bells Mill Road Bells Mill Road is a collector roadway that runs east-west. West of Germantown Avenue, it provides one travel lane each direction and connects Germantown Avenue with Ridge Avenue. Bells Mill Road is one of a limited number of bridge crossings of the Wissahickon Creek, and the road runs through Fairmount Park. The speed limit is 30 mph. At the Forbidden Drive trail in Fairmount Park, Bells Mill Road is Stop sign controlled. Cars must stop for pedestrians, cyclists and horseback riders crossing the road. East of Germantown Avenue, Bells Mill Road is a one-way eastbound street connecting to Stenton Avenue. The intersection of Germantown Avenue and Bells Mill Road is controlled by a three-phase traffic signal. Northbound Germantown Avenue left turns to west Bells Mill Road have a leading left turn arrow (northbound through and right turn traffic also has a green light during this phase), followed by a phase for all movements on Germantown Avenue, then a phase for Bells Mill Road. During the Bells Mill Road phase, southbound Germantown Avenue right turns have a right turn arrow. Existing Transit Service SEPTA runs the Route L bus on Germantown Avenue in the area of CHC. The route extends from the Plymouth Meeting Mall to Chestnut Hill and then to Broad and Olney Streets. Stops are posted at Northwestern Avenue, Rogers Drive, and Bells Mill Road. CHC runs an intercampus shuttle between the Sugarloaf Hill Campus and the Main Campus. It is anticipated that once good walking routes connecting the two campuses are constructed as proposed in the Master Plan, walking will be the primary mode of travel between the two campuses and shuttle service will be more limited. Existing Traffic Volumes Tube traffic counters were placed on Germantown Avenue from Tuesday September 15 through Thursday September 24, 2009 to capture daily traffic volumes and travel patterns along the roadway. In addition, manual vehicle turning movement counts were conducted on Thursday September 10 and Tuesday September 15, 2009 from :00 9:00 am and 4:00 6:00 pm at the following locations: o Germantown Avenue and Northwestern Avenue o Germantown Avenue and Rogers Drive o Germantown Avenue and Hillcrest Avenue o Germantown Avenue and Bells Mill Road o Northwestern Avenue and CHC Service Driveway/Lincoln Woods Apartment o Northwestern Avenue and CHC Driveway Chestnut Hill College Master Plan Expansion Page 3

Existing intersection turning volumes during the peak hours are illustrated in Figures 1 and 2. The recorded traffic data reveal that Germantown Avenue experiences a distinct peaking in volume during commuter rush hours. On Germantown Avenue, the traffic peak hours occur :30 am 8:30 am in the morning and 5:00 pm 6:00 pm in the evening. The hourly two-way traffic volume on Germantown Avenue varies between 1,200 vehicles and 1,00 vehicles during the peak hours. The heaviest travelled segment of Germantown Avenue is the one between Hillcrest Avenue and Bells Mill Road. In this segment, the southbound traffic volume is always higher than northbound volume, because of westbound vehicles turning left from Hillcrest Avenue to southbound Germantown Avenue and then turning right to travel west on Bell Mill Road (whereas eastbound Bells Mill Road traffic can continue straight across Germantown Avenue). Bells Mill Road west of Germantown Avenue carries a morning peak hour total traffic volume of 1,350 vehicles, with about 50 vehicles travelling eastbound approaching Germantown Avenue. During the evening peak hour, the total traffic volume on Bells Mill Road is about 1,400 vehicles with 800 vehicles travelling westbound away from Germantown Avenue. Northwestern Avenue east of Germantown Avenue carries a total of about 650 vehicles during both peak hours, split about evenly by direction. The majority of vehicles on Northwestern Avenue turn right onto Germantown Avenue to travel north; the reverse left turn from Germantown Avenue into Northwestern Avenue is also very heavy. Northwestern Avenue west of Germantown Avenue ends in Fairmount Park and carries a low traffic volume of about 100 total vehicles during each of the peak hours. Hillcrest Avenue carries a higher volume of traffic in the westbound direction than it carries eastbound. About 650 westbound vehicles and no more than 330 eastbound vehicles travel on Hillcrest during both the AM and PM peak hours. This is due to the fact that Bells Mill Road between Bethlehem Pike and Germantown Avenue is one-way eastbound. The majority of westbound vehicles on Hillcrest Avenue turn left on Germantown Avenue. Field observations reveal that most of these left turning vehicles from Hillcrest Avenue then turn right onto Bells Mill Road to continue traveling west towards Ridge Avenue. Existing Levels of Service While traffic volumes provide an important measure of activity on the area roadway system, evaluating how well that system accommodates those volumes is also important (i.e. a comparison of peak traffic volumes with available roadway capacity). By definition, capacity represents the maximum number of vehicles that can be accommodated, given the constraints of roadway geometry, environment, traffic characteristics, and controls. Intersections generally control capacity in road networks because most conflicts exist at these points between through, crossing, and turning vehicles. Because of these conflicts, congestion is most likely to occur at intersections. Therefore, intersections are studied most often when determining the quality of traffic flow on a roadway network. Chestnut Hill College Master Plan Expansion Page 4

