Pensacola Beach. BOARD OF COUNTY COMMISSIONERS Special Meeting

Similar documents
Balancing Operation & Safety for Motorized and Non-Motorized Traffic

CHIEF PEGUIS TRAIL EXTENSION WEST

Feasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road. October 3, 2017

West Village Mobility & Integration

North Shore Transportation Improvement Strategy

Roads and Vehicular Traffic Design Principles. Roads and Vehicular Traffic Recommendations

Purpose + Need. Connect: Thrive: Develop: < Strengthen the spine of our regional transportation system

Brian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project

Pattullo Bridge Replacement Project Community Connections Phase 2 Consultation. Appendix 3: Open House Display Boards

section 4 Existing Conditions, Issues, and Options

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

6TH AVE N/BENCH BLGS Phase II

Today s Agenda. Welcome & Introductions. I-526 Lowcountry Corridor Update. Table Discussions. Next Steps / Conclusion

List of Display Boards

Project Development & Environment (PD&E) Study Public Hearing January 12 th, 2006

Shockoe Bottom Preliminary Traffic and Parking Analysis

McGrath Boulevard Project Development Public Meeting #2 May 28 th, 2015 East Somerville Community School

PREPARED TESTIMONY OF NICK CONNOR. Q. Please state your name, professional position, and business address.

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

Princeton Avenue and Spruce Street Transportation and Site Access Enhancements Project

Dr. Naveed Anwar Executive Director, AIT Consulting Affiliated Faculty, Structural Engineering Director, ACECOMS

MEMORANDUM INTRODUCTION/PURPOSE/OVERALL FINDINGS

Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation

US 278 Corridor Concept Presentation. Avondale Estates Intersection Improvement/Roundabout and Road Diet Feasibility Study March 19, 2015

Rethinking Transportation

Transportation 6. A. Transit Center Circulation and Access. 1. Transit Center Circulation

Grade Separated Intersection

APPENDIX D. May 22, 2002 Open House Summary and Materials

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

Appendix B. Environmental Resource Technical Memorandum. Assessment on Travel Pattern and Access Impacts

The five potential solutions and some of their benefits and costs are listed in the following table: Ferry Patron Bike Parking Alternatives

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES

Frequently Asked Questions (FAQ)

Virginia Street Bus RAPID Transit Extension Project. Environmental Assessment (EA) Presentation Public Hearing June 22, 2017

72 Avenue Four Laning (BNSF Overpass to 120 Street) WELCOME. Public Information Meeting

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

TRANSPORTATION & MOBILITY

MCA Member Meeting: Tysons Update. Fairfax County Department of Transportation November 13, 2017

Harrah s Station Square Casino

APPENDIX I TRANSIT TRAVEL TIME SAVINGS

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

Malabar Road (SR 514) PD&E. Town of Malabar Briefing (July 17, 2017)

RM 620/RM 2222 CONNECTOR (BYPASS) STATUS REPORT RM 620/2222 STATUS

5. RUNNINGWAY GUIDELINES

Meeting Summary Public Information Meeting #1 Warren County Pathway Corridor Project September 27, 2018

to the Public Information Centre for the Downtown Traffic Study

Report Purpose To seek Council s approval of the Wye Road Functional Planning Study (January 2015).

Environmental Assessment Findings & Recommendations. Public Hearing November 13, 2014

Approximately 360 trail users cross during a typical summer weekday and 420 cross during a typical summer

AGENDA ITEM G-2 Public Works

15 April CAMPUS MASTER PLAN UPATE F o c us G r o up M o b ility

Ballston Station Multimodal Study WMATA and Arlington County. Meeting Minutes

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018

Casablanca Boulevard & GO Station Access

ELEMENT 11 TRANSPORTATION ELEMENT

Memorandum. Sunday, July 13, Saturday, July 19, 2014

CONNECTED VEHICLE PILOT DEPLOYMENT PROGRAM

Niantic Center Elementary School

Chapter 33. Grade Separated Intersection Overview Classification of Intersection Grade Separated Intersection

Existing Transportation System

ROADSOADS CONGESTION HAMPTON SYSTEMYSTEM MANAGEMENT. Part II Roadway Congestion Analysis Mitigation Strategies and Evaluation

S T A T I O N A R E A P L A N

DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN

Paoli Road Improvement Feasibility Study

Chapter 5 Future Transportation

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

Norfolk Tide LRT System Weaving Transit in Downtown Norfolk

6.4 RECOMMENDED IMPROVEMENTS

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

PRESENTATION OUTLINE

University Hill Transportation Study Technical Memorandum Alternatives Modeling and Analysis May 2007

See Figure 38, Existing Nonmotorized Connections.

