January 22, Steve Salwei, NDDOT

Similar documents
Theodore Roosevelt Expressway (TRE) Annual Meeting. Jane E. Berger PE, Programming Engineer North Dakota Department of Transportation Nov.

Theodore Roosevelt Expressway (TRE) study was completed in Conducted Public meetings Analyzed traffic Provided good information

4-County Big Oil Oil Impacts Analysis Dunn, McKenzie, Mountrail, & Williams Counties in association with:

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

Shenango Valley MPO. State Transportation Commission 2015 Twelve Year Program Development

Secondary Road Program

Basalt Creek Transportation Refinement Plan Recommendations

TRASBURG RANSPORTATION

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

Nevada s Transportation Infrastructure and Future Transportation Needs

I-90 Corridor Performance Corridor Result

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

Route 7 Corridor Study

Attachment One. Integration of Performance Measures Into the Bryan/College Station MPO FY 2019 FY 2022 Transportation Improvement Program

FUNDING SOURCES CHAPTER 6

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES.

DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN

US 69 RELIEF ROUTE STUDY

San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation

County of Fairfax, Virginia. Department of Transportation

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

HIGHWAY 11 CORRIDOR STUDY

Welcome. Public Meeting. Heading 1. Heading 2. DeMers Ave. Columbia Rd. Washington St. 42nd St. 32nd Ave. Heading 3 HEADING

DES MOINES AREA MPO. Presentation to Iowa Commercial Real Estate Association. April 6, 2017

STATE TRANSPORTATION COMMISSION HEARING

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.

Engineering - Bicycle and Pedestrian

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017

Regional Transportation Needs Within Southeastern Wisconsin

2040 RTP. Chapter 6: Investments in our Transportation Future

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design

Transportation Day at the Capitol. Charlie Zelle Commissioner, MnDOT Feb. 16, 2017

Staunton. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

Kentucky s Surface Transportation System

Chapter 4 Traffic Analysis

EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY

MN 5 Corridor Performance. Current Corridor Characteristics Highway: MN AADT: 2,400 73,000

Gerald P. Oliveto, P.E. George Franz NJDOT

Keep Placer Moving. Placer is Growing. POPULATION (From 2014 to 2045) 70,000 new homes and well over 180,000 more residents

Governor s Transportation Vision Panel

New Mexico Transportation Funding Challenges

2012 Capital Budget Capital Improvement Program

The Transportation Improvement Program

Looking Ahead and Looking Back: An Examination of NJDOT s and NJT s 2014 Capital Program

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

New Jersey Department of Transportation. Complete Streets Summit Shukri Abuhuzeima NJDOT-Local Aid

CITY OF SPOKANE VALLEY Request for Council Action

LARIMER COUNTY: ENGINEERING DOUGLAS ROAD (CR 54)

Proposed Project I 35 from Denton to Cooke County Line

Non-Motorized Transportation 7-1

FY 2006 TRANSPORTATION CAPITAL PROGRAM

Multi Modal Transit Access Plan KIPDA ID # 239. Project Type: STUDY

TRANSPORTATION & MOBILITY

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

RECEIVED. Be it Enacted by the People of the State of Colorado: SECTION 1. In Colorado Revised Statutes, add part 11 to article 4 of title 43 as

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Regional Transportation Priorities Survey Results. Introduction

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Project Description Form 8EE

Transportation. [Draft 12/22/2008]

APPENDIX C. Systems Performance Report C-1

MnPASS System Today and the Future

FY Transportation Capital Improvement Plan Update Arlington Committee for Transportation Choices

Executive Summary. September 3, 2014

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS

North Carolina Transportation Issues

I-25 PEL: CO Springs Denver South Connection. Presentation to Castle Rock Town Council

Transportation Enhancements, Safe Routes to School, and Recreational Trails to Transportation Alternatives. Pamela Liston, October 30 th, 2013

Planning and Programming Committee Meeting April 14,

FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION

Congress Avenue. Palm Beach MPO Subcommittee Meetings December 2017

SUMMARY OF TRANSPORTATION INVESTMENTS

What if YOU could help plan Northern Virginia s transportation future?

