VENTNOR MARGATE BICYCLE & PEDESTRIAN PLAN

Similar documents
Margate City School District School Travel Plan

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY

» Draft Recommendations» Discussion» Next Steps. Plan for Walking and Biking

If a person walks within this focus area, these are examples of the places he or she could walk to or from:

The DC Pedestrian Master Plan

Transportation Planning Division

Designing for Pedestrian Safety in Washington, DC

NJDOT Complete Streets Checklist

Arlington Public Schools New Elementary School at Thomas Jefferson Site Off-Site Transportation. Thomas Jefferson BLPC / PFRC Meeting July 27, 2016

Broad Street Bicycle Boulevard Design Guidelines

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

MONTCLAIR SAFE COMPLETE STREETS IMPLEMENTATION PLAN. Monday November 13, 2017 Michael Dannemiller, Principal Engineer NV5, Inc.

US 278 Corridor Concept Presentation. Avondale Estates Intersection Improvement/Roundabout and Road Diet Feasibility Study March 19, 2015

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Road Diets FDOT Process

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Washington County SW Beaverton-Hillsdale Hwy. & SW Scholls Ferry Rd.

Welcome and Introductions Overview of the Study to Date Community Involvement Intersection Improvement Concepts Bike-Ped Recommendations ITS

COMMUNITY MEETING AGENDA

Draft North Industrial Area-Wide Traffic Plan

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

Omaha s Complete Streets Policy

City of Davis East Covell Corridor Plan

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

SAFE ROUTES TO SCHOOL

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

EXECUTIVE SUMMARY. Vision

Water Street Promenade Engineering and Design Services

TRAFFIC ACTION PLAN. North Central Neighborhood CITY OF SAN MATEO

NEWMARKET UPHAM S CORNER

C/CAG. Sunnybrae Elementary School Walking and Bicycling Audit. San Mateo-Foster City School District JUNE 2013

STATUS OF 2009 PEDESTRIAN MASTER PLAN (AS OF DECEMBER 2013)

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

Pedestrian & Bicycle Safety Innovations & Applications

PEDESTRIAN SAFETY ASSESSMENT SR 934/NORMANDY DRIVE AND 71 Street

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Bridgewater Complete Streets Prioritization Plan and Pedestrian Safety Assessment

12/4/2016 VIA . RE: Grocery Outlet Del Paso (DR16-328)

Oakland Pedestrian Master Plan Oakland Pedestrian Plan Draft Recommendations Chapter Outline

City of Birmingham Draft Multi-modal Transportation Plan

Memo. Introduction. Memphis STP Pedestrian Sidewalk Project

City of Vallejo Traffic Calming Toolbox

Lynchburg District Update

Tonight is for you. Learn everything you can. Share all your ideas.

F L E T C H E R A V E N U E

Traffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014

KEARNY MESA COMMUNITY PLAN UPDATE

PRESS RELEASE San Joaquin Council of Governments

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017

Fulton Market Streetscape

9/21/2016 VIA . RE: The Knot (DR16-270)

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

7/23/2017 VIA . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811

Doing it Right: Leveraging Data and Evaluation to Develop Pedestrian Safety Projects

Safe Routes to School: Munroe Elementary Walk Audit Report. Image: Drexel, Barrell & Co.

About the study. North Milwaukee Ave. Key goals of this study are to: Achieve Vision Zero* by. Harmonize the space and improve walkability

Toward Zero Deaths. Regional SHSP Road Show Meeting. Virginia Strategic Highway Safety Plan. presented by

Community Transportation Plan

North Avenue Corridor Study

Freeway ramp intersection study

Arlington Public Schools Thomas Jefferson Site Evaluation Transportation Networks. Thomas Jefferson Working Group Meeting #6 November 10, 2014

Ottawa Beach Road Study

Station 1: Street & Sidewalk Upgrades

Major Bike Routes 102 Avenue Workshop April 21, 2015

SAFE ROUTES TO SCHOOL

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

6/14/2013 VIA . Evan Compton, Associate Planner Community Development Department City of Sacramento 300 Richards Blvd Sacramento, CA 95814

Dra Design and Land Use Op ons Booklet

Complete Streets Funding Program Project Prioritization Plan

Off-road Trails. Guidance

Active Transportation Facility Glossary

Pedestrian Project List and Prioritization

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

Bicycle and Pedestrian Advisory Council May 15, 2015

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs

Outreach Approach RENEW SF served as the primary liaison with the North Beach community; the Chinatown. Executive Summary

