Technical vs. Process Commissioning Final Exam: Functional Performance Testing

Similar documents
2005 CERTIFICATE OF ACCEPTANCE (Part 1 of 3) MECH-1-A

HAP e-help. Obtaining Consistent Results Using HAP and the ASHRAE 62MZ Ventilation Rate Procedure Spreadsheet. Introduction

Application Block Library Fan Control Optimization

Process Control Loops

SECTION TESTING ADJUSTING AND BALANCING FOR HVAC

Hydronic Systems Balance

TESTING OF BELIMO PRESSURE INDEPENDENT CHARACTERIZED CONTROL VALVES

The Advancement of Pressure Independent Technology

Installation Guide - C01202 & C01203 Thermostatic Mixing Valve TMV2

Practical Guide. By Steven T. Taylor, P.E., Member ASHRAE

Model-Independent Fault Detection and Diagnostics For VAV Terminal Units

REQUIREMENTS AND HAND-OVER DOCUMENTATION FOR ENERGY-OPTIMAL DEMAND-CONTROLLED VENTILATION

2. Determine how the mass transfer rate is affected by gas flow rate and liquid flow rate.

COMPARISON OF DIFFERENTIAL PRESSURE SENSING TECHNOLOGIES IN HOSPITAL ISOLATION ROOMS AND OTHER CRITICAL ENVIRONMENT APPLICATIONS

Space Pressurization: Concept and Practice ASHRAE Distinguished Lecture Series

Fisher DVI Desuperheater Venturi Inline

A Semi-Automated Functional Test Data Analysis Tool


Gerald D. Anderson. Education Technical Specialist

Outside Air Nonresidential HVAC Stakeholder Meeting #2 California Statewide Utility Codes and Standards Program

Installation, commissioning and servicing instructions

Scald Protection Three-Way Thermostatic Mixing Valve

Index. Batch processing 56 Branching xiii 52 62

GM Series Dual-Block Multi-Function Gas Control Valves

Intamix Thermostatic Mixing Valve

RESILIENT SEATED BUTTERFLY VALVES FUNCTIONAL SAFETY MANUAL

553 Series.

LOCKOUT/TAGOUT PROGRAM

This test shall be carried out on all vehicles equipped with open type traction batteries.

Hill PHOENIX Second Nature Medium Temperature Secondary Refrigeration Start-Up Guide

Module No. # 01 Lecture No. # 6.2 HAZOP (continued)

Installation, commissioning and servicing instructions

Title: Standard Operating Procedure for Elemental and Organic Carbon (EC and OC) using Non-Dispersive Infrared Detection (NDIR)

TRI LOK SAFETY MANUAL TRI LOK TRIPLE OFFSET BUTTERFLY VALVE. The High Performance Company

SEQUENTIAL SHOWER VALVE INSTRUCTION MANUAL PLEASE LEAVE THIS MANUAL WITH THE END USER

DeZURIK. KGC Cast Knife Gate Valve. Safety Manual

Improving distillation tower operation

How to Define Your Systems and Assets to Support Reliability. How to Define Your Failure Reporting Codes to Support Reliability

Twin & Triple Control Concealed Thermostatic Shower Valve

Significant Change to Dairy Heat Treatment Equipment and Systems

SECTION TESTING, ADJUSTING, AND BALANCING CONTRACT NO SECTION TESTING, ADJUSTING, AND BALANCING

2600T Series Pressure Transmitters Plugged Impulse Line Detection Diagnostic. Pressure Measurement Engineered solutions for all applications

SPIROVENT VACUUM DEGASSERS

Iteration: while, for, do while, Reading Input with Sentinels and User-defined Functions

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

Rate of Flow Valve Series 120

INSTALLATION & OPERATION MANUAL. Dual Duct VAV Terminals. Redefine your comfort zone.