An unsignalized intersection on a through route is seldom critical from an overall capacity standpoint. However, it may be of great significance to the capacity of the minor cross route and it may influence the levels of service on both. In analyzing intersections, it is assumed that the major street through movement and the right turn are unimpeded and have the right-of-way over all side streets and left turns from the major street. All other movements through the intersection cross, merge with, or are affected by other flows. A descriptive mechanism (Level of Service) has been developed for unsignalized intersections which indicates average delay at the intersection on a scale from a, indicating an average delay between zero and 10 seconds, to f, indicating an average delay greater than 50 seconds. Table 1 summarizes unsignalized intersection level of service criteria. Table 1: Levels of Service and Expected Delay for Unsignalized Intersections 1 Level of Service Expected Traffic Delay Average Total Delay (Seconds/Vehicles) a Little or no delay 10.0 b Short traffic delays 10.1 to 15.0 c Average traffic delays 15.1 to 25.0 d Long traffic delays 25.1 to 35.0 e Long traffic delays 35.1 to 50.0 f Very long traffic delays >50.0 At signalized intersections, factors that affect the various approach capacities include width of approach, number of lanes, signal green time, turning volumes, truck percentages, etc. However, operation at capacity can be less satisfactory since substantial delays or reduced operating speeds are likely. Delays cannot be related to capacity in a simple one-to-one fashion. It is possible to have delays in the Level of Service F range without exceeding roadway capacity. Substantial delays can exist without exceeding capacity if one or more of the following conditions exist: o Long signal cycle lengths o A particular movement experiences a long red time o Progressive movement for a particular lane group is poor Table 2 summarizes the level of service criteria for signalized intersections. In general, Level of Service D is considered acceptable in an urbanized area. 1 Transportation Research Board, Special Report 209, Highway Capacity Manual, Third Edition, published by the Transportation Research Board, Washington, D.C., 2000 Chestnut Hill College Master Plan Expansion Page 5

Table 2: Level of Service and Expected Delay for Signalized Intersections 2 Level of Service A B C D E F Description Very low delay, good progression; most vehicles do not stop at intersection. Generally good signal progression and/or short cycle length; more vehicles stop at intersection than Level of Service A. Fair progression and/or longer cycle length; significant number of vehicles stop at intersection Congestion becomes more noticeable; individual cycle failures; longer delays from unfavorable progression, long cycle length, or high volume/capacity ratios; most vehicles stop at intersection. Usually considered limit of acceptable delay indicative of poor progression, long cycle length, or high volume/capacity ratio; frequent individual cycle failures. Could be considered excessive delay in some areas, frequently an indication of oversaturation (i.e. arrival flow exceeds capacity), or very long cycle lengths with minimal side street green time. Capacity is not necessarily exceeded under this level of service. Average Total Delay (seconds per vehicle) 10.0 10.1 to 20.0 20.1 to 35.0 35.1 to 55.0 55.1 to 80.0 > 80.0 The capacity analysis for the study area intersections was performed using Synchro Version for signalized and unsignalized intersections. Figures 3 and 4 illustrate the existing peak hour levels of service. During the morning peak hour, all movements at each of the study intersections are operating at good service levels except for three movements. The southbound Germantown Avenue left turn at Hillcrest Avenue is operating at LOS E with average delay per vehicle of more than a minute. The southbound Germantown Avenue through movement at the intersection of Bells Mill Road operates at LOS F with 111 seconds delay. This delay means that about half the drivers making this movement do not get through on the first green. This is because the through movement is only getting 22 seconds of green time out of the 80-second total cycle. The Bells Mill Road eastbound approach to Germantown Avenue experiences long delays and queues. 2 Transportation Research Board, Special Report 209, Highway Capacity Manual, Third Edition, published by the Transportation Research Board, Washington, D.C., 2000 Chestnut Hill College Master Plan Expansion Page 6

