Agilent Inlet EPC Leak Test

Similar documents
3 Flow and Pressure Control

Agilent G3180B Two-Way Splitter Kit

Agilent G Rebuilt Electron Capture Detector

Best Practice for Identifying Leaks in GC and GC/MS Systems

Agilent 7890 Series Gas Chromatograph

Considerations and Best Practices for Maintaining Your Agilent GC s Split/Splitless Injection Port

6890 GC Site Preparation

Quick Reference Guide. OPTIC 3 - PTV on Shimadzu GC-2010 Gas Chromatograph

Agilent Flowmeter ADM1000

Simplified Backflush Using Agilent 6890 GC Post Run Command Application Note

Varian 3300 Gas Chromatograph Abbreviated Operating Instructions

6850 Series Control Module User Information

7820A GC Site Preparation Checklist

CP-3800 GC Getting Started Manual

3-Way Decoking Valve Option - Installation and Operation Instructions Accessory G Background

6890 GC Not Ready Messages (A16010)

Mass Spec will not pump down

Low-Pressure Retention Time Locking with the 7890A GC. Application. Authors. Abstract. Introduction HPI

Agilent 7697A Headspace Sampler

Agilent 7697A Headspace Sampler

SL G3. Warning

Instant Connect Helium Saver Injector Module

Detector Carrier Gas Comments Detector anode purge or reference gas. Electron Capture Nitrogen Maximum sensitivity Nitrogen Argon/Methane

Agilent 7697A Headspace Sampler

CP-3800 GC Operator s Manual

Agilent G3185B QuickSwap Accessory

Retention Time Locking: Concepts and Applications. Application

Tips and Tricks of Injector Maintenance. Abby Folk Agilent GC Technical Support August 2009

A Column-Flow Independent Configuration for QuickSwap. Application. Authors. Abstract. Introduction

Gas Diluter Portable Gas Dilution System User s Manual

WSN: XXXXXX 101 ROME COURT FORT COLLINS, CO, PHONE #: (970) FAX #: (970) TO-Clean Manual

SL G3 - Fuel Conversion to Natural Gas (LP to NG) P-Kit 301

Water Weir Flow Controller. Introduction. Safety Precautions. Mounting the Hardware

Customer Responsibilities. Important Customer Information GCMS QQQ Site Preparation Checklist

ms NoVent II Instruction Booklet

UNITY 2 TM. Air Server Series 2 Operators Manual. Version 1.0. February 2008

2.0 INSTALLATION & SERVICE

PANACEA P200 STAINLESS STEEL USER MANUAL

Agilent 1290 Infinity Pump Head Maintenance

OMCL Network of the Council of Europe QUALITY ASSURANCE DOCUMENT

Optimizing Vial Pressurization Parameters for the Analysis of <USP 467> Residual Solvents Using the 7697A Headspace Sampler

General Specifications: Forensic. Petrochemical Environmental. Lab Quality Analyses in the Field, It Goes with you Anywhere!

Agilent Auxiliary Gas Module AGM 2. User s Guide

Agilent 7820A Gas Chromatograph

Pressure Injection Cell Operator s Manual

Agilent 7667A Mini Thermal Desorber. Installation and Operation

Converting Helium Carrier Gas GC Methods Nitrogen and Hydrogen

PANACEA P125 USER MANUAL

28 Site Preparation. Supplying valve actuator air

Anti-flood device Model B-1

Superconducting Susceptometer (MPMS-5S) Quantum Design Room 296 (MPMS)

TECHNICAL DATA ANTI-FLOOD DEVICE MODEL B-1 1. DESCRIPTION

SL G3 - Fuel Conversion to Propane (NG to LP) P-Kit 302

Miniature Electronic Pressure Controllers. Precision Fluidics

Agilent 7890 / 220 Ion Trap GCMS Site Preparation Checklist

Markes Thermal Desorption Systems Site Preparation Page 1 of 8

be present throughout these services; otherwise, they will miss important operational, maintenance and safety information.

