COOPER POWER SERIES. Under-oil arrester disconnector installation/operation instructions. OEM Equipment MN800010EN

Similar documents
COOPER POWER SERIES. EL Bay-O-Net Current-Limiting Fuse Installation Instructions. Fusing Equipment MN132023EN

COOPER POWER SERIES. Manual or Hostick Operable, Padlockable 150 A Tap-Changer Switch Installation Instructions. Tap-Changer Switch MN800015EN

COOPER POWER SERIES. 50 A 2:1 series multiple (dual voltage) switch cap/wrench, lever or hotstick operable handles installation instructions

COOPER POWER SERIES. UltraSIL Polymer-Housed Distribution-Class MOV Surge Arrester Installation Instructions. Surge Arresters MN235006EN

COOPER POWER SERIES. QD8 Quik-Drive tap-changer VR or VL reversing switch stationary contact assembly kit number A48 installation instructions

COOPER POWER SERIES. 600 A 15, 25 and 35 kv class bushing adapter installation instructions. Deadbreak Apparatus Connectors MN650058EN

COOPER POWER SERIES. D-73P3 bypass switches installation instructions. Switches MN008005EN. Effective April 2016 Supersedes S June 2013

COOPER POWER SERIES. 600 Ampere Deadbreak Grounded Standoff Bushing 15 & 25 kv and 35 kv Class Installation Instructions. Bushings MN650045EN

COOPER POWER SERIES. 200 A 15, 25, and 35 KV class insulated standoff bushing installation instructions. Loadbreak Apparatus Connectors MN650039EN

COOPER POWER SERIES. 200 A 15, 25, and 35 kv class portable feedthru installation instructions. Loadbreak Apparatus Connectors MN650037EN

Effective March 2015 Supersedes S August 2002

COOPER POWER SERIES. 600 A 15, 25, and 35 kv class PUSH-OP bushing adapter cap installation instructions. Deadbreak Apparatus Connectors MN650050EN

COOPER POWER SERIES. Series winding ratio test procedure instructions. Voltage Regulators MN225060EN. 120 Vac VOLTMETER

COOPER POWER. SERIES VariSTAR type composite light-duty under-oil (CLU) MOV arrester installation instructions. Surge Arresters MN235023EN

DT400/436 Tee Connector Installation Instructions

COOPER POWER SERIES. UltraSIL polymer-housed VariSTAR surge arrester IEC for MV systems to 36 kv installation instructions

COOPER POWER SERIES. VariSTAR Storm Trapper high energy MOV arrester installation instructions. Surge Arresters MN235017EN

200 A, 15 and 25 kv class loadbreak bushing insert installation instructions

DAI630TB2669 Dead Front Arrester Installation Instruction

COOPER POWER SERIES. 200 A 15/25 kv class deadbreak straight connector installation instructions. Deadbreak Apparatus Connectors MN650043EN

COOPER POWER SERIES. DS250 deadbreak straight connector installation instructions interface A. Connectors MN650027EN

COOPER POWER SERIES. DE250 deadbreak elbow connector installation instructions interface A. Screened Separable Connectors MN650025EN

COOPER POWER SERIES. 600 A, 15, 25, and 35 kv Class Cleer Grounding Elbow Installation Instructions. Loadbreak Apparatus Connectors MN650056EN

COOPER POWER SERIES. 200 A 15/25 kv class elbow installation instructions. Deadbreak Apparatus Connectors MN650042EN

COOPER POWER SERIES. Operation Counter Replacement Instructions. Reclosers MN280047EN. Effective May 2016 Supersedes S December 2003

COOPER POWER. SERIES VariSTAR type AZE station class surge arresters installation and maintenance instructions. Surge Arresters MN235022EN 0.