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

North Avenue Corridor Study

Board-Approved Funding Awards for Cycle 4 Active Transportation Grant Program Projects (in Order of Project Rankings) Approved on

Southview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm

Closing Plenary Session

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX

HYATTSVILLE TRANSPORTATION PLAN. City Council Update March 19, 2018

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

2018 Pedestrian and Bicycle and Safe Routes to School Application for Funding Page 1 of 31

5. RUNNINGWAY GUIDELINES

MARKET/JFK VISION ZERO PILOT PROJECT FEBRUARY 2019 EVALUATION REPORT

6.4 RECOMMENDED IMPROVEMENTS

San Jose Transportation Policy

PEDESTRIAN CROSSING TREATMENTS

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

The Leadville Bikeway Design Recommendations DRAFT January 2018

Pedestrian Road Safety Audit

Transcription:

VENTNOR MARGATE BICYCLE & PEDESTRIAN PLAN Steering Committee Meeting #3 Wednesday, June 22, 2016

PROJECT BACKGROUND Study Purpose: Develop a city-wide bicycle and pedestrian circulation plan to improve safety, mobility, and access for walking and biking trips Deliverables: Planning document with recommendations for future projects or programs Outcomes: Projects & programs that improve walking/ biking can provide multiple benefits: Access / Mobility Roadway Safety + Public Health Local Economy / Tourism Livability / Quality of Life Equity & Environment

PROGRESS TO DATE Steering Committee Meeting #1 (9/21/15) Project Website Project Info at Fall Events Steering Committee Meeting #2 (2/19/16) Margate Public Meeting (3/29/16) Ventnor Public Meeting (3/30/16) Steering Committee Meeting #3 (6/22/16)

1,285 (2010) 107 (2010) 5,964 (2014) 3,759 (2013) 550 (2012) 4,129 (2013) 7,407 (2011) 8,596 (2013) 11,932 (2011) MON 29 LVD 563 VENTNOR EGG HARBOR JEROME AVE 563 ESSEX AVE MARGATE LAFAYETE AVE FREDRICKSBURG AVE AMHERST AMHERST AVE AVE MONMOUTH MONMOUTH AVE AVE MONMOUTH MONMOUTH AVE AVE QUINCY AVE WINCHESTER AVE AVE WINCHESTER AVE WASHINGTON AVE 36TH AVE LONGPORT VENTNOR AVE 2,264 (2011) ATLANTIC AVE 629 ATLANTIC AVE SPEED LIMIT 25 36 30 30 30 30 54 SPEED 35 38 SPEED LIMIT 25 60 30 30 SPEED LIMIT 25 76 54 ATLANTIC AVE 71 71 35 LIMIT 30 SPEED LIMIT 25 54 SPEED LIMIT MON 29 MARGATE BLVD 563 VENTNOR EGG HARBOR JEROME AVE 563 ESSEX AVE MARGATE LAFAYETE AVE FREDRICKSBURG AVE MONMOUTH MONMOUTH AVE AVE AMHERST AMHERST AVE AVE MONMOUTH MONMOUTH AVE AVE QUINCY AVE WINCHESTER AVE AVE WINCHESTER AVE WASHINGTON AVE 36TH AVE LONGPORT VENTNOR AVE 629 ATLANTIC AVE EXISTING CONDITIONS DATA SOURCES: Ventnor Avenue Signal Project (July 2015) Margate/Ventnor Police Departments NJDOT, NJ Transit, other public sources Site investigations INVENTORY: Street Widths Posted Speed Limits Traffic Signals One-way Streets Transit Service / Bus Stops Traffic & Pedestrian Volumes

BICYCLE & PEDESTRIAN CRASH ANALYSIS Crash Summary (2005-2015) Pedestrian Bicycle Total Ventnor 68 89 157 Margate 44 57 101 Total 112 146 258 Crashes are concentrated along major routes:» Ventnor Ave: 85 crashes (33%)» Atlantic Ave: 57 crashes (22%)» Dorset Ave: 21 crashes (8%)

