Reflow Oven HHL3000 INSTRUCTION MANUAL POHUA - jedyny autoryzowany przedstawiciel w Polsce

Similar documents
Thermal Profiling the Reflow Process

D10S/D20S Wall/Post Mount Inflator Quick Start Manual

RAM 4021 Operation Manual

T i m i n g S y s t e m s. RACEAMERICA, Inc. P.O. Box 3469 Santa Clara, CA (408)

RAM 4021-PR. Operation Manual. Worldwide Manufacturer of Gas Detection Solutions

OC Panel High Limit Aquastat Kit, Manual Reset p/n

RAM Operation Manual. Worldwide Manufacturer of Gas Detection Solutions

Scoreboard Operator s Instructions MPC Control

RAM Operation Manual. Worldwide Manufacturer of Gas Detection Solutions

RAM Operation Manual

RAM 4021-DPX Operation Manual

Standard Operating Manual

A4s Operation Manual

TANK MANAGER FOR TWO TANKS OPERATING MANUAL. 10/31/11 C-More T6C L color touch panel

Sensoric 4-20 ma Transmitter Board Operation Manual

USER S INFORMATION MANUAL

A4 Operation Manual. Fig.1-1 Controller Socket Diagram

Datasheet: K-30 ASCII Sensor

unconventional-airsoft.com

DRS25 PROCESS DEVELOPMENT GUIDE.

Operating Instructions Part No

Installation & Maintenance Instructions TEC-11N TIMER. Analogue electronic timer 02/09

CÜBE. User Manual. American Weigh Scales. CUBE-100 (100g x 0.01g) CUBE-650 (650g x 0.1g)

BCM-Series. User Manual. American Weigh Scales. BCM-100 (100g x 0.01g) BCM-650 (650g x 0.1g)

Digital Vacuum Regulator

User Manual 1 P a g e Rev. V1.6-EN 11/08/2014

WAVE 300 XL. User Instructions

In Response to a Planned Power Outage: PPMS EverCool II Shut Down and Re-start Procedure

AXIS. User Manual. American Weigh Scales. AXIS-100 (100g x 0.01g) AXIS-650 (650g x 0.01g)

MS-500. User Manual. MS-500 (500g x 0.1g) Copyright 2010 Fast Weigh Scales All rights reserved. Rev. 2.0

EC214 EC215 - EC215R Bench Conductivity Meters

testo Leakage detector for refrigerants Instruction manual

OXY Integral. INTERCON ENTERPRISES INC Tel: Fax: Internet:

Roller AC Servo System

This symbol denotes what could lead to serious injury or death if you misuse the PAR-F27MEA. WARNING CAUTION

FAULT CODE TROUBLESHOOTING INDEX

T-937 lead-free reflow oven user manual

Welcome to the World of In-Home Gardening! Simple Steps to Get Your AeroGarden Up and Growing (No Tools Required)

Stand-Alone Bubble Detection System

PROPORTIONING VALVE. Model 150 INSTRUCTION MANUAL. March 2017 IMS Company Stafford Road

MP15 Jockey Pump Controller

EPSILON. User Manual. EP-5KG (5000g x 1g) Copyright 2011 American Weigh Scales, Inc. All rights reserved. Rev. 1.0

12V AIR STATION ALL-IN-ONE

The Science Behind Conveyor Oven Thermal Profiling

ECL Comfort 110, application 131 (valid as of software version 2.00)

User Manual GRI- 1500Li

Pegas 4000 MF Gas Mixer InstructionManual Columbus Instruments

MODEL 100 NITROGEN INFLATION CART

PTG100 Precision Test Gauge

Importance of Wave Height Measurement in Wave Solder Process Control

OFI MODEL 20 CONSTANT SPEED BLENDER INSTRUCTIONAL MANUAL

O P E R A T O R S M A N U A O P E R A T O R S M A N U A L L

AC : ACCURATE CRYOCHAMBER FOR A SMALL LABORATORY WITH SMALL BUDGET

Storage Shelving. User Manual [Revision 3.0 May 2017]

MODEL NUMBER: P-A AUTOMATIC PORTABLE COMPRESSOR

FOOD INTAKE MONITOR. Hardware and Software User s Manual DOC-047 Rev 3.0. Copyright 2009 All Rights Reserved

ACV-10 Automatic Control Valve

YSC-8330 USER MANUAL XI AN TYPICAL INDUSTRIES CO.,LTD.

