Bollard Pull. Bollard Pull is, the tractive force of a tug, expressed in metric tonnes (t) or kn.

HELSINKI COMMISSION HELCOM SAFE NAV 4/2014 Group of Experts on Safety of Navigation Fourth Meeting Helsinki, Finland, 4 February 2014

Preventing Damage to Harbour Facilities and. Ship Handling in Harbours PART 2 INDEX

CERTIFICATES OF COMPETENCY IN THE MERCHANT NAVY MARINE ENGINEER OFFICER

A methodology for evaluating the controllability of a ship navigating in a restricted channel

ABP South Wales Towage Guidelines. Date of issue: January ABP South Wales and River Usk Towage Guidelines

ITTC Recommended Procedures and Guidelines

APPROACH DEPTH(m) From East 15.0 From West From East 15.0 From West From East 15.0 From West ) ) From East 15.0 ) From West 16.

3 Star Open Canoe Assessment Notes

ITTC - Recommended Procedures and Guidelines

Numerical and Experimental Investigation of the Possibility of Forming the Wake Flow of Large Ships by Using the Vortex Generators

Conventional Ship Testing

Note to Shipbuilders, shipowners, ship Managers and Masters. Summary

Forth Ports Limited. Port of Dundee. Rig Move Guidelines

Hydrographic Surveying Methods, Applications and Uses

MANOEUVRING BOOKLET V1.06

Welcome to the Bollard Pull Calculator for Barges!

ITTC Recommended Procedures and Guidelines

ITTC Recommended Procedures and Guidelines

An Investigation into the Capsizing Accident of a Pusher Tug Boat

Challenges in estimating the vessel station-keeping performance

GUIDELINES ON OPERATIONAL INFORMATION FOR MASTERS IN CASE OF FLOODING FOR PASSENGER SHIPS CONSTRUCTED BEFORE 1 JANUARY 2014 *

DP Ice Model Test of Arctic Drillship

ITTC Recommended Procedures Testing and Extrapolation Methods Manoeuvrability Free-Sailing Model Test Procedure

Chapter 1 Boat systems

ITTC Recommended Procedures and Guidelines

WATER-FREE IOM MEASUREMENT IOMICA, 2005 March 4

New Vessel Fuel Efficient Design and Construction Considerations Medium and Long-Term Options

Development of TEU Type Mega Container Carrier

Marine Kit 4 Marine Kit 4 Sail Smooth, Sail Safe

Study of Passing Ship Effects along a Bank by Delft3D-FLOW and XBeach1

Code Of Practice For Towage Operations In The Port of St Helier (Towage Guidelines)

Crew Transfer Vessel (CTV) Performance Benchmarking. Presented by Stephen Phillips of Seaspeed Marine Consulting Ltd

NIS/NOR Circular. Category: Circular no.: 07/2007

Harbourmaster s Office Tamaki River. Navigation Safety Operating Requirements 2014

SECOND ENGINEER REG III/2 NAVAL ARCHITECTURE

SSK 37300DWT BULK CARRIER "ADFINES NORTH" Sea Trial Report 17/03/2012 Page4 SECTION1 SPEED TEST AND SHAFT-POWER MEASUREMENT

Port Sections Guide Section 01

Part 1: General principles

Development of an On-board Performance and Trial Trip Analysis Tool

Precision Liquid Settlement Array Manual

Columbia River Pilots Vessel Movement Guidelines. Table of Contents

AUTORIDAD DEL CANAL DE PANAMÁ EXECUTIVE VICE PRESIDENCY FOR OPERATIONS

Hempadur Multi-Strength GF Unsurpassed low friction, abrasion and ice resistant coating

Unit 18 LEAVING THE DOCK

Interceptors in theory and practice

Crew Transfer Vessel (CTV) Performance Plot (P-Plot) Development

MANOEUVRING BOOKLET V1.06

COURSE OBJECTIVES CHAPTER 9

SILENT CLASS NOTATION

Root Cause Determination of Excessive Hull Vibration On a First-In-Class Tugboat Design By Wylie Moreshead, P.E., Azima DLI

PROJECT and MASTER THESES 2016/2017

Full Scale Measurements Sea trials

Gorgon - Pilotage - Passage Plan PBG to Materials Offloading Facility (MOF)

