Appendix A. Summary of Progress Made Since 2004 Plan. Ohio Kentucky Indiana Regional Council of Governments Regional Transportation Plan

Similar documents
OKI Awards More Than $41 Million to Transportation Projects Across the Region

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES.

2017 (FY 21,22,23) Ohio CMAQ Project Selection

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

2017 (FY 21,22,23) Ohio CMAQ Prioritization

ODOT Major Construction, Bikeways and Enhancements Report for Clermont County. (State Fiscal Years 2007 to 2010)

FY 2005 TRANSPORTATION CAPITAL PROGRAM

Draft Prioritization for STP, SNK, TA Applications in Ohio and Kentucky

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010)

Basalt Creek Transportation Refinement Plan Recommendations

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

FY 2006 TRANSPORTATION CAPITAL PROGRAM

Chapter 5 Future Transportation

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

TRASBURG RANSPORTATION

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

2040 Long Range Plan Projects Draft October 2011

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

FUNDING SOURCES CHAPTER 6

Non-Motorized Transportation 7-1

Appendix C. Data on Transportation Improvements

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension

Design Criteria. Design Criteria

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

INDEX. Geometric Design Guide for Canadian Roads INDEX

FDOT Treasure Coast Traffic Report

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Welcome to the Sellwood Bridge Project Open House!

Legislative Update Williamsburg Residency

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

Bluffdale/ UDOT South High-T Intersection Project Type Operations

2012 PRIORITY TRANSPORTATION PROJECTS

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

Transportation Corridor Studies: Summary of Recommendations

Multi Modal Transit Access Plan KIPDA ID # 239. Project Type: STUDY

BRIDGE REPLACEMENT AND REHABILITATION PROGRAM

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

Culpeper District. Albemarle County Monthly Report October, 2011

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017

Replace Bridge 51 on Blackiston Mill Dr. over Silver Creek,

Welcome to the Open House

City of Moorhead Committee of the Whole Meeting

Deerfield Township Hamilton Township

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

Gordon Proctor Director Policy on Accommodating Bicycle and Pedestrian Travel on ODOT Owned or Maintained Facilities

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

Request for Authorization to Open Public Comment Period

Funding Sources Appendix I. Appendix I. Funding Sources. Virginia Beach Bikeways and Trails Plan 2011 Page I-1

Phone: Fax: Project Reference No. (to be filled out by MassHighway):

Bicycle and Pedestrian Facilities Toolbox (Excerpt from Figure 3.1)

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents.

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

Project Description Form 6V

CY2017 Summary of STP applications

Living Streets Policy

TRANSPORTATION TRAINING TOPICS. April 6, 2010

Route 29 Solutions Projects

Modal Interrelationships: A bicycle lane is proposed between Harrington Ave and Swanns Station Rd.

Regional Transportation Needs Within Southeastern Wisconsin

MIAMI & ERIE CANAL SHARED USE TRAIL

# Southeastern Wisconsin Regional Freeway System Reconstruction Study and Preliminary Recommended Plan

PREFERRED ALTERNATIVE IMPLEMENTATION PLAN. Prepared for. Ohio Department of Transportation, District South SR 741 Lebanon, Ohio 45036

FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

FDOT Treasure Coast Traffic Impact Report

Proposed White Flint Separated Bike Lane Network September 2015

County of Fairfax, Virginia. Department of Transportation

APPENDIX D COST SUMMARY TABLES

Giles Run Connector Road

R O A D W A Y S. Chapter

When trying to gauge where future roadway extensions and/or lane widening projects will be needed, it is necessary to first anticipate and analyze

Oldham County Major Thoroughfare Plan

CHAPTER 5 TRANSPORTATION GOAL

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street)

MCA Member Meeting: Tysons Update. Fairfax County Department of Transportation November 13, 2017

Lynchburg District Update

PRESS RELEASE San Joaquin Council of Governments

FY 2006 TRANSPORTATION CAPITAL PROGRAM

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Secondary Road Program

NJDOT Complete Streets Checklist

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS

Implementation Plan. 5.1 Improvement Program

5. RUNNINGWAY GUIDELINES

Roadway Design Manual

Transcription:

Appendix A Summary of Progress Made Since 2004 Plan

Appendix A Summary of Progress Made Since 2004 Plan INTRODUCTION This appendix provides a list of transportation related projects that have been completed by OKI since the last plan update in 2004. Some of these projects may have been referenced previously in this plan. It is important to identify these projects to illustrate the variety and number of transportation plans and projects that affect residents, businesses and workers in the region. This list is separated into eight categories by type of project and include Land Use Commission recommendations, transit, bicycle, pedestrian, Transportation Enhancements (TE) funded projects, corridor studies, special studies, county transportation plans, and Transportation Improvement Program (TIP) projects, Land Use Commission In January 2005, the OKI Land Use Commission produced an interim report containing trends and conditions for strategic regional issues, goals, objectives and policies. With that action, the Land Use Commission completed a specific nine task scope of work. In April 2005, the Board of Trustees adopted the groundbreaking Strategic Regional Policy Plan (SRPP) for growth and development. Implementation of the policy plan commenced immediately pursuant to an action plan and timeline. The first implementation action was to establish criteria in the TIP, worth up to five points, for scoring proposed transportation projects on how they furthered a local comprehensive plan, thoroughfare plan, or small area plan. In early 2006, guidance on writing an effective local government comprehensive plan was produced, along with several model ordinances for use by local governments at their discretion. Over time, OKI staff met with a number of local officials to promote better comprehensive plans. OKI entered into three contracts to assist communities in writing their comprehensive plans, all of which are underway. OKI s greenspace program was refocused to help implement the SRPP and the new Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) environmental regulations. OKI staff also started a landmark project to produce a Web site based fiscal impact analysis model for use by local governments across the region. Implementation of the SRPP is being accomplished by OKI and by various jurisdictions and organizations on a voluntary basis. Transit Clermont Transportation Connection (CTC) In 2007, CTC began operating two fixed route services including one from New Richmond to downtown Cincinnati and one from Felicity to Eastgate via Amelia. Also in 2007, CTC created a strategic development plan with goals to improve transportation options to county residents, maximize existing resources through more efficient operations, reduce peak hour demand for roads and highways, and increase transportation options for zero car households and persons with disabilities. Southwest Ohio Regional Transit Authority (SORTA) In 2007, SORTA s Metro buses began using the I-71 left shoulder lane for an express bus route between Kenwood and Kings Island. This new operational improvement helps A-