During the evening peak hour, there are three movements operating at undesirable service levels. The southbound Germantown Avenue left turn at Hillcrest is operating at LOS F. At times, the left turn vehicle queue extends beyond the provided storage lane and extends onto the through lane, thus blocking all southbound traffic. The westbound left turn from Hillcrest Avenue is operating at Level of Service E and a long queue of left turn vehicles is constantly observed during the evening peak hour. Finally, eastbound Bells Mill Road approaching Germantown Avenue experiences queues that at times extend to Forbidden Drive. Field observations showed some other notable conditions: During the evening peak hour, at times a long line of westbound vehicles on Bells Mill Road was observed extending from the Stop sign at the Forbidden Drive pedestrian crossing. The queue can extend back to the signalized intersection of Germantown Avenue and prevent vehicles from turning into Bells Mill Road. When this occurs, a queue can quickly form on southbound Germantown Avenue in the exclusive right turn lane. This issue appears to be seasonal and weather limited, since it is related to a high number of joggers, cyclists and horseback riders on the Forbidden Drive trail during the PM commuter peak hour. The southbound through lane of Germantown Avenue at Hillcrest Avenue leads into the right lane of the two southbound lanes approaching Bells Mill Road. The right lane becomes an exclusive right turn lane at the intersection of Bells Mill Road. Motorists sometimes appear to be trapped in the right turn lane trying to merge back to the through lane. This slows down traffic progression and can cause backup on both of the southbound lanes between Hillcrest Avenue and Bells Mill Road. This situation could be improved by revising the pavement markings and placing another lane designation sign closer to Hillcrest Avenue. Characteristics of Chestnut Hill College Traffic Existing College Campus and Population Chestnut Hill College has two campuses, Main Campus and the Sugarloaf Hill Campus. The Main Campus is located on the east side of Germantown Avenue and north of the Wissahickon Creek. The Sugarloaf Hill Campus is located on the west side of Germantown Avenue and south of the Wissahickon Creek. Currently, the Sugarloaf Hill Campus is still under renovation and provides housing to about 60 undergraduate students. In the Fall Semester of Year 2009 2010, the total number of students enrolled is 2,300 (900 undergraduate students plus 1,400 graduate and continuing studies students). Out of the 900 undergraduate students, 560 live on campus. There are 4 full time faculty and 166 full time staff. Chestnut Hill College Master Plan Expansion Page

Existing College Daily Traffic Patterns The Main Campus has three driveways, one on Germantown Avenue and the other two on Northwestern Avenue. Rogers Drive on Germantown Avenue serves as the College s main entrance and carries the highest traffic volumes throughout the day. The driveway located across from the Lincoln Woods Apartments is used by service vehicles and carries the lowest volume among the three. The third driveway connects to the internal parking lots and provides an alternative access point to Rogers Drive. The Sugarloaf Hill campus presently has three driveways. On Bells Mill Road there is a driveway located approximately 60 feet from Germantown Avenue. There is a driveway to Germantown Avenue about 80 feet west of Bells Mill Road. The third driveway is a one-way entry-only driveway located 540 feet west of Bell Mill Road and 300 feet east of Hillcrest Avenue. Automatic Traffic Recorders (ATR) were placed on the campus driveways (except for the Main Campus service drive) to measure the daily campus traffic volumes and patterns. The data reveal that the college daily traffic has three significant peaks. The school morning peak hour is from 9:00 to 10:00 am when faculty, staff, and students arrive. The school evening peak hour is from 5:00 to 6:00 pm when daytime students and staff are leaving while students attending evening classes arrive. The third peak occurs from 8:00 to 9:00 pm when the evening students and faculty leave. The morning school traffic peak hour occurs about one hour later than the morning commuter peak hour on Germantown Avenue, while the afternoon school peak hour is the same as the commuter peak. The graph below illustrates the CHC traffic pattern throughout a typical weekday. Chestnut Hill College Master Plan Expansion Page 8

