STATUS OF 2009 PEDESTRIAN MASTER PLAN (AS OF DECEMBER 2013)

Similar documents
Designing for Pedestrian Safety in Washington, DC

The DC Pedestrian Master Plan

Pedestrian & Bicycle Safety Innovations & Applications

Citywide Sidewalk and Crosswalk Programs

Transportation Planning Division

Draft North Industrial Area-Wide Traffic Plan

Pedestrian Project List and Prioritization

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Pedestrian Safety Guide for Transit Agencies

CITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL

System Performance Innovation FACT Sheet Hawk Pedestrian Beacon

EVALUATION OF HAWK SIGNAL AT GEORGIA AVENUE AND HEMLOCK STREET, NW IN THE DISTRICT OF COLUMBIA FINAL REPORT. August 30, 2010

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

TOWN OF MORAGA MORAGA WAY AND CAMINO PABLO/CANYON ROAD IMPROVEMENTS Town Council Meeting March 13, 2019

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

PEDESTRIAN SAFETY IMPROVEMENT EVALUATION GUIDELINE FOR UNCONTROLLED CROSSINGS

GLOSSARY CROSSWALK. CROSSING TYPES

Project Team. Refined Pedestrian Crossing Toolbox. Problem Statement. Aerial of Study Corridor. Crossing Accommodations and Pedestrian Fatalities

Broad Street Bicycle Boulevard Design Guidelines

Designing for Pedestrian Safety

Geary Corridor Bus Rapid Transit SFMTA Citizens Advisory Committee

Appendix A: Crosswalk Policy

POLICY: TRAFFIC CALMING

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

The District of Columbia s. Multimodal Long-Range Transportation Plan. Pedestrian Element. October 2014

Outreach Approach RENEW SF served as the primary liaison with the North Beach community; the Chinatown. Executive Summary

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Oakland Pedestrian Master Plan Oakland Pedestrian Plan Draft Recommendations Chapter Outline

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

Pedestrian Safety at Interchanges

Pedestrian, Bicycle and Traffic Calming Strategic Implementation Plan. January 18, 2011

INTERSECTION CRASH COUNTERMEASURES

Omaha s Complete Streets Policy

Effective Pedestrian & Bicycle Safety Enforcement

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Citizen Advisory Group Meeting #8 May 5, Welcome. Today s meeting will focus on: Land Use & Transportation CHARLOTTEPLANNING.

Project Goal and Description. Why Broadway? Broadway SFMTA.COM/BROADWAY. The goal of the Broadway Safety Improvement

This page intentionally left blank.

SR 693 (Pasadena Avenue) Corridor Study from Shore Drive South to 66 th Street

Vision Zero Task Force June 28, 2017 COUNTERMEASURE PAIRING

CITY OF SARATOGA SPRINGS PEDESTRIAN CROSSING TOOLBOX

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Active Transportation Facility Glossary

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

Pedestrian Crossing Guidelines 2016

Pine Hills Road Pedestrian/Bicycle Safety Study Community Meeting #1

5 CIRCULATION AND STREET DESIGN

Chapter 3: Multi-Modal Circulation and Streetscapes

North Avenue Corridor Study

CITY MANUALS AND STANDARDS REVIEW

Pedestrian Road Safety Audit

Pedestrian Safety: A Federal Perspective. Emmett McDevitt Transportation Safety Engineer September 28, 2010

HAWK Signal. Pedestrian Safety. Illinois Traffic Engineering & Safety Conference Thursday, October 21, 2010

Station Plan: Penn & 43rd Avenue

Lynchburg District Update

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

Hennepin County Pedestrian Plan Public Comment Report

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

UNCONTROLLED PEDESTRIAN CROSSING GUIDELINES

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

PEDESTRIAN ACTION PLAN

MEMORANDUM. Date: 9/13/2016. Citywide Crosswalk Policy

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods

Mayor s Pedestrian Advisory Council. Wednesday, May 4

Addendum to SDDCTEA Pamphlet 55 17: Better Military Traffic Engineering Revision 1 Effective: 24 Aug Crosswalk Guidelines

Chapter 2: Standards for Access, Non-Motorized, and Transit

Intersection Improvement: Sturgeon Road, Silver Avenue and Murray Park Road Roundabout. Welcome. Public Information Session

PEDESTRIAN CROSSING TREATMENTS

EMPHASIS AREA 1: PEDESTRIANS

Geary Corridor Bus Rapid Transit

San Jose Transportation Policy

Access Management Regulations and Standards

Improve the livability of our streets by

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Vision Zero Priority Projects (March 2017)