buses bypass congestion as it occurs on the interstate. The Government Square transit hub in downtown Cincinnati began renovation construction in 2005 and was completed in 2007. Transit Authority of Northern Kentucky (TANK) Beginning in late 2006, TANK added 10 new Bus Rapid Transit style buses to the fleet. These buses offer many comforts usually found in over-the-road buses such as high backed, wide cushioned reclining seats and individual air vents and lamps. In January 2008, TANK placed its first hybrid electric buses into service. The vehicles are powered by a battery-powered electric motor that provides most of the vehicles power at slower speeds. A smaller clean diesel engine takes over only when the bus reaches higher speeds. BICYCLE AND PEDESTRIAN PROJECTS During 2004 to 2005, OKI carried out a pilot bicycle parking program under the Congestion Mitigation and Air Quality CMAQ program placing 35 bike racks and two bike lockers at 15 locations. Bike racks have been installed on all 110 TANK buses. Significant progress on the regional trails since the last plan includes the following; Extension of the Little Miami Scenic Trail south from Milford, through Terrace Park, to the Little Miami Golf Center on Newtown Road. Construction of the Lebanon Connector Trail from downtown Lebanon to the Little Miami Scenic Trail near Kings Mill. A multi-jurisdictional feasibility study for the Miami 2 Miami Connection was managed by OKI and identified specific routes and facilities. Construction and planning for segments of the connection are underway in Butler and Warren counties. A multi-jurisdictional feasibility study was managed for the Williamsburg Batavia Hike/Bike Trail in Clermont County. Funding has also been secured for a portion of the trail. There are active projects in Cincinnati, Anderson Township and New Richmond for the Ohio River Trail connecting Cincinnati to New Richmond along the Ohio River. Plans for Cincinnati s Central Riverfront Park include the trail. A portion of the West Fork Mill Creek Trail was built in Woodlawn and this was subsequently extended north to Glenwood Gardens County Park. Extension of the Great Miami Trail from Montgomery County south through Franklin in Warren County and additional segments built in Middletown and Fairfield in Butler County. Construction of the Dearborn Trail through Greendale, Lawrenceburg and Aurora in Dearborn County. In 2005, OKI updated the bike route guide maps for the four Ohio counties. Seventy-seven issues of the OKI Bicycle E-Info Newsletter were electronically distributed. The distribution list has grown to include nearly 250 individuals. A-2

Over 15,000 copies of Wanna Bike? - a 2004 promotional brochure for bicycling in the region - have been distributed through bike shops, events and requests. The brochure contains information about shared use paths, mountain bike trails and road riding in the region. OKI organized and conducted eight Walkable Communities workshops (April 2004), a Safe Routes to Schools program workshop (2006), a presentation on the Portland, Oregon bicycle program (2007), and annual presentations at the TE workshops. Reimbursement to OKI staff for the use of personal bicycles to conduct OKI business was implemented in the 2005 revision of the OKI Employee Handbook. The rate for bicycle miles is 10 /mile. Definition of priority cycling resources in the region including more detailed inventories of on street facilities and regional trail facilities. As part of the updated 2008 Regional Bicycle Plan, a primary shared road network was developed. OKI participates in annual bike-to-work promotions during National Bike Month programs in May. The OKI Bike Route Guides are used by cyclists to assist in finding commuting routes. Additionally, approximately 180 requests for bicycle information are filled annually. Transportation Enhancements Program Summary The Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA), the Transportation Equity Act for the 21 st Century (TEA-21), and SAFETEA-LU all included a requirement that 10 percent of federal Surface Transportation Program funding be dedicated to a TE program. These types of projects add community or environmental value to planned or completed transportation projects. The three general categories of enhancement projects include bicycle/pedestrian, historic/archaeological and scenic/environmental. Between 2004 and early 2008, an additional nine projects were approved to receive federal funding totaling $4.755 million. Two of these, the Purple People Bridge on the Ohio River in Cincinnati and a streetscape project on Five-Mile Road in Anderson Township, have already been completed. Three more, Williamsburg streetscape, Mount Adams Steps, and Sutton Five Mile Trail, are scheduled for construction in 2008. Two other projects are due to go to construction in 2009. The remaining two TE projects are programmed further in the future. Taken collectively, between the years 2000 and early 2008, 31 separate projects in the four Ohio counties of the OKI region received a total of $13.5 million in OKI allocated federal TE funding. The local sponsors contributed a total of $7 million in matching local funds for a total investment of nearly $20.5 million. As the TE program has grown through the last decade, its popularity has increased substantially and the demand for funding continues to grow. As of early 2008, OKI staff was monitoring and assisting local sponsors on approximately 12 projects which are in the active stage of development. These projects are expected to apply for an estimated $6 million to $8 million in OKI allocated TE funding in the near future, whereas OKI s A-3

annual allocation from ODOT is about $2 million. Beyond these active projects, staff has also coordinated with a similar number of applicants, who are in the earlier stages of project development, and may be applying for funding in future years. A summary of the current status of all OKI funded projects from 2000 through early 2008 is presented in Figure A-1. Fiscal Year (FY) FY01 FY02 Project Lebanon Railroad Reconstruction Building Rehab. - Waynesville s Old Lockup Figure A-1 Transportation Enhancements Project Status (Through March 2008) Federal Share $236,000 $56,708 Local Share Total Status $59,000 $295,000 $87,829 $144,537 FY03 Springdale Streetscaping $294,026 $636,591 $930,617 FY04 Little Miami River Bike/Hike Bridges $745,000 $1,453,836 $2,198,836 Cincinnati Bicycle Grates $266,650 $66,662 $333,312 West Sharon Road Bike Path $103,000 $46,315 $149,315 Murray Road Hike-Bike Trail $339,986 $0 $339,986 Oxford Bikeway & Raised Crosswalks Market Street Hub Improvement SR 129 High Street Bridge Replacement Delhi Springhouse Renovation $39,576 $205,600 $1,200,000 $180,225 $8,604 $48,180 $51,400 $257,000 $1,200,000 $81,460 $261,685 SR 747 $126,788 $31,697 $158,485 L&N (Purple People) Bridge $238,749 $0 $238,749 Fairfield Bike Path $141,600 $123,000 $264,600 FY05 SR 4 Streetscape (Fairfield) $760,000 $190,000 $950,000 SR 73 Streetscape (Springboro) $472,000 $118,000 $590,000 FY06 Lebanon Streetscape $600,000 $150,000 $750,000 Five-Mile Road Shared-Use Trail $480,000 $480,000 $960,000 Oxford Road Bridge $126,000 $31,500 $157,500 Springfield Pike Streetscape - Phase II $661,862 $165,465 $827,327 A-4

