CURRENT ORIGINAL REFERENCE SECTIONS. (Typical Section) (Typical Section) The Parade Island Bay : Concept Option Summary Sheets.

Similar documents
SANTA CRUZ/ALAMEDA ROAD CONFIGURATIONS INTERSECTION AND STREET VIEWS

Appendix B Option 1 Design, Plans and Estimates

Part B Design Guidance / Principles _

Frome Street Bicycle Route

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21

DMURS - Practical Implications

IMPLEMENTATION. PEDESTRIAN USERS (Continued /) Building Frontages: A: Stair Applications. Geometry (Accessed from the Sidewalk) Refer to A:

Frascati Road and Temple Hill Route Improvements. Outline Design Report to Accompany Public consultation

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input

STEERING COMMITTEE MEETING June 17, Streetscape Overview Burlington Comprehensive Master Plan

STREETS ENTRY ROADS E1 E2 RING ROAD R1 R2 R3 R4 R5 R6 R7 CIVIC STREETS C2 C3 B-DOUBLE ROADS B1 LOCAL STREETS LANEWAY LA1 ISSUE

1. TRANSFORM CITY ROAD WEST INTO A GREAT CENTRAL city street

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Community Meeting February 27, 2007 Dorchester Avenue Transportation & Streetscape Improvements Action Plan February 27, 2007

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017

IMPLEMENTATION. PEDESTRIAN USERS (Continued /) A: Class 2 Pedestrian / Cycle Ways. Pedestrian and Cycle Ways:

(HIGHWAY GEOMETRIC DESIGN -1)

Footpath design. A guide to creating footpaths that are safe, comfortable, and easy to use

Road Markings. Lecture Notes in Transportation Systems Engineering. Prof. Tom V. Mathew. 1 Overview 1. 2 Classification 2

NEIGHBOURHOOD DEVELOPMENT PLAN: Project update. Case: HSR Layout, Bangalore. August,2013

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Water Street Promenade Engineering and Design Services

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

Transit boulevard: A new road type for Sydney s Growth Centres

Road Markings. Lecture Notes in Transportation Systems Engineering. Prof. Tom V. Mathew

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

McLean Main Street Public Forum Follow-up

6. BREENS/GARDINERS/HAREWOOD INTERSECTION - SAFETY IMPROVEMENT PROJECT

Rhebogue Neighbourhood Greenway. Road Safety Audit Stage 2

CHECKLIST 2: PRELIMINARY DESIGN STAGE AUDIT

Policy Statement. Objective. Context. References and Supporting Documentation

City of Seattle Edward B. Murray, Mayor

forwarddallas! Implementation Proposed Chapter 43 Code Amendment On-Street Parking

Bentleigh GLEN EIRA COUNCIL TRANSFORMATIONAL CONCEPTS 15

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Proposed Mural. Ninth St. Proposed Sitting Area. Proposed Bump-out. Bike Lane and Buffer Zone. Proposed Trees and Sitting Area.

Report. Typical Sections. City of Middleton, WI

UDC Street Cross Sections

Appendix B - Street Sections

HISTON ROAD Have your say on better public transport, cycling and walking journeys

OLDER PEOPLE INDEPENDENT MOBILITY FOR LIVEABLE COMMUNITIES. Christopher G B (Kit) Mitchell

Field guide for Accessible Public Rights-of-Way Edition

01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS

Red Rocks Pari-whero. Red Rocks/Pari-Whero. Quarry. Owhiro Bay Quarry. Owhiro Bay Parade. Taputeranga Marine Reserve ISSUES AND OPPORTUNITIES ANALYSIS

Aurora Urban Street Standards For Transit Oriented Developments and Urban Centers

Sharrow Markings. Best Practice Guidance Note. February 2016

David Hung, Associate Planner City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA

Parking. Signing. Appendix C Typical detail drawings. London Cycling Design Standards