NEWMARKET UPHAM S CORNER

BENNING ROAD & BRIDGES TRANSPORTATION IMPROVEMENTS CRASH DATA AND SAFETY ANALYSIS TECHNICAL MEMORANDUM DRAFT MAY 2016

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

122 Avenue: 107 Street to Fort Road

Transportation Planning Division

Chapter 5: Crossing the Street

Bicycle Master Plan Goals, Strategies, and Policies

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

City of San Diego Vision Zero Draft Strategic Plan FY 2017

Working Group Meeting

Preliminary Transportation Analysis

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017

Double the amount of bicycle ridership while at the same time reducing the number of bicycle crashes by one-third.

Implementing Complete Streets in Ottawa. Project Delivery Process and Tools Complete Streets Forum 2015 October 1, 2015

PRESS RELEASE San Joaquin Council of Governments

Road Diets FDOT Process

Bicycle Boulevards and Neighborhood Greenways

Broadway Street Pedestrian Safety Study Cass Street to 700 Feet North of Randall Avenue

2. Vision & Goals. Vision. Santa Rosa is a community where walking and bicycling are comfortable and convenient for people of all ages and abilities.

Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation

Transcription:

Appendix P.1 STATUS OF 2009 PEDESTRIAN MASTER PLAN (AS OF DECEMBER 2013) The 2009 Pedestrian Master Plan establishes 21 core recommendations in three goal areas to improve pedestrian transportation in the District of Columbia. This section provides an update showing progress between the completion of the 2009 Plan and updates in both February and December 2013. MULTIMODAL LONG RANGE TRANSPORTATION PLAN (wemovedc.org) 2009 PEDESTRIAN MASTER PLAN UPDATE

1.1: Ensure all transportation and real estate development projects include safe and convenient pedestrian facilities Streetscape on 18th St. NW in Adams Morgan, completed in 2012, included wider sidewalks, curb extensions, a new midblock crosswalk.3 Livability Studies (Rock Creek II, Far NE, and Far SE) produced several low cost, high impact safety projects. Notable among them is the traffic calming/ped refuge island project on Naylor Rd., completed in 2012. Put Great Streets projects here that were completed before 2013. DDOT's Great Streets Program has led to the reconstruction of several major and minor arterial corridors in the city to incorporate traffic calming and pedestrian safety elements. 1) The nearly 1 mile long Sherman Avenue NW corridor was significantly reconfigured from 4 thru lanes with very sub-standard sidewalks to two 14' wide thru lanes with a raised median, turn pockets, and wider sidewalks with tree/planting zone. Bus stops were moved to far side at uncontrolled intersections. Completed in 2013. 2) A.7 mile commercial stretch of Georgia Ave. NW, including the intersection of GA and New Hampshire Ave., incorporated two new traffic signals (one at a school) and extensive use of curb extensions to slow turning vehicles and reduce crossing distances. Thru lane configuration remained the same. 3) The 1.4 mile Nannie Helen Burroughs Ave. NE corridor has new and wider sidewalks/bike side path, and a consistent 2 thru lane cross-section with medians that calm traffic speeds and improve ped crossing safety at uncontrolled crosswalks. Completed in 2012. 4) A 1.34 mile section of Penn. Ave. SE has a raised median and turn pockets in place of a reversible 5th lane. Completed in 2011. 1.2: Implement improvements to high-priority corridors identified by this Plan 1.3: Construct new sidewalks where missing on streets in the District. Preliminary planning and design on Maryland Ave. NE and East Capitol St. are nearing completion. ARRA funds were dedicated to "filling the gaps" in the sidewalk network. DDOT's Asset Management group completed roughly 10 miles of sidewalk. DDOT continues to target high priority missing segments. DDOT has draft sidewalk policy for internal use that defines the process for adding new sidewalks. A new contract for sidewalk installation will be up and running in 2014 along with a new prioritization process. Several spot sidewalk projects have move forward in 2013, for roughly 5 blocks of new sidewalk. MULTIMODAL LONG RANGE TRANSPORTATION PLAN (wemovedc.org) 2009 PEDESTRIAN MASTER PLAN UPDATE