Fiscal Year (FY) FY07 FY08 FY09 FY11 FY13 Central Parkway Streetscape $661,050 $165,262 $826,312 Gilbert Avenue Streetscape $674,960 $168,740 $843,700 Muddy Creek Bikeway (Mason) Five Mile Streetscape (Anderson Township) Main Street Streetscape (Williamsburg) Mt. Adams Steps (Cincinnati) Sutton - Five Mile Trail (Anderson Township) Buckwheat Sidewalks (Miami Township) Lebanon Streetscape - Final Phase Asbury Sidewalks (Anderson Township) Muddy Creek Trail - Phase II (Mason) $347,780 $592,000 $704,000 $647,000 $553,000 $217,596 $600,000 $536,000 $86,945 $434,725 $148,000 $740,000 $276,000 $980,000 Construction in 2008 $713,000 $1,360,000 Construction in 2008 $188,300 $741,300 Construction in 2008 $54,000 $271,596 Construction in 2009 $1,100,000 $1,700,000 Construction in 2009 $134,000 $670,000 Construction in 2011 $665,600 $187,500 $853,100 Construction in 2013 2000 to 2008 Totals $13,472,756 $7,003,106 $20,475,862 SOURCE: OKI. Project Federal Share Local Share Total Status Corridor Studies Figure A-2 Corridor, Special and County Transportation Plans and Studies of Completion Dixie Highway Corridor Study June 2005 Southwest Warren County Transportation Study August 2005 The Dixie Fix: Envisioning the Future of Dixie Highway June 2006 Southeastern Indiana Gateway: US 50 Transportation and Land Use Plan September 2006 Uptown Transportation Study January 2007 Western Hamilton County Transportation Study February 2007 I-471 Corridor Concluding in summer 2008 Special Studies Its Architecture And Strategic Plan March 2008 Traffic Analysis For Alexandria Pike August 2004 Countrywide Transportation Plans Boone County Transportation Plan 2005 Dearborn County Transportation Plan June 2004 A-5

TIP Projects OKI solicited applications for Surface Transportation Program (STP) and Congestion Mitigation and Air Quality (CMAQ) applications from Ohio entities in 2004, 2006 and 2008. There was also a special 2007 solicitation for STP projects in Ohio. In 2006, OKI solicited projects from Northern Kentucky for SNK (STP funds allocated to Northern Kentucky). This is the first time that SNK funds had been sub-allocated to OKI. Due to the lower funding levels of STP and CMAQ federal funds available to Dearborn County, OKI has been working with the County Engineer to develop projects using funds specified for Dearborn County. Presently, no projects are being funded with STP or CMAQ funds sub-allocated to OKI for Dearborn County. ODOT has sub-allocated approximately $22 million in federal STP funds and $12 million in CMAQ funds annually to OKI for projects located in the Ohio portion of the region. KYTC sub-allocates approximately $ 3.7 million in federal SNK funds annually to OKI for projects located in the Kentucky portion of the region. In addition, OKI receives approximately $77,000 in federal STP funds and $97,000 in federal CMAQ funds for projects in the Indiana portion of the region. A summary of projects that were either implemented (contract/let) or cancelled since the 2004 plan are presented in Figure A-3. This figure includes all federally funded projects, not just those using OKI sub-allocated federal funds. PID Ohio Figure A-3 Federally Funded Projects Implemented or d Since July 1, 2004 25400 8/19/2004 District 8 District-wide 24588 9/30/2004 District 8 District-wide 25387 12/6/2004 District 8 25388 12/6/2004 District 8 25389 12/6/2004 District 8 District-wide state routes District wide state routes Various state and interstate routes district-wide 25390 12/6/2004 District 8 District-wide 24584 4/14/2005 District 8 District-wide Contract to replace roadside delineators in FY 05 Ground mounted sign replacement contract for FY 04 Apply polyester painted pavement markings in FY 07 Apply polyester painted pavement markings in FY 08 Apply fast dry alkyd paint for auxiliary markings in FY 06 Apply fast dry alkyd paint for auxiliary markings in FY 07 Pavement marking contract for FY 05 Contact Let district district district district A-6

24642 4/28/2005 District 8 District-wide 24989 7/30/2005 District 8 District-wide 76555 7/30/2005 OKI 76558 7/30/2005 OKI 76562 7/30/2005 OKI 24643 9/7/2005 District 8 District-wide 25392 12/31/2005 District 8 District-wide 25381 3/22/2006 District 8 Various state and interstate routes district-wide 78118 7/12/2006 District 8 District-wide 24990 7/30/2006 District 8 District-wide 76556 7/30/2006 OKI 25394 8/23/2006 District 8 District-wide 25385 12/31/2006 District 8 75848 12/31/2006 Study OKI District-wide state routes 25271 1/10/2007 District 8 District-wide 75846 2/28/2007 OKI Bridge deck sealing for FY 05 General project inspection for FY 05 Regional Transportation Planning FY 06 Regional Ozone Program FY 06 Rideshare Program FY 06 Bridge deck sealing for FY 06 Guardrail repair and upgrading contract for FY 06 and FY 07 Apply fast dry water base pavement markings in FY 06 Replacement of prismatic retro reflectors General project inspection for FY 06 Regional Transportation Planning FY 07 Maintenance contract for highway lighting for FY 06 and FY 07 Apply polyester painted pavement markings in FY 06 Comprehensive Transportation Impact Study District-wide microsurfacing on general system. Routes to be selected Western Hamilton County Corridor Study Cancelled A-7

25401 9/26/2007 District 8 District-wide 25393 11/7/2007 District 8 District-wide 25375 2/13/2008 District 8 District-wide Butler 75510 7/15/2004 CR 18 Rural areas 75511 7/15/2004 Various 20651 10/20/2004 SR 748 Various routes in Butler County 1.87 Miles North of SR 126 24536 12/6/2004 SR 4 District-wide 20901 3/3/2005 US 42 22849 3/30/2005 SR 126 77165 4/15/2005 Breiel Blvd. 20330 5/25/2005 SR 73 Intersection of US 42 and Butler/ Warren Roads Indiana State Line to SR 128 Breiel Boulevard from SR 122 to Central Avenue.36 Miles east of SR 503 24535 7/1/2005 District 8 District-wide 17103 7/21/2005 SR 732 2.71 Miles North of SR 129 (Over Little Indian Creek) 24636 7/21/2005 District 8 District-wide 77171 8/4/2005 SR 4 In the vicinity of Mulhauser Road Bridge deck sealing project for FY 08 Guardrail repair and upgrading contract for FY 08 General system crack sealing in FY 08 Guardrail Rebuilding Pavement Markings Bridge Replacement Install replacement prismatic retro reflectors Install left turn lanes and realign intersection Resurfacing Construct three bus shelters, upgrade existing handicap ramps, resurfacing Breiel Boulevard Bridge Replacement Install by contract a maximum of 18 traffic signals-fy 05 and FY 06 Bridge Replacement (92 foot 3 span bridge) Bridge maintenance contract for FY 06 Construct a streetscape along SR 4 in the City of Fairfield district A-8