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

VEHICLE CROSSING AND PEDESTRIAN CUTDOWN SET OUT

PERFORMANCE ACTIVITY 613 IMPACT ATTENUATOR WORK DESCRIPTION 3

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

Designing Pedestrian Facilities for Accessibility. Module 3 Curb Ramps & Blended Transitions

AUTOMATED AND ZERO EMISSION VEHICLES HOW THEY MIGHT RESHAPE OUR STREETS

Memo. Ocean Avenue Corridor Design Project Public Workshop #2 Summary

NEW TOWN RETAIL PRECINCT UPGRADE

Henderson Ave. Complete Streets Project

COMPLETE STREETS PLANNER S PORTFOLIO

September 2008 REVISIONS (1) SYMMETRICAL VERTICAL CURVE EQUATIONS 12.5(12) VERTICAL CURVE COMPUTATIONS 12.5(14) TURNING LANE LENGTHS 15.

complete streets design and construction standards public primer City of Edmonton

TRANSPORTATION STANDARDS

guide to a phased approach TRIPP

Bicycle Network Submission

Liveable Neighbourhoods Design Code and Policy

Omaha s Complete Streets Policy

City of El Cerrito San Pablo Avenue Specific Plan. Capital Improvement Program

5 CIRCULATION AND STREET DESIGN

Monroe Street Reconstruction

DRAFT TENNYSON STREET ANGLED PARKING ANALYSIS

Active Transportation Facility Glossary

Drawing 5269/GA01: A2/A28 Coast bound off-slip - Wincheap Scheme

City of Fairfax, Virginia City Council Work Session

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections

4404 St. Peter Street New Orleans, LA (504) April 13 th, To Whom It May Concern:

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

2.0 LANE WIDTHS GUIDELINE

Cabinet Member for Highways & Streetscene. Highway Infrastructure Manager

TEAM: ROAD: SECTION: K K Nagar Walkability Survey 19 th June 2013

Richmond-Adelaide Cycle Tracks

RIVERSIDE, Newton MA BH NORMANDY RIVERSIDE LLC. Riverside Station. A green, transit-oriented community

Corporate. Report COUNCIL DATE: May 25, 1998 NO: R1500 REGULAR COUNCIL. TO: Mayor & Council DATE: April 27, 1998

CITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study

Walking Along the Road. Module 2

25th Avenue Road Diet Project A One Year Evaluation. Transportation Fund for Clean Air Project #05R07

Public Workshop #2. September 14, 2016

Broadway Complete Streets Project

PERFORMANCE ACTIVITY 401 MOWING WORK DESCRIPTION 5

Marcus Jones, TRL. Presented by Name Here Job Title - Date

Daleston Masterplan Traffic & Transport Assessment

US 301 Resurfacing, Restoration, and Rehabilitation

This Chapter sets forth the minimum design, technical criteria and specifications to be used in the preparation of all roadway plans.

Citizens Cycling Jury. Sharing the Roads Safely Final Recommendations. November RAA Response to Recommendations

IAN WHITE ASSOCIATES. Crawley Station Gateway Public Realm

Downtown BRT Corridor Alternatives Review: 1 st, 2 nd, 3 rd and 4 th Avenue. Bus Rapid and Conventional Transit Planning and Design Services

Maynooth Cycling. Presentation to Maynooth Community Council 14 December 2015

Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation

WELLINGTON CITY COUNCIL CYCLING NETWORK DRAFT FRAMEWORK

Cycle Track Design Best Practices Cycle Track Sections

122 Avenue: 107 Street to Fort Road

Transcription:

ORIGINAL (Typical Section) CURRENT (Typical Section) 3,900 3,000 2,000 1,500 3,100 1,600 3,100 1,500 2,000 2,500 3,900 3,000 1,800 600 2,000 3,000 3,000 2,000 600 1,800 2,500 Existing Planting Traffic Median Traffic Existing Planting Traffic Traffic 3,000 2,500 6,200 3,200 1,000 3,200 2,000 3,000 Planted strip/ Angle Traffic Median Traffic street furniture Business Zone Zone 3,000 2,500 6,200 3,200 1,000 3,200 2,000 3,000 Planted strip/ Angle Traffic Median Traffic street furniture Business Zone Business Zone REFERENCE SECTIONS

