LP31 Level Probe. 1. Safety information. 2. General product information. 3. Installation. 4. Wiring. 5. Maintenance

Similar documents
CP10 Sensor Installation and Maintenance Instructions

LP10-4 Level Probe. 1. Safety information. 2. General product information. 3. Installation. 4. Wiring. 5. Maintenance IM-P402-92

TSS21 Sealed Thermostatic Steam Tracer Trap

TP1 and TP2 Temporary Cone Shaped Strainers

Spiratec ST14, ST16 and ST17 Sensor Chambers and sensors

Dri-Line Mk2 Spirax-Monnier Compressed Air Drain Trap

MST21 Stainless Steel Balanced Pressure Thermostatic Steam Trap

TA10A and TA10P Steam Tracing Temperature Control Valves Installation and Maintenance Instructions

AVC32 Carbon Steel Air Vent for Steam Systems

DF1 and DF2 Diffusers

Dri-Line Mk3 Monnier Compressed Air Drain Trap

PV4 and PV6 Piston Valves

DCV10 Stainless Steel Disc Check Valve for use with Condensate Pumps

SA121, SA122, SA123, SA128 and SA1219 Self-acting Temperature Control Systems (Dial Adjustment)

DCV1, DCV3 and DCV3LT Disc Check Valves Installation and Maintenance Instructions

KBV21i and KBV40i Key Operated Boiler Blowdown Valves Installation and Maintenance Instructions

Fig 12, Fig 14HP, Fig 16, Fig 16HP and Fig 16L Strainers

S1, S2, S3, S5, S6, S7, S8, S12 and S13 Separators

SA121, SA122, SA123, SA128 and SA1219 Self-acting Temperature Control Systems (Knob Adjustment)

AE30 Automatic Air Eliminators / Air and Gas Vents for Liquid Systems

FV Flash Vessel Installation and Maintenance Instructions

Fig 1, Fig 12, Fig 13, Fig 14HP, Fig 16, Fig 16HP and Fig 16L Strainers

KBV21i and KBV40i Air Actuated Boiler Blowdown Valves

IFTGS14 Ball Float Steam Trap ½" and ¾" with Integral Spiratec Sensor

DCV6 Disc Check Valve

S1, S2, S3, S5, S6, S7, S8, S12 and S13 Separators Installation and Maintenance Instructions

CVS10 Sanitary Check Valves

Manual Actuated Boiler Blowdown Valves

UIB30 and UIB30H Sealed Inverted Bucket Steam Traps for use with Pipeline Connectors

MSC-P and MSC-N Manifolds for Steam Distribution and Condensate Collection

SRV66 Sanitary Pressure Reducing Valve

AE14 Automatic Air Vents for Liquid Systems Installation and Maintenance Instructions

BT6HC Hygienic Sanitary Balanced Pressure Steam Trap for High Capacity and CIP/SIP Applications

AVM7 Stainless Steel Thermostatic Air Vent

BCV31 DN40 - Blowdown Control Valve

CA44, CA44S, CA46 and CA46S Air and Gas Traps

HM and HM34 Inverted Bucket Steam Traps Installation and Maintenance Instructions

Fig 3, 7, 33, 34, 34HP, 36, 36HP, 37, 3616 and Fig 3716 Flanged Strainers

APT14, APT14HC and APT14SHC Spares 2

MF2M Monnier Miniature Compressed Air Filter

FTGS14 Ball Float Steam Trap DN15 (½") to DN25 (1")

Spirax Compact FREME Flash Recovery Energy Management Equipment

IX1 Spirax-Monnier International Compressed Air Filter Installation and Maintenance Instructions

M33F ISO, M33S ISO and M33V ISO Ball Valves Installation and Maintenance Instructions

M10HTi ISO Tobacco Ball Valve Screwed, SW, BW and Flanged versions

CS10-1 Stainless Steel Clean Steam Separator

BCV31 DN20 - Blowdown Control Valve

Airodyn, BRair and BRoil Compressed Air Drain Traps

BT6-B Sanitary Balanced Pressure Thermostatic Steam Trap

Type 130 and HL10 'Safeguard High Limit Control' Installation and Maintenance Instructions