DB 61 Dolphin TMV3 Integrated Thermostatic Mixing Valve

GeQuip Joule Thomson Plant. Process Description (see Figure 1) Standard Control Instrumentation

OHD L-47. Guidelines for Resolving Differences in Test Results

Scald Protection 3-Way Thermostatic Mixing Valve

GN 2 CONSTANT FLOW REGULATORS. GUIDANCE NOTE GN 2 Constant Flow Regulators. Page 1 COMMISSIONING SPECIALISTS ASSOCIATION.

User Manual for the Mars Calibration Bench

DeZURIK. KSV Knife Gate Valve. Safety Manual

CSC-2000 SERIES. Reset Volume Controllers MADE IN U.S.A. DESCRIPTION MODELS SPECIFICATIONS ORDERING

Technical Service Bulletin March 2015 TSB142.01

Tempering valve for solar and instantaneous applications Installation, commissioning and servicing instructions 2522HP series

This portion of the piping tutorial covers control valve sizing, control valves, and the use of nodes.

Rotary Abreast Automatic Teat Sprayer User Manual. Technical Manual Revision 0.01

HVAC Hydronic Pumps: B&G Triple Duty Valve for Proportional Balance

PH01 Perfusion Cannula Manual

Burner Management System DEMO Operating instructions

MANUAL DIRECT PURGE OPTION. UNION Instruments GmbH CWD2005 PLUS. General information, safety standards and regulations for direct purge option

CSC-2000 SERIES. Reset Volume Controllers MADE IN U.S.A. DESCRIPTION MODELS SPECIFICATIONS ORDERING

This manual provides necessary requirements for meeting the IEC or IEC functional safety standards.

CHEMICAL ENGINEERING LABORATORY CHEG 239W. Control of a Steam-Heated Mixing Tank with a Pneumatic Process Controller

IE098: Advanced Process Control for Engineers and Technicians

MANAGEMENT PROCEDURE FOR LABORATORY VENTILATION

Standard Pneumatic Test Procedure Requirements for Piping Systems

GRUNDFOS industry GRUNDFOS CR MONITOR. Intelligent warning

HOW TO MANAGE VAPORIZATION IN AN ANALYTICAL SYSTEM By Dean Slejko and Tony Waters

Risk Management Series Article 8: Risk Control

Operating Manual Body fat balance

OPERATING PROCEDURES

Manual of SF6 Comprehensive Tester

Safety manual for Fisher GX Control Valve and Actuator

Important considerations for use of Cembrane

Installation Instructions and User Guide 15mm & 22mm Thermostatic Mixing Valve

bathrooms.com Concentric Thermostatic Shower Mixers Cleaning and Care Installation Manual Contents

Discharge Relief Valve Operation & Maint.

Lockout/Tagout Training Overview. Safety Fest 2013

Exercise 2-2. Second-Order Interacting Processes EXERCISE OBJECTIVE DISCUSSION OUTLINE. The actual setup DISCUSSION

Code Basic module and level control complete with optionals code

TExT Thorough Examination & Test of LEV Local Exhaust Ventilation Systems

Drift-Chamber Gas System Controls Development for the CEBAF Large Acceptance Spectrometer

Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant

Ingersoll Rand. X-Series System Automation

Solenoid Valves used in Safety Instrumented Systems

CTC 1000 Series One-Pipe, Pneumatic Room Thermostat, Single Temperature

Simple Set. Pressure Independent Control Valves 2 Way 1/2-2

Four common PRESSURE CALIBRATION PAIN POINTS

How to Do Flight Testing for TARC. Trip Barber NAR TARC Manager

Ultima. X Series Gas Monitor

Pressure Systems Safety Regulation

TMV3 Requirements IMPORTANT Installer:

Eutectic Plug Valve. SIL Safety Manual. SIL SM.015 Rev 0. Compiled By : G. Elliott, Date: 19/10/2016. Innovative and Reliable Valve & Pump Solutions