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

CHAPTER 5 TRANSPORTATION

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Findings. TSTC went line-by-line through the STIP and categorized projects into 15 categories:

Corporate. Report COUNCIL DATE: June 26, 2006 NO: C012 COUNCIL-IN-COMMITTEE. TO: Mayor & Council DATE: June 22, 2006

Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66.

Improving Mobility Without Building More Lanes

Route 29 Solutions Projects

Project Description Form 6V

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

FM #: ETDM #: 11241

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension

Base Information. 1. Project Title Erie Parkway and WCR 7 Traffic Signal Project

Highway 1 Kamloops to Alberta Four-Laning Program

3.0 PROJECT DESCRIPTION

STREET AND HIGHWAY PLAN

Parks Highway: MP Lucus Road to Big Lake Road

STUDY PROCESS & SCHEDULE

Lithuanian Roads. LITHUANIA in Europe. Territory km 2 Population LITHUANIAN ROAD ADMINISTRATION

US287 Asset Inventory Loveland. Figure 6-1 Loveland Bridges and Traffic Signals

Tulsa Metropolitan Area LONG RANGE TRANSPORTATION PLAN

State Highway 16/McDermott Road Kuna-Mora Road to Ada/Gem County Line

State Highway 16 Kuna-Mora Road to Ada/Gem County Line

# Southeastern Wisconsin Regional Freeway System Reconstruction Study and Preliminary Recommended Plan

Class B District 1 North Sargent 60 Sargent Central 51 Sargent Central 66 Sargent Central 33 Oakes 48 North Sargent 40 Lisbon 40 Milnor 35 Lisbon 50

Transcription:

1 January 22, 2015 Steve Salwei, NDDOT

The number of miles driven on State highways have increased. From 2010-2012 North Dakota saw a 22% increase in traffic statewide and a 53% increase in traffic in western North Dakota. Traffic growth remained at high levels in 2013 and 2014. 2

The State Legislature appropriated about $2.3 billion to rebuild and repair: State highways City, county and township roads Bypass routes Other infrastructure upgrades in every region of the state. 3

4

900 800 700 NDDOT Construction Program $800+ M $800+ M 600 $590 M $550 M 500 400 300 200 100 $249 M $275 M $319 M $410 M 0 2007 2008 2009 2010 2011 2012 2013 2014 5

NDDOT Funding for 2013 2015 BIENNIUM (SB 2012, SB 2176, HB 1358) Funding West Region ($ Millions) Central and East Regions ($ Millions) Total ($ Millions) State Funds for State Highways - SB 2012/SB 2176 $1,161.6 M --- $1,161.6 M Federal Funds for STIP (2013-2014) - SB 2012 (Includes state and local match) Federal ER Carryover (from 2011-2013 biennium) SB 2012 (Includes match) State Funds Non-Oil Producing counties, cities and townships - SB 2176 State Funds Non-Oil Producing Counties - HB 1358 $148.8 M $450.0 M $598.8 M $31.1 M $77.0 M $108.1 M $100.0 M $100.0 M $120.0 M $120.0 M State Funds Oil Producing Counties - HB 1358 $160.0 M --- $160.0 M State Funds Oil Impact Township Roads - HB 1358 $8.8 M --- $8.8 M Total 2013-2015 Biennium $1,510.3 M $747.0 M $2,257.3 M Roadway investments using state and federal funding. Includes construction, right of way, engineering and utilities costs. Approximately $581 Million = Federal Funds 6

