SEMEMI SQA Unit Code H2B7 04 Assisting in the installation of compressed air equipment

Similar documents
SEMIC05 Installing mechanical equipment

SEMEMI SQA Unit Code H2AX 04 Carrying out scheduled maintenance tasks on fluid power equipment

Overview. SEMEMI216 SQA Unit Code HF4G 04 Carrying out fault location on fluid power equipment and circuits

SEMEM3-73 Maintaining medical gas pipeline systems and equipment

SEMPEO SQA Unit Code FP2P 04 Maintaining fluid power equipment

SEMEMI SQA Unit Code H2AP 04 Carrying out fault location on electrical equipment and circuits

SEMAE3064 Installing aircraft visual display units and computer systems

SEMAE3071 Installing aircraft countermeasure systems

SEMPEO SQA Unit Code FP2M 04 Maintaining mechanical devices and equipment

Assembling and testing fluid power systems

SEMEM3-65 Servicing anaesthetic and ventilation equipment

Overview. SEMEMI211 SQA Unit Code HF4E 04 Carrying out modifications or rewiring electrical circuits

General maintenance engineering applications

SEMEM SQA Unit Code HWAW 04 Carrying out maintenance activities on fluid power equipment

General maintenance engineering applications

SEMEM SQA Unit Code H2AL 04 Carrying out maintenance activities on mechanical equipment

SEMMME3-073 Checking that completed assemblies comply with specification

SEMEEE36 Checking the compliance of electrical equipment against the specification

Maintaining mechanical devices and equipment. Outcome one

SEMCW2-10 Testing quartz watches

SEMEM3-78 Testing and calibrating instrumentation and control equipment and circuits

QPEO2/037N Credit Value: 15 QCF Level: 2 GLH: 68 Maintaining electrical equipment/systems

Maintaining electrical equipment/systems

SEMFEW339 - SQA Unit Code H1WC 04 Slinging, lifting and moving materials and components

SEMPEO SQA Unit Code H2CB 04 Preparing and Manoeuvring Armoured Fighting Vehicles (AFVs) for Maintenance and Transportation

Overview IMPEM163S. Carry out preventative planned maintenance on instrumentation and control equipment used in food and drink operations

Producing Aircraft Detail Assemblies. Ofqual unit reference number (code) Organisation Reference M/508/4691. Unit Level Level 2. Unit Sub Level GLH 64

SEMETS3-17 Checking and calibrating mechanical inspection equipment

Overview IMPEM164K. This standard is for you if you work in food and drink operations or animal feed operations.

SEMAER2_41 Dismantling and removing aircraft access structures

SEMAE3327 Maintaining fuselage, nacelles and pylons on aircraft

SEMEEE3-34 Carrying out functional tests on electrical equipment

SEMFWE3-33 SQA Unit Code HF2X 04 Cutting and shaping materials using portable thermal cutting equipment

Inspecting a motorsport vehicle during a competition

SEMME2135 Assisting in modifying and adding electrical circuits in yachts and boats

SEMFEW205 - SQA Unit Code H1VP 04 Joining materials by the manual MIG/MAG and other continuous wire processes

Gas Network Craftsperson

CCSSL35 Carry out the wiring and testing of electrical circuits and equipment

SEMMPF201 Complying with Statutory Regulations and Organisational Safety Requirements

SEMFWE SQA Unit Code H1W9 04 Forming platework using power rolling machines

SEMEM4-40 Carrying out the testing and calibration of instrumentation control equipment and circuits

SEMME269 - SQA Unit Code H2BK 04 Cutting and shaping using NC/CNC plasma or gas cutting machines

SEMFWE305 HY20 04 Welding materials by the Semi-Automatic MIG/MAG and Flux Cored Arc processes

Gas Network Craftsperson

Cutting and shaping materials using thermal cutting equipment

SEMBIT SQA Unit Code F9JC 04 Complying with statutory regulations and organisational safety requirements

Release: 1. UEPOPL002A Licence to operate a reciprocating steam engine

Overview EUSSAM12. Carry out tightness testing and direct purging of gas installations

SEMPEO SQA Unit Code FP3T 04 Maintaining electronic equipment/systems

LANNAC3 - SQA Unit Code F8J4 04 Maintain the cleanliness of the working environment

COGPOLY39 Meet safety, health and environmental requirements in the workplace

Working safely in an engineering environment

Installation, Operation and Maintenance Manual for Back Pressure Regulator

Employer s Unit of Competence Magnetic particle testing of materials, products and plant

QPEO2/033N Credit Value: 14 QCF Level: 2 GLH: 64 Wiring and testing electrical equipment and circuits

Overview IMIARBBP21. Carry Out Motor Vehicle Body Metal Inert Gas (MIG) Brazing Operations

BUTTERFLY VALVES Series 800

MODEL 200 KNIFE GATE VALVES INSTALLATION & MAINTENANCE MANUAL

Latvin Luxury Shower Panel. Telephone Product Specification. ~ Minimum Working Pressure 1.0 bar ~ Maximum Working Pressure 3.