77833 8/4/2005 Forest Park Preserve 20240 8/24/2005 SR 122 Intersection of New London Road and Timberman Road Preble County Line to 1.47 Miles East of SR 744 20338 10/19/2005 SR 177 At Nichols Road 21754 12/14/2005 SR 732 80445 12/31/2005 Study OKI 18961 1/23/2006 21931 2/1/2006 CR 19 (Cincinnati- Dayton Road) SR 4 Bypass 21934 2/1/2006 SR 4 79034 3/17/2006 CR 18 (Princeton Road) 19348 6/21/2006 US 127 75512 7/18/2006 Butler County 25031 7/26/2006 US 27 1.01 miles north of Oxford south corporation line and 0.97 miles north of SR 73 Curb, gutter and storm sewer from SR 129 to Princeton Road, paved shoulder from Princeton to Millikin Hamilton SCL to NCL Hamilton southeast corporate line to northeast corporate line Intersection of CR 18 (Princeton Road) and TR 131 (Lesourdsville West Chester Road) Hamilton NCL to 0.34 miles north of New Miami NCL Various routes in Butler County Various priority system routes-i-71, I-75, SR 126 and US 27 Repair base and pave existing gravel road to Forest Run Wildlife Preserve Resurfacing, milling, striping and pavement markings Culvert Replacement Replace bridge BUT-732-0843 and replace floor and paint bridge BUT-732-1043 (toll revenue credits) Butler County Intermodal Freight Study Widen existing road from two lanes to three lanes (PIDs18961 and 21063 combined into PID18961) Pavement planing, asphalt resurfacing, replace raised pavement markers, painting & striping Pavement planing, asphalt resurfacing, replace raised pavement markers, painting & striping Install a traffic signal Planing & resurfacing mainline and shoulders Pavement Markings Crack sealing A-9

23980 9/20/2006 SR 73 24597 12/1/2006 SR 73 22850 12/13/2006 24659 12/31/2006 SR 4/SR 4B/SR 63/ SR 747 IR 75/SR 63 25308 12/31/2006 SR 4 75899 1/9/2007 SR 747 24708 2/13/2007 CR 19 (Cincinnati- Dayton Road) 75897 3/1/2007 SR 122 24440 3/7/2007 US 27 Bridge carries SR 73 over Mutton Run from 0.88 to 0.89 miles east of SR 503 From 0.14 miles west to 0.26 miles east of SR 503 Middletown NCL to Montgomery county line; Hamilton NCL to SR 4; 0.49 miles west of Monroe to WCL to Warren Intersection of SR 63 & IR 75 (Environmental cleared under PID 10752) Between Hamilton and Middletown Between Tylersville Road and SR 129 in West Chester and Liberty Townships Hamilton/Butler county line to 1.93 miles south Portions of SR 122 and US 27 in Butler County and SR 732 in Preble County 1.98 miles south of Oxford NWCL to.88 miles south of Oxford NWCL 76207 3/7/2007 SR 63 City of Monroe 25398 8/15/2007 District 8 District-wide Replace concrete slab of bridge 73-1160, SFN:0901172 Reconstruct vertical curves and widen the roadway to meet current design standards Resurfacing Modify intersection and completion of access control on SR 63 in Monroe and two bridge replacements Crack sealing Widen SR 747 from two lanes to four lanes Cincinnati-Dayton Road Safety Upgrade Plane and pave Widen to three lanes; adding center turn lane; curb and gutter; sidewalks; lighting; signal improvement Plan and pave SR 63 Maintenance and preventative maintenance contract for FY 08 Cancelled Butler Portion d A-10

25347 9/26/2007 SR 126 81476 3/5/2008 US 127 Clermont 77219 7/28/2004 SR 28 From 5.11 miles west of SR 748 to 5.04 miles west of SR 748 From 1.48 to 1.38 miles south of county line 1.56 miles east of IR 275 to 1.98 miles west of SR 48 22919 7/30/2004 US 52 Chilo Lock Park 77218 8/11/2004 SR 28 7606 10/6/2004 SR 131 21144 11/24/2004 US 50 1.56 miles east of IR 275 to 1.98 miles west of SR 48 1.63 miles east of Milford corporation line, upgrade signal at Wolfpen-Pleasant Hill Road US 50 to Wolfpen- Pleasant Hill Road 18117 12/2/2004 SR 32 At Herold Road 25379 12/2/2004 SR 133 75307 12/2/2004 SR 125 21794 12/9/2004 SR 131 Bridge No. CLE- 133-1243, SFN: 1303309 (spans Poplar Creek) White Oak Road/ Lewis Road/Bristold Lakes Drive Intersection.38 Miles East of SR 727 Replace deteriorated 102 by 66 slabtop culvert. Minor roadway alignment modifications Rehabilitate bridges BUT-127-1964 and PRE-503-1101 by replacing concrete slab superstructures Demolition of two commercial and one residential structure for utilities relocation for PID 7948 Renovate existing operations building to visitors center Tree removal and utility relocation prior to widening project PID 7948 Two-way left turn lanes Relocate Wolfpen- Pleasant Hill Road to permit installation of left turn lane on US 50 New Interchange Study Replace bridge Intersection Improvement/ Realignment Bridge Repair Study Complete District Applicant A-11

18116 12/31/2004 SR 32 At Bauer Road 18408 1/19/2005 SR 222 22835 2/3/2005 US 50 25523 3/3/2005 IR 275 75121 3/3/2005 US 52 22430 3/17/2005 SR 132 20245 4/28/2005 24617 8/22/2005 SR 743/SR 756 Various Bridges 21771 9/1/2005 SR 32 25018 9/7/2005 SR 132 1.890 Km South of US 50 SR 28 to.26 miles west of SR 131 0.9 miles south of SR 125 to Clermont/Hamilton County line from Clermont /Hamilton County line to 0.16 miles south of 5- Mile Road Bridge carries US 52 over Bear Creek.50 miles south of SR 125 to SR 125 US 52 to SR 756 and SR 232 to SR 743 Bridges are on/over priority system routes in Clermont and Hamilton counties.25 Miles West of SR 133 to Brown County Line From US 50 to SR 131 22848 9/21/2005 SR 133 US 52 to SR 222 22379 10/5/2005 US 52 76159 10/5/2005 SR 32 7948 10/19/2005 SR 28 1.29 Miles East of New Richmond East Corporate Line Eastern termini of the east bound onramp to SR 32 from SR 132 1.56 miles east of IR 275 to 1.98 miles west of SR 48 New Interchange Study Culvert Replacement Resurfacing Add lane to I-275 and rehabilitate existing pavement; plans completed under PID 10914 Replace Bridge No. CLE-52-1934, SFN: 1301950 Widen pavement to two 12-foot lanes with four-foot shoulders Resurfacing Bridge cleaning Resurfacing Plane and pave SR 132 Pavement planning, asphalt resurfacing on SR 133 and SR 125 Three bridge replacement (toll revenue credits) Repair vertical failure of embankment Widen to five lanes Sponsor A-12

