Comments on KXLY DRB Submittal from Southgate Neighborhood Council

Similar documents
Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods

Complete Streets. Designing Streets for Everyone. Sarnia

TRANSPORTATION NEEDS ASSESSMENT

Ann Arbor Downtown Street Plan

5 Circulation & Parking

Arapahoe Square Zoning + Design Standards & Guidelines Task Force Meeting 9 January 27, 2016

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Footpath design. A guide to creating footpaths that are safe, comfortable, and easy to use

5 CIRCULATION AND STREET DESIGN

1.3 Pedestrian Environments

Make Lincoln Highway an economically vibrant corridor that is safe, efficient, and beautiful for local residents and visitors.

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

Lincoln Highway Streetscape Plan Concept Plan

Executive Summary Route 30 Corridor Master Plan

Multimodal Through Corridors and Placemaking Corridors

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

Tonight is for you. Learn everything you can. Share all your ideas.

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

To: Planning Commission Date: September 19, 2012 From: By: Subject:

RZC Appendix 8A Marymoor Subarea Street Requirements

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Illustrated Principles of Good Planning

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

Bridges and Arizona Crossings

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections

Community Meeting February 27, 2007 Dorchester Avenue Transportation & Streetscape Improvements Action Plan February 27, 2007

Incentive Zoning. Zoning Ordinance Advisory Committee June 21, Pam Thompson, Senior Planner, Sustainable Development and Construction

7/23/2017 VIA . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811

Part B Design Guidance / Principles _

WHEREAS delivery trucks also pass through the Narrows, into the northern parking lot, to loading docks in the back of the building.

McLean Main Street Public Forum Follow-up

Guthriesville Village Manual of Written & Graphic Design Guidelines

Complete Streets for Niagara A working method to visualize the creation of a complete street June 20th, 2013

RECOMMENDED MOTION: I MOVE TO PASS SECOND READING AND ADOPT ORDINANCE 556, TO REMOVE NE 173RD STREET FROM THE DESIGNATED PEDESTRIAN-ORIENTED STREETS.

Living Streets Policy

Plainfield Gateway. Plainfield Context

Sidewalk Cafe City of St. Petersburg City Code Chapter 16, Land Development Regulations

Shared Court Housing Concept Summary

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

Comments The Plan for Port Whitby

ARLINGTON COUNTY, VIRGINIA

PUBLIC REALM MASTER PLAN

Chapter 2: Standards for Access, Non-Motorized, and Transit

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

Chapter 3: Multi-Modal Circulation and Streetscapes

summary of issues and opportunities

S T A T I O N A R E A P L A N

Montford Drive Parking & Circulation Study

STEERING COMMITTEE MEETING June 17, Streetscape Overview Burlington Comprehensive Master Plan

Streetscape: Core Shopping District

Table #6 VISION CHARACTERISTICS

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21

MEDIAN DESIGN example median A

STREETSCAPE CONCEPTS

A. Arlington County Master Transportation Plan Pedestrian Element B. Arlington County Horizontal Standards H-3.1 Driveway Entrances

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

Compliance with Section 18-52(4) City of Thornton Development Code

COUNCIL POLICY NAME: COUNCIL REFERENCE: 06/119 06/377 09/1C 10llC 12/1C INDEX REFERENCE: POLICY BACKGROUND

MARTIN LUTHER KING JR. WAY

GLEN EIRA CITY COUNCIL. MURRUMBEENA Transforming our neighbourhood together our concepts based on your ideas

August 3, Bay Trail Connection With The Community

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

5/31/2016 VIA . Arwen Wacht City of Sacramento Community Development Department 300 Richards Blvd., 3 rd Floor Sacramento, CA 95811

Thesis Presentation. Moorhead City Walk: A Master Plan to Reimage Moorhead, Minnesota s Urban Core. Brad Garcia Advisors: Jason Kost & Dominic Fischer