For purposes of the traffic analysis, the critical time period is the weekday afternoon commuter peak hour (5:00 6:00 pm). During the 8:00 9:00 pm evening school exiting peak, traffic volume on Germantown Avenue is much lower. Weekends are not critical for the traffic analysis because weekend traffic volume on Germantown Avenue is relatively low, and traffic generated by a weekend event at the Sugarloaf Hill Campus would also be lower than the college weekday peak. Existing College Traffic Volumes during Commuter Peak Hours Based on the traffic counts conducted at all the school driveways of both campuses, there are 145 entering vehicles and 34 exiting vehicles during the morning commuter peak hour. Rogers Drive carries about 65% of the traffic while the non-service driveway carries 25%. During the evening peak hour, there are 251 entering vehicles and 154 exiting vehicles. Rogers Drive carries 80% of the school traffic while the non-service driveway carries 15%. It can also be seen that the school generates much more traffic during the evening commuter peak hour than during the morning peak hour. The great majority of the peak hour traffic is currently generated at the Main Campus. Sugarloaf Hill Campus currently generates no more than 30 vehicles total during either of the peak hours. Projected Future Campus and Population According to the Master Plan, development will occur at both campuses but the majority of new facilities will be located at the Sugarloaf Hill Campus. The future Sugarloaf Hill Campus will host residential halls, academic buildings, and a 450-space parking garage. With the Master Plan development in place, the College is expecting to increase its undergraduate student population from existing 900 to 1,500. 80% or 1,200 of these undergraduate students will live on campus. The number of full time faculty and staff will grow accordingly from existing 240 to 433. This is to maintain the ratio of one faculty to 12 undergraduate students. However, for the graduate and continuing studies programs, the number of students is expected to remain about the same as today s 1,400. Table 3 illustrates the comparison between the existing population and the future population of different categories. Chestnut Hill College Master Plan Expansion Page 9

Table 3: Comparison of Existing and Future College Population Category Existing Population Future Population % Increase Undergraduate 900 1,500 6% Faculty/Staff 240 433 80% Graduate/Continuing Studies 1,400 * 1,400 0% * 1,400 is the headcount, or number of individual students registered, not the number of students that come to campus on a given day. Many graduate/continuing studies students take only one class per week. Methodology for Projecting Future College Traffic To project the future college peak hour traffic volume, it is assumed that the CHC travel patterns will remain the same as today. Therefore, the future college traffic was increased in proportion to the college Master Plan population increase. The school traffic during the morning commuter peak hour is a combination of faculty, staff, and undergraduate students. Faculty and staff will have a higher percentage population increase than students, but the faculty/staff rate was applied to all morning traffic in order to be conservative. The future morning entering and exiting peak hour traffic volumes were increased by 80% over the existing counts. During the evening peak hour, the entering traffic is mainly from graduate or Continuing Studies students, whose population will remain constant. The evening peak hour school exiting traffic is mainly from faculty and staff getting off work, as well as some day students. The future evening entering peak hour traffic was kept at the same level as existing, but the exiting peak hour traffic was increased by 80%. This methodology is summarized in the following Table 4. Table 4: CHC Trip Increase over Existing with Completion of Master Plan Development Entering Exiting AM Peak Hour 80% 80% PM Peak Hour 0% 80% Chestnut Hill College Master Plan Expansion Page 10

Future College Peak Hour Traffic Volumes Applying the aforementioned methodology results in projected future peak hour CHC traffic volumes as illustrated below in Table 5. With completion of the Master Plan development, it is projected that the total traffic generated by CHC will increase over today s levels by 80% in the morning peak hour and by 30% in the evening peak hour. Table 5: Future CHC Trip Projection (Vehicles in Peak Hour) Existing Future Total Entering Exiting Entering Exiting Increase AM Peak 145 34 262 61 144 PM Peak 251 154 251 28 124 Based on the parking demand study by Chance Management Advisors, the master plan parking demand will total 1,09 vehicles (daytime) and 898 vehicles (evening), which includes a parking demand of 232 spaces for junior and senior resident students. Freshmen and sophomore students will not be permitted to bring a car to campus. With the proposed 1,200 space parking supply, the daytime occupancy will be 91% and the evening occupancy (during classes) will be 5%. For purposes of the traffic study, we have assumed that 80% (186 spaces) of resident student parking will be assigned at Sugarloaf campus, with the remaining 20% (46 spaces) at the Main Campus. Applying equal occupancy rates at both campuses, it is estimated that about 25% of commuter (commuter student and faculty/staff ) parking will take place at Sugarloaf Campus. This is because of the lower parking supply and the amount of residential parking at Sugarloaf. The breakdown of the distribution to each campus is shown in the table below: Table 6: Future Trip Generation/Distribution Methodology Based on Parking Allocation CHC Sugarloaf Total Parking Supply 50 63% 450 38% 1200 Parking Demand (day) 109 Parking Demand (night) 898 Assume 80% resident parking @ Sugarloaf Resident parking 46 20% 186 80% 232 Assume equal occupancy @ both campuses Daytime parking demand (91% occupancy) 683-414 - 109 Resident parking 46 20% 186 80% 232 Commuter parking (AM) 63 4% 228 26% 865 Evening parking demand (5% occupancy) 560-338 - 898 Resident parking 46 20% 186 80% 232 Commuter parking (PM) 514 % 152 23% 666 Chestnut Hill College Master Plan Expansion Page 11