Effective January 2017 Supersedes July 2011 (I ) VariSTAR Type AZG4 Surge Arresters Installation and Maintenance Instructions

S Surge Arresters

Effective May 2017 Supersedes July 2009 (S ) 600 A 35 kv Class T-OP II connector assembly installation instructions 200 A PROTECTIVE CAP LRTP

COOPER POWER SERIES. 600 A 35 kv class PUSH-OP deadbreak connector installation instructions. Deadbreak Apparatus Connectors MN650052EN

COOPER POWER SERIES. Types E, 4E, V4E, H, 4H, V4H, L, and V4L single-phase recloser installation and operation instructions. Reclosers MN280051EN

COOPER POWER SERIES. 200 A 35 kv class LE series elbow installation instructions. Loadbreak Apparatus Connectors MN650010EN

600 A 35 kv class PUSH-OP deadbreak connector installation instructions

Installation Instructions for the Walking Beam Interlock for Eaton EHD, FDB, FD, HFD, FDC, FW, HFW, FWC, Circuit Breakers and Molded Case Switches

COOPER POWER SERIES. VFI SF6-insulated vacuum fault interrupter installation, operation and maintenance instructions. Switchgear MN285004EN

COOPER POWER SERIES. 200 A 15 and 25 kv class elbow with integral jacket seal* for use on tape and wire shielded cable installation instructions

COOPER POWER SERIES. 200 A 15 and 25 kv class elbow with optional integral jacket seal installation instructions. Loadbreak Connectors MN650008EN

Effective May 2017 Supersedes August 2005 (S )

DEH Instructions. Three-Phase, Platform-Mounted Distribution Transformers

FLANGED TWO-PIECE BALL VALVES

FLANGED TWO-PIECE BALL VALVES

Medium voltage standard-duty, heavyduty, and extreme-duty single-phase, unfused capacitor units and accessories

Norrsken Family Booklet

Operation Manual Enabling Pole-Top Communication Via the TripSaver II Magnet Tool

Inspection Recommendations

3M Liqui-Cel EXF-14x28 and 14x40 Series Membrane Contactor

DISASSEMBLING & REASSEMBLING CARTRIDGE INSTALLING SEATPOST ON BIKE

Instruction Manual LIMITED 1 YEAR WARRANTY. Hydraulic Punch Driver Read this material before using this product.

S Loadbreak Apparatus Connectors WARNING: WARNING:

TITAN FLOW CONTROL, INC.

MUELLER. A Wall Type. Indicator Post. Reliable Connections. General Information 2. Technical Data/ Dimensions 3. Installation 4-5.

USER MANUAL FLOW SELECTOR PM1000 SAVE THESE INSTRUCTIONS. Federal (USA) law restricts this device to sale by or on the order of a physician.

S Surge Arresters. Handling and Storage. Standards. Acceptance and Initial Inspection

Hygienic Bubble Trap Installation and Operations Manual

Media-Isolated Mag Plus Probe Low Pressure-ISO Kit

Yoke Block Instruction Manual

Model B-1 Pipe Line Strainer 3, 4, 6 & 8 Inch (DN80, DN100, DN150 & DN200) 175 psi (12,1 bar) General Description. Technical Data

COMPACT METAL bender 99826

BS Series Basket Strainer

FLANGED MULTI-PORT BALL VALVES

PVQ 13 A2 R SE 1 S 20 C-11 D

60 farm jack. Distributed exclusively by Harbor Freight Tools Mission Oaks Blvd., Camarillo, CA 93011

Installation and Operation Manual

NB/NBR NITROGEN BOOSTER FOR AVIATION SERVICE

Installation, Operation and Maintenance Manual

Pressure Dump Valve Service Kit for Series 2300 Units

Installation, Operation & Maintenance Manual

3" UC Ultra-Chuck Durable Lightweight Air Inflated Bladder Chuck Operation/Repair Manual. (76.2 mm) DOUBLE E COMPANY, INC.

INSTRUCTION MANUAL Pressure Relief Device LPT

OWNERS MANUAL. Model Shown with optional Primary Mooring Cleats. Portable Mooring System SAFETY OPERATION MAINTENANCE PARTS

OPERATION AND INSTRUCTION MANUAL Swivel Anchor Model: HD26248

ROPV R40 E Series User Manual

OPERATOR S MANUAL SPREADER. CSS, VNQ [For Combine Harvester AW82V] Original instructions

Model C Pipe Line Strainer 6, 8 & 10 Inch (DN150, DN200 & DN250) 250 psi (17,2) General Description. Technical Data. Page of 6 MAY, 2006 TFP1644

Un-Pressurized Orefice Fittings FIO EZ. Parts List and Operation Instructions TECHNICAL MANUAL. Dn 2-6 Class Lbs

