Traffic and Transport Safety TABLE 9.5.7: LOCATION OF MAJOR PARKING PLACES IN UDAIPUR CITY TABLE 9.5.8: MODE WISE ACCIDENT TREND IN UDAIPUR

Similar documents
PLANNING FOR SUSTAINABLE PEDESTRIAN INFRASTRUCTURE NALIN SINHA INITIATIVE FOR TRANSPORTATION & DEVELOPMENT PROG. (ITD), DELHI

IDENTIFICATION OF BLACKSPOT REGION ALONG ANANDAPURAM TO ANAKAPALLI STRECH VIA SH-38

Parking Management Strategy: Case of Udaipur

Manila-Quezon City. My City Initiative Delhi. A Safety Analysis. a project by World Vision India

Decongestion Strategies for Delhi Roads

Traffic Congestion and Mismanagement in Dhaka City

Submission on Clontarf to City Centre Cycle Route with signatures of 1,493 people

SAFETY EVALUATION OF AN UNCONTROLLED

MOBILITY CHALLENGES IN HILL CITIES

STUDY AND ANALYSIS OF ACCIDENTS ON NH 71-A

AN OVERVIEW. Road Accidents in Delhi 2015

Impact of Work Zone on Traffic Accident Characteristics of Kochi

2. Context. Existing framework. The context. The challenge. Transport Strategy

Road Safety. Inspections

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

TEAM: ROAD: SECTION: K K Nagar Walkability Survey 19 th June 2013

EMBARQ India Public bicycle sharing scheme for Mysore station locations

International Journal of Innovative Research in Science, Engineering and Technology. (A High Impact Factor, Monthly, Peer Reviewed Journal)

Intersection Improvement in Udaipur: A Demonstration of Passive Junction Design Solutions

Feasibility Report for Kumharon Ka Bhatta with an Alternative Intersection Improvement: Case Study from Udaipur

UNIT V 1. What are the traffic management measures? [N/D-13] 2. What is Transportation System Management (TSM)? [N/D-14]

Road Accident Analysis of Srinagar City

ACCIDENT BLACK SPOT ANALYSIS IN MANGALURU

Kings Road, Herne Bay: Proposed Crash Remedial Measure

Performance Criteria for 2035 Long Range Transportation Plan

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

BICYCLE SHARING SYSTEM: A PROPOSAL FOR SURAT CITY

1. Introduction. 2. Survey Method. Volume 6 Issue 5, May Licensed Under Creative Commons Attribution CC BY

Introduction Methodology Study area and data collection Results and recommendation Conclusion References

National Report of Greece. The city of Kalamaria is the reference area for all street cases, and is therefore described only once, in this chapter.

Bhopal. A Safety Analysis Report

Urban Mobility. IRF New Delhi October 3, Patrick Lepercq GRSP, Chairman Michelin, Corporate VP Public Affairs

Reducing Encroachment Problems on Roads to Reduce Traffic Congestion instead of Widening the Road

Supporting Safer Cities. ENHANCING LAST MILE CONNECTIVITY a safety analysis of the RK Ashram Marg Metro Station

EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY

Speed Limits in the Hoddle Grid

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

International Journal of Research (IJR) Vol-1, Issue-8, September *

The Limassol SUMP Planning for a better future. Apostolos Bizakis Limassol, May 16, th Cyprus Sustainable Mobility and ITS conference

DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN

SHAHJAHANABAD SAFETY AUDIT REPORT

Integrated Corridor Approach to Urban Transport. O.P. Agarwal World Bank Presentation at CODATU XV Addis Ababa, 25 th October 2012

Analysis of Causal Factors of Accidents near Mahipalpur Junction on NH-8 in Delhi

TRAFFIC OPERATION PLAN FOR TIRUR MUNICIPALITY

Punjab Road Safety & Traffic Way Ahead

Attachment One. Integration of Performance Measures Into the Bryan/College Station MPO FY 2019 FY 2022 Transportation Improvement Program

BURGAS INTEGRATED PUBLIC TRANSPORT PROJECT. Information day, 5 th July 2011, Burgas

Low Carbon Mobility Plan For Indian Cities

Sixth Line Development - Transit Facilities Plan

Comparative analysis of level of service between Muradpur - Dewanhat & Agrabad - CEPZ links with identification of the contributing factors

2.0 Existing Conditions

Transportation Assessment

November 14, Dulles To DC Loop Public-Private Partnership Proposal. Executive Summary