Article 3.0 circulation plan

/ ARLINGTON COUNTY, VIRGINIA

Stakeholder Meeting Handouts. January 2013

NJDOT Complete Streets Checklist

12/4/2016 VIA . RE: Grocery Outlet Del Paso (DR16-328)

THE ALAMEDA CONCEPT DESIGN COMMUNITY MEETING 3. A Plan for The Beautiful Way JANUARY 28, 2010

Minnesota Street Properties Community Workshop Planning for Design 3/17/2016

Roundabouts and Access Management

TENW Transportation Engineering NorthWest

West Seattle Junction CITY COUNCIL PRESENTATION Seattle, Washington. March 8, 2011

Prince George s County plans, policies, and projects

This chapter describes the proposed circulation system and transportation alternatives associated with

CONNECTING PEOPLE TO PLACES

2.0 Existing Conditions

Existing Transportation System

UNIVERSITY AVENUE CORRIDOR REDESIGN. January 8, 2017 PUBLIC OPEN HOUSE

Off-road Trails. Guidance

Public Workshop #2. September 14, 2016

10/8/2014 VIA . RE: CVS Pharmacy (P13-002) Revised August 2014

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

Introduction Parks Open Space Standards Recreation & Open Space Land Use Design Principles

Obey Creek PEDESTRIAN CIRCULATION EAST WEST PARTNERS PEDESTRIAN CIRCULATION CREEK SIDE LANE SLIP STREET SCOTT MURRAY MAIN STREETS EAST/WEST

Flatbush Avenue

City of Wilsonville 5 th Street to Kinsman Road Extension Project

Active Transportation Infrastructure Investment A Business Case

10A. DATE: October 5, Pedestrian and Bicycle Advisory Committee. Kevin Colin, Deputy Planning Manager Curt Bates, City Engineer

Pennsylvania Avenue (CR 484) Design Alternatives Study

Sponsored by Mrs. Gina Gregory and Mr. Reggie Copeland.

Southbend to Prima Vista. October 30, Floresta Corridor Master Plan

Blackfalds Downtown. Architectural Guidelines: Streetscape

FONTAINE AVENUE STUDY Final Report

6.4 RECOMMENDED IMPROVEMENTS

Transcription:

Final revision January 21, 2017 Introduction - Narrative and Summary (Page 3) Paragraph 3 states that Future-phase buildings are not part of this application. We understand that the final submittal clarifies this. Paragraph 4 remove language about market forces dictating development of an urban center. Please indicate in this submittal locations and design of pedestrian scale lighting per the CC design requirements and in accordance to the ISP Implementation Memo. City Parks Board Collaboration (Page 8) KXLY has stated that they will contribute design (apparently including construction drawings) of the trail project across the park property. We understand that the extent of this work is under discussion, but advocate that it includes constructible, bid-able designs and documents. Context (Page 10) The large basically unbroken Target parking lot is very apparent in this image. It is clear that more pedestrian routes thru the lot are needed. SNC suggests that KXLY project parking lots be configured with better pedestrian routes thru large parking lots, and that the lots be modularized and broken up via the internal curbs and sidewalks discussed in the ISP. We acknowledge that the current propose design is an improvement and advocate for even better designs on the final site plan. Preferred Site Plan (Page 16) Overall this is a better attempt at meeting the intent of the CC zoning. There is a good mix of building sizes and the largest building is much smaller than the maximum allowed by the Developer s Agreement. Drive-thrus, where indicated, are tucked behind the buildings and the buildings are built to face the street. Parking ratio is slightly below the CC maximum allowed: 3.98/1000, for the 714 CC-allowed stalls. There is a total of 849 stalls, including 139 stalls for the Soccer Complex/Park. In reality, the amount of parking is above the CC maximum. That said, SNC does acknowledge that the Park/Soccer Complex land use is also entitled to a parking allowance overall SNC would like to see more clarity on this point. The Preferred Site Plan shows good pedestrian connections to the current Soccer Complex site via the trail discussed on Page 5. This is especially true for pedestrians accessing the existing complex and/or the new soccer field from the north. However there needs to be clearer and stronger access to the new soccer field for pedestrians arriving from the south (along South Regal Street).! 1 Page