CircuFlow Quick Setup Guide

model 304 ShrinQ PEDOMETER

MODEL NUMBER: PSI AIR SOURCE KIT 200 PSI Compressor on 2.0 Gallon 200 PSI Air Tank

Hydro-Control V User Guide

Digital Melting Point Apparatus

MODEL NUMBER: M20005 AIR SOURCE KIT. 30% Duty Compressor on. 2.0 Gallon Air Tank SAVE THIS MANUAL FOR FUTURE REFERENCE

LED CONVERSION BOARD - YAKUZA SERIES EGO/GEO

GV Standard X-Vent. Setup, Commissioning & Installation Guide

444C DUAL PERFORMANCE VALUE PACK

INSTRUCTION MANUAL. Includes: OPERATION SETUP USE & CARE SERVICE. SPORTS ATTACK LLC

Misaligned Folds Paper Feed Problems Double Feeds Won t Feed FLYER Won t Run iii

JOLLY2. Installation user s manual. 6 different operating modes selectable. version 3.3. DATA TO BE FILLED OUT BY THE INSTALLER (Page 1)

LCR-6-WT-EPP CYLINDER ROLLER EXPLOSION PROOF SERIES INSTRUCTION MANUAL MANUAL NUMBER Rev A Issued November 2011

FRDS GEN II SIMULATOR WORKBOOK

TR Electronic Pressure Regulator. User s Manual

CCT-7320/ROC-2313 Reverse Osmosis Controller

Gas Countertop Griddle

accidents which arise due to non-observance of these instructions and the safety information herein.

Trion PECVD SOP IMPORTANT: NO PLASTIC, TAPE, RESISTS, OR THERMAL PASTE ARE ALLOWED IN THE CHAMBER

AIR COMPRESSOR OPERATING INSTRUCTION AND PARTS LIST

Module No GETTING ACQUAINTED GENERAL GUIDE TIMEKEEPING

450P AUTOMATIC PORTABLE COMPRESSOR EXTREME SERIES

Bante810 Benchtop Dissolved Oxygen Meter Instruction Manual

Instruction Manual BA90 Precision Barometer

9A5N Solid State CW Paddle

Operations Manual. Internal automatic Pressure control for orbital tube welding. By Exel Orbital Systems, Inc. Page

September 10, 2014 Revision 2. Puncher Unit-BE1/BF1/BG1/BH1 Service Manual

D-PAK Voiding: A Study to Determine the Origins of D-PAK Voiding

Operating Instructions Part No

Welcome to the World of In-Home Gardening! Simple Steps to Get Your AeroGarden Up and Growing (No Tools Required)

WELCOME TO THE REVOLUTION

Soft Systems. Log Flume - 1. Enter Specification. Activity One ACTIVITIES. Help. for Logicator

Model PSI Compressor with 3-Gallon Air Tank 12VDC

Electronic gas volume corrector model DGVC-04

MIL-STD-883G METHOD

TorMinal. Operating instructions V OCE-Rev.L_EN

Automatic Powder Trickler by Adam MacDonald

CONGRATULATIONS ON YOUR PURCHASE OF YOUR THUNDER COMPRESSOR For your personal safety please read, understand and follow the information provided in

77-I0PN230 Rev. A. Model 1030 User Manual

American Weigh Scales, Inc. BLADE Series D i g i t a l P o c k e t S c a l e BLADE-550. User Manual BLADE-400 BLADE-1000

ORB-400 BUBBLE/HAZE MACHINE. Item ref: UK User Manual

Version-E E100930

Transcription:

POHUA - jedyny autoryzowany przedstawiciel w Polsce www.pohua.pl AOYUE TONGYI ELECTRONIC EQUIPMENT FACTORY Jishui Industrial Zone, Nantou, Zhongshan City, Guangdong Province, P. R. China www.aoyue.com HHL3000 Reflow Oven INSTRUCTION MANUAL Thank you for purchasing Aoyue HHL3000 Reflow Oven. It is important to read the manual before using the equipment. Please keep manual in accessible place for future reference. Copyright 2007 16

