Gas Distribution Connection Forms

Similar documents
Distribution Connection Forms

Transmission Connection Forms

KEPPEL GAS PTE. LTD.

Tuas Power Supply. Gas Retailer Handbook

Natural Gas Connection Policy and Procedures

HANDBOOK ON GAS SUPPLY - PROCEDURES AND REQUIREMENTS FOR SUPPLY OF NATURAL GAS

CITY GAS HANDBOOK ON GAS SUPPLY. Version 4

ACS.TPCP1 SAFETY ASSESSMENT CRITERIA INITIAL AND RE-ASSESSMENT NON-DOMESTIC NATURAL GAS; LPG; OTHER GASES TESTING AND PURGING

Liquefied Petroleum Gas Market Regulations S.L

September 2018 Pressure Test

SAFETY FEATURES OF PORTABLE CRYOGENIC LIQUID CONTAINERS FOR INDUSTRIAL AND MEDICAL GASES

AB AMBER GRID RULES FOR NATURAL GAS TRANSMISSION SYSTEM BALANCING I. GENERAL PROVISIONS

Procedure: Pressure equipment safety

AB AMBER GRID RULES FOR NATURAL GAS TRANSMISSION SYSTEM BALANCING I. GENERAL PROVISIONS

THE APPROVAL FOR THE PROVISION AND USE OF A METER BY-PASS

ASSE International Product (Seal) Listing Program

Pressure Equipment Directive PED 2014/68/EU Commission's Working Group "Pressure"

Changes to the Gas. (Safety and Measurement) Regulations. effective 1 July 2013

IMPACT & IMPLEMENTATION REPORT SUMMARY SECTION (For AEMO to complete and administer)

INSTRUCTIONS FOR COMPLETING FORM H-9 STATEWIDE RULE 36 CERTIFICATE OF COMPLIANCE

Recommendation to the Minister of Energy by the Gas Industry Co on the Specification for Reticulated Natural Gas

BCGA GUIDANCE NOTE 17

Guide For Applicants MAIL ORDER SALES

Gas Safety Management Policy

6301 TYPE CAST IRON SAFETY VALVES

Measurement accessories METPOINT OCV for the measurement in systems up to 40 bar

MEMBERSHIP APPLICATION FORM

SUPPLY OF ISOLATION AND APPLIANCE VALVES PTS - APPLIANCE BALL VALVE

MAINTENANCE AND SAFETY OF CNG REFUELLING STATIONS

Receipt By Jurong Port Representative -To be filled by Jurong Port Representative No Item Yes No Remark 1.

Please read this document of Terms and conditions carefully so that you fully understand our responsibilities and your commitments.

JGCC Handicapping System. JGCCHS Rules and Regulations (2011)

Official Journal of the European Union L 92/3

INSPECTION, TESTING AND CERTIFICATION OF GASFITTING WORK DONE UNDER SUPERVISION

American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM

Gas Safety Code of Practice

ARAI/TA(4G)/HORIBA/MEXA 584L/ Dated 19 th Jun 2008 CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES

BUGGY POLICY Heacham Manor & Searles Resort Golf Clubs Use of Ride-on Buggies on the Golf Course.

SSR Competency Assurance Guidance Booklet No.2 (SSR Summary for Contractors CP) Revision 0 October 2014 HSEQ Department, TRANSCO

Thames Water Utilities Limited (TWUL) Wholesale Data logger installation for revenue meters - terms, conditions and guidance

Class 2 Gases Learning Tool

INSTITUTION OF GAS ENGINEERS AND MANAGERS

American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM

* William A. Sala, Jr. John A. Roscher. Columbia Gas Transmission, LLC * Sorana Linder 700 Louisiana Street, Suite 700 Director, Regulated Services


American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM

New Hampshire Public Utilities Commission CFR 49 Part 192 Regulations. MINIMUM Pipeline Safety Regulations

American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM

Approved Installation Method (AIM)

Safety Please read and keep in a safe place Operating instructions Linear flow control VFC Linear flow control with actuator IFC

UTAS EH&S INSTRUCTION No. 036 June 2012 Revision No. 3. Purging of Flammable Gas Equipment and/or Piping (Explosion Hazard)

Nottingham Township 909 Sugar Run Road Eighty Four PA (724) Fax (724)

INTERCONNECTION AGREEMENT. (UK-CONTINENT INTERCONNECTOR) Amended and Restated (25 th September 2015) between NATIONAL GRID GAS PLC.