22377 11/2/2005 SR 232 0.67 miles west of SR 222 21145 11/16/2005 SR 125 SR 132 to SR 222 10155 12/7/2005 CR 21 17725 3/1/2006 CR 33 (Clough Pike) 25369 5/11/2006 SR 48 75679 7/26/2006 SR 133 14252 11/1/2006 SR 133 21738 11/22/2006 SR 133 24598 1/24/2007 SR 232 24618 3/7/2007 Various Bridges 21796 4/18/2007 SR 28 25253 6/27/2007 Various Branch Hill-Guinea Pike at Wards Corner Road At CR 107 (Shayler Road) From 2.62 miles north of SR 28 to 2.72 miles north of SR 28 From 0.11 miles east of US 50 to 0.58 miles east of SR 32 5.70 to 6.70 miles north of SR 125.10 Miles South of Concord Hennings Mill Road 1.16 Miles South of SR 125 to 0.56 Miles South of SR 125 Bridges are on/over priority system routes in Clermont and Hamilton Counties 0.1 Miles South of Deerfield Road County-wide (Clermont County) Bridge Replacement Widen SR 125: install two-way left turn lanes between SR 132 and SR 222 Intersection Improvement Intersection Improvement Landslide repair project, project identified by Clermont County manager Crack seal a portion of I-275 in Clermont County Relocate curve and correct drainage problems Bridge Rehabilitation Reconstruct horizontal curves and widen roadway to provide two 12-foot lanes (no additional lanes) Bridge Cleaning Minor Rehabilitation of Four Culverts Ground mounted sign replacement for FY 08 Contract let District A-13

79387 9/20/2007 SR 48 75633 10/12/2007 SR 32 75627 11/30/2007 SR 727 75297 3/5/2008 SR 125 Hamilton 75109 7/7/2004 SR 125 Routes in Loveland: Clermont County- SR 48 (LM 6.45 to 6.80), Warren County-SR 48 (LM 0.00 to 0.30) Twin mainline SR 32 bridges over SR 276. Bridge Nos. CLE-32-1314 L/R, SFNs: 1300458/1300466 Bridge No. CLE- 727-0320, SFN: 1304771. Bridge carries SR 727 over Stonelick Creek Res. Spillway At Glen-Este Withamsville Vicinity of Beechmont Mall 21715 10/14/2004 US 52 At Broadway 75122 11/10/2004 SR 561 Over IR 75 24318 11/23/2004 US 22 21801 12/3/2004 IR 74 From 1.09 miles south of Montgomery corporate line to Montgomery northern corporate line Indiana State Line to IR 275 West Interchange 20956 12/14/2004 IR 74 At IR 275 21707 12/14/2004 IR 75 Glendale-Milford road to Kemper Road including bridge work Arlington Heights to north of Kemper Road Urban paving project in the City of Loveland New reinforced concrete decks, structural steel painted, minor bridge work (toll revenue credits) Bridge Rehabilitation Intersection Improvement Construct park-andride lot Bridge Painting (Three) Replace the concrete deck of SR 561 over IR 75 Planing and resurfacing Minor Rehabilitation Interchange study, resurfacing, slide repair, guardrail repair, sign upgrade Resurfacing Cancelled applicant district A-14

24474 12/14/2004 US 50 75262 12/14/2004 Caldwell/ Seymour Trail 24192 12/31/2004 SR 126 75642 12/31/2004 IR 275 77167 12/31/2004 US 22 77797 1/19/2005 Elm Avenue 4983 2/3/2005 US 50 78499 3/17/2005 IR 275/ ARTIMIS Amber Plan 22831 3/31/2005 US 22 City of Cincinnati: from 2.48 miles east of Cincinnati Corporate line to 0.56 miles west of SR 264 Trail connects Seymour Preserve off Estes Avenue to Caldwell Park/ Preserve on North Bend Road From US 22 to the City of Montgomery/Village of Indian Hill Corporate line Bridge No. HAM- 275-3571, SFN: 3116786. Bridge carries 8-Mile Road over IR 275 Along US 22/SR 3 (Montgomery Road) between Courtland Avenue and Smith Road Bridge carries ODNR bike path over Elm Avenue in Terrace Park 1.05 miles east of Indiana State Line to Cleves Corporate Line From the US 127 interchange to the SR 4 interchange 0.59 miles north of US 22 DA to 0.26 miles south of Cincinnati Corporate Line Plane and resurface Construct a multiuse (bike/hike) trail and greenway on new alignment Plane and resurface a portion of SR 126 Replace existing concrete deck, raise bridge for 16.5 clearance over IR 275, paint structural steel Construct a streetscape Repair stone masonary arch bridge HAM-ELMAV- 0000 Upgrading Design and installation of equipment between Hamilton County Emergency Management and ARTIMIS Resurfacing district Cancelled applicant district applicant A-15

22832 3/31/2005 US 127 22385 4/28/2005 IR 275 23265 4/28/2005 US 50 78087 6/13/2005 SR 562 77173 7/1/2005 SR 4 78268 9/1/2005 Lake Isabella 25499 9/21/2005 SR 562 0.64 miles north of IR 75 to 1.03 miles south of Cincinnati Corporate Line IR 74 to 0.06 Miles West of SR 4 Intersection of US 50 and SR 264 From IR 75 to 0.5 miles east of IR 75 SR 4 in the City of Springdale Various locations within Lake Isabella and Miami Whitewater Forest From IR 75 to IR 71 21146 10/5/2005 IR 74 Over IR 74 22836 11/29/2005 US 22 25196 11/29/2005 IR 71 75676 11/29/2005 SR 126 75718 11/29/2005 US 22/US 22D 21791 12/2/2005 US 50 Norwood SCL to Norwood NCL 0.07 miles south of US 50 to the Silverton/Madeira Corporate Line From 0.12 miles west of Reading/ Amberly Corporate Line to US 22 At US 22 and US 22DA over Eggleston Avenue 0.24 Miles South of North Bend NCL Resurfacing Crack Seal Install signal at intersection and construct left turn lane for westbound US 50 Install activated flashing signs to alert motorists to stopped traffic-work included in PID 24533 Construct Phase II of a streetscape along Springfield Pike (SR 4) Rehabilitate and resurface existing park drives and parking areas Rehabilitate SR 562 New Haven Road bridge replacement and expansion Resurfacing Microsurface a portion of IR 71 Crack Seal Install rigid overlays and minor bridge work: Bridge Nos. HAM-22-0091 R and HAM-22-0007L Deck replacement and painting See PID 24533 District District District District A-16