Overview. OPIPOH7 - SQA Unit Code HG1X 04. Operate an Oil and Gas Process (Gas Compression)

Overview. OPIPOH10 - SQA Unit Code HG Operate an Oil and Gas Process ( Gas Treatment)

CRP INSTALLATION, OPERATING AND MAINTENANCE INFORMATION FOR INLINE SAMPLING VALVES

SEMLATA3-12 Measuring, weighing and preparing compounds and solutions for laboratory use

Manual Actuated Boiler Blowdown Valves

Specifications Testing & Adjusting Disassembly & Assembly

ASTC210 (SQA Unit Code - F4PS 04) Clean confined spaces

INSTALLATION, OPERATION & MAINTENANCE MANUAL

Overview EUSDSG3.12. Install gas meters and regulators (2.5 to 16.0m3/hr)

Engineering Data Sheet

Overview EUSDSG3.6. Gas tightness testing and direct purging

FILTER REGULATORS MODEL NO: CAT155 & CAT156 FITTING & MAINTENANCE INSTRUCTIONS PART NO: & ORIGINAL INSTRUCTIONS

ULTRAMAGIC, S.A. MAINTENANCE MANUAL SUPPLEMENT NUMBER 14 INTRODUCTION OF A VAPOUR PILOT VALVE OPTION FOR THE ULTRAMAGIC MK 21 RANGE OF BURNERS

SKAC25 Operate plant to maintain the quality of pool water

Operation Manual Guillotine Cutter RC-5

CLARKES ERO FEEDER MANUAL

1 DRIVE INDUSTRIAL IMPACT WRENCH

Unit 24: Applications of Pneumatics and Hydraulics

Related Products: Auto Drain Valve. Model/Specifications. Model

Spiratec ST14, ST16 and ST17 Sensor Chambers and sensors

General electrical and electronic engineering applications


Installation, Operating and Maintenance Instructions. V914 Cast Iron Flanged Swing Check Valve V914

HYDRAULIC MOBILE LIFTING TABLE

Flexfence Swaging Unit. Product Manual. Release 02/16.

Finishing Surfaces by Applying Treatments A/508/5116

310 SERIES TILT-TO-LOAD ROTATOR. The Specialist In Drum Handling Equipment

KENNEDY VALVE OPERATION & MAINTENANCE MANUAL

OPERATION and MAINTENANCE Guide

QCF Unit and Assessment Specification

TA10A and TA10P Steam Tracing Temperature Control Valves Installation and Maintenance Instructions

WKM Model 320F Floating Ball Valve

3/8" Dr. Air Butterfly Impact Wrench

IX1 Spirax-Monnier International Compressed Air Filter Installation and Maintenance Instructions

Product Manual B-Safety ClassicLine & PremiumLine Emergency Eyewash and Eye/Face Wash Equipment

Air Tractor Preventative Maintenance Manual And Troubleshooting

Installation and Service Manual

Model PIV UL/FM Post Indicator Valve. Maintenance and Operation Manual UL/FM Post Indicator Valve Configuration AWWA C515

Installation, operation & maintenance manual - original version

MECHANICAL EQUIPMENTS: COMPRESSORS, PUMPS, SEALS, SPEED DRIVES, CONTROL VALVES & ACTUATORS & SAFETY RELIEF VALVES

SKSTEX36(SQA Unit Code-H7C9 04) Calibrate textile production equipment

Transcription:

Assisting in the installation of compressed air equipment Overview This unit identifies the competences you need to assist in the installation of compressed air equipment and systems, in accordance with approved procedures. You will be required to assist in the installation of a range of compressed air equipment, which will include compressed air generation, distribution and control systems. This will also include installing system components such as pumps, driers, motors, regulators, compressor components, sensors, pipework and hoses, filters, electrical wiring, gaskets and seals. This unit does not involve maintenance/repair type activities, such as removal and replacement of existing equipment. You will be required to use the appropriate tools and equipment throughout the installation activities, and to apply a range of installation methods and techniques to position, level and align the equipment, and to make connections to the required services. The installation activities will include making checks and adjustments, in line with your permitted authority, and assisting others to ensure that the installed equipment functions to the required specification. Your responsibilities will require you to comply with organisational policy and procedures for the installation activities undertaken, and to report any problems with the activities, tools or equipment used that you cannot personally resolve, or are outside your permitted authority, to the relevant people. You must check that all tools, equipment and materials used in the installation activities are removed from the work area on completion of the work, and that all necessary job/task documentation is completed accurately and legibly. You will be expected to work to instructions, alone or in conjunction with others, taking personal responsibility for your own actions, and for the quality and accuracy of the work that you carry out. The installation activity may be carried out as a team effort, but you must demonstrate a significant personal contribution to the installation activities, in order to satisfy the requirements of the standard, and you must demonstrate competence in all the areas required by the standard. Your underpinning knowledge will be sufficient to provide a sound basis for your work, and will enable you to adopt an informed approach to applying the installation of compressed air equipment procedures. You will have an understanding of the equipment being, installed and its installation requirements, in adequate depth to provide a sound basis for carrying out the installation process safely and effectively. SEMEMI2-58 1

You will understand the safety precautions required when carrying out the installation activities, especially those for ensuring the safe isolation of services. You will be required to demonstrate safe working practices throughout, and will understand your responsibility for taking the necessary safeguards to protect yourself and others in the workplace. SEMEMI2-58 2

Performance criteria You must be able to: P1 work safely at all times, complying with health and safety and other relevant regulations and guidelines P2 follow all relevant instructions/documentation for the installation being carried out P3 use the correct tools and equipment for the installation operations, and check that they are in a safe and usable condition P4 assist in the installation, positioning and securing of the equipment, using appropriate methods and techniques P5 carry out and/or assist in checking the installation, and make any adjustments in accordance with the specification P6 deal promptly and effectively with problems within your control and report those that cannot be solved P7 assist in the completion of installation documentation SEMEMI2-58 3

Knowledge and understanding You need to know and understand: K1 the health and safety requirements of the area in which the installation activity is to take place, and the responsibility these requirements place on you K2 the isolation and lock-off procedure or permit-to-work procedure that applies K3 the specific health and safety precautions to be applied during the installation procedure, and their effects on others K4 the hazards associated with installing compressed air equipment, and with the tools and equipment used, and how they can be minimised K5 the importance of wearing protective clothing and other appropriate safety equipment during the installation K6 how to obtain and interpret information from job instructions and other documents needed in the installation process (such as drawings, specifications, manufacturers' manuals, BS7671/IEE regulations, symbols and terminology) K7 the basic principles of how the equipment functions, and its operating sequence K8 methods of marking out the site for positioning the equipment, and the tools and equipment used for this K9 methods of drilling holes for rag bolts and expanding bolts (including the use of grouting and adhesives) K10 the various mechanical fasteners that will be used, and their method of installation (including, threaded fasteners, dowels, special securing devices, masonry fixing devices) K11 procedures for ensuring that you have the correct tools, equipment, and fasteners for the installation activities K12 the types of tools and instruments used to position, secure and align the equipment (such as spanners, wrenches, crowbars, torque wrenches, engineers' levels, alignment telescopes and laser devices) K13 the techniques used to position, align, level, adjust and secure the equipment K14 methods of lifting, handling and supporting the equipment during the installation activities (to include chain and rope hoists, pull-lifts/tirfors, rollers and skates, high lifts and the use of levers and crowbars) K15 the correct pipes, hoses and other equipment to accommodate the various pressure ranges K16 how to make adjustments to components to ensure that they function correctly K17 methods of connecting equipment to service supplies (such as electrical, fluid power, compressed air oil and fuel supplies) K18 why electrical bonding is critical, and why it must be both mechanically SEMEMI2-58 4

and electrically secure K19 the procedure for the safe disposal of waste materials K20 how to conduct any necessary checks to ensure the equipment integrity, functionality, accuracy and quality of the installation (including the fitting of guards to all moving parts and covers on electrical connections) K21 how to recognise installation defects (such as leaks, poor seals, misalignment, ineffective fasteners, foreign object damage or contamination) K22 the importance of ensuring that the completed installation is free from dirt, swarf and foreign object damage, and of ensuring that any exposed components or pipe ends are correctly covered/protected) K23 the fault finding techniques to be used if the equipment fails to operate correctly K24 the recording documentation to be completed for the activities undertaken K25 the extent of your own responsibility and to whom you should report if you have problems that you cannot resolve SEMEMI2-58 5