Accu-Tab Systems 1000 Series by Axiall Corporation

Pressure Dump Valve Service Kit for Series 3000 Units

COOPER POWER SERIES. Type VFI, Fluid-insulated Switchgear; Installation, Operation and Maintenance Instructions

INTRODUCTION BILL OF MATERIALS SPECIFICATIONS & TOOLS PROCEDURES OPERATION OF SEATPOST GIANT LIMITED WARRANTY

COSASCO 3600 PSI SINGLE ISOLATION SERVICE VALVE (FR) MAINTENANCE

Retractable Hose Reel with 3/8" x 50' PVC Hose

Accu-Tab Systems 2000 P Series by Axiall Corporation

2000 lb manual winch

Hot Tapping Machine. OPERATIONS MANUAL and OPERATING INSTRUCTIONS

SOTR Special Operations Tactical Respirator

AWG Fittings LLC. Pressure Relief Valve Up to 250 PSI. Product Number Read this instruction manual before use.

OPERATION AND INSTRUCTION MANUAL Swivel Anchor Model: SWY100N

UE- 90- X X X X X X O P E R AT I N G M A N UA L 0 TO 90 HYDRAULIC UPENDER

BUTTERFLY VALVES Series 800

S Vacuum Switches. Contents. Type VCS-1 Single-Phase Vacuum Capacitor Switch Installation and Operation Instructions

U S E R M A N U A L CAUTION. SAVE THESE INSTRUCTIONS Federal (USA) law restricts this device to sale by or on the order of a physician.

GRAVITY BIKE RACK ASSEMBLY & OPERATING INSTRUCTIONS

WHEATLEY Series 500 Swing Check Valve

Model No Product Name Handpiece Only Complete System

foldable/adjustable sawhorse

Interface Devices, Inc. Hydraulic Mini Mule

Type BBS-03, BBS-05, BBS-06, BBS-25

This document to be used with Hurley traditional Davits

3M Liqui-Cel EXF-10x28 Series Membrane Contactor

MUELLER A A Non-Adjustable. Vertical Indicator Posts. Reliable Connections. General Information 2. Technical Data 3.

Transcription:

OEM Equipment MN800010EN Effective February 2016 Supersedes S800-51-1 August 2012 COOPER POWER SERIES Under-oil arrester disconnector installation/operation instructions

DISCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITY The information, recommendations, descriptions and safety notations in this document are based on Eaton Corporation s ( Eaton ) experience and judgment and may not cover all contingencies. If further information is required, an Eaton sales office should be consulted. Sale of the product shown in this literature is subject to the terms and conditions outlined in appropriate Eaton selling policies or other contractual agreement between Eaton and the purchaser. THERE ARE NO UNDERSTANDINGS, AGREEMENTS, WARRANTIES, EXPRESSED OR IMPLIED, INCLUDING WARRANTIES OF FITNESS FOR A PARTICULAR PURPOSE OR MERCHANTABILITY, OTHER THAN THOSE SPECIFICALLY SET OUT IN ANY EXISTING CONTRACT BETWEEN THE PARTIES. ANY SUCH CONTRACT STATES THE ENTIRE OBLIGATION OF EATON. THE CONTENTS OF THIS DOCUMENT SHALL NOT BECOME PART OF OR MODIFY ANY CONTRACT BETWEEN THE PARTIES. In no event will Eaton be responsible to the purchaser or user in contract, in tort (including negligence), strict liability or other-wise for any special, indirect, incidental or consequential damage or loss whatsoever, including but not limited to damage or loss of use of equipment, plant or power system, cost of capital, loss of power, additional expenses in the use of existing power facilities, or claims against the purchaser or user by its customers resulting from the use of the information, recommendations and descriptions contained herein. The information contained in this manual is subject to change without notice. ii UNDER-OIL ARRESTER DISCONNECTOR INSTALLATION AND OPERATION INSTRUCTIONS MN800010EN February 2016

Contents SAFETY INFORMATION Safety instructions...iv GENERAL Read this manual first...1 Additional information...2 Acceptance and initial inspection...2 Handling and storage...2 Standards...2 INSTALLATION Internal mounting nut...2 External mounting nut...2 OPERATION Operating from closed to open positions...3 Operating from open to closed positions...3 UNDER-OIL ARRESTER DISCONNECTOR INSTALLATION AND OPERATION INSTRUCTIONS MN800010EN February 2016 iii