7

Some of the projects completed this biennium: Watford City US 85 Southwest Bypass Watford City ND 23 Southeast Bypass Alexander Bypass New Town Truck Reliever Route US 85 Four Lane - Phase 1 & 2 from Watford City to County Road 16 north of Alexander Dickinson Interim Bypass US 2 between Berthold and Surrey I-29 from Buxton to south of ND Highway 15 Washington Street in Grand Forks 25 th Street reconstruction in Fargo ND 21 widening/paving Elgin to Junction ND 31 Bismarck Divide Avenue construction US 83 paving from Washburn to Underwood I-94 paving from Bismarck to Sterling ND 200 widening /paving from ND 1806 to US 83 Bridge replacement on ND 26 at Sibley US 281 paving from Ellendale to Edgeley Valley City Frontage Road construction from 7 th Street to I-94 Business Loop I-94 eastbound paving near Valley City US 281 paving from Churchs Ferry to Cando US 2 westbound paving Devils Lake to Churchs Ferry Cando City section rehabilitation Bridge replacement north of New Rockford Devils Lake 5 th Avenue paving ND 20 paving & culvert rehab Starkweather to Clyde ND 17 paving & culvert rehab Starkweather to Edmore Grand Forks 32 nd Avenue rehabilitation Grand Forks Columbia Road reconstruction Grand Forks Gateway Drive rehabilitation US 2 eastbound from Niagara to near Larimore I-29 southbound paving from Drayton to Canada US 2 westbound paving from Niagara to near Arvilla ND 15 paving from near Northwood to Thompson ND 27 paving from Lisbon to junction ND 18 ND 13 paving from Gwinner to junction ND 1 Wyndmere rehabilitation West Fargo 13 th Avenue Lighting I-94 rehabilitation in Fargo ND 46 widening and paving from west of Enderlin to 8 near Sheldon ND 46 widening/ paving from near Leonard to I-29

Approved by State Legislature in 2003 9

Western ND Highway Energy Corridors Major projects completed or bid 10

Over 78% of projects completed with this funding increased local road load carrying capacity to 105,500 pounds. $280 Million HB 1358 County State Aid Road Program Allocation Total Available Total Requested Remaining % Remaining Oil Producing $160,000,000 $151,802,724 $8,197,276 5.1% Non-Oil Producing $120,000,000* $96,122,984 $23,877,016 19.9% Total $280,000,000 $247,925,707 $32,074,293 11.5% * Funds were not available until February 2014. As of December 31, 2014 11

Transit Services Thirty-four transit service providers received federal funding and state continued appropriation funds. $550,000 additional resources per year was provided this biennium. Transit Ridership *Based on state fiscal year (July through June) 3,500,000 3,000,000 2,500,000 2,000,000 1,500,000 1,000,000 500,000 0 2012 2013 2014 Rural Urban 12

Planning Activities Freight Plan Working with counties in Western ND 13

Freight Mode Level One Critical Rural Freight Corridors International/Interstate Level Two Regional/Intrastate Level Three Local Roads Interstate & Interregional Highways Congressional Designated High Priority Corridors STRAHNET National Truck Network Energy/Agricultural Access Corridors High Truck Volume Segments Principal Arterials State Corridors District Corridors County Major Collectors City Principal Arterials District Collectors Other County, City, Township and Tribal Roads Air Commercial Airports Air Force Bases General Aviation Airports Public Use Airports Private Airports Rail Class 1 Mainlines STRACNET Class 1, Regional Railroad branchlines capable of carrying 286K cars Class 1, Regional Railroad branchlines capable of carrying 268K cars Pipeline Interstate Pipelines Gathering Pipelines Distribution Pipelines 14

15

We are working with the four largest oil producing counties to establish a system of integrated energy corridors. 16

The needs are based on the following objectives: Paved Roads Maintain the existing levels of service for the projected increased traffic associated with agriculture, energy, and manufacturing. (This will involve reconstruction and widening of some roadways) Gravel Roads Maintain and preserve the existing condition taking into consideration changing traffic patterns. Bridges Replace all bridges that are functionally obsolete on the county major collector system in the next 20 years. 17

18

IRI (in/mi) Ride Quality 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Projected Average Network Ride Quality Federal Funding Only 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 19

In addition to the County, Township and Tribal Transportation studies requested by the Legislature, the DOT worked with Upper Great Plains Transportation Institute on a traffic modeling program, several needs studies and surveys which include: State Needs Transit Needs Short Line Railroad Needs City Surveys 20

The State Needs Study identified resources necessary to take state highways up to HPCS guidelines. These guidelines allow continued seasonal load restrictions. UGPTI State Highway & Bridge Needs Time Frame Cost in Millions 2015-2016 $3,543 2017-2018 $1,878 2019-2020 $750 2021-2022 $604 2023-2024 $650 21