The total future college traffic is then distributed between the Main and Sugarloaf campuses as follows: Table : Future Trips by Campus AM Peak Hour PM Peak Hour In Out Total In Out Total Future Trip Projection (Table 5) 262 61 323 251 28 529 Using commuter traffic % by campus in Table 6 CHC 194 45 239 193 214 40 Sugarloaf 68 16 84 58 64 122 Figures 5 and 6 illustrate projected college traffic movements for the AM and PM peak hours. Future Traffic Conditions Sugarloaf Hill Campus Driveway Access The three existing driveways that serve the Sugarloaf Hill Campus are not suitable to support increased traffic activity. The driveways are too close to the intersection of Germantown Avenue and Bells Mill Road, and queues at the traffic signal block exits from the driveways. None of the existing driveways is at a location that is suitable for a traffic signal. It is recommended that the existing driveways be closed. The driveway on Germantown Avenue closest to Bells Mill Road should be retained as an emergency access only. An extensive study was performed to determine the best location for a new main access driveway. The location must be suitable for a traffic signal, must provide acceptable traffic operations within the existing constraints of Germantown Avenue and its other existing signals, and the driveway must be able to achieve acceptable alignment and grades to its destinations within the Sugarloaf Campus. Traffic analysis and simulations show that the best location for meeting all these criteria is on Germantown Avenue opposite Hillcrest Avenue. The driveway will form a fourth leg to what is now a T intersection. The following improvements to the intersection are recommended in order to provide for the new driveway: 1. The Sugarloaf Hill driveway should provide on entry lane and two exit lanes: an exclusive left turn lane and a lane for through and right turn movements. Chestnut Hill College Master Plan Expansion Page 12

2. A left turn lane for motorists travelling north on Germantown Avenue to turn into the Sugarloaf Hill Campus should be created within the existing street width. This is accomplished by reallocating 125 feet of the center lane on Germantown Avenue south of Hillcrest Avenue that is now used by southbound traffic to create a 5-foot long full width left turn lane with 50 foot taper. 3. On Hillcrest Avenue, the existing right turn lane would also provide for straight through movements into the new driveway. 4. The traffic signal should be upgraded in several ways: Since the left turn from Hillcrest Avenue to eastbound Germantown Avenue has such a high volume, it is recommended that the traffic signal provide a long advance left-turn phase for Hillcrest Avenue before the signal turns green for the CHC Driveway. Detectors should be installed for the CHC driveway. This phase will not appear when there is no vehicle present. A left turn signal arrow is recommended for the southbound left turn into Hillcrest Avenue, to prevent the left turns from backing up into the through lane. A detector is recommended for this phase. A pedestrian crosswalk should be striped across Germantown Avenue on the north side of the intersection. Pedestrians would cross Germantown Avenue on the Hillcrest Avenue eastbound advance left-turn phase, which provides ample time for the crossing. Pedestrian signal heads should be included for all crosswalks in the upgraded signal. 5. The traffic signal at Hillcrest Avenue should be interconnected and coordinated with the signal at Bells Mill Road. This will improve the level of service on Germantown Avenue at Bells Mill Road. Future Peak Hour Traffic Volumes Comparison of traffic counts along Germantown Avenue conducted in Years 2006 and 2009 shows no significant change in traffic volumes along Germantown Avenue during the last several years. Therefore, for the purposes of projecting future traffic, the new CHC traffic was added to the 2009 volumes. The existing directions of approach and departure to Chestnut Hill College, as described below, were used to distribute the projected college traffic onto the roadway network: o 34% from / to the north on Germantown Avenue; o 25% from / to the south on Germantown Avenue; o 26% from / to the east on Northwestern Avenue or Hillcrest Avenue; o 15% from / to the west on Bells Mill Road. Chestnut Hill College Master Plan Expansion Page 13

