Bluffdale/ UDOT South High-T Intersection Project Type Operations

Similar documents
Projects to Be Evaluated for the STP and CMAQ Funds and the 2021 TAP Programs

Bluffdale South (SR140) Bicycle/Shoulder Lanes Project Type Bicycle

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Building Great Neighbourhoods QUEEN ALEXANDRA

Building Great Neighbourhoods BONNIE DOON

Cottonwood Heights HAWK Pedestrian Crossing on Fort Union Blvd. Project Type Capital Improvement

Clackamas County Comprehensive Plan

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

APPENDIX 9: TOP 25 PROJECT AREAS INFORMATION SHEETS

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

5. RUNNINGWAY GUIDELINES

RZC Appendix 8A Marymoor Subarea Street Requirements

Route 7 Corridor Study

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

Giles Run Connector Road

Route 29 Solutions Projects

Design Criteria. Design Criteria

Building Great Neighbourhoods LANSDOWNE

Basalt Creek Transportation Refinement Plan Recommendations

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES

El Paso County 2040 Major Transportation Corridors Plan

State Route 160 (Blue Diamond Highway)

Transportation Corridor Studies: Summary of Recommendations

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project

RTP Amendment Number 4 RGC Release for Public Comment. May 18, 2017

122 Avenue: 107 Street to Fort Road

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

This chapter describes the proposed circulation system and transportation alternatives associated with

TRASBURG RANSPORTATION

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.

APPENDIX D COST SUMMARY TABLES

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018

EAGLE MOUNTAIN MASTER TRANSPORTATION PLAN. Prepared For

CTH M HIGHWAY PROJECT CTH Q to STH 113

EXHIBIT B. Bass Lake Rd US 50 to Hollow Oak Rd 2 Lanes with unimproved median and 4 foot paved shoulders. $ %

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Classification Criteria

State Street and Pierce Park Lane Intersection Concept Report

Lynchburg District Update

Chapter 5 Future Transportation

Legislative Update Williamsburg Residency

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation

City of Hyattsville. Citywide Traffic Study and Transportation Plan. Sabra, Wang & Associates. February, 2010

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Access Routes from US 101 to the Richmond San Rafael Bridge

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County.

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Recommended Roadway Plan Section 2 - Land Development and Roadway Access

US-6 Spanish Fork Fact Finding Study. December 2017

Replace Bridge 51 on Blackiston Mill Dr. over Silver Creek,

INTRODUCTION THOROUGHFARE SYSTEM CLASSIFICATIONS

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

INDEX. Geometric Design Guide for Canadian Roads INDEX

FY 2006 TRANSPORTATION CAPITAL PROGRAM

STATION #3 INITIAL ALTERNATIVES

DES MOINES AREA MPO. Presentation to Iowa Commercial Real Estate Association. April 6, 2017

Bay to Bay Boulevard Complete Streets Project

Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66.

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

Frequently Asked Questions

Application of a Complete Street

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

Southbend to Prima Vista. October 30, Floresta Corridor Master Plan

Final Sidewalk Feasibility Study

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

3.0 Future Conditions

Welcome to the Quebec Alternatives Analysis Public Meeting

TRANSPORTATION & MOBILITY

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

Roadway Project Recommendations:

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

LSC TRANSPORTATION CONSULTANTS, INC. 516 North Tejon Street Colorado Springs, CO (719) FAX (719)

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

Road Diets FDOT Process

PRESS RELEASE San Joaquin Council of Governments

2012 PRIORITY TRANSPORTATION PROJECTS

Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No

US 20 Feasibility Study. Village Board Meeting. Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20)

3.0 PROJECT DESCRIPTION

2018 Transportation Survey October 17, Prepared by:

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY

Project Update May 2018

Modal Interrelationships: A bicycle lane is proposed between Harrington Ave and Swanns Station Rd.