76034 12/2/2005 US 50 76172 12/2/2005 IR 275 19044 1/27/2006 US 50 75123 2/1/2006 IR 71 75882 2/8/2006 US 22 77277 2/8/2006 US 127 21792 3/8/2006 SR 126 22938 3/8/2006 77174 3/8/2006 CR 504 (Five Mile Road) Oxford Road 17228 3/16/2006 SR 126 Fairbanks Avenue to Mt. Echo Road Southbound lanes just north of Kilby Road 0.595 Km E of Mariemont East Corporate Line to 0.29 Km E of Newtown Road Bridge No. HAM- 71-1435, SFN: 3105164; at Cooper Road over IR 71.03 mi. S. of Montgomery Corporate line to 1.41 miles north of IR 275. 0.18 miles south to 2.72 miles north of Hamilton/ Warren line From 0.2 miles south of Kemper Road to 0.2 miles north of Kemper Road 0.28 Miles West of Indian Hill East Corporate Line Along 5-Mile Road from State Road to Clough Road then extending north in 5-Mile Road to Newtown Road Relocate bridge from Oxford Road to a walking trail at the Willey Road Senior Center/ Crosby Township 0.10 Miles West of Loveland-Madeira Road Widening to Standard Width Slide Repairs Safety Upgrade Install rigid concrete overlay on bridge; Work includes raising structure over interstate Phase 4-Phases 1,2 and 4 combined for construction. Widen to five lanes. RWsee PID 75879 Add left turn lanes for northbound and southbound US 127 at Kemper Road Culvert Replacement Construct shareduse trail Relocate and reconstruct a bowstring arch bridge to the Willey Road Senior Center/Crosby Township Civic Culvert Replacement (combined with PID 21792 for construction) A-17

22844 3/22/2006 SR 125 18953 4/5/2006 US 22 24485 5/2/2006 M.L. King (CR612) 24473 5/17/2006 US 42 77076 6/7/2006 SR 128 24691 6/21/2006 US 50 78120 6/21/2006 SR 264 75675 7/27/2006 IR 275 25190 8/9/2006 IR 71 80990 8/9/2006 IR 275 Cincinnati ECL to Clermont County Line Silverton North Corporate Line to Kenwood Road R/R: Woodside Place to Vine Street; I/I: at Vine Street/Jefferson Avenue Various portions of US 42, US 52 and US 127, all in the City of Cincinnati From 0.13 miles south of IR 74/IR 275 to 0.09 miles north of IR 74/IR 275 From 0.46 miles east of SR 264 to 0.02 miles west of IR 71 From Ebenezer Road to Race Road From 0.1 miles east of US 42 to 0.07 miles east of US 22 Various priority system routes IR 71 from IR 275 to SR 48 and IR 275 from US 42 to US 22 Winton Road to 0.11 miles east of US 42 Resurfacing Add Turning Lane and Curbed Median Reconstruction/ Rehabilitation and Intersection Improvement Plane and resurface Construct left turn lane on SB SR 128 for turn to EB IR 74/IR 275 entrance ramp Resurface 6 th Street Expressway and perform minor bridge work Minor pavement repair and pavement inlet repair Crack sealing Crack Seal Overlay of 1.5 for maintenance of traffic prior to phase 1 of PID 22386 Contact Let District A-18

75918 9/28/2006 CR 456 25225 10/6/2006 SR 126 25269 11/1/2006 IR 74 77000 11/3/2006 IR 275/ Mosteller 22386 11/9/2006 IR 275 0.15 miles north of US 42 in Sharonville 0.14 miles west of Galbraith Road to 0.12 miles west of the Reading/ Amberly Village Corporation line Dry Fork Road to Harrison Road (omitting the overlap with IR 275) IR 275 at Mosteller Road 0.06 miles west of SR 4 to 0.11 miles east of US 42 22380 12/30/2006 US 22 At US 22 DA 25065 12/31/2006 US 22 25346 12/31/2006 IR 71 From 0.30 miles north of IR 275 to 1.41 miles north of IR 275 (Cornell to Kemper) Hamilton County from Silverton/Madeira Corporation Line to 0.26 miles south of Blue Ash/ Montgomery Corp. Two-part study for rail grade separation, includes right-of-way and construction. Right-of-way and construction eliminated. Concrete pavement restoration Plane and resurface Westbound and eastbound IR 275 off ramps widen and reconstructed. Includes rightof-way and PE. Construction in PID 22386. Rehabilitation and widening. Project includes 28 structures. Bridge Paining (Eight) Phase I (PE and right-of-way only). Widen to five lanes. Combined with PID 75882 for construction Crack seal a portion of I-71 Study completed Cancelled Cancelled A-19

75879 12/31/2006 US 22 80066 1/18/2007 IR 75 25297 1/24/2007 US 50 76378 1/24/2007 US 27 77615 1/24/2007 IR 275 75507 1/31/2007 SR 4 78010 3/29/2007 78015 3/29/2007 Gilbert Avenue Central Parkway 77547 4/4/2007 US 42 24533 4/18/2007 IR 75 From.18 miles south to 2.72 miles north of Hamilton/ Warren County Line Fields Ertel to Foster Viaduct From 300 north of Galbraith Road on IR 75 southbound exit ramp to Galbraith Road Cincinnati Corporate line to Village of Mariemont From 0.06 miles south of Banning Road to 0.08 miles north of Banning Road Between IR 71 and Loveland-Madeira Road City of Springdale- Glensprings Drive to northern corporate line Gilbert Avenue between Eden Park Drive and East McMillan Street Central Parkway between Broadway and 12 th Street At Carthage/ Norwood Lateral Entrance On IR 75 from IR 74 to Sharon Road and On SR 562 from IR 75 to IR 71 Phase 2 (PE and right-of-way only) Widen to five lane. See PID 75882 for construction Remove slip ramp right turn on Galbraith, construct standard right turn lane Plane and pave Construct right turn lane and center median Construct noise barriers at various locations, both north and south sides Urban paving Streetscape Project Streetscape Project Intersection Realignment Overhead Sign Replacements A-20