This manual is designed to familiarize and instruct the technician with the proper operation and maintenance of the equipment. The Care and Safety Precautions section explains the hazards of using any type of soldering or reworking device. Please read carefully and observe the guidelines in order to maximize usage and minimize the risk of injury or accidents. OPERATING GUIDELINES 7. Press the START button again to return to the profile selection menu. 8. Repeat procedures D and E to continue working on boards using the same profile settings. NOTE: Profile setting would need to be manually re adjusted every time power is cut off from the system. ATTENTION Temperature settings presented in this manual are provided for reference purpose only. Please refer to device manufacturer data for the tolerances and characteristics of items to be soldered. Actual temperature settings for soldering and reworking are dependent on the size of the material to be soldered and solder paste reflow temperatures. Very high reworking temperatures can damage sensitive SMT materials. ERROR MESSAGES 1. Error messages occur when the temperature sensor detects over heat (over 250 C) or when the unit detects temperature abnormalities (e.g., sensor does not detect rising temperatures or sensor is damaged). The display will show the detected temperatures while displaying the Err message. 2. Error messages will also occur if the connector for the control and sen sor is not properly secured. Reconnect properly the sensor main controls wire if this happens. 3. When an error message is displayed, press the ON/OFF button to exit from the current process and begin from the start. Turn off the entire unit then on again. If error message recurs: Check the connection of the sensor main control wire Check the sensor inside the reflow system Check the heating lamps. Replace any defective parts as needed. 2 15

OPERATING GUIDELINES E. STARTING/ENDING THE REFLOW PROCESS 1. While the display is showing the Prof 1 screen, press the SET button to take us to Stage A and display our set duration for this stage. 2. Wait for the internal temperature to rise between the range 50 to 60 C. This temperature will be displayed on the top screen (1 from the panel). 3. When the display is between 50 to 60 C, start the reflow oven by pressing the START button (3 from the panel). The reflow oven would heat up and cool down based on the setting we indicated on profile 1. 5. After all five stages have finished, the display would show End indicating the entire process is completed. The upper display would still show the current internal temperature of the reflow oven. 6. Wait for the display to show a significantly low temperature before handling the contents. If it is desired to move the contents while hot, use appropriate tools or equipments to handle (hot) objects. NOTE: The reflow oven has a normal cool down rate of approximately 2 3 C/s, any value significantly larger than this would render the oven unable to keep up with the cool down rate. STAGE A E F P L Duration 130 80 70 70 99 Peak Temperature 130 170 195 220 58 Profile 1 (default values) STAGE A E F P L Duration 130 78 65 65 99 Peak Temperature 130 160 185 210 58 Profile 2 (default values) TABLE OF CONTENTS Product Description. 4 Package Inclusion. 5 Installation/Setup. 5 Specifications.. 6 Functions and Features. 6 Safety Precautions 7 Control Panel Guide. 8 Operating Guidelines.. 9 15 Initial Procedures Profile selection Profile setup Preparing the Board Start/End of reflow process WARNING: Items can be very hot. Allow sufficient time for items to cool down before handling. Use proper equipment to handle hot objects. 14 3

PRODUCT DESCRIPTION The Aoyue HHL3000 Reflow Oven is a highly versatile equipment used for reflowing and preheating different SMT components and PCB. The system utilizes a microcontroller to effectively and efficiently manage the working temperature while facilitating the duration of the heating process. It has a bright LED display that clearly displays the time and temperature plus a fully digital control panel for monitoring and ease of use. The system makes use of infrared (IR) heat wave technology to distribute heat evenly on the component and PCB. It has also an integrated temperature sensor that is positioned in such a way that the actual temperature measurement of the PCB and component is obtained. This provides effective measure to minimize damage to the board and its components due to thermal shock or low temperature level conditions. OPERATING GUIDELINES Cooling Stage The cooling rate of the solder joint after reflow is generally recommended to be very fast to allow smaller grain size of the solder. Otherwise, if the cooling rate is slow, increased grain size causing relatively weaker solder joints would result. 16. When the duration for stage L has been adjusted, press SET button. 17. The display will indicate the set peak temperature value required at the end of stage L. The display will show u058, which means the temperature would decrease until the set temperature of 58 C is reached at the end of stage L. The set peak temperature can be adjusted by pressing the + and buttons. To compute for the falling slope rate of stage L, subtract the temperature at the beginning of the stage L (which is approximately 220 C) from the peak temperature at the end of stage L (for this example 58 C). Divide the answer by the duration in seconds. (58 C 220 C)/70= 1.63 C/s. Therefore the slope rate of stage L, is around 1.63 C/s. 18. Pressing the SET button would bring us back to Prof 1 display. We can now start utilizing the reflow oven using our set parameters. D. PREPARING THE BOARD 1. Prepare the board to be reflowed. 2. Apply solder paste to the pads of the board. 3. Place the components to its proper footprint on e board. 4. Pull out the reflow oven tray and carefully place the board at the center of the tray. WARNING: The tray could be very hot. Handle the tray with caution to avoid injury to personnel or damage to equipments. 5. Place the temperature sensor at the center of the board and make sure the thermal sensor tip is touching the board or the top of a component. 6. Push the drawer back to close the reflow oven. 4 13