Operation of the Perkin Elmer TGA-GC/MS

Recent Advances to Ensure Simple, Leak Free GC Column Connections. Ken Lynam R&D/Application Chemist Agilent Consumables and Supplies Division

Agilent 490 Micro GC Natural Gas Analyzer

Site Preparation Specification for GCMS system. Dimensions and Weight. Agilent 7820MSD Series G3175A (G7020A), G3176A (G7021A)

SRI Model H2-40 Hydrogen Generator Operation and Maintenance Nov 2006

Model GFC 7000T CO 2 Analyzer (Addendum to GFC 7000TA Manual, PN 07272)

Instructions for Assembly, Installation, and Operation of the Gas Addition Kit Accessory with the CEM Discover Systems

ASE SOLVENT CONTROLLER INSTALLATION INSTRUCTIONS Dionex Corporation

GILMONT ACCUCAL FLOWMETERS

Environmental Petrochemical, Pharmaceutical, Foods & Flavors, Chemicals, Personal Care, Forensics,...and more!

GCMSD-Headspace Analysis SOP

Operating Instructions Models and Hydrostatic Test Pumps

Mass Spec will not Autotune

HPICAL Operation & Data Logging Procedures. Click spacebar to advance through slides 1

MB-SP Series Solvent Purification System

Agilent 6820 Gas Chromatograph

Operating Instructions Models and Hydrostatic Test Pumps

INSTRUCTIONS FOR CONVERTING CONDENSING GAS MOBILE HOME FURNACES MODEL SERIES: CMA3*, CMC1*, VMA3*, VMC1*

LARGE DRY CHEMICAL, TWIN-AGENT, AFFF, HALON 1211, AND AQUASONIC (NITROGEN-OPERATED SYSTEMS) Pressure Regulator Test Manual

Welker Sampler. Model GSS-1. Installation, Operation, and Maintenance Manual

USER'S GUIDE. Nanoflow Probe. Red Stripe. 3-4mm. ptfe Sleeve. To Injector. ZU1XC Fused Silica TTF115. Fused Silica. ptfe Sleeve

Impact of Air Leaks on the Productivity of GC and GC/MS Systems

Agilent 5975T LTM GC/MSD

Advances in Capillary Column Backflushing

5890II GC Standard Operating Procedure 9/2/2005

Installation, Operation, and Maintenance Manual

Automated Determination of Dissolved Gases in Water Anne Jurek

Agilent 7820A GC. Site Preparation Guide. Agilent Technologies

For additional information about our solutions, please visit our web site at US/Pages/HomePage.

Using the PreVent System in Time-Saver Mode with the AutoSystem XL Gas Chromatograph and the TurboMass Mass Spectrometer

EASTERN ENERGY SERVICES PTE LTD. 60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG Singapore Telephone: Fax:

WIDDER TOOLS. HPICAL Calibration Station 1 (203)

Please refer to the Hydrogen Safety Guide which is shipped with the Instrument. 5977B Series GC/MS Systems Site Preparation Checklist

Agilent 1220 Infinity II LC Mobile Upgrade Kit

Installation Instructions

Chromat Calibration Updated October 27th, 2017

S & M Water Consultants

SERVICE MANUAL. Technical Bulletin No GEOPROBE GH40 HYDRAULIC HAMMER. PREPARED: February, REVISED: April, 2002 A DIVISION OF KEJR, INC.

Pegas 4000 MF Gas Mixer InstructionManual Columbus Instruments

1805 Series Relief Valves

Products Designed to Solve Nagging GC Problems

Operating Instructions Models 36200, , 46200, Hydrostatic Test Pumps

PANACEA P100 LOW PRESSURE USER MANUAL

Transcription:

Agilent Inlet EPC Leak Test Gas Chromatographs Instructions Agilent Technologies

Notices Agilent Technologies, Inc. 2002 No part of this manual may be reproduced in any form or by any means (including electronic storage and retrieval or translation into a foreign language) without prior agreement and written consent from Agilent Technologies, Inc. as governed by United States and international copyright laws. Manual Part Number G1545-90100 Edition First edition, May 2002 Printed in USA Agilent Technologies, Inc. 2850 Centerville Road Wilmington, DE 19808-1610 USA 2 Instructions

Leak Test Kit G1545-60501 Kit G1545-60501 includes the following materials: G1545-90100 Inlet EPC Leak Test Instructions G1530-80510 Inlet EPC Leak Test Fixture 0905-1493 Replacement O-rings, 12-pk While this kit is provided to attain accurate leak tests for Cool On-Column inlets, the test fixture may prove to be useful for checking other EPC inlets as well. In order to turn the 3 Way Valve to the OFF position, turn handle 180 degrees counterclockwise until it turns no more. Handle will be pointed towards GC (not pictured) - step 6 (COC, PP) or step 8 (S/SL). Valve is in ON position. Handle is pointed towards gas supply (pictured) - step 1. To purge vent Connect gas supply line to open fitting of valve - step 1. To supply fitting Figure 1 Inlet EPC Leak Test Fixture attached to a COC inlet Agilent Technologies