DOR DOR LONGPORT CRASH CLUSTERS IN VENTNOR DORSET A Legend Bicycle (#) BALFOUR AVE 629 2 21 CRASHES (8%) SURREY AVE AVE Pedestrian (#) Boardwalk (#) Incapacitated Fatal Crash Intersection Crash Corridor MONMOUTH AVE 14 CRASHES (5%) 3 4 Sources: Bike/Ped Crashes: Plan 4 Safety (2005-2015) Boardwalk Crashes: Ventnor PD (2010-2015) GG HARBOR Intersections/Corridors: SJTPO (2009-2013) 629 2 2 2 3 2 36 CRASHES (12%) 3 2 5 2 3 4 4 2 4 3 2 12 CRASHES (4%) 2 36TH AVE MONMOUTH AVE WASHINGTON AVE VE AMHERST AVE AT ATLANTIC AVE

MARSHALL AVE VENT BALFOUR AVE ESSEX AVE 3 MONMOUTH AVE AVE WINCHESTER WINCHESTER AVE AVE WELLINGTON AVE MARGATE ATLANTIC AVE OUTH OUTH AVE AVE AMHERST AMHERST AVE AVE QUINCY AVE 2 WASHINGTON AVE 6 2 2 3 4 2 LAFAYETE AVE 2 2 629 CRASH CLUSTERS IN MARGATE WINCHESTER AVE MONMOUTH AVE FREDRICKSBURG AVE VENTNOR AVE ESSEX AVE MARGATE BLVD Legend Bicycle (#) Pedestrian (#) Boardwalk (#) Incapacitated Fatal GG HARBOR Crash Intersection Crash Corridor Sources: Bike/Ped Crashes: Plan 4 Safety (2005-2015) Boardwalk Crashes: Ventnor PD (2010-2015) Intersections/Corridors: SJTPO (2009-2013) JEROME AVE 10 CRASHES (4%) MARGATE AMHERST AVE MONMOUTH AVE MONMOUTH AVE QUINCY AVE WINCHESTER AVE WASHINGTON AVE 36TH AVE ATLANTIC AVE VENTNOR 15 CRASHES (6%) 13 CRASHES (5%) LONGPORT

SUMMARY OF PUBLIC MEETING #1 Margate Public Meeting (3/29)» Approx. 90 attendees» 17 written comments Ventnor Public Meeting (3/30)» Approx. 36 attendees» 6 written comments Common Themes: (36 total comments, 13 from website)» Improve pedestrian conditions/safety on Atlantic Ave (7)» Road diet for Atlantic Ave (4 in favor, 2 against)» Don t remove parking on Atlantic Ave (5)» Lower speed limit on Atlantic Ave (4)» More enforcement for biking, walking, and driving (4)» Traffic signal improvements on Atlantic Ave (3)» Support bike lanes on Monmouth/Winchester (2)» Explore options for a beach path in Margate (2)

PROJECT WEBSITE ventnor-margate.com INPUT TO-DATE: 276 Map Points 119 Written Comments PROBLEM AREA POINTS (115) 60 Atlantic Ave 19 Ventnor Ave 10 Ventnor Ave

PLAN ELEMENTS Pedestrian Network Plan Bicycle Network Plan Major Travel Routes Safe Routes to School Policy & Program Recommendations

BALFOUR BALFOUR AVE AVE SURREY AVE AVE DORSET DORSET AVE AVE EDGEWATER EDGEWATER AVE AVE GRANVILLE LE AVE WASHINGTON WA WA AVE WYOMING W AVE NEW HAVEN EN AVE CORNWALL AVE SUFFOLK AVE VASSAR SQ SQUARE 629 PEDESTRIAN NETWORK PLAN Commercial Nodes Park / Open Space MARGATE BLVD Legend Existing Traffic Signal Corridor-wide Signal Upgrades & Intersection Improvements Wider Beach Access Ramps Location-specific Un-signalized Intersection Improvements (12) New Marked Crosswalk (6) Schools Other Destinations New Traffic Signal or Beacon (2) New Sidewalk MONMOUTH MONMOUTH AVE AVE MONMOUTH AVE PACIFIC PACIFIC AVE AVE AMHERST AMHERST AVE AVE LAGOON LAGOON DR DR WELLINGTON AVE JEROME AVE HUNTINGTON AVE * Implement additional multi-way stop control on Monmouth & Winchester Avenues LAFAYETE AVE CLERMONT AVE DELAVAN AVE FREDRICKSBURG AVE WINCHESTER WINCHESTER AVE AVE WINCHESTER AVE WINCHESTER AVE OSBOURNE AVE WASHINGTON AVE MADISON AVE 36TH AVE VENTNOR AVE VENTNOR AVE ATLANTIC AN TIC CA AVE ATLANTIC AVE I 563 629 629 629 563 629 ATLANTIC AVE AVE VENTNOR & MARGATE BICYCLE & PEDESTRIAN PLAN Steering Committee Meeting #3 --- DRAFT 6.22.16 0 600 3000 6000

