Pensacola Beach Congestion Management Plan BOARD OF COUNTY COMMISSIONERS Special Meeting Board Chambers Suite 100 Ernie Lee Magaha Government Building - First Floor 221 Palafox Place http://www.myescambia.com/pensacola-beach/congestion-management-plan May 30 2017 May 30, 2017 5:30 p.m.
Public Involvement Meeting #1 Public Kick-off Meeting @ Pensacola Beach Community April 28, 2016 Attendees: 94 signed-in Witt Written Comments Received: 77 One on One Stakeholder Meetings: 18
Public Involvement Meeting #2 Public Input Meeting @ Pensacola Beach Community October 25, 2016 Attendees: 97 signed-in Written Comments: 40 One on One Stakeholder Meetings: 9
Public Involvement Meeting #3 Public Town Hall Meeting @ Downtown Board Chambers February 23, 2017 Attendees: 49 signed-in Written Comments: 11
Short Term Improvement Projects Aerial View
Short Term Improvement Projects Ingress/Egress to Circle K Parking Area Design Completed: July 2016 CST Completed: February 2017
Short Term Improvement Projects Ingress/Egress to Casino Beach Parking Design Completed: November 2016 CST: March May 2017
Short Term Improvement Projects Pedestrian Crosswalk Upgrades Design Completed: November 2016 CST: March May 2017
Long Term Congestion Alternatives Consultants were tasked with recommending: Long Term Alternatives at Signalized Intersection (New Signalized Configuration, Roundabouts, Flyover / OverPass, etc.) Analyzing the existing transit operations and options for expansion, modifications, and new opportunities for consideration Evaluating the signal timing i at Fort Pickens and Via De Luna Intersection for optimal traffic management (seasonal timing modifications, time of day plans, etc.) Other improvements projects that would relieve vehicular traffic (e.g. Multi-use paths, Park N Rides, etc.)
Long Term Congestion Alternatives Many alternatives considered Public input Operations Safety Roundabouts Consistent Flow Proven Safer Reduces Speeds Fits traffic patterns
The image part with relationship ID rid4 was not found in the file. Flounder s Casino Beach Parking SRIA
The image part with relationship ID rid4 was not found in the file. Alternative B Roundabouts with Elevated Walkways Flounder s SRIA Casino Beach Parking
Alternative B Roundabouts with Elevated Walkways
The image part with relationship ID rid4 was not found in the file. Alternative C Roundabouts with Pedestrian Underpass Flounder s SRIA Casino Beach Parking
Alternative C Roundabouts with Pedestrian Underpass
Alternative C Roundabouts with Pedestrian Underpass Approx. 20-30 wide and 50 long
Parking & Additional Parking Options Currently, 2,323 approximate public spaces; cannot support the traffic demands during peak times. 1. Public property near fire station along Via DeLuna 2. Public property near sheriff s substation at Casino Beach 3. Public property near Old Visitors Center Building 4. Public property where current office is located Option 1 surface parking Option 2 parking garage
Proposed Parking Area Locations
SRIA property near fire station along Via DeLuna Provides 167 parking spaces
Public property near Sheriff s Substation at Casino Beach Provides 135 parking spaces
Old VIC Office Parking Area Provides 16 parking spaces and additional access to existing public parking
SRIA Office Site Surface Parking Provides 108 parking spaces
SRIA Office Site Parking Garage Provides 368 parking spaces
Possible Parking # s Existing Fire Station Casino Beach Old VIC SRIA Site Total 2,323 167 136 16 108* 2,750 2,323 167 136 16 368** 3,010 * Surface Parking * 15.5% ** Parking Garage ** 22.8%
Proposed Transit Improvements Adjust hours of service to better match observed ridership Adjust months of operations to better match peak season Modify schedule and/or alignment to accommodate ferry Split route to improve on-time performance Extend trolley off island
Roundabout Alternative Cost Estimates Alternative A = $4,000,000 At Grade Crosswalks Alternative B = $10,000,000 Elevated Walkway Alternative C = $15,000,000 Pedestrian Underpass
Transit & Parking Area Cost Estimates Transit = $600,000 Fire Station ti Parking Area = $709,750750 Casino Beach Parking Area = $728,000 Old VIC Office Parking Area = $68,000 (does not consider relocation of building) SRIA Office Parking Area (does not consider SRIA Office) Surface Parking = $459,000 Parking Garage = $5,600,000
Pensacola Beach Congestion Management Plan Phasing / Recommendations Phase 1- Ingress/Egress to Circle K / Ingress / Egress to Casino Beach Parking Area / Pedestrian Crosswalk Improvements- Work completed Construction Costs- $554,487.58487 58 Completed 5/21/7
Phase 2- Additional Parking- Casino Beach Parking Area near Sheriff's Substation / Old Visitors Center / Parking Area Near Fire Station 319 Additional Parking Spaces Estimated Costs Construction Costs- $1,505,750.00 Contingencies- $225,862.50 CEI- $138,529.00 Engineering/Design/Permitting-$198,000 Total- $2,068,141.50
Phase 3- Preferred Option- Alternative C- Roundabouts w/ Pedestrian Underpasses Estimated Costs Construction Costs- $11,500,000.00 Contingencies- $1,725,000.00 CEI- $1,058,000.00 Engineering/Design/Permitting-$1,389,000.00 g g g, Total- $15,672,000.00
Past & Future Projects 4-Laning Via DeLuna Pensacola Beach Blvd. 2004 (SRIA) Access Road 2017/18 Multi-Use Path 1980 s (SRIA) Toll Plaza Upgrades Electronic Tolling - 2016 Pensacola Bay Ferry Passenger Service 2018
Board Recommendation That the Board consider the following two Actions: 1) Accept the Pensacola Beach Congestion Management Plan. 2) Provide input and/or direction to Staff on which plan recommendations to pursue possible funding opportunities for future Board consideration.