Additional Information Scope/range related to performance criteria You must be able to: 1 carry out all of the following during the installation of the compressed air equipment: 1.1 adhere to procedures or systems in place for risk assessment, COSHH, personal protective equipment and other relevant safety regulations 1.2 confirm that authorisation to carry out the installation activities has been given 1.3 check that safe access and working arrangements for the installation area have been provided 1.4 confirm that services have been safely isolated, ready for the installation (such as mechanical, electricity, gas, air or fluids) 1.5 check that all required installation consumables are available 1.6 leave the work area in a safe condition and free from foreign object debris 2 assist in the installation of equipment for two of the following types of compressed air system: 2.1 compressed air generation 2.2 compressed air distribution 2.3 compressed air control 3 assist in the installation of eight of the following compressed air system components: 3.1 pipework 3.2 regulators 3.3 sensors 3.4 hoses 3.5 valves 3.6 lubricators 3.7 pumps 3.8 control equipment 3.9 safety devices 3.10 driers 3.11 gauges/indicators 3.12 electrical wiring and connectors 3.13 motors 3.14 manifolds 3.15 electrical components 3.16 compressors 3.17 monitoring equipment 3.18 gaskets and seals 3.19 silencers 3.20 filters SEMEMI2-58 6

3.21 actuators 3.22 other components (specify) 4 apply installation methods and techniques, to include five of the following: 4.1 marking out of locating and securing positions 4.2 dressing and securing piping and hoses 4.3 drilling and hole preparation 4.4 fitting anti-vibration mountings 4.5 positioning equipment/components 4.6 securing by using mechanical fixings 4.7 aligning pipes, ducting and equipment 4.8 securing by using masonry fixings 4.9 making installation connections (such as mechanical, electrical, fluid power, utilities) 4.10 applying screw fastener locking devices 5 assist in the movement and positioning of equipment, using two of the following: 5.1 slings 5.2 portable lifting devices 5.3 hoists 5.4 cranes 5.5 block and tackle 5.6 jacks 5.7 fork lift 5.8 rollers 5.9 manual handling and moving loads 6 use three of the following instruments during the installation activities: 6.1 alignment devices 6.2 temperature sensing devices 6.3 measuring devices (mechanical and electrical) 6.4 flow testing devices 6.5 pressure sensing and monitoring devices 7 carry out all of the following checks and adjustments, as appropriate to the equipment being installed: 7.1 topping up fluid/oil reservoirs 7.2 making visual checks for completeness and freedom from damage 7.3 making `off-load' checks 7.4 making sensory checks (sight, sound, smell, touch) 7.5 checking level and alignment 7.6 ensuring that moving parts are clear of obstruction, and are guarded plus: assist with four more from the following: 7.7 setting working clearances 7.8 checking torque settings of fasteners SEMEMI2-58 7

7.9 tensioning 7.10 ensuring that locking devices are fitted to fasteners (as appropriate) 7.11 pressurising the system 7.12 functionally testing to ensure that the equipment operates correctly 7.13 making line pressure tests 8 assist in dealing with two of the following conditions during the installation process: 8.1 installations with no faults 8.2 partial equipment malfunction 8.3 complete malfunction of equipment 9 assist in using fault location methods and techniques on the installed equipment, to include one of the following: 9.1 diagnostic aids (such as company records/history, manufacturers' manuals, fault analysis charts, troubleshooting guides) 9.2 fault finding techniques (such as six point, half-split, unit substitution) 9.3 function testing the installation/running equipment self-diagnostics 10 produce installations which comply with all of the following, as appropriate to the equipment being installed: 10.1 equipment manufacturer's operation range 10.2 BS, ISO and/or BSEN standards 10.3 BS7671/IEE wiring regulations 10.4 customer (contractual) standards and requirements 10.5 company standards and procedures 11 assist in the completion of the relevant paperwork, to include one of the following: 11.1 installation records 11.2 company-specific documentation 11.3 job card SEMEMI2-58 8

Developed by SEMTA Version number 1 Date approved August 2008 Indicative review date Validity Status Originating organisation December 2014 Current Original SEMTA Original URN 58 Relevant occupations Engineering Professionals; Engineering; Manufacturing technologies; Engineering Technicians; Process Operatives; Plant and Machine Operatives; Assemblers and Routine Operatives Suite Engineering Maintenance And Installation Suite 2 2008 Key words Engineering, manufacturing, installation, compressed air, generators, distribution, control, compressors SEMEMI2-58 9