Functional, Preliminary Design and Detailed Design

Similar documents
Construction Newsletter No. 32 October 14, 2016 On-Going

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

Why invest in the 1 Street S.W. Corridor?

Hospital Link Project Project Update September 2017

Welcome to the Quebec Alternatives Analysis Public Meeting

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017

5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION

1. Provide a dedicated westbound approach bus lane at the intersection;

Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street)

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

Complete Streets. Designing Streets for Everyone. Sarnia

122 Avenue: 107 Street to Fort Road

Governance and Priorities Committee Report For the July 2, 2015 Meeting

Tonight is for you. Learn everything you can. Share all your ideas.

Rideau Canal Corridor Pedestrian Crossing Study. Queen Elizabeth Dr.: Preston St. to Laurier Ave. & Colonel By Drive: Hog s Back to Daly Ave.

APPENDIX 1 CIMA RECOMMENDED TREATMENTS

Welcome. If you have any questions or comments on the project, please contact:

Public Open House #2. THE CITY OF NORTH VANCOUVER CHESTERFIELD AVENUE CYCLING IMPROVEMENTS (4th - 13th STREET) JULY 2013

Henderson Ave. Complete Streets Project

Traffic Safety Plan Second Avenue

Hospital Link Project Project Update November 2017

01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

MARTIN LUTHER KING JR. WAY

Hennepin Avenue Reconstruction Washington Avenue to 12 th Street

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

CLOSED. Highlights of the Final Concept Design:

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

2017 Temporary traffic control guidelines for pedestrians. v.2

Town of Ashland. Downtown Planning Initiative 2 nd Community Workshop. March 29, Presented by:

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

Bicycle Traffic Control Signal - St. Clair Avenue West and Poplar Plains Road

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Bank Street Widening Class EA Study Leitrim Road to Rideau Road. Gloucester South Seniors Centre, 4550 Bank Street

Road Alterations - Wellington Street East, Church Street, and Front Street Intersection

CITY OF SAINT JOHN TRAFFIC CALMING POLICY

Chicago Safe Routes to School Safe Routes to High School (SRTS/SRTHS)

TRANSPORTATION COMMISSION Agenda Staff Report

Traffic Management and Mitigation Study in the Leslieville Community Transportation Services Division & IBI Group IBI GROUP

City of Seattle Edward B. Murray, Mayor

STONY PLAIN ROAD STREETSCAPE

North Avenue Corridor Study

Rebuilding Highway 7 Town Centre Boulevard to Sciberras Road

Decision on North Waterloo Routing

10.0 CURB EXTENSIONS GUIDELINE

El Centro Mobility Hub

GRTC Bus Rapid Transit: Semi-Final Design Phase Public Meetings: October 26 & 27, 2015

CITY OF VANCOUVER ADMINISTRATIVE REPORT

Fulton Market Streetscape

Better Market Street Project Update. Urban Forestry Council September 17, 2014

STEERING COMMITTEE MEETING June 17, Streetscape Overview Burlington Comprehensive Master Plan

Colchester/Riverside/Barrett/ Mill Intersection Study. PAC Meeting #3 September 22, 2016

Harbord Street and Hoskin Avenue Bicycle Lane Upgrades

Southside Pilot Proposal

Broad Street Bicycle Boulevard Design Guidelines

Mandan Commission Meeting August 2, 2016 Mandan City Hall

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

ALBERTA AVENUE WHAT WE HEARD REPORT BUILDING GREAT NEIGHBOURHOODS

CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON JANUARY 10, 2017

MASONIC AVENUE STREET DESIGN STUDY Community Workshop 2. Masonic Ave Street Design Study Community Workshop 2 August 10, 2010

Appendix A Guiding Principles for Cycling Safety in Work Zones

Providence Downtown Transit Connector STAKEHOLDER MEETING #2. Stakeholder Meeting #1 October 24, 2016

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

C Line Rapid Bus Preliminary Station Design

Summary of Comments Public Meeting: Marietta Street Resurfacing Project Atlanta Contemporary August 29, 2017 / 6:00 pm to 8:00 pm

What Is a Complete Street?

Cycle Track Design Best Practices Cycle Track Sections

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

Downtown BRT Corridor Alternatives Review: 1 st, 2 nd, 3 rd and 4 th Avenue. Bus Rapid and Conventional Transit Planning and Design Services

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

MCARTHUR AVENUE AS WE HEARD IT REPORT CYCLING LANES. City of Ottawa Transportation Services. Photo: istock

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Thank you for attending

Hennepin County Transportation Department

Memo. Ocean Avenue Corridor Design Project Public Workshop #2 Summary

Potential Bicycle Facility on Bayou Street Mobile, Alabama

Public Works and Infrastructure Committee. General Manager, Transportation Services

Pre-Construction Meeting

Polk Streetscape Project

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Short-Term Enhancements Improvements to keep Austin moving. MetroRapid