CAST IRON SAFETY VALVE TYPE 6301

STICTION: THE HIDDEN MENACE

M-06 Nitrogen Generator (Nitrogen Making Machine)

29th Monitoring Research Review: Ground-Based Nuclear Explosion Monitoring Technologies

Transcription:

ASHRAE www.ashrae.org. Used with permission from ASHRAE Journal, June 2014 at www.atkinsglobal.com. This article may not be copied nor distributed in either paper or digital form without ASHRAE s permission. For more information about ASHRAE, visit www.ashrae.org. Technical vs. Process Commissioning Final Exam: Functional Performance Testing BY DAVE MCFARLANE, MEMBER ASHRAE So far in this series on technical commissioning, we have examined commissioning functions and practices associated with the planning, design, and construction phases of a new building project. We have outlined the owner s expectations in the Owner s Project Requirements (OPR) document, and we have reviewed and approved the Basis of Design (BOD) document, which shows how the design meets the requirements of the OPR. In addition, we have created a plan that outlines the tasks everyone involved in the project must complete to ensure the project meets its OPR. We have also monitored the construction process to ensure that all equipment and systems were properly installed, and we have verified that all equipment and systems can be properly started and run. The next phase of technical commissioning functional performance testing (FPT) is the final exam a new building must pass before it can graduate and be turned over to a satisfied owner. This is the seventh in a series of bimonthly articles that explain the technical commissioning process for new buildings. Some of these articles content is based on ASHRAE Guideline 0-2005, The Commissioning Process (published 2005) and the National Environmental Balancing Bureau (NEBB) publication Procedural Standards for Whole Building Systems Technical Commissioning for New Construction (revised April 2013). In addition, some of the information in this article series has been adapted from an unpublished NEBB standard titled NEBB Standard Owner s Project Requirements (OPR) Guideline (draft dated June 20, 2011); and from NEBB s Procedural Standards for Building Enclosure Testing (March 2013). Dave McFarlane is principal project director at Atkins in Fort Myers, Fla. Importance of the Issue Log Up til now, at each step in the commissioning process either the commissioning authority (CxA) or the contractor has carefully documented issues of concern in the project issue log (which we have not discussed previously due to space limitations). But the issue log is more than just a chronicle of problems. It also should include the date the issue was first identified (and by whom), a description of possible solutions, who is responsible to correct the issue, and the date the issue was corrected (and by whom). The CxA must maintain the issue log, and a significant part of all commissioning-related meetings should be devoted to discussing possible resolutions, assignments, costs, and completion dates for the items in the log. These discussions are vital, because the CxA should resolve 14 ASHRAE JOURNAL ashrae.org JUNE 2014