! SAFETY FOR LIFE Safety for life! SAFETY FOR LIFE Eaton meets or exceeds all applicable industry standards relating to product safety in its Cooper Power series products. We actively promote safe practices in the use and maintenance of our products through our service literature, instructional training programs, and the continuous efforts of all Eaton employees involved in product design, manufacture, marketing, and service. We strongly urge that you always follow all locally approved safety procedures and safety instructions when working around high voltage lines and equipment, and support our Safety For Life mission. Safety information The instructions in this manual are not intended as a substitute for proper training or adequate experience in the safe operation of the equipment described. Only competent technicians who are familiar with this equipment should install, operate, and service it. A competent technician has these qualifications: Is thoroughly familiar with these instructions. Is trained in industry-accepted high and low-voltage safe operating practices and procedures. Is trained and authorized to energize, de-energize, clear, and ground power distribution equipment. Is trained in the care and use of protective equipment such as arc flash clothing, safety glasses, face shield, hard hat, rubber gloves, clampstick, hotstick, etc. Following is important safety information. For safe installation and operation of this equipment, be sure to read and understand all cautions and warnings. Hazard Statement Definitions This manual may contain four types of hazard statements: DANGER Indicates an imminently hazardous situation which, if not avoided, will result in death or serious injury. WARNING Indicates a potentially hazardous situation which, if not avoided, could result in death or serious injury. CAUTION Indicates a potentially hazardous situation which, if not avoided, may result in minor or moderate injury. CAUTION Indicates a potentially hazardous situation which, if not avoided, may result in equipment damage only. Safety instructions Following are general caution and warning statements that apply to this equipment. Additional statements, related to specific tasks and procedures, are located throughout the manual. DANGER Hazardous voltage. Contact with hazardous voltage will cause death or severe personal injury. Follow all locally approved safety procedures when working around highand low-voltage lines and equipment. G103.3 WARNING Before installing, operating, maintaining, or testing this equipment, carefully read and understand the contents of this manual. Improper operation, handling or maintenance can result in death, severe personal injury, and equipment damage. G101.0 WARNING This equipment is not intended to protect human life. Follow all locally approved procedures and safety practices when installing or operating this equipment. Failure to comply can result in death, severe personal injury and equipment damage. G102.1 WARNING Power distribution and transmission equipment must be properly selected for the intended application. It must be installed and serviced by competent personnel who have been trained and understand proper safety procedures. These instructions are written for such personnel and are not a substitute for adequate training and experience in safety procedures. Failure to properly select, install or maintain power distribution and transmission equipment can result in death, severe personal injury, and equipment damage. G122.2 iv UNDER-OIL ARRESTER DISCONNECTOR INSTALLATION AND OPERATION INSTRUCTIONS MN800010EN February 2016

CAUTION The arrester disconnector should be installed only by personnel familiar with good safety practice and the handling of high voltage equipment. Externally Secured General Eaton s Cooper Power series arrester disconnector provides the transformer manufacturer or utility with a means of disconnecting and reconnecting the under-oil arrester ground (earth) for transformer testing. It is designed for mounting (secured from inside or outside the tank) in transformers filled with transformer oil, R-Temp fluid, Envirotemp FR3 fluid, or an approved equivalent. Read this manual first Read and understand the contents of this manual and follow all locally approved procedures and safety practices before installing or operating this equipment. Internally Secured Figure 1. Arrester disconnector, internally secured (bottom), externally secured (top) (shown with standard padlocking provision, in the open position). Additional information These instructions cannot cover all details or variations in the equipment, procedures, or process described nor provide directions for meeting every possible contingency during installation, operation, or maintenance. For additional information, contact your Eaton representative. Air Side Handle/Cap Ground (Earth) Lead Terminal Stud 1/4-20 X.56" L (14mm) Load Spring For Positive Ground (Earth) Connection Acceptance and initial inspection Each fuse is in good condition when accepted by the carrier for shipment. Upon receipt, inspect the shipping container for signs of damage. Unpack the fuse and inspect it thoroughly for damage incurred during shipment. If damage is discovered, file a claim with the carrier immediately. Handling and storage Be careful during handling and storage of the fuse to minimize the possibility of damage. If the fuse is to be stored for any length of time prior to installation, provide a clean, dry storage area. Standards ISO 9001 Certified Quality Management System Table 1. Voltage Ratings and Characteristics Description kv ka Standard Voltage Class 35 AC 60 Hz. 1 Minute Withstand 50 (in Open Position) BIL (Full Crest Wave) 150 (in Open Position) BIL (Chopped Wave) 175 (in Open Position) Discharge Current Withstand (in Closed Position) 100 Tank Wall Sealing Gland w/contained Gasket.661" (17 mm).141" RAD. (4 mm) Mounting Nut (Metal Conduit) +0.030 ø 1.320" - 0.000 (33.5 mm ) +0.8-0.0 Oil Side Figure 2. Arrester disconnector (shown with Internal Nut and in the open position). Figure 3. Mounting hole. UNDER-OIL ARRESTER DISCONNECTOR INSTALLATION AND OPERATION INSTRUCTIONS MN800010EN February 2016 1