Regarding access from the south, SNC agrees with the KXLY suggestion to strengthen the attractiveness of the major E-W axis (north of the grocery site) as opposed to pedestrians using the southernmost driveway, which will be used by delivery vehicles. Ideally, there would be a very strong pedestrian promenade from the west along the main auto entrance, with pedestrian enhanced crossings of all parking lanes, extending all the way to the new soccer field as well as north to the Page 5 trail and south to the southern boundary trail suggested here. These suggested improvements make the space between the two western-most KXLY buildings an ideal location for a pedestrian plaza (this is one of several possible sites shown). SNC suggests that the corner curb radii in all other areas of the site be no more than 15-20 feet to facilitate pedestrian movement and calm traffic movements. We realize that the City of Spokane dictated the radii at the 4 Way stop light and ask that the City reduce the current radii on favor of the CC-1 intention of an enhanced pedestrian environment. Please assure that all sidewalk/driveway crossing implement the C&C requirement that the sidewalk be present across the driveway - not sure that is shown on all the crossings. Landscaping Plan (Page 17) The plan indicates that the separation median along Regal Street does have trees planted on it. That s a good thing as it will screen users from the traffic along Regal as well as encourage pedestrians to follow the sidewalk instead of using the median. We support the inclusion of required trees based on the total number of parking stalls that includes the Park stalls. Possibly strengthen the landscaping plan to enforce the pedestrian access across the site to the new soccer field as suggested above. Additional vegetation needed to screen the long south wall of the Anchor Grocery building. This could include a Green Wall on the structure itself. We understand that the site s subsurface conditions limit options to apply LID infiltration techniques. We therefore suggest that the site plant palette be extended to include drought tolerant varieties of vegetation listed in the Kit of Parts, or drought-tolerant species similar in form, habit and character to those in the Kit of Parts.! 2 Page

Irrigation Concept (Page 18) Another aspect of the original DA is designation of this District Center as a Stormwater Pilot Area (See Item #4 in the DA). In part, Item 4 states, Owners shall endeavor to implement Low Impact Development (LID) measures in any development of the property. SNC encourages implementation of site-compatible LID techniques including pervious pavement, Green Roofs, and any other current LID techniques to help meet this DA requirement. Ribbon Park Concept (Page 19) The 3/4 view rendering shows pedestrian-scaled light poles. Will they be continued down the length of the Regal frontage? SNC believes they should to enhance the safety and aesthetic goals of the CC-1 District Center design goals. We support the concept of (Public) Art at the SW corner the Ribbon Park. An opportunity for community wide art competition? The concept rendering shows Park Benches on both sides of the sidewalk. Few people would be comfortable sitting with their back to the traffic on S Regal at that location unless the full suite of Traffic Calming tools indicted in the ISP, the ISP Implementation Memorandum, the SNC Connectivity Plan and CC/City codes are implemented. SNC supports making those benches usable and comfortable. Please study and possibly revise the proposed Ribbon sidewalk design in terms of a safe & consistent pathway for individuals with limited vision. There should be a clear, unobstructed path that is safe and usable for all. SNC has had reports of problem with the pathway along the north side of the Target property from this perspective. This also applies to the Zig-Zag connection between Grocery A and Building G. As noted above, the radii on both corners of the proposed Ribbon Park design are too large, which conflicts with pedestrian movement across the street and driveways, and also supports higher speeds in vehicle turning movements. SNC suggests that the corner curb radii be no more than 15-20 feet. Alternate Zoning Application: On-Street Parking (Page 21) SNC notes that the simulations do not show a Treed Median as described in the ISP Implementation Memo, and the Southgate Neighborhood Connectivity Plan. SNC s settlement with the City of Spokane (the ISP Implementation Memo) includes City commitment to provide this amenity and traffic calming tool. SNC requests that DRB highlight the importance of the City honoring its commitments in support of the pedestrian-enhanced District Center specified in City Code and in the ISP Memo and other documents that the City is party to.! 3 Page