BTM7, BTS7 and BTS7.1 Stainless Steel Thermostatic Clean Steam Traps

ML3M Monnier Miniature Compressed Air Lubricator

SA Control Valve types: BM, BMF, BX, SB, NS, KA, KB, KC (Normally open) BMRA, BMFRA, BXRA, SBRA, NSRA, KX, KY (Normally closed)

Fig 7, 33, 33.1, 34, 34HP, 36, 36HP, 37, 3616 and Fig 3716 Flanged Strainers Installation and Maintenance Instructions

TW Temperature Control Valve

S and SF Inverted Bucket Steam Traps

BRV71 and BRV73 Pressure Reducing Valves

TD62LM and TD62M Thermodynamic Steam Traps with Replaceable Seats

TDC46M, TDS46M and UTDS46M Thermodynamic Steam Traps with Maintainable Seat Installation and Maintenance Instructions

PC10HP Pipeline Connector (ASME 600)

BPT13 Balanced Pressure Thermostatic Steam Traps

BDV1 and BDV2 Blowdown / Depressurisation Valves

Vane Flow Switches Colima FLU Series

M70i ISO and M80i ISO Stainless Steel Ball Valves for Sanitary Systems Installation and Maintenance Instructions

MFP14-PPU (Vented) Automatic Packaged Pump Units

TD62LM and TD62M Thermodynamic Steam Traps with Replaceable Seats Installation and Maintenance Instructions

CA10S, CA14 and CA14S Air and Gas Traps

SCA Series Inverted Bucket Steam Traps

FT53, IFT53, FT54, IFT54, FT57 and IFT57 Ball Float Steam Traps - DIN

SRV2S Pressure Reducing Valve

AVS32 Stainless Steel Air Vent for Steam Systems Installation and Maintenance Instructions

Thermocirc Installation and Maintenance Instructions

BCVi43 Blowdown Control Valve

M45 ISO Ball Valve DN25 to 150 Installation and Maintenance Instructions

A3S Bellows Sealed Stop Valve Installation and Maintenance Instructions

CA16 and CA16S-14 Air and Gas trap Installation and Maintenance Instructions

USM21 Sealed Bimetallic Steam Trap for use with Pipeline Connectors Installation and Maintenance Instructions

BSA6T and BSA64T Stainless Steel Bellows Sealed Stop Valves Installation and Maintenance Instructions

Spirax SafeBloc TM DBB3 Double Block and Bleed Bellows Sealed Stop Valve. 1. Safety information. 2. General product information. 3.

QuickHeat TM Packaged Heat Exchanger Solutions

FT16 Ball Float Steam Trap Installation and Maintenance Instructions

MPC1M, MPC2M and MPC2AM Monnier High Efficiency Compressed Air Filter / Regulators

STERI-TROL Clean Service 'S' Series Two-port Control Valves DN15 (½") to DN100 (4")

M111 Spiraflo Transducer

Colima TOR Magnetic Level Switches

BTD52L Thermodynamic Steam Trap Installation and Maintenance Instructions

IP2M, IP2AM and IP2DM Monnier International Compressed Air Filter/ Regulators

UBP32 Sealed Balanced Pressure Thermostatic Steam Trap for use with PC_ Pipeline Connectors Installation and Maintenance Instructions

1. General safety information. 2. General product information. 3. Installation. 4. Commissioning. 5. Operation. 6. Maintenance. 7.

AE50S Automatic Air and Gas Vent for Liquid Systems Installation and Maintenance Instructions

BDV60 Blowdown Vessel Installation and Maintenance Instructions

SRV461S and SRV463S Stainless Steel Direct Acting Pressure Reducing Valves

TD45 Thermodynamic Steam Trap Installation and Maintenance Instructions

TD10, TD52M and TD259 Thermodynamic Steam Traps Installation and Maintenance Instructions

Fig 1, Fig 12, Fig 13, Fig 14, Fig 16 and Fig 16L Strainers Installation and Maintenance Instructions

PC3000, PC3001 and PC4000, PC4001 Pipeline Connectors

BSA and BSAT Bellows Sealed Stop Valves Installation and Maintenance Instructions