Cool On-Column inlets Be sure that the preparation steps found in the current 6890 manual for Cool On-Column inlets are complete before proceeding with these steps, with the exception of the installation of the septum purge vent cap. This will be replaced by the Inlet EPC Leak Test Fixture provided. 1 Install the Inlet EPC 3-Way Valve Leak Test Fixture, G1530-80510, as shown in Figure 1. Be sure O-rings are in good condition and that brass knurled fittings are adequately finger tightened. Turn the 3-Way Valve to the ON position as pictured in Figure 1. The handle on the valve is pointed towards the gas supply when turned ON (pictured). The handle on the valve is pointed towards the GC when it is turned OFF (not pictured). 2 Make sure a length and a diameter for a capillary column are entered on the 6890 keypad. To set these values, press [Config], and scroll to Column 1 or Column 2, depending on inlet position. Recommended settings are column length 30 m and column diameter 320 µm. 3 Set inlet pressure to 25 psi on the 6890 keypad. 4 Allow about 15 seconds for pressure equilibration. If pressure cannot be achieved, check the following: Is the carrier gas source pressure at least 35 psi, connected to the proper inlet (front or back) and turned on? Is the 3-Way Valve in the correct position with the handle pointed towards the gas supply? Is the COC inlet column nut properly plugged? Are the test fixture brass fittings tightened and the O-rings under them in good condition? If these conditions are all true, it is possible that there is a gross leak in the system that must be corrected prior to going to step 5. 4 Instructions

5 Turn the inlet pressure OFF at the 6890 keypad. 6 Turn the 3-Way Valve OFF by turning the valve handle 180 degrees counterclockwise, so that the handle on the valve handle is pointed towards the GC. 7 Set the inlet pressure to 40 psi on the 6890 keypad. Allow about 15 seconds for the pressure to equilibrate. The pressure should drop from 25 psi to a pressure above 10 psi (usually between 17 and 24 psi). 8 Set the inlet pressure to 10 psi on the 6890 keypad. 9 Record the inlet pressure at this time and monitor the pressure for 10 minutes on the 6890 display. You can use the stopwatch feature of the 6890 GC to monitor the time. Press [Time] and then [Enter] to start timing, then toggle between the time and the pressure reading with the [Time] and the [Front Inlet]/[Back Inlet] keys. If there is less than 1.0 psi pressure loss in 10 minutes, consider the system leak tight. If the pressure loss is greater than 1.0 psi in 10 minutes, there is a leak that must be found and corrected. See Correcting Leaks for Cool-On Column inlets in the 6890 Service Manual for help. 10 When the system is considered leak tight, set the inlet pressure to zero, disconnect the 3-Way Valve from the system, and re-connect the gas supply line to the inlet supply fitting. Now you may reinstall the column, restore the column dimension configuration at the keyboard, and set the desired inlet pressure. Instructions 5

Split/Splitless inlets Be sure that the preparation steps found in the current 6890 manual for Split/Splitless inlets are complete before proceeding with these steps, with the exception of the installation of the septum purge vent cap. This will be replaced by the Inlet EPC Leak Test Fixture provided. 1 Install the Inlet EPC 3-Way Valve Leak Test Fixture, G1530-80510, as shown in Figure 1. Be sure the O-rings are in good condition and that brass knurled fittings are adequately finger tightened. Turn the 3-Way Valve to the ON position as pictured in Figure 1. 2 Set the Column Length to zero and the Column Diameter to zero by pressing [Config] on the 6890 keypad, and scroll to Column 1 or Column 2, depending on inlet position. 3 Set the inlet Mode to SPLITLESS on the 6890 keypad. 4 Set the inlet pressure to 25 psi on the 6890 keypad, set the inlet total inlet flow to 60 ml/min. 5 Allow about 15 seconds for pressure equilibration. If pressure cannot be achieved, check the following: Is the carrier gas source pressure at least 35 psi, connected to the proper inlet (front or back) and turned on? Is the 3-Way Valve in the correct position with the handle pointed towards the gas supply? Is the Split/Splitless inlet column nut properly plugged? Are the Test Fixture brass fittings tightened and the O-rings under them in good condition? If these conditions are all true, it is possible that there is a gross leak in the system that must be corrected prior to going to step 6. 6 Confirm the inlet Mode is SPLITLESS on the 6890 keypad. Press [Prep Run] twice. 7 Turn the inlet pressure OFF at the 6890 keypad. 6 Instructions