In terms of the Airport Parking concept, SNC supports this alternative implementation of the zoning-code required on-street parking. Alternate Zoning Application: Fencing and Screening (Page 22) SNC supports this design deviation. In fact, SNC suggests eliminating as much fence as possible to allow easy access between the commercial and park space. As suggested previously, clearer, more direct pedestrian access would improve the site plan from the SNC perspective. DA Criterion 5.1: Pedestrian Connections (Page 24) Please consider enhancing the pedestrian connections as described previously, especially the a strong east/west pedestrian axis from Regal to a plaza and then to the new soccer field. In addition, please add the following pedestrian connections: A more direct path from the parking area (J)60 SW to building F in future phases of the development. In addition, several plans show mid-block connectivity between the KXLY property across Regal Street to the Target site. SNC again urges the City of Spokane to honor its commitments in developing this connection The ISP calls for pedestrian crossings connecting the District Center properties and the Comp Plan envisions these zones as being Pedestrian Emphasis, Auto Accommodating. Pedestrian crossings at one or both of the main development entrances on Regal would help increase the pedestrian emphasis of the District Center. DA Criterion 5.3: Design Theme (Page 26) Retail A (Grocery) It is very nice to see the building moved up to engage the street. The large glass entrance at the NE corner looks to be a great focal point and prominent entrance as envisioned in the CC design guidelines. It appears the materials and architectural details carry over from the Target site with flat roofs and outward projecting cornices to meet the massing requirements of the code. North Elevation This side seems to show two sets of entrances, a prominent entrance on the NE corner and a secondary entrance at the SE corner. This is a great feature for pedestrians accessing the building. The added glass around the second entrance breaks up the facade in a good way. The large blank facade areas should have added interest via more plan articulation, vegetation, etc.! 4 Page

any possible also by outdoor display or other activities that grocery stores have along their front entrances in other areas. South Elevation As mentioned, this elevation needs additional interest thru articulation, vegetation etc. East Elevation (Regal Street) How much of the Regal-facing windows are vision glass vs. display glass. The renderings seem to indicate it is mostly vision glass. Per the CC design guidelines, how will this project use pedestrian-oriented signage. The main one shown here is a large format blade sign designed, it appears, for passing cars. The relatively blank southern end of the building needs improvement. West Elevation We also suggest additional articulation and vegetation screening. Could there also be high windows added to take advantage of the light like was done with the Yoke s remodel on North Foothills? Retail B (Vanilla Shells) West Elevation Entrances from this side are evident per standard strip mall designs. Signage location similar to Black project. Is this pedestrian signage as intended in the CC Design Guidelines? SNC encourages implementing unique signage as envisioned in the CC Design Guidelines. North Elevation SNC applauds including lots of glass and what looks like secondary entrances for the business on the end. This could be a good location for outdoor dining or use adjacent to the park. South Elevation This side of the building faces a proposed plaza. It appears that the business could have access to it for outdoor use and programming. There is a great opportunity to turn this plaza area into a landing space for a pedestrian crossing between the Target site across Regal and the new KXLY development. East Elevation (Regal Street)! 5 Page