FT43, FT44, FT46 and FT47 Ball Float Steam Traps Installation and Maintenance Instructions

FTC62 and FTS62 Ball Float Steam Traps Installation and Maintenance Instructions

PC3_ and PC4_ Pipeline Connectors

Transcription:

404151/7 IM-P40-80 AB Issue 7 LP1 Level Probe Installation and Maintenance Instructions 1. Safety information. General product information. Installation 4. Wiring 5. Maintenance IM-P40-80 Printed in the AB UK Issue 7 Copyright 0111

IM-P40-80 AB Issue 7

1. Safety information Safe operation of these products can only be guaranteed if they are properly installed, commissioned, used and maintained by qualified personnel (see Section 1.11) in compliance with the operating instructions. General installation and safety instructions for pipeline and plant construction, as well as the proper use of tools and safety equipment must also be complied with. The boiler must be depressurised and vented to atmosphere before installation of the probe. Wherever possible the boiler manufacturer should be consulted for advice on the working and alarm water levels. Under certain circumstances the water level in a boiler can be different to that shown in the gauge glass. Separate literature is available from Spirax Sarco on this subject. Do not install the probe outdoors without additional weather protection. Drain / vent holes must be kept clean - do not cover. 1.1 Intended use Referring to the Installation and Maintenance Instructions, name-plate and Technical Information Sheet, check that the product is suitable for the intended use / application. The LP1 level probe and LC050 level controller comply with the requirements of the European Pressure Equipment Directive 97 / / EC and carry the mark. They are classed as Safety Accessories and therefore fall within Category 4 of the Directive. i) The products have been specifically designed for use on steam and water, which are in Group of the above mentioned Pressure Equipment Directive. The products use on other fluids may be possible but, if this is contemplated, Spirax Sarco should be contacted to confirm the suitability of the product for the application being considered. ii) Check material suitability, pressure and temperature and their maximum and minimum values. If the maximum operating limits of the product are lower than those of the system in which it is being fitted, or if malfunction of the product could result in a dangerous overpressure or overtemperature occurrence, ensure a safety device is included in the system to prevent such over-limit situations. iii) Determine the correct installation situation and direction of fluid flow. iv) Spirax Sarco products are not intended to withstand external stresses that may be induced by any system to which they are fitted. It is the responsibility of the installer to consider these stresses and take adequate precautions to minimise them. v) Remove protection covers from all connections and protective film from all name-plates, where appropriate, before installation on steam or other high temperature applications. 1. Access Ensure safe access and if necessary a safe working platform (suitably guarded) before attempting to work on the product. Arrange suitable lifting gear if required. 1. Lighting Ensure adequate lighting, particularly where detailed or intricate work is required. IM-P40-80 AB Issue 7

1.4 Hazardous liquids or gases in the pipeline Consider what is in the pipeline or what may have been in the pipeline at some previous time. Consider: flammable materials, substances hazardous to health, extremes of temperature. 1.5 Hazardous environment around the product Consider: explosion risk areas, lack of oxygen (e.g. tanks, pits), dangerous gases, extremes of temperature, hot surfaces, fire hazard (e.g. during welding), excessive noise, moving machinery. 1.6 The system Consider the effect on the complete system of the work proposed. Will any proposed action (e.g. closing isolation valves, electrical isolation) put any other part of the system or any personnel at risk? Dangers might include isolation of vents or protective devices or the rendering ineffective of controls or alarms. Ensure isolation valves are turned on and off in a gradual way to avoid system shocks. 1.7 Pressure systems Ensure that any pressure is isolated and safely vented to atmospheric pressure. Consider double isolation (double block and bleed) and the locking or labelling of closed valves. Do not assume that the system has depressurised even when the pressure gauge indicates zero. 1.8 Temperature Allow time for temperature to normalise after isolation to avoid danger of burns. If parts made from the PTFE have been subjected to a temperature approaching 60 C (500 F) or higher, they will give off toxic fumes, which if inhaled are likely to cause temporary discomfort. It is essential for a no smoking rule to be enforced in all areas where PTFE is stored, handled, or processed as persons inhaling the fumes from burning tobacco contaminated with PTFE particles can develop 'polymer fume fever'. 1.9 Tools and consumables Before starting work ensure that you have suitable tools and/or consumables available. Use only genuine Spirax Sarco replacement parts. 1.10 Protective clothing Consider whether you and/or others in the vicinity require any protective clothing to protect against the hazards of, for example, chemicals, high/low temperature, radiation, noise, falling objects, and dangers to eyes and face. 1.11 Permits to work All work must be carried out or be supervised by a suitably competent person. Installation and operating personnel should be trained in the correct use of the product according to the Installation and Maintenance Instructions. Where a formal 'permit to work' system is in force it must be complied with. Where there is no such system, it is recommended that a responsible person should know what work is going on and, where necessary, arrange to have an assistant whose primary responsibility is safety. Post 'warning notices' if necessary. 4 IM-P40-80 AB Issue 7

