BURNHAMTHORPE ROAD EAST RECONSTRUCTION INFORMATION SESSION. November 9, 2017

Similar documents
Shifting Gears for a Healthier City

Shifting Gears for a Healthier City.

P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No. Halifax Regional Council January 16, 2017

Welcome and Purpose of Meeting

Intersection Improvement: Sturgeon Road, Silver Avenue and Murray Park Road Roundabout. Welcome. Public Information Session

APPENDIX 4 PEDESTRIAN FACILITY DESIGN INFORMATION

Functional, Preliminary Design and Detailed Design

Environmental Assessment Airport Road from King Street to Huntsmill Drive Community Working Group (CWG) Orientation November 30, 2017

TRANSPORTATION NEEDS ASSESSMENT

PROJECT FACT SHEET March 21, 2018

4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL

West Village Mobility & Integration

APPENDIX 1 CIMA RECOMMENDED TREATMENTS

City of Waterloo Complete Streets Policy

MUNICIPALITY OF ANCHORAGE TRAFFIC CODE UPDATE MASTER RECOMMENDATION REPORT: 9.20, 9.38

to the Public Information Centre for the Downtown Traffic Study

Cyclists and Bikeways: What s your match? A guide to bikeway options for a variety of cyclists

Crystal City Potomac Yard Transitway. Enforcement Ordinance & Construction Update

The Peel Region Cyclists Handbook Everything you need to know about cycling in Mississauga, Brampton, and Caledon

Sharrows and Elephants and Bike Boxes!, s, Oh My!

Governance and Priorities Committee Report For the July 2, 2015 Meeting

PROJECT FACT SHEET May 25, 2018

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

Community Bicycle Planning

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS

Sixth Line Development - Transit Facilities Plan

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

122 Avenue: 107 Street to Fort Road

AIRPORT ROAD ENVIRONMENTAL ASSESSMENT

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

Reams Road RCA Study. Board of County Commissioners Public Hearing

WELCOME! OPEN HOUSE SHAW ROAD IMPROVEMENT PROJECT JUNE 30, 2015

Cycle Track Design Best Practices Cycle Track Sections

Bikeable/Walkable Community Plan. Oct. 11, 2012 City Council Workshop

MCARTHUR AVENUE AS WE HEARD IT REPORT CYCLING LANES. City of Ottawa Transportation Services. Photo: istock

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

City Snapshot September 27, 2018

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Crystal City Citizen Review Council Meeting. July 10, 2013

FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION

SINGAPORE NATIONAL GAMES 2018 ROUND ISLAND BIKE ADVENTURE (RIBA) TOWARDS SG100

Bicycle Safety Skills

Ohio Share the Road Driver s s Education Unit

Active Transportation Facility Glossary

ITS-NY ANNUAL MEETING Bus Rapid Transit in New York City: Bus Lane Operations on One-Way Arterial Streets

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

Coquitlam Cross-town Bike Route Improving Bicycle Facilities in a Mature Suburban Environment

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input

BURGAS INTEGRATED PUBLIC TRANSPORT PROJECT. Information day, 5 th July 2011, Burgas

El Centro Mobility Hub

Work Session. Agenda Item # 4. Meeting Date September 8, Daryl Braithwaite Public Works Director. Prepared By. Suzanne R. Ludlow City Manager

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

Glebe Neighbourhood Cycling Plan

Lake to Lake LAKE YORK. CYCLING ROUTE and WALKING TRAIL FEASIBILITY and DESIGN STUDY LAKE. CITY of REGION ONTARIO SIMCOE TORONTO

Building Great Neighbourhoods BONNIE DOON

Chapter 3 DESIGN SPECIFICATIONS

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

CITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL

Highway School, Ithaca NY

SINGAPORE NATIONAL GAMES 2018 COMPETITION RULES & REGULATION - ROUND ISLAND BIKE ADVENTURE (RIBA) TOWARDS SG100

Building Great Neighbourhoods QUEEN ALEXANDRA

Minor Amendments to the Street and Traffic By-law 2849 and Skateboards in Protected Bike Lanes

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012

Traffic Management and Mitigation Study in the Leslieville Community Transportation Services Division & IBI Group IBI GROUP

PEABODY SQUARE RECONSTRUCTION PROJECT

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

Preliminary Engineering Study

Construction Newsletter No. 32 October 14, 2016 On-Going

TOWN OF MORAGA. CAMINO PABLO & CANYON ROAD INTERSECTION IMPROVEMENTS Public Information Meeting February 20, 2019

Highway 56 Traffic Study Rymal Road to Cemetery Road

Side Roads and Other Non-Signalised Junctions

COASTAL RAIL TRAIL ROSE CREEK BIKEWAY PROJECT COMMUNITY WORKSHOP #2 AUGUST 15, 2013

Stakeholder Consultation Survey Proposed Cycle Options on Napa Valley Avenue

T R A F F I C S K IL L S 101

4.7 Best Route to School Maps and Mapping

Honorable Mayor and Members of the City Council. Contract: AJW Construction for the 2013 Safe Routes to School Project