SIGNIFICANCE OF SHAFTING LENGTH: A SUEZMAX TANKER DESIGN PROBLEM *

GUIDELINES FOR NAVIGATION UNDER THE CONFEDERATION BRIDGE

23 RD INTERNATIONAL SYMPOSIUM ON BALLISTICS TARRAGONA, SPAIN APRIL 2007

ITTC Recommended Procedures and Guidelines

SLOP RECEPTION AND PROCESSING FACILITIES

RULES FOR CLASSIFICATION Naval vessels. Part 1 Classification and surveys Chapter 5 Surveys for submarines. Edition January 2016 DNV GL AS

EXPERIMENTAL MEASUREMENT OF THE WASH CHARACTERISTICS OF A FAST DISPLACEMENT CATAMARAN IN DEEP WATER

S0300-A6-MAN-010 CHAPTER 2 STABILITY

Pre Feasibility Study Report Citiwater Cleveland Bay Purification Plant

Chapter 2 Hydrostatics and Control

SHIPS FOR NAVIGATION IN ICE

Deckhand Crew. Deckhand Crew Responsibilities

Transport Infrastructure Act 1994 Gladstone Ports Corporation. Port Notice 04/17 LNG Vessel Operating Parameters

Rules for Classification and Construction Additional Rules and Guidelines

NEW BUILD - SB-ST 19 Steel Trawler Listing ID:

Enhancing tug safety through internationally harmonised stability regulations

FUEL EFFICIENCY IN MODERN RESEARCH ICEBREAKER DESIGN. Martin Melzer

3 Star Touring Canoe Assessment Notes

Stevpris installation

SPEED LOGS & ECHO SOUNDERS

SHAFTING VIBRATION PRIMER

SPEED LOGS & ECHO SOUNDERS

Pressure transmitters EMP 2

SECTION 11 ADVENTUROUS ACTIVITIES BOATING: SAILING

Application Research for DP Enhanced Notation

An innovative windvane pendulum system for sailing boats with outboard rudders.

We re Going Global. Vessel Loss Control. Technical Notes #36

PART 5 - OPTIONS CONTENTS 5.1 SYSTEM EXPANSION 5-3

INNOVATIVE MOORING SYSTEMS

applied to Port Development and Inland Waterway Transport

IMPACT OF DOCKING METHOD ON LOADS IN ELEMENTS FLOATING DOCK VESSEL UNIT

API MPMS Chapter 17.6 Guidelines for Determining the Fullness of Pipelines between Vessels and Shore Tanks

Tug regulations Port of Gothenburg 29/03/2018

1.10 Disponent Owners for the purpose of this C/P: N/A (if applicable)

Gorgon - Pilotage - Passage Plan Materials Offloading Facility (MOF) to PBG

Understanding of Meteorology. for. Handling LNG at Ports

1. Outline of the newly developed control technologies

GENERAL LIMITATIONS AND RESTRICTIONS. LNGC Temporary Exemption (Effective August 21, 2018)

STEEL VESSELS UNDER 90 METERS (295 FEET) IN LENGTH 2012

BERNOULLI EFFECTS ON PRESSURE.ACTIVATED W ATER LEVEL GAUGES

Transcription:

TECHNICAL INFORMATION BOLLARDPULL TRIALCODE ForTugs with SteerpropPropulsion Steerprop

A Skogman / 22 March 2001 BOLLARD PULL TRIAL CODE FOR TUGS This Bollard Pull Trial Code is established to define the procedures of performing bollard pull trials in a manner that ensures repeatability as well as comparability for trials performed at different locations and/or with different vessels. The need for this code originates from the lack of an acceptable standard for bollard pull trials, as well as from the large variation in requirements for bollard pull trials in the rules of different classification societies. In the compiling of this code the rules and requirements of BSRA (1961), Lloyd s Register of Shipping (1992), Det norske Veritas (2000), American Bureau of Shipping (xxx), Germanischer Lloyd (xxxx) and Bureau Veritas (1985) have been used as a basis. 1 General Bollard pull trials are conducted in order to determine the static pull that a tug is able to employ in operating conditions. To enable fair comparison, the trials are not performed in typical operation conditions (e.g. shallow and confined harbour basin), but in conditions as close to ideal as possible, i.e. in conditions where the environmental and external effects are minimised. This code introduces the minimum requirements for trial site, vessel state and environmental conditions as well as the actual procedures for conducting the trials and definitions on bollard pull, to be used on tugs equipped with Steerprop Azimuth Propulsors. 2 Trial Site and Vessel s The trial site should be carefully chosen to minimise the effect of the environmental conditions. The following minimum requirements have to be fulfilled with regard to trial site and vessel state. 2.1 Trial Site Recommendation The location for the trials should be chosen with no piers, docks, jetties breakwaters or other obstructions close to the tug. The best place for the bollard is on a legged jetty with no wall, allowing the propeller wake to flow through/under the jetty. If a solid pier is chosen the bollard should be located as to give a clear run for the propeller wake, see fig. 1 and 2. The water depth on the trial site should comply with the below requirements (see chapter 2.2 Water Depth).