Elmhurst Metra Station. Public Hearing Wednesday - November 30, 2016

Kennedy Plaza and Providence Downtown Transit Connector PUBLIC MEETING. Stakeholder Meeting #1 October 24, 2016

Following are our comments and findings based on the site visit and review of the complete Traffic Impact Study:

8 PROPOSED ROUNDABOUT DUFFERIN STREET AND KING VAUGHAN ROAD INTERSECTION CITY OF VAUGHAN

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

I-90 ALLSTON INTERCHANGE A MULTIMODAL TRANSPORTATION PROJECT MEPA CONSULTATION MEETING NOVEMBER 20, 2014 BRIGHTON HIGH SCHOOL

TRANSPORTATION & MOBILITY VISIONING MEETING. August 23 24, 2017

PROPOSAL: Review of Alaska DOT&PF project 68471, Glacier Highway reconstruction and pedestrian improvements from

Display Boards Including Five Refined Design Concepts

EXECUTIVE SUMMARY. Vision

SR 693 (Pasadena Avenue) Corridor Study from Shore Drive South to 66 th Street

Huntington Station Metro Zone / North Kings Highway Concept Plan

MORRISVILLE TRANSPORTATION PLAN TOWN COUNCIL WORK SESSION AUGUST 8, 2017

Transportation Investment Act Gwinnett County. Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners

INTRODUCTION THOROUGHFARE SYSTEM CLASSIFICATIONS

CTH M Reconstruction

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Project Description Form 8EE

I 10 Phoenix to California Border Multimodal Corridor Profile Study

Roosevelt Estates Neighborhood Improvements

Hennepin/First Transportation Study

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

Chapter 4: Transportation Systems

A Case Study in Innovation 26 Avenue Roundabout

4. Action Plan & Projects

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

Transportation Feasibility Study

Transcription:

Pensacola Beach Congestion Management Plan BOARD OF COUNTY COMMISSIONERS Special Meeting Board Chambers Suite 100 Ernie Lee Magaha Government Building - First Floor 221 Palafox Place http://www.myescambia.com/pensacola-beach/congestion-management-plan May 30 2017 May 30, 2017 5:30 p.m.

Public Involvement Meeting #1 Public Kick-off Meeting @ Pensacola Beach Community April 28, 2016 Attendees: 94 signed-in Witt Written Comments Received: 77 One on One Stakeholder Meetings: 18

Public Involvement Meeting #2 Public Input Meeting @ Pensacola Beach Community October 25, 2016 Attendees: 97 signed-in Written Comments: 40 One on One Stakeholder Meetings: 9

Public Involvement Meeting #3 Public Town Hall Meeting @ Downtown Board Chambers February 23, 2017 Attendees: 49 signed-in Written Comments: 11

Short Term Improvement Projects Aerial View

Short Term Improvement Projects Ingress/Egress to Circle K Parking Area Design Completed: July 2016 CST Completed: February 2017

Short Term Improvement Projects Ingress/Egress to Casino Beach Parking Design Completed: November 2016 CST: March May 2017

Short Term Improvement Projects Pedestrian Crosswalk Upgrades Design Completed: November 2016 CST: March May 2017

Long Term Congestion Alternatives Consultants were tasked with recommending: Long Term Alternatives at Signalized Intersection (New Signalized Configuration, Roundabouts, Flyover / OverPass, etc.) Analyzing the existing transit operations and options for expansion, modifications, and new opportunities for consideration Evaluating the signal timing i at Fort Pickens and Via De Luna Intersection for optimal traffic management (seasonal timing modifications, time of day plans, etc.) Other improvements projects that would relieve vehicular traffic (e.g. Multi-use paths, Park N Rides, etc.)