Applying this distribution to the future total trip generation for each campus (from Table ) results in the AM and PM peak hour college trips illustrated in Figures 5 and 6. Figures and 8 illustrate the projected total future peak hour traffic volumes at the study area streets and intersections with full development of the CHC Master Plan. Future Peak Hour Levels of Service Capacity analysis was conducted of the study area intersections with the projected future traffic volumes. Roadway and signal improvements were assumed to be in place as described in this report section on Sugarloaf Hill Campus Driveway Access (page 12). Figures 9 and 10 illustrate the future peak hour Level of Service of the studied intersections. The comparison of existing and future intersection overall average level of service (with average delay in seconds) is summarized in Table 8. Table 8: Level of Service Comparison Signalized Intersections on Germantown Avenue Intersection AM Peak Hour PM Peak Hour Existing Future Existing Future Northwestern Avenue C(21) B(18) B(1) B(1) Rodgers Drive A(3) A(5) A(9) A(9) Hillcrest Avenue C(25) C(2) E(69) D(55) Bell Mill Road D(46) D(38) C(23) C(20) It can be seen that, with the optimized signal timings and lane reassignment (but no widening for new travel lanes), all intersections will operate at good service levels comparable to their existing conditions during both peak hours. All intersections will operate with an overall Level of Service D or better during both peak periods. In addition to levels of service, queue lengths were examined to check that the queues do not exceed the available storage. On Germantown Avenue between Bells Mill Road and Hillcrest Avenue, the expected queues in both directions will have adequate room to store. The queue in the southbound Germantown Avenue left turn lane at Hillcrest Avenue will sometimes exceed the available 180 feet of storage in the PM peak hour and extend into the through lane (as happens today). The average left turn vehicle queue is projected to be 130 feet. The left turn lane could be lengthened by reconfiguring the lanes within the existing road width without pavement widening; this would involve some reconstruction of the Belgian block median area. Some community members indicated in previous public meetings they are not in favor of that improvement. Chestnut Hill College Master Plan Expansion Page 14

Conclusion From a traffic perspective, the impacts of the Master Plan development of Chestnut Hill College are low. Of today s undergraduate population of 900 students, 560 live on campus and 340 are commuters. The Master Plan will house 80% of undergraduate students on campus, so that while the undergraduate population will increase to 1,500, the number of commuting undergraduates will decrease from today s number to 300 students, resulting in a decrease in student trips. The parking supply will increase, but that is largely to correct an existing deficiency in parking supply and to account for a future increase in upper-class resident students. These students, while they may have a car on campus, will not be making trips during the commuter peak hours. The graduate and continuing studies student population is expected to remain at today s levels and the numbers of students arriving at campus during the PM commuter peak hour will not increase. The primary means of transportation between the Main Campus and the Sugarloaf Hill Campus will be by walking. The AM campus entry and exit traffic and the PM exiting traffic were increased by 80% of today s counted levels, based on the projected percentage increase in faculty and staff. This is a conservatively high estimate, since existing peak hour traffic includes an unknown number of commuter students, and the number of commuter students will decrease, not increase, in the future. Even so, the projected traffic increase at most intersections averages 4%. For overall network traffic operations, the best location for the new Sugarloaf Hill Campus driveway is on Germantown Avenue opposite Hillcrest Avenue. The levels of service generally remain the same as existing at all intersections. Except for certain specific movements during the PM commuter peak hour, all movements at all intersections will operate at good levels of service during all times. Future Levels of Service at Hillcrest Avenue will not degrade from existing Levels of Service with signal optimization and phasing changes. In conclusion, with the proposed site access and traffic improvements, the Master Plan development of Chestnut Hill College will provide acceptable and safe traffic operations, as well as safe pedestrian movements and intersection crossings. Chestnut Hill College Master Plan Expansion Page 15

Orth-Rodgers & Associates, Inc. TRANSPORTATION ENGINEERS AND PLANNERS Existing AM Peak Hour Traffic Volumes Chestnut Hill College PHILADELPHIA, PENNSYLVANIA FIGURE 1 2009_125_Figs.cdr Lincoln Woods Apartments 3 323 20 0 33 9 NORTHWESTERN 3 0 2 342 22 2 2 289 364 28 PEAK HOUR 9/15/09 :15-8:15 AM PEAK HOUR 9/15/09 :15-8:15 AM 641 86 251 25 6 146 483 12 49 5 21 14 32 52 4 92 602 12 6 PEAK HOUR 9/10/09 :30-8:30 AM ROGERS 3 528 5 3 DRIVE Chestnut Hill College PEAK HOUR 9/15/09 :30-8:30 AM 53 692 GERMANTOWN LEGEND HILLCREST 664 439211 453 99 230 - SIGNALIZED INTERSECTION PEAK HOUR 9/10/09 :30-8:30 AM 131 534 899 Sugar Loaf Hill 65 PEAK HOUR 9/10/09 :30-8:30 AM 6 436 45 629 BELLS MILL 41 463 181 420 140 ROAD 3 494 12 56 03