issues as they come up, during any phase of the construction process, before moving to the next phase. For example, FPT cannot begin until all equipment and systems are verified to start up and function properly during pre-functional testing. So when key startuprelated items are entered into the issue log but not corrected, FPT will probably fail and need to be repeated after the issues are corrected. So pay careful attention to the issue log, and make sure all issues are resolved before FPT begins. Role of Functional Performance Testing It s important to note that ASHRAE Guideline 0-2005 requires functional performance testing. But the Guideline does not describe the number or type of tests to perform, nor does it define how stringent the tests must be or even who should conduct them. This article is an attempt to flesh out the Guideline in a practical manner, and from a technical commissioning perspective. This article also assumes that every issue in the issue log has been corrected, all pre-functional tests have been verified complete and successful, all building systems and components are properly installed and functional, and all valves and dampers open and close as required. At this point, you may ask, OK, if everything is well designed, installed correctly, and fully functional and all known issues have been corrected what else is there to do? This is an important question, as my experience indicates that a traditional process-commissioning CxA would give a very different answer than would a technical-commissioning CxA. I ve found that a traditional process-commissioning CxA would likely answer: You re right. We ve prepared the FPT forms, and the contractors have informed us that all of their testing was successful. We ve verified that all of the commissioning forms have been completed, and we ve randomly sampled the building s equipment and systems to verify correct installation and proper operation. If our project employed traditional process commissioning, it would be complete; and we would be ready to turn over the new building to its owner. But when faced with the same question, a technical commissioning CxA will likely answer: Our commissioning team has done a great job so far! We ve verified that the design satisfies the OPR. We ve corrected every issue in the issue log, and we ve personally confirmed that all equipment and systems have been properly installed and are fully functional. We re now ready for the project s final exam: real-world, functional performance testing of every building system. Our goal is to ensure that the building itself (not just the design) satisfies the OPR, so we must ensure that the occupants find the internal environment to be efficient, healthy, and comfortable. We ve given all relevant contractors their FPT forms, and we ll now work with them during FPT, observing and assisting as they perform every test. This test-and-verify-everything perspective is a big difference between process commissioning and technical commissioning. Process commissioning permits contractors to serve as their own SMEs, and allows them to perform their own tests. However, technical commissioning requires the CxA to serve as the SME and as such the CXA either performs or supervises all functional performance testing. Test Example: A Variable Air Volume Box To illustrate how the FPT process works, this article uses the example of a single variable air volume (VAV) box serving a single space. But note: Proper technical commissioning requires that the CxA measure and verify the correct operation of all control loops not just a sample. It is true that the CxA is permitted to perform limited sampling during pre-functional testing (refer to the previous article in this series). But no sampling is allowed during FPT. Instead, all systems and equipment must be actively verified for real-world operation. You may ask, What s wrong with sampling? It can save time and potentially reduce overall costs. The problem is sampling can work well for homogenous systems such as a batch of well-mixed concrete: Every sample taken has a high probability of having the same chemical composition as any other sample. So if one sample meets specifications, the rest of the batch should also meet the specs. But mechanical systems are never homogenous. Why? Every system has probably been touched by multiple contracting firms and multiple technicians. Our sample VAV box, for example, has had electrical, piping, sheet metal, control, test-and-balance, and chemical-treatment contractors involved in its installation. Also, different employees of the same firm may build or install each of their components and systems differently. So it is likely that every VAV box will respond differently to control inputs. JUNE 2014 ashrae.org ASHRAE JOURNAL 15

During the final exam, each control loop FIGURE 1 VAV box control sequence is too tight. of every system is checked to make sure its 80 control sequence actually does what it is supposed to do. This is much more than 76 simply testing to see if a valve opens in 72 response to a call for heat, or a reheat valve closes in response to a call for cooling. In 68 fact, from a technical commissioning perspective, those tests would have already been performed during the operational performance testing (OPT) phase. Instead, the FPT phase calls for hands-on FIGURE 2 VAV box control sequence is too loose. verification that every controlled device 80 performs all of the functions it is required to 76 perform, including: The performance of all required steps it 72 is supposed to perform. 68 A controller/actuator response speed that is appropriate for the application. A stable response. All events are controllable to the setpoint. All adjustments take place automatically FIGURE 3 Properly adjusted VAV box control sequence. through the building automation system. Figure 1 illustrates a control sequence that 80 is too tight. The figure shows a temperature that fluctuates hourly between 76 F 76 and 68 F (24 C to 20 C). The problem is 72 that when the temperature drifts from its 68 setpoint, the controller causes the temperature to cycle unacceptably. If a thermostat controls this VAV box, the air flow damper and heating control valve responses are too rapid, which causes the cycling and I can practically guarantee that the occupants will complain that it s too hot or too cold. But when called to resolve the problem, the building maintenance staff may not be able to properly diagnose it because the temperature is fairly close to the setpoint much of the time. So the maintenance staff leaves, having done nothing except to accuse the occupants of being oversensitive. Figure 2 illustrates a different challenge: A controller that does not respond quickly enough. The problem is when the room temperature is below its setpoint, the reheat valve or air flow damper does not change quickly enough to meet the setpoint; and when the temperature is above its setpoint, the heating valve does not close Temperature ( F) Temperature ( F) Temperature ( F) 10 20 30 40 50 60 70 80 90 100 110 120 Time (Minutes) 10 20 30 40 50 60 70 80 90 100 110 120 Time (Minutes) 10 20 30 40 50 60 70 80 90 100 110 120 Time (Minutes) quickly enough nor does the airflow increase at a rate sufficient to maintain the setpoint. In this case, when occupants complain, the maintenance staff may simply see the temperature as too high or too low. So to resolve overcooling, they reduce air flow; to resolve overheating, they throttle back valves. But neither of those solutions is the proper fix. Figure 3 reflects proper system calibration, adjustment, and tuning: When the setpoint is adjusted, the VAV airflow damper and the reheat control valve respond correctly, the temperature reaches the control setpoint within a reasonable time interval, and afterward the temperature is stable. In this case, most occupants would feel comfortable, as OPRs often call for a temperature of 72 F (22 C), ±2 F (1 C). 16 ASHRAE JOURNAL ashrae.org JUNE 2014