CONNECTING PEOPLE TO PLACES

DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN

OKI Awards More Than $41 Million to Transportation Projects Across the Region

Chapter 4: Transportation Systems

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway

Dr. Naveed Anwar Executive Director, AIT Consulting Affiliated Faculty, Structural Engineering Director, ACECOMS

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Transcription:

Bluffdale/ UDOT 14600 South High-T Intersection Project Type Operations 14600 South and Redwood Road $ 600,000 $ 550,000 This project is to install a new High-T intersection at Redwood Road and 14600 South where the City is planning to extend 14600 South. Currently, the intersection of 14400 South and Redwood Road is functioning at a level service F and has large delays and significant safety issues due to the poor sight distance and geometry of the 14400 South and its connection to 1690 West and Loumis Parkway being less than 300 feet.

Bluffdale City 14600 South Sidewalk and Bike Lanes Project Type Bike and Ped Redwood Road to Railroad Bridge $ 1,142,000 $ 1,064,687 14600 South is a main east/west thorough way in Bluffdale City. The section of roadway between Redwood Road and the railroad trestle consists of two travel lanes with limited curb, sidewalk and gutter. To improve the level of service the City intends to widen the roadway, add bicycle lanes and sidewalk, curb and gutter. This will help accommodate a wide range of users and provide a safe mode of transport for pedestrians. The addition of the bicycle lanes will promote outdoor activities and decrease automobile pollution.

Bluffdale City 14600 South Railroad Bridge Project Type Study 14600 South and Union Pacific Railroad Structure $ 128,600 $ 119,894 Perform an engineering study of alternatives to replace the existing one-lane railroad crossing on 14600 South with a crossing that meets future geometry and aligns with 14600 South.

Bluffdale/ UDOT Pony Express Realignment Project Type Reconstruction Pony Express Road / PR Blvd $ 5,335,900 $ 4,974,660 Realign Pony Express Road in Bluffdale to connect to Porter Rockwell Blvd. instead of 14600 South at the I-15 interchange. This will eliminate the existing Y-Intersection and divert most traffic accessing the I-15 interchange from the frontage road to Porter Rockwell Blvd.

Bluffdale City 1950 West Sidewalk Project Type Bike and Ped Intersection of Redwood Road and 14000, and the surrounding neighborhood $ 232,000 $ 205,911 This project will provide a pedestrian connection for a planned commercial center at the intersection of Redwood Road and 14000, and the surrounding neighborhood. Currently, there is no sidewalk and pedestrians must use the road. This project will install sidewalks with park strip that will allow residents to safely walk to the planned commercial center. This will reduce the total number of vehicle trips and increase the separation of vehicles and pedestrians, thereby increasing safety.

Cottonwood Heights Highland Drive Reconstruction Project Type Reconstruction I-215 to Bengal Blvd $ 3,611,700 $ 3,326,167 The purpose of this project is primarily a pavement rehabilitation project milling off 6 inches of asphalt and an overlay of 6 inches on the existing pavement. This project also includes the construction of ADA ramps and sidewalks to improve pedestrian access.

Draper 1300 East Reconstruction & Minor Widening Project Type - Reconstruction Wayne s World Drive to Nashi Lane $ 3,600,000 $ 3,270,000 Reconstruct and widen 1300 East to provide a continuous 3 lane section with shoulders/bike lanes, curb, gutter, and sidewalks, and improve the function of the intersection at Wayne's World Drive (13800 South).

Draper Lone Peak Parkway Widening Project Type - Capacity 12650 South to 12300 South $ 6,100,000 $ 4,870,000 Lone Peak Parkway is a north/south minor arterial just west of I-15. Currently, Lone Peak Pkwy begins at the northern limits of Draper City at 11400 South and terminates at Golden Harvest Rd. The project under this request will reconstruct 0.4 miles of the existing road from 12650 S to 12300 S. This section has problematic geometry and is not wide enough to accommodate the planned 5-lane section. Lone Peak Pkwy is identified in the WFRC Regional Transportation Plan.

Magna Metro Township 8000 West Sidewalk Project Type Bike and Ped 2600 South to 3100 South $ 1,346,700 $ 1,255,528 Construct sidewalk, curb and gutter on the west side of 8000 West from the existing sidewalk at about 2600 South to the 3100 South intersection.