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

CURBSIDE ACTIVITY DESIGN

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Station Plan: Penn & 43rd Avenue

STATUS OF 2009 PEDESTRIAN MASTER PLAN (AS OF DECEMBER 2013)

Elmhurst Metra Station. Public Hearing Wednesday - November 30, 2016

Non-Motorized Transportation 7-1


UPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS

25th Avenue Road Diet Project A One Year Evaluation. Transportation Fund for Clean Air Project #05R07

2.0 LANE WIDTHS GUIDELINE

Transcription:

Functional, Preliminary Design and Detailed Design Main Street (Echo Drive to the Rideau River), Lees Avenue (Main Street to Chestnut Street), and Rideau River Drive (Main Street to 130m south of Main Street) Working Group Meeting #19 June 11, 2014

Agenda 1. Main Street Project Update 2. 2014 Early Utility Reconstructions 3. 2015 Traffic Management 4. Pedestrian and Cyclist Mobility at Intersections 5. Public Art Update 6. Next Steps 2

2014 Utility Works The City is taking the opportunity to coordinate the relocation of some utilities during summer/fall 2014 to streamline the full street renewal reconstruction in 2015 Workplace rules require only one contractor being able to occupy a working space at one time Bell Canada needs to reconstruct underground bell plant that is susceptible to damage Hydro Ottawa plans some minor pole replacement work and manhole reconstructions

2014 Bell Works

2014 Hydro Works

2014 Hydro Works

Traffic Management Street renewal includes construction of new underground services, which occupies at least half of the available rightof-way

Traffic Management Between Greenside and Springhurst, a large deep storm sewer needs to be installed. Traditional open cut installation would occupy the entire ROW A plan for directional tunnelling is being developed This should allow one lane to be kept open in one direction

Traffic Management Priority is for traffic flow in the southbound direction Best services needs of emergency services vehicles towards hospital precinct Best mitigates risk of traffic congestion in downtown areas

Traffic Plan

Typical Street Arrangement Separation between pedestrians and cyclists on Main Street maintained by: Utility zone in Traditional Mainstreet area, where street lights, bike racks, seating, and trees (where feasible) are to be located Visually distinct paving stones of utility zone Typical street arrangement in Traditional Mainstreet area

Wider Sidewalk typical sections

Cyclist/Transit User Interaction Cyclists must yield to pedestrians at bus stops Area of cycle track adjacent to bus stop marked by shark s teeth zigzag markings, to indicate area of interaction with pedestrians

Cyclist/Transit User Interaction Signage plays important role in reminding cyclists to yield to pedestrians Cyclist Yield to Pedestrian Sign (Ontario Traffic Manual Book 18) Cyclist Yielding to Pedestrian on Sherbourne Street, Toronto

Crossing Main Street Design team is updating curb ramps to reflect the City s latest specifications, complying with accessible design standards For cyclists, path through intersection is delineated by crossrides, highlighted by elephant s feet markings Raised pedestrian crosswalk at the mouth of sidestreets slow vehicle traffic Accessible Curb Ramp (City of Ottawa Accessibility Design Standards) Intersection design features

Bus Stops Rationalization of the number of OC Transpo bus stops is proposed with the objective of improving transit efficiency through Main St. corridor. West side (Southbound): New stop at Oblate Avenue Herridge stop redundant Hazel will be the priority stop Riverdale, Centennial stops not required by OC Transpo East side (northbound): Hazel St. and Clegg Ave. stops to be consolidated in a midblock stop with bus bay 19

Bus Shelters Space is limited in the ROW for new bus shelters Currently, there are bus shelters on the east side of Main Street, at the Oblate, Hazel, and Clegg bus stops The proposed future bus stop consolidating Hazel and Clegg will include bus shelters and bike racks, as priority stop serving the community and university The design team continues to explore the opportunity for a bus shelter at Oblate Avenue within the right-of-way

Public Art Process The public art selection committee has chosen 5 finalists The City is seeking public input on the proposals: Kiosk at the Main Event Main Street Farmers Market Main St./Hazel St. Saturday, June 14 th 9a.m.-2p.m. Open House - meet the artists, view proposals, and provide comments: Saint Paul University Room 120 Laframboise Hall Wednesday, June 25 th 4p.m. 7 p.m. The proposals will also be shown on ottawa.ca on June 13, with comment period open until midnight June 24

Next Steps - Working with individual land owners on land acquisitions - Brantwood Place Gates Heritage Reconstruction: Built Heritage Subcommittee Meeting June 26 th (9:30AM City Hall Champlain Room) Planning Committee July 8 th (9:30AM City Hall Champlain Room) City Council July 9 th (10:00AM City Hall Champlain Room) - Working Group: Next working group meeting expected in September 2014 - Open Houses: Open House planned for Fall 2014 to present final plans

Round Table Discussion 23