Advertisement formerly in this space.

Advertisement formerly in this space.

So for the final exam for our sample VAV box involves verifying that: Control sequences generate the appropriate temperature control responses; Control sequences adjust the temperature to the setpoint; All sequences yield stable results; All sequences occur automatically through the control system; The box reacts properly to a power failure; and Room occupancy/co 2 sensors are properly set to open the air inlets in order to maintain proper CO 2 levels and room temperature. Under the process commissioning model, I have seen a contractor simply set a thermostat to full heat and then to full cool; and that was submitted as the FPT. But this kind of test does not measure response time or stability, which is why such tests are unacceptable for technical commissioning. Space limitations do not permit me to describe the FPT requirements and processes for all of the systems and components for an entire project. Suffice it to say that the CxA must perform functional performance tests on every control loop in the project, which encompasses all of a building s major systems and equipment, including boilers, chillers, air handlers, cooling towers, pressurization systems, and so forth. controllers with pneumatic differential-pressure sensors, thermostats, and control valves. In one of the processes I oversaw, an explosion could result if the chemical mixture got too hot. If the temperature were too cold, the proper reaction would not occur. In another process, the final result was a material that could be either too brittle or too soft, depending on chemical flow rates. Advertisement formerly in this space. Importance of Control Loop Adjustments In the 1970s, I worked as a chemical process engineer. Part of my job was to ensure pumps started and valves opened and closed as required. We used tuned control loops to maintain chemical flows, pressures, and temperatures within tight constraints. This was before the advent of computerized controls, so we used JUNE 2014 ashrae.org ASHRAE JOURNAL 19