2 Fig. 1 Positioning the tug for bollard pull trials Fig. 2 Positioning the tug for bollard pull trials

3 2.2 Water Depth In order to achieve a fair bollard pull the build-up of water circulation has to be avoided. Water circulation is generated by the propeller wash and available amount of water below and around the vessel in very confined and shallow water there will certainly be circulation. Hence the water depth has to be as large as possible, not only below the tug but also around it. Minimum required water depth within a radius of 100 m from the tug is obtained as depth below the keel (see fig. 4) using equation (1), from the graph in fig. 3, or from table 1. d min = k 1 * (k 2 * P a k 3 * P b ) + 3 [m] (1) where d min = minimum required depth under the tug k 1 = 0.060 k 2 = 52.00 k 3 = 46.26 P = total propulsion power [kw] a = 0.60 b = 0.61 Minimum Water Depth 25 20 Minimum Water Depth [m] 15 10 5 0 0 1000 2000 3000 4000 5000 6000 Total Propulsive Power [kw] Fig. 3 Minimum required water depth below the keel of the tug

4 Table 1. Minimum required depth under the keel Total propulsive power [kw] Required depth under the keel [m] 1000 12.2 1500 13.8 2000 15.0 2500 16.0 3000 16.8 3500 17.5 4000 18.1 4500 18.7 5000 19.2 Fig. 4 Definition of towline length and depth below the keel 2.3 Towline Length For practical reasons bollard pull trials are usually conducted in the confined waters of a harbour basin. In order to avoid the influence of a solid pier the towline should be as long as possible.

5 The length of the towline measured between the edge of the pier or shoreline and the stern of the tug (see fig. 4) must not be less than given by equation (2), obtained from the graph in fig. 5 or from table 2. L T = k 1 * P a k 2 * P b [m] (2) where L T = minimum required towline length k 1 = 52.00 k 2 = 46.26 P = total propulsion power [kw] a = 0.60 b = 0.61 Minimum Towline Length 350 300 250 Towline Length [m] 200 150 100 50 0 0 2000 4000 6000 8000 Total Power [kw] Fig. 5 Minimum required towline length for bollard pull trials Recommendation It is, however, recommended that a towline of at least 200 m be used, although the required towline length is less.

6 Table 2. Minimum required towline length Total propulsive power [kw] Required towline length [m] 1000 153 1500 179 2000 200 2500 216 3000 230 3500 242 4000 252 4500 261 5000 270 2.4 Draft The tug has to be loaded to its construction waterline in order to ensure an adequate immersion of the propellers. 2.5 Trim Recommendation The tug should be trimmed on even keel or with a stern trim. If the propulsors are tilted (not vertically installed) an aft trim will be beneficial. 3 Environmental Conditions The influence of wind and current can be significant on the trial results and thus the following requirements have to be followed. 3.1 Wind Speed The wind speed during the trials shall not exceed 5 m/s. If wind gusts causes the vessel to yaw significantly the test should be stopped and repeated. 3.2 Current The trials should be conducted in waters with no current, wherever possible. The current must not exceed 1 knot (a current of 1 knot from the bow correspond to a drop in bollard pull of approx. 4 %). In areas with tidal current special attention has to be taken in the timing of the trials. The trials should be started 1 1.5 hours before high tide, when the current speed is less than 1 knot and the water level only slightly below maximum. This timing allows for a retrial if required. Trials after high tide should be avoided.