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

Identification of Accidental Locations on NH-10 Highways

5/31/2016 VIA . Arwen Wacht City of Sacramento Community Development Department 300 Richards Blvd., 3 rd Floor Sacramento, CA 95811

VRU Safety & Traffic Calming Measures in Urban & Rural Areas

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

FEASIBLE SOLUTIONS FOR REDUCING TRAFFIC FROM MEERAMAKKAM MOSQUE JUNCTION TO THOPAWANA TEMPLE AREA IN KANDY

Application of Traffic Management Plan a Sustainable Solution of Traffic Congestions in Pabna City, Bangladesh

Transportation Policy Manual

TRAFFIC SURVEYING AND ANALYSIS

Cycling Inclusive Transport Planning

Downtown BRT Corridor Alternatives Review: 1 st, 2 nd, 3 rd and 4 th Avenue. Bus Rapid and Conventional Transit Planning and Design Services

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A

Research Offices in India. Delhi, Kolkata, Mumbai, Lucknow, Chennai, Bangalore, and. Hyderabad. TNS INDIA Pvt. Ltd

BOGOTA. Introduction: Methodology: 19,351 Audit Pins. 1,927 km covered

Chapter 5 Future Transportation

Welcome. The Brooklin Secondary Plan and Transportation Master Plan are collectively referred to as the Brooklin Study.

Pedestrian Safety in Cities

Existing conditions of each bridge and repair plan are presented in Table

Municipality of Sofia Traffic Master Plan. Intelligent Transport Systems Strategy Andrew Walsh

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents.

Better Market Street Project Update. Urban Forestry Council September 17, 2014

Pedestrians safety. ROAD SAFETY SEMINAR PIARC/AGEPAR/GRSP Lome, Togo October 2006 Lise Fournier, Canada-Qu

MCTC 2018 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV13.xlsx

A study on Nh-11 to find out the causes and High accident Zone between Jaipur to Sikar

Regional Transportation Needs Within Southeastern Wisconsin

Integrated Mobility Plan for Gurgaon Manesar Urban Complex

Highway 111 Corridor Study

GIS Based Data Collection / Network Planning On a City Scale. Healthy Communities Active Transportation Workshop, Cleveland, Ohio May 10, 2011

This objective implies that all population groups should find walking appealing, and that it is made easier for them to walk more on a daily basis.

I write in response to the current consultation. I am copying this to Derrick Ashley and I will be posting this online.

Traffic Volume Analysis on Surrounding Temple Area Madurai

Traffic Congestion at Road Intersection due to Absence of Efficient Traffic Management and Planning: A Case Study on Fulbarigate, Khulna

ANALYSIS OF ACCIDENT SURVEY ON PEDESTRIANS ON NATIONAL HIGHWAY 16 USING STATISTICAL METHODS

Urban Street Design and Development

Frequently Asked Questions (FAQ)

Use of Skywalks in Mumbai City

Public transport and town planning from a retroactive point of view C. Wallstrom, S. Johansson et al

CHAPTER 7 CIRCULATION

Public Health and Safety Community. Associate Prof. Dr. Chulaporn Sota Department of Health Education Faculty of Public Health Khon Kaen University

SITUATIONS AND CHALLENGES OF ROAD SAFETY IN CHINA

Supporting Safer Cities. ENHANCING LAST MILE CONNECTIVITY a safety analysis of the Mandi House Metro Station

Road Crash Analysis and Alleviation Measures

CITY OF SASKATOON COUNCIL POLICY

TRAFFIC ANALYSIS AND SIGNAL DESIGN AT PATAN A PROJECT REPORT

VILNIUS SUMP. Gintarė Krušinskaitė International project manager place your logo here

Case Study on Traffic Management for Rectification of Congestion on a Road Stretch

TRAFFIC STUDY AND DESIGN OF TRAFFIC SINGNAL AT IDENTIFIED INTERSECTIONS IN MANSAROVAR, JAIPUR

Transcription:

TABLE 9.5.7: LOCATION OF MAJOR PARKING PLACES IN UDAIPUR CITY SI No. Stretch Link Length (m) Existing Parking Demand in ECS 1 Patel Chowk to Choraha 1600 291 2 Udaipol Choraha to Surajpol Choraha 530 158 3 Surajpol Choraha to Town hall Entry 460 55 4 Town hall Entry to Delhi Gate 370 115 5 Delhi Gate to Hathipol Choraha 760 238 6 Hathipol Choraha to Chetak Circle 500 141 7 Delhi Gate to Durajpol (Bapu Bazar) 660 315 Source: Traffic Management Plan, Udaipur 9.5.15 Traffic and Transport Safety Transport safety is an important component of traffic and transportation mechanism. During the analysis of accident data it was found that accidents occur especially along major corridors and at major junctions where roads meet national highway or bypass. Heavy commercial vehicles are involved in most of the accidents. The accident rate has come down marginally due to construction of bypass. On accounting of inadequate training and education maximum persons are killed and injured in accidents with involvement of trucks followed by cars/jeep/taxi and buses. TABLE 9.5.8: MODE WISE ACCIDENT TREND IN UDAIPUR Year Trucks Buses Mini Buses Cars & Three Two Jeeps Wheelers Wheelers Others Total Accidents 1997 494 125 0 231 58 149 85 1142 1998 475 150 8 266 32 151 73 1155 1999 491 181 33 278 35 142 46 1206 2000 417 171 32 326 32 164 74 1216 2001 311 261 31 307 12 140 155 1217 FIGURE 9.5.5: ROAD ACCIDENTS FIGURE 9.5.5 ROAD ACCIDENT Number of Accidents 1200 1000 800 600 400 200 0 1997 1998 1999 2000 2001 Persons Killed Serious Injuries Minor Injurious

Major accident points inside the city are Sewashram, Pratap Nagar bypass, Paras cinema, Kailash puri, Sukher, Bhuwana Village and Chirta.

Map 9.5.3: Parking Spaces

9.5.16 Issues Under developed road network Old city doesn t have well developed road network, considering present situation of high traffic levels along with the fact that these roads are extremely narrow and Zig-Zag. Irregular development of city has resulted in roads being constructed in unplanned fashion, resulting in incomplete links to major roads. This has resulted to bottlenecks along major roads as they near a junction. Due to absence of links, citizens of Udaipur are also forced to travel extra distance in order to reach locations, which are otherwise very near. V/C Ratio of Roads A large numbers of roads are already operating beyond their carrying capacity. If it is not taken care of majority of city main roads would be come dumps for vehicles (negligible or no movement). Lack of Parking at commercial, institutional, and tourist areas Parking has become a major problem particularly in old city. Blocked streets due to parking is virtually choking the old city to death. Commercial areas in high density zones of city don t have adequate parking facilities resulting in spillovers to streets, thus adversely affecting through traffic. Large numbers of parking lots are encroached by informal activities and are also being used as solid waste dumps. Tourist spots like Fatehsagar boating point, Public Gardens, and marriage halls/plots etc. are rapidly growing and are proving as a menace on account of traffic congestion due to inadequate facilities for parking. improper junction design Road and junction development has also taken place in a very irregular fashion. Majority of junctions have not been properly designed, adding to congestion and incidences of accident. Few road intersections are controlled junctions as stated earliar. Moreover due to lack of awareness and improper design people mostly disregard traffic lights are traffic police personnel are invariably not present at site. Stray Cattle, animals The stray cattle accountfor a major reason fortraffic congestion on city roads, and give rise to accidents. Straying of cattle on city roads is a very common feature and a major cause for traffic hazards.

Encroachment by shops (formal/ informal) Encroachment of roads and footpath has come across as a major problem in smooth flow of traffic. People have encroached upon ROW by construction of various type of structures. Shopkeepers use the footpathsfor advertising, displaying their products etc. Pedestrian System There is an absence of a safe and comprehensive system of pathways exposing pedestrians to risks. It also creates pedestrian-vehicular conflict zones in almost all stretches of major arterial and sub-arterial roads of the city. Light poles, transformers, hand-pumps, and trees on the footpaths also create a major hindrance for pedestrians. Bare live wires are a persistent risk for pedestrians along these roads. 9.5.16.8 Absence of mass transportation: There is a lack of good and reliable public transport system in Udaipur city. Mainly 3 modes namely private bus, auto rickshaws and Shared Auto (Tempo) cater to needs of people. Mini buses run by private operators do not have any fixed schedule and are not reliable. Shared Autos haves well identified spots (stands) for loading and off-loading passengers, still they stop anywhere and everywhere for potential passengers. More over in order to maximize profits and also due to lack of fleet size these can be frequently seen carrying more passengers than their capacity. Truck traffic from centre of city Udaipur falls on junction of NH8 and NH76. This has lead to large amount of traffic (especially trucks and busses entering right into the heart of city. This is a major reason of traffic congestion. Development of new bypass has relieved the city to a considerable extent; still existence of wholesale markets within the heart of the city (which were according to earlier plan outside walled city) attracts a substantial volume of truck traffic into city for different purposes. 9.5.16.10 Vehicle Growth Rapid growth of vehicles has been observed in city and in absence of a good mass public transportation system this is bound to increaseexponantially in years ahead. Accident Zones Majority of junctions happen to be accident-prone zones due to improper design, flouting of