My coworkers and I became adept at checking and tuning control loops, which measured and controlled three parameters, together known as PID: 1. The proportional (P) parameter, which measures present error; 2. The integral (I) parameter, representing the accumulation of past errors; and 3. The derivative (D) parameter, predicting future errors. We were required to maintain our control loops within specific ranges; and our PID tuning resulted in quick adjustments. We controlled temperatures, pressures, and flow rates to the appropriate setpoints and stability requirements thus yielding materials that met the quality standards. Today, computerized controls are commonplace in HVAC systems, but the same tuning of control loops is still essential. That s because technical commissioning is about minimizing energy consumption as well as improving occupant comfort. However, the tuning of control loops is normally not performed during traditional process commissioning. It is common for the manufacturer s standard control loops to be left in place until there s a complaint. I would be a rich man if I had a dollar for every time I heard a control technician say, We don t need to adjust the PID loops; they re preset at the factory. PID Loop Testing Process It is important to ensure that a system s control loops are properly tuned. But because PID loop tuning is done so infrequently, it may be necessary for the CxA to brush up on how it s done, in order to help the controls contractor properly test the equipment and systems they ve installed. As previously noted, proper technical commissioning calls for the CxA to oversee the measurement and verification of all control loops. This objective is accomplished by making minor system setpoint changes and then data-logging the controlled event. For the VAV box example, the controlled event is the space temperature, so the CxA must ensure these five data points are logged: Space temperature; Damper position; Reheat valve position; Discharge air temperature; and Airflow volume from the box. For each loop, the tests involve subjecting the controller to small but definitive changes from the wall thermostat setpoint and measuring the results. In our VAV box example, the system is started and run at a setpoint of 72 F (22 C) until stable. Next, the setpoint is adjusted to 75 F (24 C), which should cause the box to begin heating, and the system s response is measured by readings taken every minute. In a typical VAV box, the damper position should throttle back, the airflow should be reduced to the heating (or minimum) setpoint, and the reheat valve should open. The CxA then makes sure the required data points are logged, ensures that the temperature has adjusted to 75 F (24 C), and verifies that the system s response time conforms to either the OPR or to acceptable responses as described in the Commissioning Plan. Finally, the setpoint is lowered to 69 F (20 C), which should cause the box to begin cooling. As before, the system s response is measured via readings taken every minute. In a typical VAV box, the damper position should open to the maximum or cooling airflow, the airflow should increase, and the reheat valve should close. As previously, the CxA also makes sure the required data points are logged, ensures that the temperature has adjusted to 69 F (20 C), and verifies that the response time conforms to either OPR or Commissioning Plan standards. If performance is unsatisfactory in any way, the CxA collaborates with the contractor to investigate the problem, determine the cause, and adjust the control loops as needed. Testing all control loops is another difference between FPT in technical and process commissioning. A typical process commissioning approach calls for the CxA to sample 10% to 15% of a building s control loops and by extrapolation conclude that all systems work properly. In contrast, under technical commissioning the CxA verifies that 100% of a building s control loops work properly. Identifying and Resolving Problems As noted in the previous article in this series, project contractors have the ultimate responsibility for their own quality control. Therefore, all contractors need to perform their own tests before the CxA either conducts or witnesses FPT. For our sample VAV box, multiple contractors would be involved in a successful testing process. It s worth noting that each contractor should have verified their work during pre-functional testing. However, that is an insufficient level 20 ASHRAE JOURNAL ashrae.org JUNE 2014

Advertisement formerly in this space.

of testing in the world of technical commissioning if for no other reason than the amount of time that often elapses (weeks or months) between pre-functional testing and FPT. While our sample VAV box may have passed prefunctional testing, conditions can change in the weeks or months before FPT. For example, the box will fail FPT if there is an insufficient flow of hot water to the reheat coil; and there are many reasons why the flow might be reduced Advertisement formerly in this space. during the time that passes since pre-functional testing, including: A plugged strainer (responsibility: chemical treatment contractor); A manual valve having been closed (mechanical piping contractor); Improper testing and balancing (testing, adjusting, and balancing contractor); The control valve failing to open (controls contractor); or The VAV box fan failing to start properly (electrical contractor). In a previous article, I noted how a project s contract documents should permit the owner to financially penalize a contractor for testing beyond a specified limit; and retests required during FPT would fall under the financial-penalty stipulations. But contractors can avoid those penalties by ensuring their systems work properly before the CxA shows up on site to oversee the final tests. Fully Tested = Fully Confident Functional performance testing is the final exam that verifies all of a building s systems work in the real world. After all project issues are resolved and functional performance testing is complete, the technical-commissioning CxA can look the owner in the eye and confidently state: Your building works as you ve intended. We ve verified that your project requirements have been fully satisfied. Through careful and detailed hands-on testing, we ve made certain that the building functions as designed. All known issues have been corrected, and we ve personally verified that 100% of the building s equipment has passed every test. Congratulations! Your building has been through a comprehensive technical commissioning process. And we know this because we ve overseen or conducted all of the tests in person. 22 ASHRAE JOURNAL ashrae.org JUNE 2014