Pressure Equipment Directive PED 2014/68/EU Commission's Working Group "Pressure"

Sample Written Program for The Control of Hazardous Energy (Lockout/Tagout)

Occupational Safety and Health (Vessels under Pressure) GN. No. 274 (contd.)

High-Pressure Boiler Inspection Procedures: A Complete Checklist

GAS DELIVERY PRESSURE AND MEASUREMENT

AUTHORISE THE SETTING AND SEALING OF REGULATORS AND ASSOCIATED SAFETY DEVICES. AUTHORISE THE INSTALLATION OF A METER BY- PASS

Connected Systems, CSEPs and ISEPs

APPLICATION FOR PROFESSIONAL / APPRENTICE JOCKEY LICENCE

SUPPLY OF ISOLATION AND APPLIANCE VALVES PTS - ISOLATION BALL VALVE

MSC Guidelines for Compressed Air Systems

TENDER FOR THE SUPPLY OF MEDICAL OXYGEN AND NITROUS OXIDE GASES CYLINDERS FOR ONE YEAR.

Veterinary Services Animal Health

Allowances, Assessment Requests and Incentive Payments. U pdated - 3 rd October 2016

STS 650 PRESSURE EQUIPMENT

American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM

Safety. Operating instructions Solenoid valve for gas VG 6 VG 15/10 DANGER. Contents WARNING CAUTION. Changes to edition 09.14

Your water byelaws explained

PECIMEN IMM6. Minor Electrical Installation Works Certificates. Amd 3: In accordance with BS 7671

NSW ABORIGINAL RUGBY LEAGUE KNOCKOUT 2017 NOMINATION FORM. Instructions to Nominee Clubs. Your participation

REFERENCE SPECIFICATION FOR END

RE: PROPANE SYSTEM & REGULATOR TESTING/INSPECTION PROCEDURE

CITY AND COUNTY OF DENVER POLICY DENVER FIRE DEPARTMENT. Number: 2015 IFC Effective Date: February 1, 2017 Page 1 of 5

G REQUIRMENTS FOR BRANCH LINES SUPPLYING MULTIPLE REGULATORS AND / OR METERS. 3 and Gas Blue Book

THE FOLLOWING MATERIALS ARE FOUND IN THIS PACKET:

CERTIFYING GASFITTER

REQUESTING GAS SERVICE PIPE PRESSURE AND CAPACITY INFORMATION FROM GAS TRANSPORTERS.

USER GUIDE. Fog Generator. ATMOSPHERE APS TM Series Haze Generator. MAX APS TM Series. No: , Revision A/a

Code of Practice for Veterinary Surgeons Passports and Medicines. European Community (Equine Stud Book & Competition) S. I.

PRESSURE SYSTEMS POLICY

G REQUIREMENTS FOR THE INSTALLATION OF GAS BOOSTERS, MICROTURBINES AND ASSOCIATED SYSTEM PROTECTIVE DEVICES

Durham Soccer League. Rights and Responsibilities

PLAYER STATUS, PLAYER CONTRACTS AND PLAYER MOVEMENT REGULATIONS

Interconnected Party (IP) Rights and Obligations. In relation to Interconnection Agreements (ICAs), the Final Assessment Paper (FAP) determined that:

CLASS DH - PNEUMATIC TESTING - GREATER THAN 1 BAR (15 PSIG)

Self-Certification Documentation

Gas Interruptions. customer guide

ISSUING AGENCY: New Mexico Department of Game and Fish. [ NMAC - Rp, NMAC, 01/01/2018]

APPENDIX 4 STANDARD FORMAT FOR THE PROCEDURES AND ARRANGEMENTS MANUAL

CITY AND COUNTY OF DENVER POLICY DENVER FIRE DEPARTMENT

Safety. Operating instructions Magnetic relief valve VAN DANGER. Contents WARNING CAUTION. Changes to edition 11.11

ACCESSORY KIT INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

TOWN OF BURLINGTON HUNTING POLICY 2013 ARCHERY SEASON FOR DEER IN THE LANDLOCKED FOREST

For such purposes, UEFA intends to organise a tendering process ( Tender ).