CORRIDOR-WIDE INTERSECTION IMPROVEMENTS Strategies to slow traffic, improve visibility, and enhance business environment: Consistent crosswalk striping (high-visibility or textured) Curb extensions at major crossing locations Daylighting of intersections Flexible Bollards (source: www.togethernorthjersey) Textured Crosswalk Curb Extensions with Landscaping (source: www.pedbikeimages.org/db) Flexible Bollards with Bike Parking (source: www.togethernorthjersey)

UN-SIGNALIZED CROSSWALK TREATMENTS Potential Treatments: Pedestrian Warning Signs In-Street Pedestrian Crossing Signs Rectangular Rapid Flashing Beacons (RRFBs) Pedestrian Hybrid Beacons (PHBs) In-Roadway Lighting (IRWL) Pedestrian Hybrid Beacon (source: KXAN, Texas) Pedestrian Warning Signs Rectangular Rapid Flashing Beacon (source: www.pedbikeimages.org/mf) In-Roadway Lighting (IRWL)

BALFOUR BALFOUR AVE AVE SURREY AVE AVE DORSET DORSET AVE AVE EDGEWATER EDGEWATER AVE AVE GRANVILLE GRANVILLE AVE AVE WASHINGTON WASHINGTON AVE AVE WYOMING WYOMING AVE AVE NEW NEW HAVEN HAVEN AVE AVE CORNWALL CORNWALL AVE AVE SUFFOLK SUFFOLK AVE AVE VASSAR VASSAR SQUARE SQUARE 629 BICYCLE NETWORK PLAN Legend Shared Lane Markings Bicycle Lanes Shared Use Path One-way Conversion Commercial Nodes Park / Open Space Wider Beach Access Ramps Schools Other Destinations MARGATE BLVD One-way (existing) Bicycle Lane (existing) 563 MONMOUTH MONMOUTH AVE AVE MONMOUTH AVE PACIFIC PACIFIC AVE AVE AMHERST AMHERST AVE AVE LAGOON LAGOON DR DR WELLINGTON AVE JEROME AVE LAFAYETE AVE CLERMONT AVE DELAVAN AVE HUNTINGTON AVE FREDRICKSBURG AVE WINCHESTER WINCHESTER AVE AVE WINCHESTER AVE WINCHESTER AVE VENTNOR AVE VENTNOR AVE 629 629 563 629 629 OSBOURNE AVE WASHINGTON AVE MADISON AVE 36TH AVE ATLANTIC AVE ATLANTIC AVE ATLANTIC AVE AVE VENTNOR & MARGATE BICYCLE & PEDESTRIAN PLAN Steering Committee Meeting #3 --- DRAFT 6.22.16 0 600 3000 6000

BICYCLE FACILITIES Shared Lane Markings Bicycle Lanes Shared Use Paths

MAJOR TRAVEL ROUTES Boardwalk / Beach Path Atlantic Avenue Ventnor Avenue Jerome Avenue

PERMITTED BIKING HOURS ON BOARDWALK JACKSON ATLANTIC CITY PEAK (5/15 to 10/15) 6 AM to 10 AM OFF-PEAK (10/15 to 5/15) 24 hours/day ATLANTIC CITY PEAK (5/15 to 10/15) 6 AM to 10 AM OFF-PEAK (10/15 to 5/15) 24 hours/day PEAK (6/30 to LD) OFF-PEAK (LD to 6/30) VENTNOR 6 AM to 12 PM (Weekend) Daylight Hours (Weekday) Daylight Hours ALBANY ATLANTIC CITY PEAK 6 AM to 10 AM (5/15 to 10/15) OFF-PEAK Before 12 PM (10/15 to 5/15) After 4 PM CONNECTICUT