OPERATING GUIDELINES To determine the rising slope rate of stage F, subtract the tem perature at the beginning of stage F (which is approximately 170 C) from the set peak temperature at the end of stage F (for this example 195 C). Divide the difference by the duration in seconds. (195 C 170 C)/70= 0.35 C/s. Therefore the slope rate of stage F, is around 0.35 C/s. 12. Press the SET button again. The display would change to P070, which means we are now in Stage P. The duration for stage P is 70 seconds. Stage P can also be set as the reflow stage. WARNING: Be extra careful when setting the temperature during reflow stage. Very high temperature may cause boards to char or burn. If the temperature is too low, cold solder joints will occur. The peak temperature in this zone should be sufficient enough for adequate flux action and obtain good wetting. 13. When the duration for stage P has been adjusted, press SET button. 14. The display will indicate the set peak temperature value required at the end of stage P. The display will show o220, which means the temperature would slowly increase until the peak temperature of 220 C is reached at the end of stage P. The set peak temperature can be adjusted by pressing the + and buttons. To compute for the rising slope rate of stage P, subtract the tem perature at the beginning of the stage P (which is approximately 195 C) from the peak temperature at the end of stage P (for this example 220 C). Divide the answer by the duration in seconds. (220 C 195 C)/70= 0.35 C/s. Therefore the slope rate of stage P, is around 0.35 C/s. 15. Press the SET button again. The display would change to L099, which means we are now in Stage L. The duration for stage L is 99 seconds. Stage L can also be set as our cooling stage. PACKAGE INCLUSION PCB Holder Main Unit Sensor Main controls connector Power Cord Instruction Manual INSTALLATION / INITIAL SETUP Connect the Sensor Main controls connector wire to the receptacles found at the side of the main controls and front of the unit. 12 5

SPECIFICATIONS MAIN STATION Power Input Station Dimensions Weight Heating Power FUNCTIONS and FEATURES Microprocessor controlled equipment. Direct PCB temperature measurement, improves accuracy and lessens damage or distortion. Five (5) temperature and time control points with automatic slope adjustment. Configurable to suit different solder paste and circuit boards. Two (2) default profiles suitable with most common solder paste specifications. Quick and easy resetting of control points for precise tuning of reflow profiles. Built in safety feature of industry standard 0.01 C/s to 3 C/s rising slope. Fully digital panel controls and read out of time and temperature for monitoring and ease of use. Highly compatible with lead free applications. Available in 110V / 220V 360 (l) x 385 (w) x 190 (h) mm 3.5 Kgs. 1100W Temperature Range 100 C 250 C Heating Element Type Valid Solder Area Standard reflow time Rising slope Infrared 210 mm x 190 mm 4 mins 8 mins 0.01 /s to 3 /s OPERATING GUIDELINES The purpose of the Soak Stage is to bring the temperature across the en tire board to a uniform level. The ramp rate in this stage should be very low. The temperature is now raised at around 150 C to 195 C. A very high tem perature in this stage can cause solder splatter due to excessive oxidation of paste. The soak stage also acts as the flux activation zone for solder paste. 7. When the duration for stage E has been adjusted, press SET button. 8. The display will indicate the set peak temperature value required at the end of stage E. The display will show c170, which means the temperature would slowly increase until the peak temperature of 170 C is reached at the end of stage E. The set peak temperature can be adjusted by pressing the + and buttons. To compute for the rising slope rate of stage E, subtract the temperature at the beginning of the stage E (which is approximately 130 C) from the peak temperature at the end of stage E (for this example 170 C). Divide the difference by the duration in seconds. (170 C 130 C)/80= 0.5 C/s. Therefore, the slope rate of stage E, is around 0.5 C/s. 9. Press the SET button again. The display would change to F070, which means we are now in Stage F. The duration for stage F is 70 seconds. Stage F can be set as continuation of soak stage or the start of the reflow stage. The default settings for Stage F is set as the con tinuation of the soak time and flux activation stage. 10. When the duration for stage F has been adjusted, press SET button. 11. The display will indicate the set peak temperature value required at the end of stage F. The display will show d195, which means the temperature would slowly increase until the peak temperature of 195 C is reached at the end of stage F. The set peak temperature can be adjusted by pressing the + and buttons. 6 11