RESOLUTION 15/04 CONCERNING THE IOTC RECORD OF VESSELS AUTHORISED TO OPERATE IN THE IOTC AREA OF

HARVARD FOREST RESEARCH SHOOTING POLICIES AND PROCEDURES

ISLE OF MAN GAMBLING SUPERVISION COMMISSION

Transcription:

Gas Distribution Connection Forms Updated on: 1 April 18

Gas Distribution Connection Forms S/No. Form No. Description 1 GDP101 Application for Gas Distribution Connection 2 GDP102 Consumer Project Data Sheet (For information only) 3 GDP105 Application for Admittance of Gas 4 GDP106 Certificate of Completion 5 GDP107 Certificate of Final Pressure Test 6 GDP108 Certificate of Proof Test 7 GDP111 Authorisation to Turn On Gas Meter Control Valve

APPLICATION FOR GAS DISTRIBUTION CONNECTION To: PowerGas Ltd c/o HOS (Gas Network Planning) Signature of Retailer Representative GAS CONNECTION TO: (Address of Gas Installation) I would like to apply for connection to the PowerGas gas distribution pipeline network for the above project. I hereby submit the following documents and certify that the information provided is correct: Consumer Project Data information Location / site plan showing the project site and proposed connection point(s) Pipe route from property boundary to the Meter Installation and location of Meter Installation where applicable. Name of Applicant : Designation : Company : Signature/ Date: GDP101

Consumer Project Data Sheet Project Name : Consumer Information Address of Premises/ Development : Request type : Retailer switch (NG only) / New supply connection * Consumption Information Type of Gas : Town Gas / Natural Gas * Consumer Type : Residential / Non-residential * Application of Gas : Co-Gen / Tri-Gen / Boiler / Cooking / Water Heating / Others* If Others, please specify : Shipper Name (NG only) Injection Point (NG only) Gas Consumption Duration per Day Expected Gas Admittance Date (DD/MM/YY) Gas Usage Applicable to NG projects only* Load profile 8 / 12 / 24* hours or otherwise please specify : If gas supply is meant for interim use (less than 5 yrs), please specify duration of gas usage in years: Delivery Pressure and Flowrate Year 1 Year 2 Year 3 Year 4 Year 5 Maximum Instantaneous Flowrate: Sm 3 /hr Applicable to TG projects only* MPRS Outlet Pressure Design pressure of gas installation Average Monthly Consumption Maximum Instantaneous Flowrate: barg kwh/mth Sm 3 /hr barg Submitted by Applicant Confirmation by Retailer Name of Company : : Name of Officer : Name of Officer : Designation : Designation : Date : Date : I agree with the above information provided by the applicant. Signature : Signature : Note : The above is for information purposes only. PowerGas may not be able to nor is obliged to fulfill any of the above requirements. *Delete where applicable GDP102

PowerGas Ltd APPLICATION FOR ADMITTANCE OF GAS Signature of Retailer Representative (Address of Premises / Development) (A) i Ii iii I, the Designated Representative (DR) of the above project, certify that, The gas installation from, but excluding, the GSIV up to, but excluding, the meter installation is ready to receive gas. The consumer internal pipe is not connected to the meter installation. I attached the following forms for your reference please: - GDP 106 Certificate of Completion - GDP 107 Certificate of Final Pressure Test iv v All end points are capped / blanked / plugged off I undertake to conduct Proof Test and submit GDP 108 Certificate of Proof Test immediately prior to the connection. *PE / LGSW No. : Name, Signature and Stamp of DR / Date (B) I hereby request for admittance of gas to the gas installation up to, but excluding, the meter installation on. Signature of Applicant / Date To the Retailer: This is to confirm gas admittance shall be carried out on (date) at (time). Please notify all relevant personnel to be present on site. Name : Designation : SPPG Officer-in-charge GDP105