24503 5/1/2007 US 127 On US 127 at Two Intersections: Windermere Way and Belmont Avenue 75771 5/2/2007 US 22 Various Routes 75876 5/16/2007 SR 264 Various Routes 78082 5/23/2007 IR 74 75503 6/1/2007 SR 126 24537 7/18/2007 Various 77100 7/18/2007 SR 32 80797 7/18/2007 77706 8/1/2007 CR 504 (Five Mile Road) Vine Street Pedestrian Bridge 77152 8/8/2007 IR 471 From Harrison/ Rybolt Interchange to the Spring Grove Interchange City of Indian Hill western corporate line to eastern corporate line County-wide (Hamilton County) Improvements are on Church Street, Main Street, and Round Bottom Road Along Five Mile Road between SR 125 (Beechmont Avenue) and State Route in Anderson Township Bridge over Vine Street from Erkenbrecher to the Zoo s parking lot Mt. Adams wall along IR 471 Minor widening, construct new curb and sidewalks, resurface pavement, construct left turn lanes Urban paving in Cincinnati including US 22, US 42 and US 52 Urban paving in Cincinnati including SR 264, US 22, US 27 and US 27 DA Install ramp meters for eastbound entrance ramps Urban paving Ground mounted sign replacements in FY 2008 Traffic signal interconnection system total of six signals through the Village of Newtown Streetscape Project Construct new pedestrian bridge Minor rehabilitation and repair to the Mt. Adams Slope Stability System A-21

82159 8/15/2007 IR 75 21798 11/16/2007 US 27 80757 1/8/2008 Mt. Adams Steps 75648 1/9/2008 SR 126 77599 1/9/2008 US 42 79399 1/10/2008 US 22 11895 1/25/2008 US 50 (Columbia Parkway) 75626 2/29/2008 SR 128 76376 3/5/2008 SR 264 77745 3/5/2008 US 127 From the Western Hills Viaduct to IR 275 1.16 Miles south of SR 126 Between the Mt. Adams neighborhood and the Cincinnati riverfront Bridge No. HAM- 126-2943, SFN: 3105342. Bridge carries SR 126 over a tributary of Little Miami River 2.06 miles south of IR 275 to Hamilton/ Butler line and on US 42 south from US 42 to US 42 From east of Elwynne to eastern corporate line (deleted and combined with PID 81662) Kemper Lane to Delta Avenue From 2 miles south to 1.98 miles north of IR 74. Bridge spans a tributary of the Great Miami River From 0.05 miles west of Race Road to 0.05 miles south of Race Road From south corporate line to north corporate line Various signing, striping, vegetation removal, skid surface treatments, etc. to improve safety Bridge Overlay (Three) Construct a sidewalk and steps to re-establish the connection between Mt. Adams and the riverfront Bridge Replacement Urban paving project Urban paving project in the City of Silverton (TIP Amendment 1-10- 08) Acquire limited access right-ofway and safety improvements Replacement of Bridge No. HAM- 128-0296, SFN: 3104265. Project deleted and added to PID 75890. Intersection improvement add right turn lane on Race Road, eliminate three curb islands Urban paving project in North College Hill Project d Project d A-22

Warren 21803 11/12/2004 SR 132/SR 730 22351 11/12/2004 SR 48 11932 12/9/2004 SR 123 19725 12/9/2004 SR 741 22328 12/31/2004 SR 73 77900 3/2/2005 SR 73 22427 3/17/2005 SR 741 77226 6/3/2005 SR 73 On SR 132 and SR 730 in Warren and Clinton counties At Lower Springboro Road 0.19 Miles West of US 42 Mason NCL to Springboro SCL SR 73, SR 741 and various city streets From 2.16 miles west to 2.24 miles west of US 42 1.25 miles to 1.65 miles north of SR 63 Along SR 73 between Clearcreek-Franklin Road and SR 741 20679 6/16/2005 IR 75 At Union Road 19941 7/1/2005 SR 63 77181 7/1/2005 22394 8/9/2005 Lebanon Streetscape Great Miami Bikeway 19677 8/22/2005 SR 122 22373 11/2/2005 SR 73 Monroe ECL to Lebanon WCL Along Broadway (SR 48) and Mulberry Streets in Lebanon Baxter Street to Montgomery County Line 3.45 miles east of Butler County line to SR 48 From 0.87 miles west of SR 741 to 0.85 miles west of SR 741; from 0.22 miles west of SR 741 to 0.20 miles west of SR 741 Rehabilitate two structures Intersection Improvement Culvert Replacement Resurfacing Construct Bike Path City not pursuing (12/10/02) Replace culvert no. WAR-73-16.47 Reconstruct Curve Construct a streetscape Bridge Deck Replacement Planing and resurfacing existing pavement Construct a streetscape in the City of Lebanon Construct bikeway along Great Miami River Resurfacing Overlay and rehabilitate two bridges in Springboro Applicant A-23

79715 2/9/2006 IR 75/SR 63 24319 3/8/2006 SR 741 78813 4/5/2006 Mathers Mill 24405 5/16/2006 IR 71 22677 5/17/2006 SR 48 22834 5/25/2006 SR 741 22840 6/2/2006 SR 123 78694 8/17/2006 Various 77743 9/21/2006 SR 122 75504 9/26/2006 SR 48 76038 12/31/2006 IR 75 On SR 63 from 0.15 miles west of IR 75 to 0.16 miles east of IR 75; on IR 75 at SR 63 From the southern Springboro corporate line to SR 73 Ohio Department of Natural Resources park entrance road 1.45 miles north of SR 123 At Bunnell Hill Road/Pekin Road 1.01 miles north of IR 71 to Mason NCL Franklin north corporate line to the Warren/ Montgomery County line Various routes in Warren County From the Butler/ Warren County Line to Commerce Drive Various routes in the City of Lebanon including SR 48, SR 63, SR 123 and US 42 IR 75/State Route 122 Interchange Replace SR 63 bridge over IR 75 for proposed single point interchange. Accelerated from PID 24659 Replace SR 63 bridge over IR 75 for proposed single point interchange. Accelerated from PID 24659 Culvert construction/repair Waste water treatment plant replacement Relocate Bunnell Hill Road to eliminate five leg intersection, straighten curve on SR 48 at Pekin Road Resurfacing Paving and asphalt resurfacing on SR 123 Correct unsafe roadway conditions by adding and replacing guardrail Urban paving project in the City of Middletown Urban paving project in the City of Lebanon Study the existing interchange for geometric and capacity improvements District Contract let A-24

NP 12/31/2006 SR 123 22027 2/1/2007 SR 63 11258 2/28/2007 SR 132 76375 3/16/2007 US 42 77614 6/1/2007 US 42 25371 8/15/2007 SR 28 78084 10/12/2007 IR 71 24602 12/12/2007 SR 28 Kentucky 400.01 7/30/2005 401.01 7/30/2005 400.02 7/30/2006 From SR 63 north to SR 123 0.12 to 0.84 miles east of Butler county Line 1.36 miles south of Clinton County Line From 0.12 miles south of SR 73 to 0.12 miles north of SR 73 From 1.15 miles west of SR 741 to Mason east corporate line Clermont/Warren County line to Warren/Clinton County Line IR 71 ramps, Western Row Road and Kings Island Drive 0.22 miles south of SR 123 to 0.06 miles south of SR 123 Boone, Campbell and Kenton Boone, Campbell and Kenton Boone, Campbell and Kenton Two-lane roadway Installing raised median, turn lanes and realignment of intersections for access management Bridge Replacement SFN: 8305048 over a branch of Todd Fork Offset and lengthen left turn lanes on US 42 at SR 73 Urban paving project Plane and pave Intersection improvement Replacement of the railroad bridge and box culvert on existing alignment Northern Kentucky Rideshare Program FY 06 OKI Regional Transportation Planning FY 06 (See Ohio Line Items) Northern Kentucky Rideshare Program FY 07 Contact Let A-25