1.1 Handling Manual handling of large and/or heavy products may present a risk of injury. Lifting, pushing, pulling, carrying or supporting a load by bodily force can cause injury particularly to the back. You are advised to assess the risks taking into account the task, the individual, the load and the working environment and use the appropriate handling method depending on the circumstances of the work being done. 1.1 Residual hazards In normal use the external surface of the product may be very hot. If used at the maximum permitted operating conditions the surface temperature of some products may reach temperatures of 50 C (66 F). Many products are not self-draining. Take due care when dismantling or removing the product from an installation (refer to 'Maintenance instructions'). 1.14 Freezing Provision must be made to protect products which are not self-draining against frost damage in environments where they may be exposed to temperatures below freezing point. 1.15 Disposal Unless otherwise stated in the Installation and Maintenance Instructions, this product is recyclable and no ecological hazard is anticipated with its disposal providing due care is taken, except: PTFE: - Can only be disposed of by approved methods, not incineration. - Keep PTFE waste in a separate container do not mix it with other rubbish, and consign it to a landfill site. 1.16 Returning products Customers and stockists are reminded that under EC Health, Safety and Environment Law, when returning products to Spirax Sarco they must provide information on any hazards and the precautions to be taken due to contamination residues or mechanical damage which may present a health, safety or environmental risk. This information must be provided in writing including Health and Safety data sheets relating to any substances identified as hazardous or potentially hazardous. IM-P40-80 AB Issue 7 5

. General product information.1 General description The Spirax Sarco LP1 is designed for use with an LC000 or LC050 controller to provide a high-integrity, self-monitoring alarm for high water levels in steam boilers and other vessels. The probe is supplied in three nominal tip lengths, and is cut to the exact length required prior to installation. The standard LP1 (non-ul listed version) can also be used as a simple (non self-monitoring) high or low level probe with a suitable controller.. Available tip lengths mm (in) 500 (19.7), 1000 (9.4) and 1500 (59).. Limiting conditions Maximum boiler pressure bar g (464 psi g) Maximum temperature 9 C (46 F) Maximum ambient temperature 70 C (158 F) Maximum probe cable length 50 metres (164 ft) Cable socket protection rating IP65.4 How the LP1 works.4.1 LP1 used as a high water alarm with either an LC000 or LC050 controller: In normal operation as a high level alarm probe: - The tip is above the water level. - There is a high resistance path to earth. If the water level rises to touch the probe tip: - The resistance path to earth becomes low. - The alarm relays in the controller are de-energised. - The high alarm sounds. The integrity of the LP1 and its wiring are monitored by the LC000 controller, and an alarm is signalled if a fault occurs..4. LP1 used as a low or high water alarm with either an LC1000, LC100 or LC150 controller: The LP1 works in the same way, (low resistance in water, high resistance out of water), but its integrity is not monitored. 6 IM-P40-80 AB Issue 7

Cable socket ½" NPT conduit thread adaptor Pg 11 cable gland 4 off 18 AWG flying leads 00 mm (1") long Probe body 7 A/F ½" BSP ½" NPT Probe tip Fig. 1 LP1 Standard version Fig. LP1 UL version IM-P40-80 AB Issue 7 7