VENTNOR BOARDWALK RECOMMENDATIONS Expand hours to include dark periods (coordinate with Atlantic City) VENTNOR VENTNOR PEAK (6/30 to LD) 6 AM to 12 PM (Weekend) Daylight Hours (Weekday) PEAK (6/30 to LD) 6 AM to 12 PM (Weekend) All Hours (Weekday) OFF-PEAK (LD to 6/30) Daylight Hours OFF-PEAK (LD to 6/30) All Hours Advisory signs to reinforce boardwalk as a recreational bike route:» Slow speeds» Passing on left (using audible devices)» Yield to pedestrians

MARGATE BEACH PATH OPTIONS SEA BRIGHT, NJ VENICE BEACH, CA NORTH WILDWOOD, NJ NEW BRUNSWICK, NJ

ATLANTIC AVENUE - EXISTING CONDITIONS KEY ISSUES: Crash history / speeding Conditions at signalized intersections Multi-lane un-signalized crossings Incomplete bicycle network Dooring incidents in Margate bike lanes RECOMMENDED STRATEGIES: Traffic signal synchronization Traffic calming / lowering speed limit Pedestrian improvements Continuous bike lanes

ATLANTIC AVENUE - TRAFFIC SIGNALS Immediate/Low-Cost Strategies: Modify signal timings to provide enough time for pedestrians to cross at 3.5 ft/sec Install GPS-based clocks to coordinate signals and maintain a 25-30 mph traffic flow Ventnor Signals 18 of 43 intersections are signalized Multisonic 820A controllers Likely compatible (Ventnor Ave project) Margate Signals 14 of 42 intersections are signalized PEEK and Econolite Controllers Likely compatible

ATLANTIC AVENUE - CORRIDOR OPTIONS Overall Strategy: Address bicycle & pedestrian needs comprehensively along the Atlantic Avenue corridor and balance with parking, traffic, and other needs 4-Lane Section Buffered Bike Lanes 3-Lane Section Buffered Bike Lanes + Pedestrian Refuge Separated Bikeway + Pedestrian Refuge

4-LANE SECTION W/ BIKE LANES Reduce travel lane widths from 12 to 10 to create space for Buffered Bike Lanes Limited improvements for pedestrians - evaluate additional crossing treatments (RRFBs, PHBs, signals) at major un-signalized crossings To Beach Atlantic Avenue

Atlantic t Avenue 4-Lane w/ Bike Lanes SPEED LIMIT 25 ATLANTIC AVENUE TWO-WAY TWO-WAY

3-LANE SECTION W/ BIKE LANES + PEDESTRIAN REFUGE Buffered Bike Lanes in each direction Center lane can be used as pedestrian refuge at One-Way/Southbound streets Provides speed management/traffic calming benefit May provide opportunity to reduce traffic signals along Atlantic Ave To Beach Atlantic Avenue

Atlantic Avenuee 3-Lane w/ Bike Lanes * Example with traffic signal located at side streets with NB one-way ATLANTIC AVENUE SPEED LIMIT 25 Pedestrian Refuge TWO-WAY TWO-WAY

Atlantic Avenuee 3-Lane w/ Bike Lanes * Example with traffic signal located at side streets with SB one-way SPEED LIMIT 25 ATLANTIC AVENUE TWO-WAY TWO-WAY

3-LANE SECTION W/ SEPARATED BIKEWAY + PEDESTRIAN REFUGE Two-way Separated Bikeway on beach side Center lane can be used as pedestrian refuge at One-Way/Southbound streets Provides speed management/traffic calming benefit May provide opportunity to reduce traffic signals along Atlantic Ave To Beach Atlantic Avenue

Atlantic t Avenue 3-Lane w/ Separated a Bikeway ATLANTIC AVENUE SPEED LIMIT 25 With driveways Without driveways TWO-WAY TWO-WAY

ATLANTIC AVE NEAR LUCY/GREENHOUSE Painted/textured intersection ATLANTIC AVE Head-in Parking Shared/curbless street with distinctive surface LUCY THE ELEPHANT DECATUR AVE Major access ramp to beach

VENTNOR AVENUE - EXISTING CONDITIONS KEY ISSUES: Several crash clusters Long crossing distances (54 ) at uncontrolled crosswalks No provision for bike travel Bike parking is needed in business districts - but little space for it RECOMMENDED STRATEGIES: High-visibility or textured crosswalks Curb extensions in business districts: - Shorten pedestrian crossings - Provide space for bicycle parking Buffered bike lanes