3,900 3,000 2,000 900 1,500 3,000 3,000 1,500 900 2,000 2,500 Existing Planting Traffic Traffic 5,500 2,100 1,000 1,500 3,200 3,200 1,500 1,000 2,100 3,000 Traffic Traffic Road-side cycle lane adjacent to parking Painted buffer space separating the cycle lane from the adjacent parking door zone lane is not protected from moving vehicles widths and kerb positions are generally Traffic lane and parking widths remain from current in the residential zone Traffic lane widths remain in the business zone Parallel parking on western side of business zone No central flush median strip in the residential and business zones Approx. 40 parking spaces (25%) removed from the residential zone Approx. 17 parking spaces (29%) removed from the business zone OPTION A

3,900 3,000 1,500 900 2,000 3,000 3,000 2,000 900 1,500 2,500 Existing Planting Traffic Traffic 5,500 1,500 1,000 2,100 3,200 3,200 2,100 1,000 1,500 3,000 Traffic Traffic Separated kerb-side cycle way at road level Raised kerb separators provides a physical buffer space separating the cycleway from the adjacent parking door zone lane is separated from moving vehicles widths and kerb positions are generally Traffic lane and parking widths remain from current in the residential zone Traffic lane widths remain from current in the business zone Parallel parking on western side of business zone No central flush median strip in the residential and business zones Approx. 40 parking spaces (25%) removed from the residential zone Approx. 17 parking spaces (29%) removed from the business zone OPTION B

3,900 2,400 1,500 1,000 2,000 3,200 3,200 2,000 1,000 1,500 2,500 Existing Planting Traffic Traffic 5,200 1,500 1,000 2,000 3,200 3,200 2,000 1,000 1,500 3,500 Traffic Traffic Separated kerb-side cycle way raised above road level Kerb-side provides a buffer space separating the cycleway from the adjacent parking door zone lane is separated from moving vehicles width is reduced on the western side in the residential zone approximately 0.6m (eastern side width remains ) width in the business zone is wider than current on the eastern side approximately 0.5m (additional street furniture zone), and 0.3m narrower on the western side (although space is retained for tables and seating) Traffic lane widths are 0.2m wider than current in the residential zone, parking widths remain Traffic lane widths remain in the business zone Parallel parking on western side of business zone No central flush median strip in the residential and business zones Approx. 40 parking spaces (25%) removed from the residential zone Approx. 17 parking spaces (29%) removed from the business zone OPTION C

3,900 1,600 1,500 900 2,000 3,200 1,000 3,200 2,000 900 1,500 2,500 Existing Planting Traffic Median Traffic 3,400 1,500 600 5,200 3,000 3,000 2,000 900 1,500 3,000 Traffic Traffic Separated kerb-side cycle way raised above road level Kerb-side provides a buffer space separating the cycleway from the adjacent parking door zone lane is separated from moving vehicles width is significantly reduced on the western side in the residential zone approximately 1.4m (eastern side width remains ) width in the business zone is on the eastern side, and is significantly reduced on the western side approximately 2.1m (space for tables and seating is lost) Traffic lane widths are 0.2m wider than current in the residential zone, parking widths remain Traffic lane widths are reduced in the business zone Angled-parking retained on western side of business zone Central flush median strip in the residential zone only Approx. 40 parking spaces removed from the residential zone (25%) Approx. two parking spaces removed in the business zone (3%) OPTION D

Proposed layout for OPTION: A Proposed layout for OPTIONS: B,C,D (Looking North) (Looking North) Raised table and new planting at side roads lane passes side roads and pedestrian crossings at road level No buffer space between cycle lane and traffic lane Raised table and new planting at side roads lane passes side roads and pedestrian crossings while raised at footpath level Buffer space between cycle lane and traffic lane TYPICAL INTERSECTION