Pre-control risk estimate. Likelihood Risk

Similar documents
JOB SAFETY ANALYSIS. How to use the Risk Assessment Charts. Likelihood A (Almost Certain) B (Likely) C (Possible)

PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO HIGH LEVEL LIGHT UNITS

Important Safety Information Enclosed

SAFE WORK METHOD STATEMENT Part B

WORK METHOD STATEMENT STRUCTURAL STEEL

Safe Work Method Statement

S31 Opening Statement Working at Height

THE CONTROLLED COPY OF THIS DOCUMENT IS ON THE COMPUTER NETWORK PRINTED COPIES ARE ONLY CURRENT FOR THE DATE AT THE BOTTOM OF THE PAGE.

SAFE WORK METHOD STATEMENT SWMS No Version

Instructions for the Use of the Excel Spreadsheet. There are Three tabs at the bottom of this worksheet. Instructions tab is the one you are reading

Specific Safety Legislation/Codes of Practice/Australian Standards applicable to this JSA (Tick those applicable).

HEALTH & SAFETY ARRANGEMENTS FOR MANAGEMENT OF WORK AT HEIGHT

Safe Work Method Statement

Safe Work Method Statement

SAFE WORK METHOD STATEMENT Part 1 CONCRETE SAWING

PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO LOW LEVEL LIGHT UNITS

Company Health and Safety Policy

WORK METHOD STATEMENT TERMITE PROTECTION

FIRE HYDRANT TESTING METHOD STATEMENT.

WORK METHOD STATEMENT ALUMINIUM WINDOWS AND DOORS

Method Statement. Main Contractor: xxxx. Address: Tel: xxxxx. Sub-Contractor: Firepro Logistics Limited. Tel:

ACCREDITED SAFETY TRAINING FOR EQUIPMENT OPERATORS

Safe Work Method Statement LRB TREE SERVICES 6 Behland St, Kearneys Spring QLD, 4350 ABN

WHS OHS HAZARD REGISTER (SITE AND OFFICE OPERATIONS)

Safety Risk Assessment Roofing Works / Surveying / Inspections

SAFE WORK METHOD STATEMENT CARPENTER

B S Glass Ltd Safety procedures- outsourced Workplaces

Example of an Occupational Health Risk Assessment

Contractor / Exhibitor Handbook

WORK METHOD STATEMENT ELECTRICAL

Leicester City Council Health & Safety Risk Assessment Form Ref:

Safety Risk Assessment Hand and Power Tools

Contractor handbook. Purpose

TASK DAY RISK ASSESSMENT FORM

Safe Work Method Statement

Accident /Incident/Injury Report & Investigation Form

HAZARD MANAGEMENT PROCEDURE

SCOPE OF WORK, SAFETY METHOD STATEMENT & RISK ASSESSMENT

Pocklington Town Council Risk Assessment Christmas Festival Wednesday Assessor: Gordon Scaife Date

Prevention of Falls and Working at Heights

How severely could the risk hurt someone? Low/Insignificant First aid

Safety Risk Assessment Carpentry

Working at Height - MEWPS & Ladders. Your company details Address Tel: Fax: Mobile:

Telco Antennas SWMS Working At Height Above 2m

WH&S Act 2011 & Regulations 2011, Environmental Protection Act and Regulations

WORK METHOD STATEMENT CARPET LAYING

SWMS No 012 Samark North Qld Pty Ltd ABN : Electrical Contractors License C37121 Page 2 of 6

WORK METHOD STATEMENT RENDERING

SAFE WORK METHOD STATEMENT

Safe Work Method Statement

Work At Heights Toolkit. for Supervisors

20/07/2017. Procedures. Page 01

Temporary load-bearing support for structural alterations or repairs

TOOL BOX TALK NO3. Use of P.P.E

Risk Assessment. Appendix A contains

C&P ENGINEERING SERVICES LTD

How severely could the risk hurt someone? Low/Insignificant First aid

SAFE WORK METHOD STATEMENT

Safe Work Method Statement (SWMS)