8 Turn the 3-Way Valve OFF by turning the valve handle 180 degrees counterclockwise, so that the handle on the valve handle is pointed towards the GC. 9 Set the inlet pressure to 40 psi on the 6890 keypad. Allow about 15 seconds for the pressure to equilibrate. The pressure should drop from 25 psi to a pressure above 10 psi (usually between 17 and 24 psi). 10 Now set the inlet pressure to 10 psi on the 6890 keypad. 11 Record the inlet pressure at this time and monitor the pressure for 10 minutes on the 6890 display. You can use the stopwatch feature of the 6890 GC to monitor the time. Press [Time] and then [Enter] to start timing, then toggle between the time and the pressure reading with the [Time] and the [Front Inlet]/[Back Inlet] keys. If there is less than 0.5 psi pressure loss in 10 minutes, consider the system leak tight. If the pressure loss is greater than 0.5 psi in 10 minutes, there is a leak that must be found and corrected. See Correcting Leaks for Split/Splitless inlet in the 6890 Service Manual for help. 12 When the system is considered leak tight, set the inlet pressure to zero, disconnect the 3-Way Valve from the system, and re-connect the gas supply line to the inlet supply fitting. Remove the instrument from Prep-Run state by pressing the STOP key on the 6890 keypad. Now you may reinstall the column, restore the column dimension configuration at the keyboard, and set the desired inlet flow and pressure. Instructions 7

Purged/Packed inlets Be sure that the preparation steps found in the current 6890 manual for Purged/Packed inlets are complete before proceeding with these steps, with the exception of the installation of the septum purge vent cap. This will be replaced by the Inlet EPC Leak Test Fixture provided. 1 Install the Inlet EPC 3-Way Valve Leak Test Fixture, G1530-80510, as shown in Figure 1. Be sure O-rings are in good condition and that brass knurled fittings are adequately finger tightened. Turn the 3-Way Valve to the ON position as pictured in Figure 1. The handle on the valve is pointed towards the gas supply when turned ON (pictured). The handle on the valve is pointed towards the GC when it is turned OFF (not pictured). 2 Make sure a length and a diameter for a capillary column are entered on the 6890 keypad. To set these values, press [Config], and scroll to Column 1 or Column 2, depending on inlet position. Recommended settings are column length 30 m and column diameter 320 µm. 3 Set inlet pressure to 25 psi on the 6890 keypad. 4 Allow about 15 seconds for pressure equilibration. If pressure cannot be achieved, check the following: Is the carrier gas source pressure at least 35 psi, connected to the proper inlet (front or back) and turned on? Is the 3-Way Valve in the correct position with the handle pointed towards the gas supply? Is the Purged/Packed inlet column nut properly plugged? Are the test fixture brass fittings tightened and the O-rings under them in good condition? If these conditions are all true, it is possible that there is a gross leak in the system that must be corrected prior to going to step 5. 8 Instructions

5 Turn the inlet pressure OFF at the 6890 keypad. 6 Turn the 3-Way Valve OFF by turning the valve handle 180 degrees counterclockwise, so that the handle on the valve handle is pointed towards the GC. 7 Set the inlet pressure to 40 psi on the 6890 keypad. Allow about 15 seconds for the pressure to equilibrate. The pressure should drop from 25 psi to a pressure above 10 psi (usually between 17 and 24 psi). 8 Set the inlet pressure to 10 psi on the 6890 keypad. 9 Record the inlet pressure at this time and monitor the pressure for 10 minutes on the 6890 display. You can use the stopwatch feature of the 6890 GC to monitor the time. Press [Time] and then [Enter] to start timing, then toggle between the time and the pressure reading with the [Time] and the [Front Inlet]/[Back Inlet] keys. If there is less than 1.0 psi pressure loss in 10 minutes, consider the system leak tight. If the pressure loss is greater than 1.0 psi in 10 minutes, there is a leak that must be found and corrected. See Correcting Leaks for Purged/Packed inlets in the 6890 Service Manual for help. 10 When the system is considered leak tight, set the inlet pressure to zero, disconnect the 3-Way Valve from the system, and re-connect the gas supply line to the inlet supply fitting. Now you may reinstall the column, restore the column dimension configuration at the keyboard, and set the desired inlet pressure. Instructions 9

Agilent Technologies Agilent Technologies, Inc. Printed in USA, May 2002 G1545-90100