Millcreek City 3300 South Sidewalk Safety Project Type Bike and Ped 2600 East to 2700 East $ 429,500 $ 400,423 Construct sidewalk, curb and gutter on the north side of 3300 S. There is little to no shoulder and pedestrians are often seen walking in the travel lane. Sidewalk here is identified as a critical need in the Walk Millcreek Plan (2015) and 3300 S Sidewalk Safety Study (2016).

Millcreek and Holladay Cities 3900 South Improvements Project Type Reconstruction 2300 East to Wasatch Blvd $ 8,652,500 $ 8,066,726 Create a safer environment for all users including the construction of curb, gutter, sidewalk, ADA ramp, enhanced bus stops, a bicycle facility, lighting and the relocation of utility poles out of asphalt, eliminate open ditch and pipe irrigation/storm drainage along 3900 South from 2300 East to Wasatch Blvd.

Murray City Winchester and 700 West Intersection Project Type Operations 700 West and Winchester Street $ 2,257,700 $ 2,104,854 The purpose of this project is to improve safety and operation of the intersection by replacing an aging signal, widening lanes for right turns while improving curve radii and improving pedestrian access.

Salt Lake City 1300 East Reconstruction Segment 2 Project Type - Reconstruction 2100 South to Southern Boundary $ 6,975,600 $ 6,503,352 This project encompasses pavement improvements for this deteriorated street, including removal and replacement of the pavement, curb and gutter, and pedestrian improvements. This project will incorporate Complete Streets concepts to make pedestrian, bicycle, & transit safety improvements.

Salt Lake County Emigration Canyon Retaining Walls Project Type Safety 4877 East to 5646 East $ 4,739,500 $ 4,418,636 An Emigration Canyon hazard study was completed in 2016, identifying safety issues in the canyon. The County is in the process of spending $1.0M to address some of these issues. However, additional funding is necessary to construct two retaining walls the report identifies as top safety priorities.

Salt Lake County Galaxie Drive & 1300 East - Intersection Project Type Intersections & Signals 8800 South to 8900 South $ 552,000 $ 515,189 Unincorporated Salt Lake County is requesting at Galaxie Drive/1300 East a signal to improve safety and the function of the intersection in the Sandy Hills Community. Funding to install a signal at this intersection and removal of the median along 1300 East south of Galaxie Drive are the goals of the project.

Salt Lake County/ West Valley/ Kearns 4700 South Recon. w/ Minor Widen Project Type Reconstruction 4000 West to 5600 West $ 16,367,300 $ 15,259,234 The project is needed to meet capacity needs, by improving capacity at the intersections, railroad crossings, reconstructing and widening canal bridges, and to reconstruct the existing pavement with its various deficiencies.

Sandy City Automall Drive Roundabout Project Type Intersection 11000 South $ 5,356,300 $ 4,980,626 Sandy City/JUB completed a modeling analysis of Automall Dr. from 11000 South to State St in August of 2017. The goal of the analysis was to examine existing conditions and provide improvement recommendations. An additional lane in each direction and a roundabout at the Costco intersection was the recommended proposal.

South Jordan City 1000 West Reconstruct w/ Minor Widening Project Type Reconstruction 10000 South to 10200 South $ 1,217,300 $ 1,134,889 Reconstruct roadway with minor widening to 3-lanes, including center turn lane. Also curb & gutter, sidewalk, park strips, shoulder pavement, and if necessary, streetlights and utilities.

South Salt Lake 700 West Reconstruct & Minor Widening Project Type - Reconstruction 3300 South to Carlisle Street (3655 South) 700 West is a collector road that serves residential areas, the County Jail, the UTA headquarters, and other light industrial businesses. 700 West carries a high volume of trucks, causing accelerating pavement deterioration. This project will replace the failing asphalt pavement with concrete pavement, and upgrade pedestrian and drainage facilities by filling in sidewalk, curb and gutter; and add bike lanes. $ 6,571,575 $ 6,118,032

Taylorsville City 1780 BRT Connector Road Project Type - Transit Bruin Blvd to 4700 South The Murray-Taylorsville-West Valley BRT project is a critical regional and local transit project for Salt Lake Valley. The Transit project s purpose is to provide a reliable, efficient transit system and connection between the Murray Central TRAX and FrontRunner stations, Taylorsville, Salt Lake Community College and the West Valley Central TRAX Station. As part of the overall BRT project 1780 W will allow the BRT to better access SLCC from 4700 S. $ 1,002,800 $ 655,220

UDOT/ Murray City 5300 South - Intersection Improvements Project Type Operations 5300 South (SR-173) and State Street (SR-89) $ 525,000 $ 489,458 The purpose of this project is to add a WB to NB right turn lane at 5300 S and SR-89 (State Street). This is one of the busiest intersections in Murray and congestion is a problem throughout the day. The right turn lane will reduce congestion by removing right turn traffic from the thru lane.