Risk Assessment Underwritten For:

Slips, Trips and Falls

Guidance for Exhibitions

EHS Workplace Inspection Checklist (Ref. SOP QMS-080; EHS-010)

Safe Work Procedure for installation of external cladding

WHS F029 Job Safety Analysis (JSA) and volume less than 10m2

HAZARD IDENTIFICATION AND RISK ANALYSIS RECORD

FLYING OBJECTS MANUAL HANDLING EXCESSIVE NOISE

PLANT RISK ASSESSMENT REPORT

How severely could the risk hurt someone? Low/Insignificant First aid

Site-Specific Safety Plan

Chairman: Doctor: Ambulance: Secretary: Gardai: Other: The Club will comply with Schedule 3 of the Safety, Health and Welfare at Work Act 2005 by:

SAFE WORK METHOD STATEMENT

The Site-Specific Safety Plan V prepared for

SAFE WORK METHOD STATEMENT

How severely could the risk hurt someone?

CLIENT: UNIVERSAL TOOL & PRODUCTION COMPANY Ltd. METHOD STATEMENT Commissioning and Final connections to IHT Skid

RISK ASSESSMENT Installation of electrically operated service lifts (non passenger type)

Contractor OHS Induction. AOHS-05-GUI September 2016

CONSTRUCTION HEALTH AND SAFETY MANAGEMENT SYSTEM BASELINE HIRA

Charmborough Bells Risk Assessment and Method Statement

Risk Management Guide

SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt, GEEBUNG PH M ABN

SAFE WORK METHOD STATEMENTS

Recognition, Evaluation, and Control of Hazards

SAFETY MANAGEMENT SYSTEM

Accident/Incident Reporting and Investigation Procedures

1. Objective of the initiative To ensure that all employees and subcontractors are aware of the risks associated with working at height.

Job Safety and Environmental Analysis (JSEA)/Safe Work Method Statement (SWMS)

Work Health & Safety Event Safety Checklist Small Event

TUDOR PARK EDUCATION TRUST. Working at Heights and Risk Assessment

Safety Guidelines for Live Entertainment and Events I Part 2. Hazard Identification and Risk Management 1

SAFETY MANAGEMENT SYSTEM

Wheeler Cranes 6 McIntyre Rd Tomago NSW 2324

SAFE WORK METHOD STATEMENT Part 1

SAFETY MANAGEMENT SYSTEM

ROOF ACCESS AUDIT SPRING 2017

Safety Risk Assessment Working at Height: Mobile Tower Scaffold

JOB SAFETY ENVIRONMENT ANALYSIS (JSEA) Working With In Situ Testing Rigs

RISK ASSESSMENT/SAFE WORKING PRACTICE SD008 Speed Sessions and Competitions Including resurfacing

Risk Assessment for: Fume cupboards

Transcription:

Activity Consequence s mitigation measures Site Access & Egress Slips, trips & falls al injury by falling. Sprains & broken bones. Site operatives 3 4 12 Ensure access to site is kept clear of plant & materials, waste to be disposed of and work area to be kept clear of trailing leads and cables. 3 2 6 Site operatives and supervisors Use of extension leads. Trips and falls al injury by falling. Sprains & broken bones. Site operatives 3 4 12 Extension leads to be placed away from walkways. Use of hazard tape or tie up off floor. Toolbox talks. Manual Handling of harm through handling items which are too large / too heavy. Site operatives 3 4 12 Installation team to read & sign off this risk assessment & related Method Statements prior to starting work on Site. Daily Site briefing to discuss the sequence and works to be undertaken during the day. Where necessary assistance to be requested in advance. Operatives must complete a Manual Handling Assessment for all tasks.