Long Term Congestion Alternatives Many alternatives considered Public input Operations Safety Roundabouts Consistent Flow Proven Safer Reduces Speeds Fits traffic patterns

The image part with relationship ID rid4 was not found in the file. Flounder s Casino Beach Parking SRIA

The image part with relationship ID rid4 was not found in the file. Alternative B Roundabouts with Elevated Walkways Flounder s SRIA Casino Beach Parking

Alternative B Roundabouts with Elevated Walkways

The image part with relationship ID rid4 was not found in the file. Alternative C Roundabouts with Pedestrian Underpass Flounder s SRIA Casino Beach Parking

Alternative C Roundabouts with Pedestrian Underpass

Alternative C Roundabouts with Pedestrian Underpass Approx. 20-30 wide and 50 long

Parking & Additional Parking Options Currently, 2,323 approximate public spaces; cannot support the traffic demands during peak times. 1. Public property near fire station along Via DeLuna 2. Public property near sheriff s substation at Casino Beach 3. Public property near Old Visitors Center Building 4. Public property where current office is located Option 1 surface parking Option 2 parking garage

Proposed Parking Area Locations

SRIA property near fire station along Via DeLuna Provides 167 parking spaces

Public property near Sheriff s Substation at Casino Beach Provides 135 parking spaces

Old VIC Office Parking Area Provides 16 parking spaces and additional access to existing public parking

SRIA Office Site Surface Parking Provides 108 parking spaces

SRIA Office Site Parking Garage Provides 368 parking spaces

Possible Parking # s Existing Fire Station Casino Beach Old VIC SRIA Site Total 2,323 167 136 16 108* 2,750 2,323 167 136 16 368** 3,010 * Surface Parking * 15.5% ** Parking Garage ** 22.8%

Proposed Transit Improvements Adjust hours of service to better match observed ridership Adjust months of operations to better match peak season Modify schedule and/or alignment to accommodate ferry Split route to improve on-time performance Extend trolley off island

Roundabout Alternative Cost Estimates Alternative A = $4,000,000 At Grade Crosswalks Alternative B = $10,000,000 Elevated Walkway Alternative C = $15,000,000 Pedestrian Underpass

Transit & Parking Area Cost Estimates Transit = $600,000 Fire Station ti Parking Area = $709,750750 Casino Beach Parking Area = $728,000 Old VIC Office Parking Area = $68,000 (does not consider relocation of building) SRIA Office Parking Area (does not consider SRIA Office) Surface Parking = $459,000 Parking Garage = $5,600,000

Pensacola Beach Congestion Management Plan Phasing / Recommendations Phase 1- Ingress/Egress to Circle K / Ingress / Egress to Casino Beach Parking Area / Pedestrian Crosswalk Improvements- Work completed Construction Costs- $554,487.58487 58 Completed 5/21/7

Phase 2- Additional Parking- Casino Beach Parking Area near Sheriff's Substation / Old Visitors Center / Parking Area Near Fire Station 319 Additional Parking Spaces Estimated Costs Construction Costs- $1,505,750.00 Contingencies- $225,862.50 CEI- $138,529.00 Engineering/Design/Permitting-$198,000 Total- $2,068,141.50

Phase 3- Preferred Option- Alternative C- Roundabouts w/ Pedestrian Underpasses Estimated Costs Construction Costs- $11,500,000.00 Contingencies- $1,725,000.00 CEI- $1,058,000.00 Engineering/Design/Permitting-$1,389,000.00 g g g, Total- $15,672,000.00

Past & Future Projects 4-Laning Via DeLuna Pensacola Beach Blvd. 2004 (SRIA) Access Road 2017/18 Multi-Use Path 1980 s (SRIA) Toll Plaza Upgrades Electronic Tolling - 2016 Pensacola Bay Ferry Passenger Service 2018

Board Recommendation That the Board consider the following two Actions: 1) Accept the Pensacola Beach Congestion Management Plan. 2) Provide input and/or direction to Staff on which plan recommendations to pursue possible funding opportunities for future Board consideration.