EMPHASIS AREA 1: PEDESTRIANS

Reducing Speed: The C-Roundabout

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

Nelson City Council Tahunanui Pathways 7 December 2017

Designing Pedestrian Facilities for Accessibility. Module 8 Maintenance of Pedestrian Facilities and Alternate Pedestrian Access Routes in Work Zones

Dowling/Beaty Cycling Route

Southside Pilot Proposal

UPC Design / CN Locally Administered PE Phase VDOT Administered CN Phase

Plant City Walk-Bike Plan


2018 Transportation Survey October 17, Prepared by:

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

Building Great Neighbourhoods STRATHEARN

Appendix O. Assessment of Bicycle Facility Alternatives

BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY

SAFETY GUIDE FOR SCHOOL CHILDREN & PARENTS. toronto.ca/visionzeroto #VisionZeroTO

MEET IN THE STREET MOVING TO ZERO

ADA on Construction. Guidance for Section C Plan Preparers

Public Information Meeting

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County.

Part I: BYPAD the method Part II: Example: Basel, Switzerland

Frome Street Bicycle Route

Transcription:

BURNHAMTHORPE ROAD EAST RECONSTRUCTION INFORMATION SESSION November 9, 2017

What Is This Project? The City of Mississauga will be working in your This Information Session has been arranged to neighbourhood to reconstruct Burnhamthorpe Road present the following: East from approximately 200 m east of Dixie Road to the East City Limit. The Project Schedule; This project will include: The Design Plan; and Reconstruction of Burnhamthorpe Road East Next Steps. (approximately 2 km); Representatives of the Project Team are The extension of the multi-use trail along the north side of the road, including lighting and connecting with the Etobicoke Creek Trail; available to discuss the project with you. Catch basin lead replacements; Management of stormwater runoff using Low Impact Development; and, Intersection improvements including, traffic signal replacements, bus stop/queue jump lanes constructed at Bough Beeches Boulevard/Havenwood Drive, Fieldgate Drive and Ponytrail Drive intersections. To find out more about the project, please see the Design Plan. The construction cost is approximately $8.5 million.

Project Schedule Finalize Detail Design Plans Tender Project Construction

Procurement Process The Project will be following the City s High Value Acquisition Process / Formal Competitive Bid Process. The Project will be Publicly Advertised Biddingo.com. All submitted Proposals will be evaluated based on cost and accuracy of form of tender and will be reviewed and approved by the City s Finance, Materiel Management and Legal sections. The lowest priced qualified bidder is awarded the Project. A completion date will be specified in the Contract Tender Document. Liquidated damages will be assessed if the project is not completed by the specified completion date.

Construction Management Plan Advanced digital signage will be displayed along Burnhamthorpe Road to allow drivers to better understand their commute time based on construction delays. During construction, there will always be inspectors on site to answer any questions residents may have. The City will be working with the Region of Peel and other agencies (utility companies) to coordinate projects in the area: The Region of Peel will be completing sanitary and watermain works on Ponytrail Drive and Rathburn Road. The project is expected to commence December 2017/January 2018 weather permitting and will take approximately 52 weeks to complete. For more information, contact the Region of Peel Project Manager: Derek Gorzynski, P. Eng. Derek.Gorzynski@peelregion.ca 905.791.7800 x5013

Cycling Facilities Multi-use Trails are paved trails separated from the road and shared by cyclists and pedestrians. These trails are denoted by Shared Path signage. General traffic principles apply on multi-use trails keep to the right as appropriate for a two-way transportation facility, and slower users should keep as far to the right as practical. Courteous use of the trail is encouraged. Faster moving users should clearly communicate to other users of their approach using a bell, horn or audible call; slower moving users should move to the right to allow them to pass.

Cycling Facilities A crosswalk is intended for pedestrians and/or dismounted cyclists to walk through an intersection. CROSSWALK CROSSRIDE Riding beside ( along ) a crosswalk is specifically permitted and called a crossride. In order to allow cyclists to cross the intersection, a bicycle signal is provided. The cycling crossride will be provided using elephant s feet markings beside the pedestrian crosswalk.

Next Steps Following this Information Session the Project Team will: Finalize the detail design plans; Tender the project for construction; and, Commence construction in April 2018 with anticipated completion in December 2018. If you have any questions please contact the City s Project Manager: Domenic Galati, C.E.T., L.E.L., City of Mississauga Project Manager City of Mississauga 201 City Centre Drive, Suite 800 Mississauga, ON L5B 2T4 Tel: 905-615-3200 ext. 5792 Email: domenic.galati@mississauga.ca