Installation HANDLE Sidewall mounted with the internal end completely immersed under oil: All parts should be inspected for damage before installation. Internal mounting nut Insert the arrester disconnector through the tank hole (Fig. 3) from outside the tank (Fig. 4). The disconnector may have to be opened slightly to allow for assembly into larger gage tank walls. Ensure that the sealing gasket is clean and properly positioned in the sealing gland. Secure the disconnector with the supplied metal conduit nut. The conduit nut should be tightened to hand tight plus a 3/4 turn or a minimum of 15 ft-ibs (20 Nm). Re-tighten handle (closed position) (Fig. 6) by rotating handle 3/4 to 1 turn after handle has come in contact with the sealing gland. The disconnector should remain in the closed position unless transformer is being tested. The ground (earth) lead of the under-oil arrester should be secured onto the ground (earth) lead terminal of the disconnector. Recommended torque for ground (earth) terminal connection is 40 to 60 in-lbs (4.5-6.8 Nm). Dielectric clearances Using the center line of the shaft, the disconnector shall be clear of all internal components and leads for a 3 (76 mm) radius area from this center line. The shaft shall also be clear from internal components and leads behind for a 2 (57 mm) distance when disconnector is in the open position. SHAFT NUT HEX. TANK WALL WASHER, FINGER SPRING GASKET INTERNALLY SECURED SEALING GLAND TERMINAL ASY, WITH STUD AIR SIDE OIL SIDE NUT, CONDUIT LOCKNUT Figure 4. Internal mounting nut installation (Top view). HANDLE External mounting nut Insert the arrester disconnector through the tank hole (Fig. 3) from inside the tank (Fig. 5). Ensure that the sealing gasket is clean and properly positioned in the sealing gland. AIR SIDE OIL SIDE NUT, CONDUIT LOCKNUT GASKET TANK WALL SEALING GLAND SHAFT NUT HEX. WASHER, FINGER SPRING TERMINAL ASY, WITH STUD EXTERNALLY SECURED Figure 5. External mounting nut installation (Top view). 2 UNDER-OIL ARRESTER DISCONNECTOR INSTALLATION AND OPERATION INSTRUCTIONS MN800010EN February 2016

