Authorised by: Date: list individually, do not group, M or Installing Pipework in ground, M or Induction Take 5 review working area for hazards Falls, crushing, explosions, slips and trips MUST be inducted to site. MUST attend Pre-Start meetings prior to commencing work DO NOT USE Mobile Phones whilst carrying out works Unstable surface Review ground conditions each day as can change due to weather i.e. slipping muddy surface if conditions has changed prepare another SWMS to deal with the current condition Marking out trenches Other services in the area M Tripping, dangers from their unfinished works Co-ordinate at Pre Start meetings as to what is live on site / what other trades are in the area Unstable surface Review ground conditions each day as can change due to weather i.e. slipping muddy surface if conditions has changed prepare another SWMS to deal with the current condition Co-ordinate at Pre Start meetings as to what is live on site / what other trades are in the area Other services in the area Tripping, dangers from their unfinished works Review #5 9/1/18 1 Installing Pipework in ground
Excavation of trench by Principal Contractors contractor Co-ordinate with Manager/oad Master for Unloading materials from transport list individually, do not group Crushing by Mechanical machinery Falling into trench Musculoskeletal Disorders (MSD), M or, M or Not to be present at the location whilst working being carried out Builder/ by the Principal Contractors contractor. Await approval to commence works in area. Mechanical devices (supplied by Manager) ensure all safety requirements are followed as per the Managers Mechanical Device SWMS. Prior to lifting materials from transport - plan where the materials are to be located. Ensure pathway to the final location is clear of all hazards i.e. holes, unstable ground, obstacles etc. oading Master/ Preparing materials for installation of pipe laying MSD Minimise quantity of pipes for lifting/lowering Ensure 2 people are to lift &/ lower from original location to trench. Ensure lifting/lowering commands are clear and precise. Ensure pathway is clear of all hazards i.e. holes, unstable ground, obstacles etc. Ensure carrying out the correct manual handling procedures for lifting/lowering Refer to SWMS for Manual andling Ensure you are wearing PPE for the task at all times and making sure you are wearing the appropriate PPE for the weather conditions. (refer to SWMS for PPE) Review #5 9/1/18 2 Installing Pipework in ground
list individually, do not group, M or, M or Preparing job location with equipment Explosion Oxy-acetylene has flash back arrestors on the bottle and the oxy handle. osing and gauges are in good working order and compatible with the product. Inspect outlet If any signs of dirt, blow out with a jet of clean compressed air or nitrogen DO NOT SNIFT acetylene azardous materials Breathing, skin irritations, eye irritations, inhaling Fire Extinguisher to be ready for immediate use Be aware of flammable materials in the vicinity of welding operation Barricades for welding areas Ensure following the MSDS safety procedures highlighted in the Substances Brought on sheets in the OS Manual under MSDS. M Wear the appropriate PPE cotton or leather gloves, clothing to be 100% cotton or fire-resistant Storage Explosion Storage of Oxygen & Acetylene MUST BE stored separately to each other. Storage of oxy-acetylene will be a well vented lockable storage area (location to be discussed with Manager). Otherwise to be taken off site. Ensure not stored near sources of ignition, oxidising agents, poisons, flammable liquids or combustible materials. Cylinders should be stored upright and secured Builder/ Review #5 9/1/18 3 Installing Pipework in ground
Retrieving Oxy-acetylene from Storage to work location. list individually, do not group, M or, M or Explosions Do not drag, drop, slide or roll cylinders. Do not open cylinder valve without the regulator attached. Builder/ Ensure regulators etc are compatible with the product. Inspect outlet If any signs of dirt, blow out with a jet of clean compressed air or nitrogen DO NOT SNIFT acetylene aying pipes Falls Ensure trench openings are clear of debris MSD Using 2 personnel to manage the laying of pipe work into the trench (i.e. one being in the trench and other from above). Make sure personnel are giving clear instructions to each other. Welding of Copper Pipework Explosion Obtain ot Works Permit from Builder. Using Oxy-Acetylene Oxy-acetylene has flash back arrestors on the bottle and the oxy handle. osing and gauges are in good working order Fire Extinguisher to be ready for immediateuse Be aware of flammable materials in the vicinity of welding operation Barricades around the welding areas Review #5 9/1/18 4 Installing Pipework in ground
Connection of PVC Pipework Using PVC Glue and Primer list individually, do not group Eye/Skin/Breathing irritation Burns Eye, skin, breathing irritations, M or Wear the appropriate PPE cotton or leather gloves, clothing to be 100% cotton or fire-resistant Ensure you Pay attention to the welding task and do not be distracted. Ensure following the MSDS safety procedures highlighted in the Substances Brought on sheet in the OS Manual Avoid contact with skin & eyes by wearing protective eye wear and gloves and clothing to protect the skin Environmential impact Follow principal contractor s procedures for waste removal if applicable. Otherwise will recycle containers or return to factory for appropriate disposal. ousekeeping Tripping hazards M All material is cleaned up at the end of each day and stored/removed in the appropriate locations agreed upon by the Manager/ Supervisor Storage Chemical hazards/ Explosions All material is cleaned up at the end of each day and stored/removed in the appropriate locations agreed upon by the Manager/ Supervisor. Storage of oxy-acetylene Explosions Storage of Oxygen & Acetylene MUST BE stored separately to each other. Storage of oxy-acetylene will be a well vented lockable storage area (location to be discussed with Manager). Otherwise to be taken off site., M or Review #5 9/1/18 5 Installing Pipework in ground
list individually, do not group, M or, M or Ensure not stored near sources of ignition, oxidising agents, poisons, flammable liquids or combustible materials. Cylinders should be stored upright and secured Storage of primer/glues Explosions The storage area should not reach temps above 45 deg and be well ventilated and dry. evel Surfaces, not stored near emergency exits or heavy traffic areas Do not store near an Oxidising agents Keep away from heat or ignition sources Store in cool, dry, well ventilated place out of direct sunlight (storage cage) as agreed with Manager. Completed all works trench to be back fill ed Crushing by mechanical devices Not to be present at the location whilst working being carried out by the Principal Contractors contractor. Await approval to re enter work area.. Builder/ Review #5 9/1/18 6 Installing Pipework in ground