. Installation Before proceeding with any installation or maintenance read Section 1, 'General safety information'. The probe is normally installed directly in the boiler shell, in a protection tube of at least 80 mm (") diameter, but can be mounted in an external chamber if regulations permit. The switching level is at the extreme end of the tip. A DIN 4650 cable socket is supplied with each unit and is provided with a Pg 11 cable gland, or, for the UL version, a ½" NPT conduit thread adaptor with four flying leads. In most shell boilers the water will 'swell' when it is firing, such that the actual water level will be higher than the level shown in the gauge glass. In practice this can be up to 50 mm (") in very large boilers, reducing to about 10 mm ( ") in smaller ones. This difference in levels needs to be taken into consideration when cutting the probe tip to length. When the probe is to be installed in the boiler, ensure it is positioned at least 1 metre (9") from any safety valve or steam take-off, as increased localised water levels may occur..1 Procedure.1.1 Caution: It is essential that the PTFE probe tip sleeving is not damaged during probe tip cutting. - Ensure the water is at the required alarm level, including any increase in level due to 'swelling'. - Mark a metal rod with a water soluble felt pen, and dip the boiler to find the depth from the top of the probe mounting flange to the water level. Alternatively, obtain this depth by transferring the level from the gauge glass. - Measuring from the underside of the probe body, cut the probe tip to 15 mm (½") less than the dipped length with a fine hacksaw and de-burr the end. See fig.. This takes the thread engagement into account. Note: The minimum sleeved probe length is 0 mm (1 "), and the minimum exposed tip length 40 mm (1½"). Install the probe in a ½" BSP (standard version) or ½" NPT (UL version) female connection..1. Install the probe as follows: - Ensure both male and female threads are in good condition. - Use up to three turns (no more) of PTFE thread sealing tape on the probe thread. WARNINGS: Do not use excessive tape. Do not use paste type jointing compound. - Fit and tighten the probe by hand initially - use a suitable spanner to tighten the probe. Under no circumstances use a pipe wrench. - Due to the nature of a taper/parallel joint it is not possible to recommend tightening torque figures. - Do not overtighten - there should always be visible thread on the probe. - Note: The probe thread will not 'bottom out' (i.e. probe body hexagon contacts the face of the female screwed connection), unless there is excessive wear or an out-of-tolerance female thread, in which case it will be necessary to replace or re-work the flange or connection..1. Subsequent removal and refitting: WARNING: Ensure boiler or vessel is de-pressurised and vented to atmosphere before attempting to unscrew or remove the probe. - Always use the correct size spanner - not a pipe wrench. - Inspect male and female threads for signs of damage, which may have occurred through overtightening, leading to torn threads or even localised cold welding (galling/picking up). - If damage has occurred replace the probe. 8 IM-P40-80 AB Issue 7

15 mm (½") approximately Probe body Minimum 0 mm (1 1 / 8") Dipped length Minimum 40 mm (1½") Fig. Installation IM-P40-80 AB Issue 7 9