Secure the disconnector with the supplied metal conduit nut. The conduit nut should be tightened to hand tight plus a 3/4 turn or a minimum 15 ft-ibs (20 Nm). Re-tighten handle (closed position) (Fig. 7) by rotating handle 3/4 to 1 turn after handle has come in contact with the sealing gland. The disconnector should remain in the closed position unless transformer is being tested. The ground (earth) lead of the under-oil arrester should be secured onto the ground (earth) lead terminal of the disconnector. Recommended torque for ground (earth) terminal connection is 40 to 60 in-lbs (4.5-6.8 Nm). CAUTION It is necessary that the accompanying decal be prominently displayed at or near the location of the arrester disconnector as a caution to service personnel. Failure to do so will constitute a waiver of all warranty and indemnity obligations which may be attributable to Eaton. CAUTION All leads should remain below the oil level. Dielectric clearances Using the center line of the shaft, the disconnector shall be clear of all internal components and leads for a 3 (76 mm) radius area from this center line. The shaft shall also be clear from internal components and leads behind for a 2 (51 mm) distance when disconnector is in the open position. Operation The arrester disconnector is operated as follows (see Figure 6 or Figure 7): Operating from closed to open positions Unscrew the handle from the shaft. Re-attach small diameter end of handle to shaft. Push handle and shaft toward the transformer until the shaft flange (adjacent to handle) is flush to the sealing gland. Operating from open to closed positions Pull handle and shaft away from the transformer until a positive stop is felt (approximately 2 or 50 mm). Unscrew handle and reattach to shaft with large diameter end towards the transformer. The handle should be re-tightened by rotating handle 3/4 to 1 turn after handle has come in contact with the sealing gland to assure good ground contact. HANDLE SHOWN REVERSED & THREADED ONTO SHAFT SEE NOTE 3 LOCKING EYE HOLE LOCATION SEE NOTE 3.44" (11 mm) 2.00" DIA. TYP (51 mm) 2.97" (75 mm) 4.17" (106 mm) 1.21" (31 mm) OPERATING POSITION (FULLY CLOSED) 1/4-20 X.56" UNC STUD GROUND (EARTH) LEAD TERMINAL READY TO OPEN SEE NOTE 2 HANDLE PUSHED THIS DIRECTION TANK WALL 2.86" (73 mm) SEE NOTE 2.56" (14 mm) DISCONNECT POSITION (OPEN) 2.75" (70 mm) AIR SIDE 1.48" (37 mm) OIL SIDE LOAD SPRING FOR POSITIVE GROUND (EARTH) CONNECTION Figure 6. Arrester disconnector (internally secured) shown with standard locking provision. NNote: 1. Dimensions given are for reference only. 2. Dimensions given using a 14-gauge tank wall. Designed to accommodate tank wall thicknesses 14-gauge to 5/16. 3. Dimensions shown include additional.44 (11 mm) for locking provision. Locking eye hole diameter for padlock provision is.17 (4 mm). Without locking provision, air side extension dimension is reduced from 2.97 (75 mm) to 2.52 (64 mm), for the internally secured version, and 3.25 (83 mm) to 2.81 (71 mm), for the externally secured version. UNDER-OIL ARRESTER DISCONNECTOR INSTALLATION AND OPERATION INSTRUCTIONS MN800010EN February 2016 3

SEE NOTE 3 3.25" (83 mm).86" (22 mm) SEE NOTE 2 LOCKING EYE HOLE LOCATION OPERATING POSITION (FULLY CLOSED) 2.00" DIA. (51 mm) TYP SEE NOTE 3.44" (11 mm) 4.17" (106 mm) TANK WALL 1/4-20 X.56" UNC STUD GROUND (EARTH) LEAD TERMINAL HANDLE SHOWN REVERSED & THREADED ONTO SHAFT READY TO OPEN 2.86" (73 mm) 2.60" (66 mm) SEE NOTE 2.57" (14 mm) HANDLE PUSHED THIS DIRECTION 3.40" (86 mm) 1.48" (37 mm) AIR SIDE 1.64" (42 mm) OIL SIDE DISCONNECT POSITION (OPEN) LOAD SPRING FOR POSITIVE GROUND (EARTH) CONNECTION Figure 7. Arrester disconnector (externally secured) shown with standard locking provision. NNote: 1. Dimensions given are for reference only. 2. Dimensions given using a 14-gauge tank wall. Designed to accommodate tank wall thicknesses 14-gauge to 5/16. 3. Dimensions shown include additional.44 (11 mm) for locking provision. Locking eye hole diameter for padlock provision is.17 (4 mm). Without locking provision, air side extension dimension is reduced from 2.97 (75 mm) to 2.52 (64 mm), for the internally secured version, and 3.25 (83 mm) to 2.81 (71 mm), for the externally secured version.! SAFETY FOR LIFE Eaton 1000 Eaton Boulevard Cleveland, OH 44122 United States Eaton.com Eaton s Cooper Power Systems Division 2300 Badger Drive Waukesha, WI 53188 United States Eaton.com/cooperpowerseries 2016 Eaton All Rights Reserved Printed in USA Publication No. MN800010EN Rev 00 (Replaces S800511 Rev 00) Eaton is a registered trademark. All trademarks are property of their respective owners. For Eaton's Cooper Power series product information call 1-877-277-4636 or visit: www.eaton.com/cooperpowerseries.