OPERATING GUIDELINES The Pre Heat Stage Pre heating is a requirement to avoid thermal shock to sensitive components and warping of the board. The appropriate tem perature should be around 100 130 C. During pre heating, if the tempera ture increase rate is too fast (>3 C), the solder paste may explode and splatter causing solder balls which may then cause a short circuit. Therefore, proper temperature setting should be observed. 3. With the display showing Prof 1, press the SET button (5 from the panel). The display would show the default setting which is A130 in the lower duration/time display window (2 from the control panel). The upper display (1 from the control panel) would show the current internal temperature. 4. The default duration for stage A is 130 seconds. Press SET when duration of stage A is adjusted. NOTE: Always keep the drawer closed when setting the profile. This is required as the oven stabilizes the internal temperature to 50 C. 5. The display would change to the set peak temperature value that is required at the end of stage A (Pre Heat stage). The display will show b130, which means the temperature would slowly increase until the peak temperature of 130 C is reach at the end of stage A. The set peak temperature can be adjusted by pressing the + or buttons (6 or 7 from the panel). To compute for the rising slope rate of this stage, subtract the tempera ture at the beginning of the stage A (which is approximately 50 C) from the peak temperature at the end of stage A (for this example 130 C). Di vide the difference by the duration (in seconds). (130 C 50 C)/130= 0.6 C/s. Therefore the slope rate of this stage (stage A, pre heat stage ) is 0.6 C/s. 6. Press the SET button. The display would change to E080, which means we are now in Stage E. The duration for stage E is 80 seconds. Stage E is also normally set as our soak time. 10 SAFETY PRECAUTIONS CAUTION: Improper usage can cause serious injury to personnel and/or damage to equipment and work area. For your own safety, please observe the following precautions. Check each component after opening the package to make sure everything is in good condition. If there are any suspected damage, do not use the item and report the issue to your vendor. Turn OFF the main power switch and unplug the device from the main power source when moving the device from one location to another. Do not strike or subject the main unit (and all its components) to physical shock. Use carefully to avoid injury and damage to any part. Handle with care. Never drop or sharply jolt the unit. Contains delicate parts that may break if the unit is dropped. Make sure the equipment is always grounded. Always connect power to a grounded receptacle. Temperature may reach as high as 300 C when switched ON. Do not use the device near flammable gases, paper and other flammable materials. Do not touch heated parts, which can cause severe burns. Do not touch metallic parts near the tip. Disconnect the plug from the main power source if the unit will not be used for a long period. Power OFF the device during breaks, if possible. Use only genuine replacement parts. Turn off power and let the unit cool down before replacing any part. The unit may produce a small amount of smoke and unusual odor dur ing initial usage. This is due to the flux contained inside the solder paste. This is normal and should not yield any negative impact. Soldering process produces smoke use on well ventilated places. Do not alter the unit, specifically the internal circuitry, in any manner. 7

CONTROL PANEL GUIDE 1 2 START Temperature Duration /Time 3 SET b120 A060 STANDBY WORKING SETUP CONTROLS 4 5 6 7 LEGEND: 1 Actual and Set Temperature display 2 Timer and duration display 3 Operation Lamp 4 Start button 5 Set button 6 Increase button 7 Decrease button 8 On/Off button IMPORTANT REMINDERS: 1. Make sure the equipment is placed on a flat stable surface. 2. Ensure all function switches are OFF prior to reworking. 3. Ensure all terminal connections are properly secured. C Sec. ON OFF 8 OPERATING GUIDELINES IMPORTANT: Please refer to the CONTROL PANEL GUIDE A. INITIAL PROCEDURES page for buttons and display panel directory. 1. Make sure all function switches are deactivated and all terminal connections properly secured. 2. Plug the device to the main power source using the power cord provided in the package. 3. Switch the unit ON via the switch located at the back of the unit. 4. The display would show AOYUE briefly then revert to displaying OFF. B. PROFILE SELECTION 1. Follow initial procedures, A. INITIAL PROCEDURES. 2. Press the ON/OFF button (8 from the control panel ). 3. The display would show Prof 1, which means Profile 1 will be used. Profile 1 is preset with an estimated generic working reflow profile. Profile 2 is preset for preheating boards for reworking. Components to be removed should be extracted before the cool down stage (last stage L ) goes into effect. 4. Pressing the increase or decrease buttons (6 and 7 from the control panel, respectively) would change the Prof 1 to Prof 2, which means profile 2 has been selected. 5. When the required profile is selected press SET (5 from control panel). C. PROFILE SETUP 1. Follow initial procedures, A. INITIAL PROCEDURES. 2. Setting up the pre heat stage: This stage is labeled as A at our profile panel with temperature at point b as the peak temperature reached when stage A is over. 8 9