1.4: Improve the system for prioritizing sidewalk maintenance and repair. 1.5: Improve pedestrian access and safety at controlled crossings and intersections. 1.6: Improve pedestrian access and safety at uncontrolled crossings and intersections. 1.7: Improve pedestrian access and safety at bus stops while maximizing transit efficiency. In late 2012, the Pedestrian Advisory Council began to focus on this issue and will work with DDOT to improve the prioritization process. Leading Pedestrian Intervals have been implemented at nearly 100 intersections. All new signal timing uses slower walk speed. Using new R10-15 "Turning Veh. Stop for Peds" signs at selected intersections. A "Barnes Dance" all-red pedestrian phase signal was installed at 7th and H Sts. NW. Installed a HAWK/Pedestrian Hybrid Beacon on Georgia Ave. and conducted a safety study in 2009. Installed five Rectangular Rapid Flashing Beacons (RRFB) at crosswalks at selected locations in the city in 2010. Multiple crosswalk enhancements are planned as part of the Rock Creek II, Far NE, Far SE Livability Studies and Ped Corridors projects which draw heavily on countermeasures recommended in the Ped Plan. In spring of 2013, two new HAWK signals will be installed on Connecticut Ave. NW and several standard signals to address hazardous crossings across the City. Development review and street reconstruction projects are reviewed for bus stop siting by the DDOT safety staff. 117 intersections now have Leading Pedestrian Intervals. 5 new HAWK signals (6 total) installed in summer of 2013. More locations are receiving warrant analyses for possible installation in 2014.

2.1: Revise the DDOT Design and Engineering Manual to better address pedestrian needs, specifically incorporating the revisions identified in Appendix C and D. The 2009 revision of the DEM included some recommendations from the Ped Plan, for example on design speed and crosswalk safety. However, most of the recommendations were not incorporated. PPSA needs to be involved in contract scoping of next update project. 2.2: Issue new and/or revised independent policy statements as needed to support pedestrian safety and accommodation on District streets. 2.3: Provide education as necessary to roadway planners and designers responsible for improvements to the public rightof-way in the District to ensure they are fully aware of new policies and practices. 2.4: Evaluate progress on implementing the pedestrian design policies recommended in this Plan after 5 years. Policy positions have been circulated at the program level and these have been helpful in moving forward with crosswalk innovations, such as LPIs, HAWK signals and rapid flashing beacons. FHWA delivered a two day Designing for Pedestrian Safety training, Oct. 27-28, 2011. This same training was delivered in 2008 and a similar training was delivered by the Ped Plan consultant (Toole Design Group) in 2007. Additionally, several webinars have been held on pedestrianrelated issues. No action taken. 3.1: Increase penalties for motorists for infractions that impact pedestrian safety. 3.2: Develop an Educational Campaign Program for New Pedestrian Facilities DC City Council raised the penalties for drivers for four pedestrian safety violations from $50 to $250 and 3 license points in 2008. An educational brochure was developed and used for the pilot HAWK/Pedestrian Hybrid Beacon and the Barnes Dance.

MPD is responsible for implementing all automated enforcement. DDOT is in contact with MPD's Automated In November 2013, MPD expanded automated 3.3: Expand the District s Photo Enforcement program manager who is enforcement to include stop signs (16 locations) and Radar Speeding Reduction working to implement more automated uncontrolled crosswalks (8 locations). If this works Program speed enforcement technologies and well, more locations will be added. attempting to create automated enforcement of pedestrian right of way. 3.4: Expand the DDOT Pedestrian Program Website The DDOT Pedestrian/Bike website pages were reconfigured and expanded in June of 2011 3.5: Integrate walking information into the District of Columbia s official tourism site 3.6: Develop a tag line that conveys the walkability of the District of Columbia and promotes walking 3.7: Expand Pedestrian Safety Campaign Efforts 3.8: Conduct an Educational Campaign on the Benefits of Walking 3.9: Expand the Implementation of the Safe Routes to School Program No action taken No action taken The twice-annual regional Street Smart Safety Campaign continues to be DDOT principle outreach tool for pedestrian safety education. No action taken. Preliminary discussion with DDOT's Go DC Go TDM program coordinator indicates there may be an opportunity to use the Go DC Go website to create more "buzz" about the health benefits of walking. Since 2008, the DC SRTS program has provided planning assistance and significant implementation resources to 25 schools with more on the way. The program received the Oberstar Award in Award winning new visual materials debuted in Spring 2013. Sidewalk contract above is also a SRTS contract.

2009. 3.10: Develop a Snow Removal Educational Campaign Program The Active Transportation Program has been collaborating with DDOT's Snow Coordinator to develop a new policy for slow removal on sidewalks, curb ramps, and gutters. This will be implemented in the winter of 2011/2012