Orth-Rodgers & Associates, Inc. TRANSPORTATION ENGINEERS AND PLANNERS Existing PM Peak Hour Traffic Volumes Chestnut Hill College PHILADELPHIA, PENNSYLVANIA FIGURE 2 2009_125_Figs.cdr Lincoln Woods Apartments 0 312 8 0 1 NORTHWESTERN 0 2 23 332 4 ROGERS 30 15 26 12 340 PEAK HOUR 9/15/09 4:45-5:45 PM PEAK HOUR 9/15/09 5:00-6:00 PM 212 25 94 366 322 985 596 253 23 9 60 10 26 42 80 34 26 PEAK HOUR 9/10/09 5:00-6:00 PM 6 46 48 3 50 DRIVE Chestnut Hill College 133 440 PEAK HOUR 9/15/09 5:00-6:00 PM GERMANTOWN LEGEND HILLCREST 640 59103 53 216 336 - SIGNALIZED INTERSECTION 120 468 PEAK HOUR 9/10/09 5:00-6:00 PM 1134 Sugar Loaf Hill 588 PEAK HOUR 9/10/09 5:00-6:00 PM 24 433 128 25 400 09 83 BELLS MILL 58 341 155 292 131 ROAD 531 585

Orth-Rodgers & Associates, Inc. TRANSPORTATION ENGINEERS AND PLANNERS Existing AM Peak Hour Levels of Service Chestnut Hill College PHILADELPHIA, PENNSYLVANIA FIGURE 3 b(14) Lincoln Woods Apartments a(0) a(0) D(35) D(39) ROGERS DRIVE Chestnut Hill College GERMANTOWN a(1) b(14) D(50) A(9) C(25) b(14) C(21) B(22) A(6) A(3) A(3) A(3) B(14) C(30) HILLCREST E(2) B(15) C(25) C(25) F(111) A(4) D(50) D(46) C(29) C(2) 2009_125_Figs.cdr NORTHWESTERN B(1) LEGEND - SIGNALIZED INTERSECTION A(#) - SIGNALIZED LEVEL OF SERVICE (DELAY IN SECONDS) a(#) - UNSIGNALIZED LEVEL OF SERVICE (DELAY IN SECONDS) Sugar Loaf Hill BELLS MILL ROAD

Orth-Rodgers & Associates, Inc. TRANSPORTATION ENGINEERS AND PLANNERS Existing PM Peak Hour Levels of Service Chestnut Hill College PHILADELPHIA, PENNSYLVANIA FIGURE 4 b(13) Lincoln Woods Apartments a(0) C(28) C(31) ROGERS DRIVE Chestnut Hill College GERMANTOWN a(1) b(12) C(29) B(16) C(23) a(1) b(12) B(1) B(11) A() A(9) A(9) A(5) HILLCREST B(13) E(61) F(364) C(26) E(69) B(19) D(54) A(5) C(26) C(23) C(21) C(20) 2009_125_Figs.cdr NORTHWESTERN B(15) LEGEND - SIGNALIZED INTERSECTION A(#) - SIGNALIZED LEVEL OF SERVICE (DELAY IN SECONDS) a(#) - UNSIGNALIZED LEVEL OF SERVICE (DELAY IN SECONDS) Sugar Loaf Hill BELLS MILL ROAD

Orth-Rodgers & Associates, Inc. TRANSPORTATION ENGINEERS AND PLANNERS Future AM Peak Hour College Traffic Volumes Chestnut Hill College PHILADELPHIA, PENNSYLVANIA FIGURE 5 9 38 (8) (2) (10) 45 Total College Trips 262 enter (61) exit NOTE: THESE VOLUMES INCLUDE EXISTING CHESTNUT HILL COLLEGE TRAFFIC AS WELL AS TRAFFIC FROM MASTER PLAN EXPANSION. Lincoln Woods Apartments (2) 9 (3) (2) 4 13 (5) Chestnut Hill College HILLCREST (3) 4 (11) 21 (5) 66 66 2009_125_Figs.cdr 89 (21) (4) 11 8 NORTHWESTERN (1) (30) ROGERS (12) (18) 58 20 DRIVE 136 8 (5) GERMANTOWN LEGEND 21 (18) 20 68 (16) - SIGNALIZED INTERSECTION 8 2 (5) (5) (6) Sugar Loaf Hill (15) (9) (9) BELLS MILL 39 39 ROAD (15)