VENTNOR AVENUE (CR 629) Existing Modified Section Buffered Bike Lanes + Curb Extensions

VENTNOR AVENUE NEAR DORSET AVENUE RECOMMENDATIONS: Remove 2nd EB lane Allow parking in EB direction Install marked crosswalks w/ refuge islands DORSET AVE VENTNOR AVE

DORSET AVENUE BRIDGE AREA P P Bicyce lanes with parking-side buffer Major travel corridor for Ventnor schools Curb extensions to improve visibility N. DERBY AVE EDGEWATER AVE Painted/textured intersection to serve as traffic calming feature and gateway Trim bushes and cut guard rail back DORSET AVENUE (CR 629) Apply bikeable surface over open bridge grate

JEROME AVENUE - EXISTING CONDITIONS KEY ISSUES: High-speed, multi-lane roadway section with no bike accommodation Long pedestrian crossings at uncontrolled locations near major activity generators: - Katz JCC / parking lots - Fremont Ave / park entrance RECOMMENDED STRATEGIES: Traffic calming/curb extensions 3-lane cross section w/ buffered bike lanes

JEROME AVENUE (CR 563) Existing 3-Lane Section Buffered Bike Lanes + Pedestrian Refuge

MONMOUTH AVE WINCHESTER AVE 629 WALKING & BIKING ROUTES TO SCHOOLS Ventnor/Margate Safe Routes to School Infrastructure Improvement Plan DRAFT 5.19.16 LEGEND LAFAYETTE AVE WYOMING/VENTNOR GARDENS VENTNOR MARGATE JEROME AVE LAFAYETE AVE HUNTINGTON AVE DOUGLAS AVE 563 FULTON/HUNTING N GTON Ventnor Educational Community Complex FREDRICKSBURG AVE AMHERST/H ERST/HUNTINGTON TINGTON AMHERST/GLADSTONE S MONMOUTH AVE AVE WINCHESTER WINCHESTER AVE AVE Ross ES Tighe MS Major School Travel Corridor Minor School Travel Corridor Pedestrian Intersection Improvements Proposed Bicycle Lanes Proposed Shared Lane Markings VENTNOR AVE 629

BUFFERED BIKE LANES ON MONMOUTH/WINCHESTER AVENUES Existing With Buffered Bike Lanes

FULTON/N. HUNTINGTON CONCEPT PLAN SEASIDE CT N. HUNTINGTON AVE Add median island to shorten crossing and organize/slow traffic Painted/textured intersection to serve as traffic calming feature FULTON AVE Extend curbline to reduce crossing distances Minor travel corridor for Margate schools TO FIELDS COLMAR CIRCLE

AMHERST/GLADSTONE CONCEPT PLAN COLMAR CIRCLE GLADSTONE AVE Add median island to shorten crossing and control/slow traffic Painted/textured intersection to serve as traffic calming feature AMHERST AVE Major travel corridor for Margate schools GLADSTONE AVE

LAFAYETTE AVENUE IMPROVEMENTS Ventnor Educational Community Complex BALFOUR AVE Relocate crosswalk to align with sidewalk and add pedestrian refuge island Modify 60 wide cross-section to include bike lanes and a center turn Add new high-visibility crosswalk with pedestrian refuge island Straighten crosswalk and add pedestrian refuge island BIKE LANE LAFAYETTE AVE CENTER TURN LANE BIKE LANE BALFOUR AVE Add curb extensions to shorten crossing, calm traffic, and improve visibility ESSEX COURT Add curb extensions to shorten crossing, calm traffic, and improve visibility FULTON AVE

Wyoming/Ventnor Gardens Intersection Concept Plan N. ROSBOROUGH AVE Extend curbline to reduce size of intersection while still accommodating all turns Extend curbline to reduce speed of turning vehicles and shorten crossings VENTNOR GARDENS PLAZA Add high-visibility crosswalks on all approaches Add curb extensions to shorten crossing & improve visibility Major travel corridor for Ventnor Schools Shared Lane Markings WYOMING AVE 5/19/16 DRAFT