Activity Consequence s mitigation measures al Protection of harm though working without appropriate PPE whilst carrying out required tasks Cuts, bruise and injury to body. Site operatives 3 3 9 Site operatives should be issued a minimum PPE requirement of Safety Footwear, Hard Hat, Hi- Vis, Safety Glasses, Safety Gloves, Ear defenders and dust mask. All tools & equipment should be used correctly and as intended. All operatives must be familiar with correct use & application of PPE in relation to the tasks required to successfully complete on-site activities. All operatives should complete required on Site induction & apply necessary PPE controls. Site Supervisors

Activity Consequence s mitigation measures Working at Height: of harm through falls from height during works Site operatives 3 2 6 Site Supervisor to decide on correct type of access equipment needed for the specific task. Surrounding area to be deemed clear, level and safe to work in. Before use the operative shall check that the equipment has been signed off and is safe to use. Revised Toolbox talks will take place as required to advise staff of any changes or potential hazards. Only PASMA trained operatives will be allowed to build & Sign off Access equipment. Weekly inspection sheets and training cards will be kept on file. Site Supervisors All equipment should be used correctly and for its intended purpose. Any damaged equipment should be reported to the Site Supervisor and removed from Site immediately. Use of MEWP of harm through falls from height during works Site operatives 5 3 15 Site Supervisor to decide on correct type of access equipment needed for the specific task. Surrounding area to be deemed clear, level and safe to work in. Before use the operative shall check that the equipment has been signed off and is safe to use. Revised Toolbox talks will take place as required to advise staff of any changes or potential hazards. Harness must be worn in all BOOM type MEWPs and MEWP are to be used in accordance with the manufacturer s guidance. Only IPAF trained operatives will be allowed to operate MEWPs. Daily inspection sheets and training cards will be kept on file. 5 1 5 Site operatives

Activity Consequence s mitigation measures Inspection & Testing Falling from Heights, Injury from Hand tools Broken bones, bruises, cuts and abrasions caused by falling from height or misuse of hand tools Site operatives 5 3 15 All Operatives carrying out Inspection & Testing will be suitably qualified and certified. Danger notices stating Testing in progress will be posted at all work stations where Inspection and Testing is being carried out. Access to Switch rooms / Plant Rooms will be by access permits only. Access towers to be constructed by PASMA or equivalent certified operative. Care must be taken to avoid over stretching/reaching when working on scaffold towers. Step ladders will only be used as a last resort and in switch rooms, a permit is required for their use. At no time, will the working platform be moved while operatives or materials are working on it. Tool box talks 5 1 5 Test Operatives, Site operatives and Supervisors Inspection and Testing Electrocution & burns. s injured or death by contact with electricity. Test Team Operatives Other Site nel 5 3 15 All Operatives carrying out Inspection & Testing will be competent persons and be trained to City & Guilds 2391 or equivalent. Danger notices stating Live work in progress will be posted at all work stations where Inspection and Testing is being carried out to live equipment. Access to Switch rooms / Plant Rooms will be by access permits only. Permit system and safe system of work Tool box talks 5 1 5 Test Team Operatives Supervisors Other Site nel

Quantification ( X ) Building loss, catastrophic environmental Major injury, damage or environmental impact RIDDOR not life changing Minor injury, damage or environmental impact Insignificant SEVERITY LIKELIHOOD 5 4 3 2 1 Almost certain 5 25 20 15 10 5 A high likelihood 4 20 16 12 8 4 A small likelihood 3 15 12 9 6 3 Low likelihood 2 10 8 6 4 2 Not likely 1 5 4 3 2 1 Notes: 1. Low Residual = is TOLERABLE. No further preventative action required, consider cost effective solutions or improvements that 2. Medium Residual = Work may only start if the risk has been reduced to As Low as Reasonably Practicable (ALARP). Consider additional control measures that reduce the risk without significantly increasing cost. 3. High Residual = is INTOLERABLE. Do not start work or continue until risk level is reduced using suitable control measure is to a practicable level. 4. Control measures are to ensure that residual risks are reduced to as low as reasonably practicable. Where controls fail to reduce to a TOLERABLE or ALARP level the assessment must be referred to your Line Manager. 5. If the operations are likely to affect the public or the safe operation of a public transport system, the control measures must reduce the risk before likelihood of significant risk before work is commenced.