4. Wiring Refer to the relevant controller documentation/ wiring diagram for full details. Cabling should be installed in accordance with BS 679 - Instrumentation in Process Control Systems: Installation design and practice or local equivalent. For the US and Canadian installations the probe must be wired in accordance with the National and Local Electrical Code (NEC) or the Canadian Electrical Code (CEC). Wiring should be carried out using or 4 core, 1 mm² (18-16 AWG), high temperature screened cable, with a maximum length of 50 metres (165 ft). Pirelli FP 00 or Delta Crompton Firetuf OHLS are two suitable types for the standard LP1. For the UL version NEC Class I screened cable with a suitable temperature rating (75 C/167 F minimum) must be used to connect the terminal box to the controller. Ensure that sufficient cable length is provided to allow removal of the cable socket and to ensure that no strain is placed on the unit. To unplug the cable socket, remove the central screw. Note: To provide environmental protection the probe is supplied with a gasket between the cable socket and the probe connector. To maintain environmental integrity, ensure gasket is always present when reconnecting cable socket and all contact surfaces are clean and undamaged. To gain access to the connector block within the cable socket, remove the central screw and withdraw the hinged cover. The connector block on the standard LP1 maybe rotated in 90 steps to facilitate wiring: - Remove the retaining screw and withdraw the socket. - Remove connector block and reposition as required. It is not possible to rotate the connector block on the UL version. Earth via internal 6.8 k resistor. Red 1 1 probe tip 1 1 probe tip probe tip Yellow Earth Fig. 4 Connector block removed from cable connector. Wired for use with an LC000 controller as a high integrity, self-monitoring high level probe. Earth Fig. 5 Connector block removed from cable connector. Wired for use as a simple (nonself-monitoring) high or low level probe. 4.1 Additional wiring information - UL version The socket is supplied with four 18 AWG, 00 mm (1") long colour coded flying leads. These are to be cut to length and connected to a suitable metal terminal box. A length of flexible UL listed metal conduit is required between the probe and terminal box to provide environmental protection and easy electrical connection. The cable socket is provided with a ½" NPT conduit adaptor for this purpose. WARNING: The flying leads supplied with the probe are rated to 1 F (105 C). This temperature rating must not be exceeded. The flexible conduit and terminal box are not to incorporate any other control wiring as this may damage or reduce the performance of the product. It is not possible to rotate the cable socket in 90 steps, as with the non-listed LP1. To do so may damage the internal wiring. Ensure that any condensation which might build up in the conduit network is prevented from accumulating in the probe cable connector and terminal box. 10 IM-P40-80 AB Issue 7

LC000 controller LC000 Screen 9 10 11 1 LC050 controller LC050 Screen 50 51 5 5 Red Yellow Red Yellow 54 1 LP1 connector 1 LP1 connector Internal link High alarm tip * * Internal resistor Ensure resistance from the probe body to pipework/boiler shell is less than 1. Internal link High alarm tip * * Internal resistor Ensure resistance from the probe body to pipework/boiler shell is less than 1. Fig. 6 Standard version Fig. 8 Standard version Screen LC000 9 Screen LC050 50 10 51 11 5 1 5 54 Red Yellow Red Yellow Terminal box Terminal box 1 LP1 connector 1 LP1 connector Internal link High alarm tip * * Internal resistor Ensure resistance from the probe body to pipework/boiler shell is less than 1. Internal link * High alarm tip * Internal resistor Ensure resistance from the probe body to pipework/boiler shell is less than 1. Fig. 7 UL version Fig. 9 UL version IM-P40-80 AB Issue 7 11

5. Maintenance Probe body cleaning instructions - Use a cloth dampened with tap / de-ionised water or isopropyl alcohol. Use of other cleaning materials could damage the product and invalidate the warranty. Frequent maintenance of the probe should not be necessary. However steam boiler water level controls do require regular testing in accordance with National and Regional regulations, and in the UK, Guidance Notes published by the Health and Safety Executive. The UK Health and Safety Executive recommends that boiler controls should be inspected at least at quarterly intervals. We recommend that this frequency is also followed outside the UK unless National or Regional regulations state otherwise. Where regular tests are carried out properly in a well run boiler house with good water treatment, it may be that only an annual inspection of the probe is required. This is a matter, however, for the user to decide in liaison with the boiler inspector in order to determine a sensible inspection programme to suit the individual boiler plant. We recommend that the inspection is carried out as follows: - Depressurise and vent boiler/ vessel, - observe safety precautions. - Disconnect the electrical supply to controller. - Remove probe upper housing and inspect for dirt or moisture. - Disconnect wiring and remove probe. - Clean housing if necessary. - Check condition of probe. - Clean probe tips and insulation if necessary with a cloth or soft bristle brush - do not use abrasive or conductive products such as steel wool. WARNING If scale is present on the probe, it will also be forming on the boiler, and a competent water treatment specialist must be consulted as soon as possible. - Check that all extension connector lock-nuts are tight. - Inspect the probe controller wiring, and the controller supply wiring. - Check the controller for damage. - Reassemble and carry out a full functional check of the equipment. For specific testing instruction for Spirax Sarco systems please see separate literature. 1 IM-P40-80 AB Issue 7