BALFOUR BALFOUR AVE AVE SURREY AVE AVE DORSET DORSET AVE AVE EDGEWATER EDGEWATER AVE AVE GRANVILLE GRANVILLE AVE AVE WASHINGTON WASHINGTON AVE AVE WYOMING WYOMING AVE AVE NEW NEW HAVEN HAVEN AVE AVE CORNWALL CORNWALL AVE AVE SUFFOLK SUFFOLK AVE AVE VASSAR VASSAR SQUARE SQUARE 629 BICYCLE PARKING PLAN Bike Parking Locations Commercial Nodes Park / Open Space MARGATE BLVD A. Amherst Ave Commercial B. Madison-Decatur Commercial C. Decatur Ave Beach Access D. Osbourne Ave Beach Access E. Jerome Avenue Park F. Lancaster-Jerome Commercial G. Margate Library Beach Access H. Granville-Frontenac Commercial I. Delavan Ave Beach Access J. Fredericksburg-Washington Commercial K. Washington Ave Beach Access L. Wyoming Ave Beach Access M. Ventnor Library Beach Access N. New Haven-Sacramento Commercial O. Cornwall Ave Beach Access P. Suffolk Ave Beach Access Q. Little Rock-Frankfort Commercial R. Dorset Ave Commercial S. Surrey Ave Recreational Area T. Dorset Ave Boat Launch U. Vassar Square Beach Access Wider Beach Access Ramps Schools Other Destinations T 563 MONMOUTH MONMOUTH AVE AVE MONMOUTH AVE PACIFIC PACIFIC AVE AVE AMHERST AMHERST AVE AVE LAGOON LAGOON DR DR WELLINGTON AVE JEROME AVE HUNTINGTON AVE 629 LAFAYETE AVE CLERMONT AVE DELAVAN AVE FREDRICKSBURG AVE WINCHESTER WINCHESTER AVE AVE WINCHESTER AVE WINCHESTER AVE OSBOURNE AVE WASHINGTON AVE MADISON AVE 36TH AVE VENTNOR AVE VENTNOR AVE 629 629 563 A F B H J 629 ATLANTIC AVE ATLANTIC AVE N R Q ATLANTIC AVE AVE C D E G I K L M O P U S VENTNOR & MARGATE BICYCLE & PEDESTRIAN PLAN Steering Committee Meeting #3 --- DRAFT 6.22.16 0 600 3000 6000

BICYCLE PARKING OPTIONS Inverted U-Racks (Individual) Inverted U-Racks (Grouped) Post & Loop Racks Specialty Bike Racks Specialty Bike Corrals INVERTED U One rack element supports two bikes. A One rack element supports two bikes. POST AND LOOP One rack element supports two bikes. COMB One rack element is a vertical segment of the rack. WAVE One rack element is a vertical segment of the rack. (see additional discussion on page 3) TOAST One rack element holds one wheel of a bike. Source: Bicycle Coalition of Greater Philadelphia

POLICY & PROGRAM RECOMMENDATIONS Local Ordinance Review Education Strategies Enforcement Strategies Bike Share for Absecon Island

LOCAL ORDINANCE REVIEW Margate All bicycles owned by Margate residents must be inspected and registered (REMOVE) Ventnor All bicycles owned by Ventnor residents must be inspected and registered (REMOVE) If a bike path is located adjacent to the road, bicycles must use the path and not the road (REMOVE) People riding bikes on roadways must ride in single file (REMOVE) Governors strip (buffer) for street trees shall be minimum 3 wide (INCREASE TO 5 ) Obstructions within public Right-of-Way are regulated and may exclude bike racks (MODIFY) Example: Bicycle parking within the public right-of-way shall be located so as not to block the pedestrian path on a sidewalk or within a site. A minimum of 5 of unobstructed passage is required on public sidewalks. All bike racks shall be located at least 24 inches in all directions from a wall, door, landscaping, or other obstruction that would render use of the racks difficult or impractical.

EDUCATION STRATEGIES STREETSMART Pedestrian Safety Program (NJTPA)

ENFORCEMENT STRATEGIES Pedestrian Safety Enforcement (PSE) Program Sponsored by NJDHTS Training and support for local police officers Driver knowledge of law and yielding behavior

BIKE SHARE SYSTEM FOR ABSECON ISLAND Physical Characteristics:» Service Area» Station Density/Siting Business Model:» Jurisiction Owned/Managed» Non-Profit Business» For Profit Business Other Considerations:» Year-round vs. Seasonal» Program Marketing

NEXT STEPS Public Meeting #2 Develop Draft/Final Report

VENTNOR MARGATE BICYCLE & PEDESTRIAN PLAN