» The needs are based on the following objectives: Operational and capital costs to maintain existing transit service levels. Costs associated with providing an increase in service trips per week to meet national averages for transit systems serving similar geographical regions. Public Transit Needs Summary Biennium 2015-2017 2017-2019 Transit Funding Program UGPTI Needs UGPTI Needs Total $44,271,900 $39,576,663 22

The needs are based on the following objective: + Capital infusion costs to build up a 1,210 mile rail system that would allow railroads to increase the load capacity. Track Rehabilitation Needs* Minimum Rehabilitation Net Cost Rail Standard Mileage (Millions) Option 1 90 lbs/yd 730 $386 Option 2 100 lbs/yd 896 $471 *Any improvements proposed in the study will upgrade the rail to 115 lbs/yds. According to information provided to UGPTI during a recent study of regional rail infrastructure, the current program funding level, terms and short-line balance sheets will support roughly four miles of rail rehabilitation, annually, on an approximately 1,210-mile system. 23

» Surveyed all cities. Annual Maintenance Annual Non-maintenance Annual Total Biennium Total All Cities $96.24 M $186.5 M $282.74 M $565.48 M 24

1950 = 17.1 Billion Pounds* 2010 = 89.4 Billion Pounds* 422% Increase 2013 = 81.8 Billion Pounds* 378% Increase 25 * Approximate numbers

In 1950, the state had 1,025 grain elevators with a total licensed storage capacity of 60,791,000 bushels. By 2013, the number of elevators had dropped to 394 but licensed storage capacity had increased to 418,775,265 bushels; up nearly a 680%. Of the 394 licensed elevators in 2013, 52 are considered shuttle facilities capable of loading 75 to 110 car unit grain trains. It takes approximately 475 truckloads of grain to fill a 110 car unit. Also since 1980, 1,751 miles of rail line in North Dakota has been abandoned. 2014 Licensed Grain Facilities 26

Truck Vehicle Miles traveled (Millions of VMT) 1,800 1,500 1,200 900 600 300 0 2004 2009 2014 2019 Measured Projected 100 Rigs* Projected 250 Rigs* Historical Baseline Growth 27

NDDOT s Executive Budget recommendation assumes approximately $616.5 million in federal funding will be received. Congress recently passed legislation that appropriated funding for the 2015 federal fiscal year. Unfortunately, the current transportation funding program MAP-21 was extended to only May 31, 2015. This is a short-term extension of the program and as a result 2015 funding is still uncertain. 28

Dollars in Billions ESTIMATED FEDERAL HIGHWAY TRUST FUND OBLIGATIONS 45 Highway Highway Safety Transit 40 38.1 39.0 40.0 40.0 35 34.5 34.5 34.5 34.5 34.5 34.5 34.5 34.5 30 25 20 15 10 9.9 9.9 10.0 10.0 6.2 6.2 6.2 6.2 6.2 6.2 4.0 5 0.1 0.1 4.1 1.2 1.4 1.3 1.3 1.0 0.9 1.0 1.0 1.0 1.0 1.0 1.0 1.0 0 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 * Assumes Congress will fully fund MAP21 proposed expenditures in 2015. * 29 If no new revenues are found, federal highway obligations will fall by almost 100% in FY 2016.