rules by road users and haphazard growth of structures affecting the sight distance. 9.6 STREET LIGHTING Providing and maintaining of streetlights is an obligatory function of Udaipur Municipal Council. The electricity department of UMC is responsible for installation, replacement, repairs, operation and maintenance of streetlights in the city. There are about 20153 street light poles in the city. Considering a total road length of about 822 km in UMC limits, the average spacing works out to be about 40.79m, which is a little beyond standard norms of 30m. However there still is a big scope of improvement toproperly illuminate the streets. The following table gives the details of various types of streetlights existing in the city. TABLE 9.6.1: TYPES AND NO. OF STREET LIGHTS IN UDAIPUR Sl. Description Number Type of roads 1 High Mast Lamps 3 Chetak Circle, Delhi Gate, Udiyapol 2 Mercury Vapour Lamps 200 Only in Parks 3 Sodium Vapour Lamps 2950 All Divided Roads @ 30 m C/C 4 Tube Lights 17000 All other roads Total 20153 Source: Electricity department UMC. Considering the above figure, it can be concluded thatcity roads need additional streetlights. More over in view of an additional road length of about 140 km being proposed in the Transport Master Plan, it is expected that an addition 4700 street lights would be required by the year, 2021. At the same time, replacing existing tube lights with sodium vapor lamps also needs to be considered. Moreover Transport Master Plan has proposed development of at least 34 new junctions out of which at least 20 junctions can be considered for being provided with high mast lamps. 9.6.1 Key Issues?? It will be desirable that UMC takes steps to address the following issues: -?? Improve functioning of existing streetlights by proper maintenace and operation?? Provide additional street lights on areas/zones which lack facility in this respect.?? Adopt automatic switch for operation of streetlights?? Explore possibility of solar energy as a source of electricity for street lights.

9.7 FIRE SERVICES Fire service in any city are a very important part and have one of the most important roleplay in disaster management, preparedness and services for any city, and so is the case with Udaipur. In spite of its importance it is one of the most neglected sectors of urban services, in Udaipur, a in most cities of India. Fire services norms for any city of size of Udaipur is to provide 1 fire tender for every 10000 people of city. This however is not the case with Udaipur. Area of jurisdiction of Udaipur Fire Services is UMC Limits however they are actually working and providing for services for an area much larger to that. It is important to note that Udaipur having a population of 389428 (UMC) in 2001 is having the following for its fire services. TABLE 9.7.1 FIRE TENDER DETAILS Type of fire tender No. 1 Water tenders 4 2 Water/ Foam tenders 1 3 Rescue/ Emergency tenders Nil 4 Fire Fighter Nil 5 Mini Fire Fighter Nil Type of Equipment No. 1 Hydraulic Platform Nil 2 Portable Pump Nil 3 Trailer Pumps Nil TABLE 9.7.2 OTHER EQUIPMENTS: TABLE 9.7.3 BURNOUT AND LOSSES Description 2001 2002 2003 2004 2005 1 Fire Accidents 285 228 209 276 231 2 Groundings - - - - - 3 Building Collapses - - - - - 4 Deaths (Humans) 2-4 - - 5 Deaths (Animals) 4-9 - - 6 Others - - - - - 7 Estimated Loss (Rs) 5,79,88,501 6,85,06,910 47,48,450 1,03,65,000 1,03,99,800 In case of inadequacy of local body to provide adequate or timely fire services for a mishap,

fire tenders from Airport, Hindustan Zinc Limited and other Industries are called for services, and vice versa. Udaipur is a town of 10-15 km size (max. distance from one point to another, hence it should take about 4 to 5 minutes for fire service to reach from any point of location to site of burnout. However due to congestion on roads, lack of public awareness and civic sense, it takes up to 10 minutes to reach the same location even in case of emergency. More over, there is a large no. of areas in old city wards where in case of a burnout, it is extremely difficult for fire tender to access the site. In addition to above there is only one fire station to serve Udaipur. Whereas there is a requirement of at least 10 more fire stations spread across the city in present scenario.