All proposed shells have street-facing entrances. Please assure that these are utilized as the Prominent Entrances when the Tenant Improvement permits are applied for. Signage is located and scaled for motorized users along Regal. The CC Design Guidelines say signs in CC-1 zones (which includes this development, under the DA) should be highly graphic, convey the product or service graphically, and are strongly encouraged to be projecting from the building to engage pedestrians. Pedestrian-oriented signs are granted a size bonus in CC-1 zones. Retail C Comments from Retail B can be applied here as well regarding signage, designing prominent entrances on the Regal-facing side, and working to ensure the plaza is a vibrant space. Retail D, E, F, and G We are omitting discussion of Retail D, E, F and G until later permitting or additional design review for the next phases of the development. DA Criterion 5.4: Community Plaza Based on SNC previous comments, the potential plaza between Buildings F & G seems key. Since it is more distant from Regal Street it may also be more peaceful than locations closer to Regal. It also aligns with the major East/West axis across the site and can connect to the new soccer field. The submittal identifies many opportunities for community plazas or public spaces. How will this development encourage them to be used by tenants and the neighborhood? The currently designated plaza at the Target site is a sparse and uninviting place rarely used by anyone. How can that be addressed in this development? SNC suggests that the other identified plazas are most suited for use by the individual businesses, for dining and similar opportunities. Possible open-air markets in those along Regal? DA Criterion 5.5: Viewscapes The submittal does a good job of showing potential viewscapes from the proposed plazas and public spaces indicated in previously in the submittal. KXLY deserves credit of the potential viewscape linearly along Regal Street. The placement of their buildings along the street and the Ribbon Park provide an excellent new viewscape north and south along that road. It could be improved by further enhancements along the east side of Regal Street at the Target site and by completing the envisioned street character from the ISP for Regal Street with planted medians and other pedestrian-oriented amenities. One place that they could take better advantage of the viewscape is by better engaging the border between the larger KXLY property and existing park. There is a gap north of Building F! 6 Page

where, if a building was sited correctly, it could have expansive views across the park directly adjacent to the proposed multi-use trail. Criterion 5.6: Long-term Urban Development The response to this requirement hinges on the development of a nascent grid of vehicle/ pedestrian pathways through the development and that is certainly a good start to creating the bones of urban style development in our District Center. What is lacking is how this plan will encourage opportunities for mixed-use development. In addition, as far as SNC is aware, and as with the prior District Center development across the street, this plan is not truly mixed use as it offers no residential or non-retail uses. The current plan does not contribute to or plan for future density because all of the proposed buildings are single-story with no indication that they could be converted to multi-story in the future. Spokane Municipal Code allows, and the Comp Plan encourages, buildings up to 5 stories tall in District Centers. Is there potential for the large open parking areas to be easily converted to more intense uses in the future? Or will there be tenant/corporate developer agreements that forbid this as there are on the Target site? Lastly, this plan is still overall an auto-oriented design. It could best be described as pedestrian accommodating, but certainly not pedestrian emphasized as called for in the Developer Agreements and CC-1 zoning. As suggested above, there needs to be a robust conversation and detailed plan from the City about what they can do to encourage the creation of these conditions since many of the required changes need to happen on a broader systemic level on the South Hill (i.e. traffic management, ROW design, etc.). In addition, SNC suggests even stronger pedestrian internal connections (with landscaping) that will further enhance the pedestrian experience (and somewhat reduce parking which is of course a Low Impact Development concept. Other Concerns Stormwater Management This plan does not indicate where the developer will manage the stormwater generated by creating such large swaths of impervious surfaces. As noted, DA Item #4 designated this Center as a Stormwater Pilot Area. SNC is looking for innovation from KXLY in this respect. Stormwater is an issue of great concern for adjacent residents as they have repeatedly seen flooding in their neighborhoods and homes before this project will remove the infiltration capacity of the site. There is also a design concern here as well, as whatever stormwater! 7 Page

management plan is ultimately approved would change the site plan dramatically if more retention ponds are needed. Pedestrian-scale Lighting in the District Center Pedestrian light poles are continually highlighted by City staff as a key feature in CC-1 designated zones around the City. They are touted as essential pieces to creating the streetscape character of Perry, Garland, Market Street, and 14th and Lincoln. This feature was not carried consistently throughout the Black project (specifically along the Palouse and Regal frontages) and as a result, the street character does not match other CC-1 zones in the City. SNC supports the KXLY- stated intention that such pedestrian light poles will be placed along all pedestrian ways in the KXLY development and along the Regal Street frontage.! 8 Page