401.02 7/30/2006 Boone 1058.0 12/31/2004 KY 842 316.01 6/17/2005 6-225.0 7/1/2006 KY 1017 (Turfway Road) New Connector 6-4 10/12/2006 KY 237 6-5.00 10/12/2006 KY 237 6-10.00 11/17/2006 IR 71 6-219.0 12/21/2006 Airport Boone, Campbell and Kenton Over Utterback Creek US 25 to KY 717 (Thoroughbred Avenue) Between Walton and Nicholson At the intersection of US 42 in Florence At the intersection with Rogers Lane in Burlington Weigh Facility along IR 71 Cincinnati/ Northern Kentucky International Airport 6-219.0 12/31/2006 IdleAire Near Richwood 6-8000 3/31/2007 IR 275 6-207.0 4/20/2007 KY 338 TE 15 5/1/2007 Walton Gaines TE 21 5/1/2007 KY 18 At KY 212 including connections to KY 20 Intersection with IR 75 Walton Gaines Tavern History Center Along KY 18 and extending east to Tanners Lane OKI Regional Transportation planning FY 07 (See Ohio Line Items) Replace bridge and approaches Widen to five lanes Scoping study for new roadway Construct a southbound left turn lane on KY 237 (toll credits) Construct a left turn lane on northbound 237 at Roger Lane (toll credits) Add Restroom Construct infrastructure for biodiesel fuel and one-year buy down (toll credits) Construct an idleaire facility Airport Access Interchange Improvements (toll credits) Construct a right turn lane on KY 338 to southbound IR 75 (toll credits) Restoration of property and minor repairs Construction of sidewalks and pedestrian connection across IR 71/75 District Cancelled Cancelled Cancelled Cancelled See 8000.20 & 8000.21 A-26

6-106.1 5/25/2007 KY 1829 (Industrial Road) 6-2028 5/25/2007 IR 275 6-152.00 9/28/2007 KY 237 6-152.01 9/28/2007 KY 237 6-152.02 9/28/2007 KY 237 Campbell 1055.0 7/12/2004 KY 2925 959.00 12/31/2004 KY 8 5003.0 2/4/2005 KY 8 6-209.0 9/29/2006 KY 8 6-205.0 3/23/2007 From US 42 to US 25 (first phase) From milepost 11.00 to the Ohio River Bridge From IR 275 north three miles toward KY 8 From IR 275 north three miles toward KY 8 From IR 275 north three miles toward KY 8 0.5 miles north of county route 5306 Between mileposts 8.90 and 10.60 Milepost 18 to Milepost 20 At the intersection with Riviera Drive in Bellevue 12/31/2006 Study Campbell County Park Avenue 6-8.00 4/20/2007 IR 471 Kenton 3018.0 12/31/2004 Various On Park Avenue at KY 8 All steel bridges and bearings on IR 471, except the Daniel Carter Beard Bridge City of Covington on Madison Avenue, Pike Street and Seventh Street Widen roadway to five lanes Structural overlay (toll credits) Reconstruct and widen (toll credits) Reconstruct and widen (toll credits) Reconstruct and widen (toll credits) Replace the bridge over Owl Creek Shoulder stabilization on KY 9 Slide Repairs Increase turning radius at intersection for better traffic flow (toll credits) I-471 Corridor Study (toll credits) Construct a left turn lane (toll credits) Powerwash and paint Installation of historic boulevard lighting, planters, sidewalk improvements and urban landscaping Study Initiated A-27

17.90 2/28/2005 IR 75 313.20 6/17/2005 KY 17 71.03 8/26/2005 KY 1303 6-17.01 12/31/2005 IR 75 6-350.0 4/28/2006 KY 1072 (new) 6-220.2 9/29/2006 KY 17 Brent Spence Bridge From Apple Drive to Pelly Drive Autumn Road to Richardson Road Brent Spence Bridge from Kyles Lane in Kentucky to Ezzard Charles Drive in Ohio From KY 17 at Highland Pike directly to Fidelity Investments Roebling Suspension Bridge over the Ohio River 6-11.00 11/17/2006 IR 75 Kenton County Brent Spence Bridge congestion relief project Widen to five lanes Widen to five lanes Replacement of bridge, preliminary engineering, environmental, design, right-ofway, utilities New two-lane connector Structural analysis Add restroom to weight facility (toll credits) Study Complete 6-8307 12/31/2006 KY 1501 Hands Pike Scoping Study 6-995.0 12/31/2006 KY 17 6-999.0 12/31/2006 KY 16 TE 10 12/31/2006 Royal Drive TE 9 12/31/2006 Lyndale Road 6-8201 1/18/2007 KY 8 6-8306 3/31/2007 13 th Street On KY 17 at Independence Station Road On KY 16 at KY 2045 (Cox Road) Royal Drive in Ft. Mitchell Old Edgewood section of the city Along KY 8 in Ludlow Office development in Covington Construct a northbound left turn lane on KY 17 Construction of left turn lanes Construct a sidewalk Construct a sidewalk on Lyndale Road Streetscape revitalization and beautification project Construct ingress/ egress roadways via 13 th Street to office development d d d A-28

6-996.0 6/22/2007 KY 17 Indiana Dearborn 020117 6/30/2006 SR 1 040008 12/31/2006 US 50 Various 040097 12/31/2006 IR 74 050098 12/31/2006 US 50 940584 12/31/2006 SR 1 940805 12/31/2006 Bike/Ped On KY 17 at the intersection of KY 14 Bridge over Central Railroad Company of Indiana, 0.35 miles north of US 50 Along IR 465 and IR 74 from Marion County to Dearborn county On US 50 from SR 56/SR 350 to SR 1 At Georgetown Road Surrounding Greendale 060003 2/28/2007 SR 46 From SR 1 to US 52 Reconstruct the intersection and improve site distance through horizontal realignment Bridge rehabilitation Pump Station replacements Riprap repair District pavement project Intersection Improvement Bike/pedestrian trail roadway HMA overlay, preventive maintenance Eliminated 071006 2/28/2007 SR 62 At RP 224.5 Slide Correction Suspended SOURCE: OKI. A-29