Orth-Rodgers & Associates, Inc. TRANSPORTATION ENGINEERS AND PLANNERS Future PM Peak Hour Chestnut Hill College PHILADELPHIA, PENNSYLVANIA College Traffic Volumes FIGURE 6 38 (43) (12) (55) 45 NOTE: THESE VOLUMES INCLUDE EXISTING CHESTNUT HILL COLLEGE TRAFFIC AS WELL AS TRAFFIC FROM MASTER PLAN EXPANSION. 2009_125_Figs.cdr Lincoln Woods Apartments (12) NORTHWESTERN () (50) 45 Total College Trips 251 enter (28) exit 85 (95) (14) 11 4 () (2) (81) 4 11 (9) (150) ROGERS (63) (8) 58 16 DRIVE 13 Chestnut Hill College 9 (18) GERMANTOWN LEGEND 20 (8) 16 HILLCREST 20 58 (22) (64) - SIGNALIZED INTERSECTION 9 22 (18) (22) (24) Sugar Loaf Hill (69) (42) (42) BELLS MILL 38 38 ROAD 63 (69) 63

Orth-Rodgers & Associates, Inc. TRANSPORTATION ENGINEERS AND PLANNERS Future AM Peak Hour Traffic Volumes Chestnut Hill College PHILADELPHIA, PENNSYLVANIA FIGURE 10 8 2 45 2009_125_Figs.cdr Lincoln Woods Apartments 3 323 20 0 33 9 NORTHWESTERN 28 342 38 295 380 681 86 251 25 6 146 523 12 49 3 0 2 5 21 14 32 52 4 92 611 12 6 13 5 30 ROGERS 12 18 58 54 DRIVE 136 Chestnut Hill College 8 694 GERMANTOWN LEGEND HILLCREST 68 204 21 453 96 456 20 68 232 16 - SIGNALIZED INTERSECTION 5 56 131 563 2 Sugar Loaf Hill 6 451 466 631 BELLS MILL 51 463 200 420 131 ROAD 3 531 165 582 33

Orth-Rodgers & Associates, Inc. TRANSPORTATION ENGINEERS AND PLANNERS Future PM Peak Hour Traffic Volumes Chestnut Hill College PHILADELPHIA, PENNSYLVANIA FIGURE 8 43 12 5 45 2009_125_Figs.cdr Lincoln Woods Apartments 0 312 8 0 1 NORTHWESTERN 340 30 38 383 345 985 631 212 25 94 253 23 9 60 0 2 23 332 10 26 42 4 80 409 26 6 11 9 150 ROGERS 63 8 58 65 DRIVE 13 Chestnut Hill College 9 458 GERMANTOWN LEGEND HILLCREST 61 60 20 53 216 635 16 58 358 64 - SIGNALIZED INTERSECTION 120 45 22 18 22 24 Sugar Loaf Hill 25 439 33 854 BELLS MILL 54 341 159 292 123 ROAD 24 440 121 562 585

Orth-Rodgers & Associates, Inc. TRANSPORTATION ENGINEERS AND PLANNERS Future AM Peak Hour Levels of Service Chestnut Hill College PHILADELPHIA, PENNSYLVANIA FIGURE 9 b(14) Lincoln Woods Apartments a(0) a(0) C(31) C(33) ROGERS DRIVE Chestnut Hill College GERMANTOWN C(21) D(44) a(1) b(12) C(22) A(10) D(38) b(14) B(18) B(13) A(6) A(3) A(5) A(5) C(24) B(16) HILLCREST C(2) D(45) D(45) C(25) B(11) D(49) A() D(51) D(38) C(34) D(53) 2009_125_Figs.cdr NORTHWESTERN C(23) LEGEND - SIGNALIZED INTERSECTION A(#) - SIGNALIZED LEVEL OF SERVICE (DELAY IN SECONDS) a(#) - UNSIGNALIZED LEVEL OF SERVICE (DELAY IN SECONDS) Sugar Loaf Hill BELLS MILL ROAD

Orth-Rodgers & Associates, Inc. TRANSPORTATION ENGINEERS AND PLANNERS Future PM Peak Hour Levels of Service Chestnut Hill College PHILADELPHIA, PENNSYLVANIA FIGURE 10 c(18) Lincoln Woods Apartments a(0) a(1) C(26) C(32) ROGERS DRIVE Chestnut Hill College GERMANTOWN B(18) E(6) a(1) b(12) B(20) B(12) D(40) c(16) B(1) A(9) A(6) A(6) A(9) A(5) E(8) C(33) HILLCREST D(55) D(43) E(59) E(5) B(20) C(23) A(8) D(35) C(20) B(19) B(19) 2009_125_Figs.cdr NORTHWESTERN C(22) LEGEND - SIGNALIZED INTERSECTION A(#) - SIGNALIZED LEVEL OF SERVICE (DELAY IN SECONDS) a(#) - UNSIGNALIZED LEVEL OF SERVICE (DELAY IN SECONDS) Sugar Loaf Hill BELLS MILL ROAD