FUNDING 2015-2017 BIENNIUM WEST REGION CENTRAL & EAST REGIONS TOTAL ($ Millions) ($ Millions) ($ Millions) Enhanced State Highway Investments (Rural, city and state highways) (1) TOTAL $1,354.0 TOTAL $0.0 TOTAL $1,354.0 (2) (3) (4) (5) (6) STIP (2015-2016) (Federal funds with state and local matches) State $46.6 State $449.6 State $496.1 Urban $21.5 Urban $87.4 Urban $108.9 County $45.4 County $29.1 County $74.4 TOTAL $113.4 TOTAL $566.0 TOTAL $679.4 Emergency Relief (ER) (2) Urban $0.0 Urban $0.0 Urban $0.0 County $0.0 County $7.2 County $7.2 State $22.8 State $2.7 State $25.5 TOTAL $22.8 TOTAL $9.8 TOTAL $32.7 State Funds Non-Oil Producing Counties, Cities, & Townships (7) $0.0 $100.0 $100.0 TOTAL 2015-2017 BIENNIUM $1,490.2 $675.8 $2,166.1 (1) Total costs (Construction, Engineering, ROW & Utilities) (2) Construction & CE costs only on roadway projects (3) Includes Rural, Urban, County, Bridge, Safety, TAP, ROM, & PEP (4) County includes ROM; Urban & County include TAP (5) No state funds included (H, PM, MDF) (6) Dollars amounts from Schedules A, B & C with the % breakout per Regions based on the 2015-2018 Final STIP (7) Includes $52 M for Counties, $28 M for Cities, & $20 M for Townships 30

» Aggressive construction program planned. 31

Devils Lake Railroad Underpass I-94 Concrete Overlay (Valley City Area) Bismarck North Washington Street West Fargo Main I-29 (Fargo Area) Grand Forks Kennedy Bridge Pembina Border Crossing Fargo 12 th Avenue North Grand Forks Columbia Road I-94 Paving from Sterling to County Line ND 3 widening and paving from junction ND 34 to Dawson ND 49 widening and paving from Glen Ullin to County Line US 52 paving from Jamestown to Buchanan ND 20 paving and widening from Jamestown to Junction ND 9 US 52 from west junction ND 200 to Carrington US 2 paving from Devils Lake to Crary US 281 paving from Cando north to the west junction of ND 66 Grand Forks Sorlie Bridge Project US 2 reconstruction and CPR from Lakota to Michigan Grand Forks Demers Avenue rehabilitation I-29 Reconstruction Argusville to Hunter ND 46 paving east junction ND 18 to I-29 ND 27 paving from junction ND 1 to Lisbon 32

$1.354 Billion for Enhanced State Highway Investments Restore Pavement Infrastructure $ 332,538,246 Bypass Construction Work $ 192,269,229 Rebuilding Roads within Communities $ 363,891,601 Enhanced Load Carrying and Roadway Capacity $ 465,416,482 (includes Environmental for US 85 from I-94 to Watford City) Total $ 1,354,115,558 33

$450 million State Highways in Western North Dakota $100 million Non-oil producing counties $52 million Counties $28 million Cities $20 million Townships $300 million To cities in 10 largest oil producing counties $75 million Willison $50 million Dickinson $50 million Watford City $50 million Minot $75 million Remaining cities 34

$0 State Highways $300 million Oil producing counties $140 million Oil impacted cities $8.75 million Oil impacted townships $140.8 million Non-oil counties $19.2 million Non-oil townships $21.25 million Cities above 50 (excluding hub cities) $215 million Hub cities 35

The Executive Budget includes appropriations for Transit Services: $15.3 Million Federal Funding $9.3 Million State Funding (Continued Appropriation) 36

Executive Budget Proposal includes $5 million to be used on roads leading to recreational areas. Special Road Fund (SRF) program is to help finance highway projects identified by city, county or other state agencies that provide access to and within recreational, tourist and historical areas. The maximum award per project is $250,000. Depending upon the proposed project s location, the application must be sponsored by either a county, a city with a population more than 5,000 or a state agency. 37

NDDOT administers a Short Line Rail Loan Program. The Executive Budget includes $10 million in the State Industrial Commission s Budget Bill HB 1014 for a Short Line Rail Loan Program to be administered by the Bank of North Dakota. 38

NDDOT receives many requests throughout the year that we are unable to fund. Examples of some requested projects include: + Interchanges + Railroad overpasses + Load restriction changes + Passing lanes + Four-lane roadways 39

Number of traffic related deaths in state declined from 148 in 2013 to 136 in 2014. Primary contributing factors to fatal crashes: Alcohol, Not using seatbelts, Speed 200 150 100 148 Traffic Fatalities 170 148 136 50 0 2011 2012 2013 2014 40

41 Questions?