PowerGas Ltd CERTIFICATE OF COMPLETION Signature of Retailer Representative (Address of Premises / Development) I, the Designated Representative of the above project, hereby certify that the Gas Installation for the above project from, but excluding, the GSIV up to, but excluding, the Meter Installation have been designed and constructed in compliance with the requirements of the latest revision of the following: Gas Act (Cap 116A); Gas (Supply) Regulations; Gas Supply Code; Singapore Standard, SS 608 Code of Practice for gas Installation; Other relevant code / standard : All relevant acts, regulations and rules which are applicable to the gas installation; All statutory and relevant codes which are applicable to the gas installation; All statutory requirements in government laws and relevant regulations of government departments. 2 The design pressure of the Gas Installation is barg. Name : Signature and Stamp of DR / Date PE / LGSW * No. : GDP106

PowerGas Ltd CERTIFICATE OF FINAL PRESSURE TEST Signature of Retailer Representative (Address of Gas Installation) 1. I, Designated Representative of the above project, hereby certify that the Gas Installation from, but excluding, the GSIV up to, but excluding the Meter Installation, has been successfully tested and passed the final pressure test in accordance to the requirements of: Note: Please tick below where applicable Codes / Standards Singapore Standard, SS 608 Code of Practice for Gas Installation; or Other relevant code / standard: Pressure Test Test First test Second test Other test Pressure (Barg) Duration (Hour) Date Passed 2. I hereby declare that the Maximum Allowable Operating Pressure (MAOP) and the Design Pressure of the above Gas Installation is (Barg) and (Barg) respectively. 3. I shall notify all parties concerned that the Gas Installation has been completed and pressure tested. Signature and Stamp of DR / Date Name: PE / LGSW * No.: * Delete where applicable GDP107

PowerGas Ltd CERTIFICATE OF PROOF TEST Signature of Retailer (Address of Premises / Development) I, Designated Representative of the above project, hereby certify that the Gas Installation for the above project from, but excluding, the GSIV up to, but excluding, the Meter Installation have been tested and successfully passed the proof test 1 on (date). 2 I further certify that the test pressure has been released and the said Gas Installation is currently at atmospheric pressure. Accordingly, I hereby request to proceed with the connection and gas admittance. 3 I shall undertake to purge and commission the Gas Installation from, but excluding, the GSIV up to, but excluding, the Meter Installation immediately after the gas admittance. Signature and Stamp of DR / Date Name : PE / LGSW * No. : 1 Proof test shall be conducted in accordance to the requirements of Singapore Standard SS 608 for installation designed to operate up to 50 kpa or 20 kpa respectively, otherwise, proof test shall be carried out at 100 kpa or the operating pressure, whichever is lower, for a period of 30mins. REQUEST FOR INTERIM ADMITTANCE OF GAS I, Designated Representative of the above project, hereby certify that the Gas Installation for the above project from, but excluding, the GSIV up to, but excluding, the Meter Installation have been prepared and is ready for purging and commissioning. Please proceed to admit gas for the purpose of purging and commissioning. Signature and Stamp of DR / Date Name : PE / LGSW * No. : * Delete where applicable GDP108

Date : AUTHORISATION TO TURN ON GAS METER CONTROL VALVE PowerGas Ltd (Address of Premises / Development) I, Project Coordinator ( PC ) of the above project, certify that all legal requirements pertaining to gas safety have been complied with, including (but not limited to) (*) Regulation 3(4)(b) of the Gas (Supply) Regulations. 2 I hereby authorise PowerGas to turn on the Gas Meter Control Valve on my behalf now on (date) at (time). Signature of PC Name : Designation : : * Regulation 3(4)(b) of the Gas (Supply) Regulations states that where an application for a supply of gas (or for an increase to an existing supply) is made to a gas retailer the relevant gas retailer shall prior to turning on the gas supply at the relevant gas meter control valve, ensure that the appropriate test as specified in the Gas Supply Code is conducted on the gas appliance and the consumer s internal pipe including the meter installation to ascertain that MPRS GDP111