UDOT/ Murray City State Street - Intersection Improvements Project Type Operations State Street (SR-89) and Vine Street $ 311,500 $ 290,411 The purpose of this project is to extend the left turn lanes for the EB to NB and NB to WB movements. This is a busy intersection and significant redevelopment is planned in the area. Extending the turn pockets will reduce congestion by removing turning traffic from thru lane.

UDOT/ Sandy City Monroe - Intersection Improvements Project Type Operations Monroe and 90 th South (SR-209) $ 6,145,100 $ 5,729,077 The purpose of this project is to widen Monroe and SR-209 to provide dual left turn lanes in all directions. This improvement would allow for less congestion by removing turning movements from the thru lanes and by clearing the left turn queue more efficiently.

UTA University of Utah Hospital Stop Expansion Project Type Transit U of U Bus Bays $ 399,400 $ 372,361 The U of U is a large transit trip generator in Salt Lake City and the Hospital is one of the most used stops. Currently there are limited bays for buses. This project would extend bays and allow more buses to serve the area simultaneously.

West Jordan 7000 South & 1500 West New Construction Project Type Bicycle and Pedestrian Pedestrian Bridge $ 1,608,900 $ 1,499,977 Heartland Elementary School needs to have a pedestrian bridge for the safety of children crossing 7000 South, which is slated to expand from its present 4 lane configuration to a 7 lane configuration in the future. This project will salvage a bridge span from 10600 South and 1300 West to save on project costs.

West Jordan 7000 South Environmental Impact Statement Project Type - Study 1300 West to Bangerter Highway (SR-154) Presently there are 25,000 plus vehicles per day that use this important east -west arterial street. This traffic is projected to grow to up to 50,000 vehicles per day. This project will complete the NEPA documentation process to allow the future widening of 7000 South from an existing 4 and 5 lane roadway to a full 5 to 7 lanes with shoulders from 1300 West to SR-154. $ 2,000,000 $ 1,860,000

8600 South is a major collector street on the west side of the Salt Lake Valley, and is projected to carry 15,000 to 25,000 VPD by the year 2030. This crossing connects to Ron Wood Park, a regional park for the entire west half of the City of West Jordan, serving approximately 50,000 residents. A major recreation center ($45 to $50 million) is slated to be built within this park in the next few years. This bridge is the essential connector for that project, and will provide the connectivity for existing residents living west of the MVC. West Jordan 8600 South Bridge over MVC New Construction Project Type Capacity 5600 West to 6000 West $ 17,900,000 $ 4,000,000

West Valley Parkway Blvd. (2700 South) - Widening Project Type New Capacity Mountain View Corridor to 6400 West $ 5,392,000 $ 4,994,331 Parkway Blvd is a collector between Magna and WVC, with 13,000 vpd. The road consists of a two-lane section with no shoulder/median. After the extension of Mountain View Corridor (MVC) to 5400 S.; 6400 W. to Parkway Blvd became a popular alternative route to SR-201 over 5600 W. In 2019, as part of the next phase of construction for MVC a half interchange will be built creating additional need for capacity.

UDOT Connected Vehicle Infrastructure Project Type ATMS or ITS Salt Lake City Metro Area Connected Vehicles are about to fundamentally alter traffic management capabilities by allowing the communication of vehicles to vehicles and vehicles to infrastructure via short range radio. This initial project will continue to develop connected vehicle technology using vehicle to infrastructure systems to help maintain bus schedules. This technique is intended to allow a bus that is behind schedule to request an extended green light cycle in order to help the bus maintain schedule. $ 1,200,000 $ 1,124,000