7 During the trials the direction of the current should be from the stern. Current from the bow or from the side are not acceptable, see fig. 6. Fig. 6 Definitions of current directions and accepted direction 4 Trial Procedures 4.1 Preparations The main engines have to be warmed up before starting a bollard pull trial. In order not to disturb the water on the trial site, the warming of the engine and preliminary engine adjustments need to be completed before bringing the tug into position for the trials. Where the trails are to cover a range of different propeller revolutions / engine powers, the maximum bollard pull has to be conducted first, while the water on the site still is as undisturbed as possible. Subsequent bollard pull measurements as well as re-trials should not be carried out directly after last test, but a period of at least 10 minutes should be allowed for the water to settle. The build-up of water circulation around the tug should be monitored and must not exceed 0.5 m/s.

8 Recommendation 4.2 Trial Set-up 4.2.1 Dynamometer The bollard pull should be measured using an electric / electronic dynamometer, with a measuring range suitable for the bollard pull in question. Alternatively a mechanical load gauge may be used. The dynamometer should be calibrated, preferably both before and after the trials. Maximum acceptable deviation within the measuring range is less than ±2%. Recommendation 4.2.2 Towline Set-up The bollard pull should be taken on the normal towing winch, hook or towing bit of the tug. The dynamometer should be connected between the bollard and the towline ashore. Where this is not feasible, the towline may be connected between the towline and the towing hook onboard the tug. Special attention should be paid to the towline at the pier edge. The towline should not be allowed touch the pier between the dynamometer and the tug, as the friction in this contact is prone to reduce the dynamometer readings. If this cannot be avoided, a roller under the towline should be utilized. 4.2.3 Communication With the load cell ashore, communication between the tug and the shore station has to be provided, either by mobile phones or be VHF. Before the test it should be ensured that the telecommunication does not disturb the data logging. 4.3 Steering During Trials Recommendation A tug can normally not be maintained in position during bollard pull trials without steering. Steering action will, however, affect the bollard pull and should be kept to a minimum. If possible the vessel should be allowed to seek its natural position. If any violent yaw or steering motions occur during the trials the test should be repeated. 4.4 Engine Power and Revolutions The only way to accurately determine the actual engine power in bollard pull trials, is by measuring the torque on the intermediate shaft, using a torsion meter. Fuel consumption, fuel rack position, exhaust temperature readings may contain inaccuracies in power of up to 5%. In many cases it is considered satisfactory to relate the bollard pull to the engine revolutions. 4.5 Bollard Pull Reading Recommendation The bollard pull should during the tests be continuously recorded by a data logger / computer. Alternatively a graphic recorder may be used.

9 If this is not possible or if a mechanical load gauge is used, the gauge should be monitored continuously and the readings should be recorded at 30 seconds intervals during the test. 4.6 Accuracy 4.6.1 Load Cell Accuracy Maximum acceptable deviation of the dynamometer used in the tests within the measuring range is less than ±2%. 4.6.2 Accuracy of the Result Whilst the accuracy of bollard pull measurement necessarily depends on the reliability and cumulative accuracy of all instruments utilized in the measurement process, it is anticipated that the accuracy of certified bollard pull at the stated machinery output will be contained within 5 % of the true value (Lloyd s Register of Shipping) 5 Bollard Pull 5.1 Sustained Bollard Pull Sustained bollard pull is the mean value of the pull during a 5 minutes test. If the readings are recorded at 30 seconds intervals, sustained bollard pull is the mean value of these readings during a 5 minutes test. 5.2 Maximum Static Bollard Pull Maximum static bollard pull is the mean value of the highest 30 seconds measured during the 5 minutes test. If the readings are recorded at 30 seconds intervals, maximum static bollard pull is the highest mean value of two subsequent readings. 5.3 Maximum Bollard Pull Maximum bollard pull is the highest measured single value. 6 Corrections 6.1 Correction for Shallow Water and Short Towline If it is not possible to fulfil the requirements of minimum towline length according to chapter 2.3 in this code or the requirement of minimum depth below the keel according to chapter 2.2 in this code, the measured bollard pull shall be corrected using equation (3) and a correction factor obtained from fig. 7. BP = k 1 * BP m (3) where BP = Sustained bollard pull k 1 = correction factor from fig. 7 BP m = Measured sustained bollard pull

10 Correction Factor Correction Factor k1 1.14 1.12 1.1 1.08 1.06 1.04 L/LT=1.0 L/LT=0.8 L/LT=0.6 L/LT=0.5 L/LT=0.4 1.02 1 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 L = Towline length used LT = Required minimum towline length d = depth under the keel on trial site dmin = required minimum depth under the keel d/dmin Fig. 7 Correction factor for shallow water and short towline