How to Optimize the Disposal System With Staggered Analysis Using BLOWDOWN Technology. Jump Start Guide

Similar documents
Ammonia Synthesis with Aspen Plus V8.0

1 PIPESYS Application

Separation of Acetone-Water with Aspen HYSYS V8.0

This portion of the piping tutorial covers control valve sizing, control valves, and the use of nodes.

Steam generator tube rupture analysis using dynamic simulation

DSTWU A Shortcut Distillation Model in Aspen Plus V8.0

Heat of Vaporization with Aspen Plus V8.0

Tutorial. BOSfluids. Relief valve

Quantitative Risk Analysis (QRA)

NORDCALC Introduction... 2 Registration... 2 Flow Calculations tab Torque Calculation & Actuator Mounting Data tab... 21

PIG MOTION AND DYNAMICS IN COMPLEX GAS NETWORKS. Dr Aidan O Donoghue, Pipeline Research Limited, Glasgow

Every things under control High-Integrity Pressure Protection System (HIPPS)

RESIDENTIAL WATER DISTRIBUTION

Dynamic Analysis of a Multi-Stage Compressor Train. Augusto Garcia-Hernandez, Jeffrey A. Bennett, and Dr. Klaus Brun

Gas Gathering System Modeling The Pipeline Pressure Loss Match

RELIEF VALVES IN PARALLEL

Dynamic Simulation for T-9 Storage Tank (Holding Case)

COMPRESSORS WITH SIDE STREAM

POP Safety Valve. POP Safety Valve INTRODUCTION DEFINITIONS

Challenges in Relief Design for Pilot Plants

DIGITAL SOLUTIONS TRAINING CATALOGUE. QRA and CFD simulation. Phast, Safeti and KFX SAFER, SMARTER, GREENER

Becker* Products Below Ground Ball Valve Regulators

CENTER PIVOT EVALUATION AND DESIGN

Transient Analyses In Relief Systems

The Use of a Process Simulator to Model Aeration Control Valve Position and System Pressure

Exercise 2-2. Second-Order Interacting Processes EXERCISE OBJECTIVE DISCUSSION OUTLINE. The actual setup DISCUSSION

Using the CONVAL software for the petrochemical plant control valves checking. Case study

ZIN Technologies PHi Engineering Support. PHi-RPT CFD Analysis of Large Bubble Mixing. June 26, 2006

OIL AND GAS INDUSTRY

Olympus Production Contour Plot

About this document. This document contains screenshots of software available from Cheresources.com. You can find this title in our online store at:

SIDRA INTERSECTION 6.1 UPDATE HISTORY

COMMITTEE DRAFT. API 520 Part I 10 th Edition Ballot Item 2.1. This ballot covers the following item:

Modelling of the Separated Geothermal Water Flow between Te Mihi flash plants

Suppress Your Surges: Surge Suppression Fundamentals. April 13, 2017

Section 5: Pond Outlets

Time-Delay Electropneumatic Applications

Hazard Operability Analysis

P3000 Deadweight Tester Setup, Part 1: Limited Partial Correction Method

Optimizing Compressor Design for Complex Reciprocating Compressor Installations Presented at the 2006 Gas Machinery Conference in Oklahoma City

Diver Training Options

RICK FAUSEL, BUSINESS DEVELOPMENT ENGINEER TURBOMACHINERY CONTROL SYSTEM DESIGN OBJECTIVES

The Race Director. Race Director Go [RACE DIRECTOR GO] This document describes the implementation of Race Director Go with a beginning to end example.

Gas Accumulation Potential & Leak Detection when Converting to Gas

Efficiency Improvement of Rotary Compressor by Improving the Discharge path through Simulation

Safety Engineering - Hazard Identification Techniques - M. Jahoda

DESIGN DATA. Dry 105a. September 5, 2008

ERCBH2S Frequently Asked Questions.

44 (0) E:

UNITY 2 TM. Air Server Series 2 Operators Manual. Version 1.0. February 2008

Pump-Fan-Compressor Sizing

Courses of Instruction: Controlling and Monitoring of Pipelines

Tube rupture in a natural gas heater

Modelling Today for the Future. Advanced Modelling Control Techniques

776 Cryogenic Safety Valve

Impact of imperfect sealing on the flow measurement of natural gas by orifice plates

T e l N o : F a x N o : E m a i l : a i s h c m c - m e. c o m w w w. c m c - m e.

The API states the following about tube rupture for a shell-and-tube heat exchangers:

BROCHURE. Pressure relief A proven approach

Rupture Disc Sizing for Micro Motion Coriolis Sensors

SIZING OF WATER PIPING SYSTEM

THE IMPACT ON ENERGY CONSUMPTION CAUSED BY PRESSURE DROP IN A COMPRESSED AIR SYSTEM

S-CO 2 Brayton Recompression Loop Design and Control

Looking Beyond Relief System Design Standards

SOFTWARE. Sesam user course. 12 May 2016 HydroD Hydrostatics & Stability. Ungraded SAFER, SMARTER, GREENER DNV GL 2016

OPERATING PROCEDURES

Verification and validation of computer codes Exercise

Autodesk Moldflow Communicator Process settings

Expansion Tank Design (Chilled Water)

Pigging as a Flow Assurance Solution Avoiding Slug Catcher Overflow

Evaluating Surge Potential in CSO Tunnels

Relief Systems. 11/6/ Fall

Exercise 4-2. Centrifugal Pumps EXERCISE OBJECTIVE DISCUSSION OUTLINE DISCUSSION. Pumps

6-way characterised control valves DN15 and DN 20

MODULE III - PROCESS DESIGN

The Discussion of this exercise covers the following points:

Salad Tutorial 3 - Acoustically Induced Vibration in Piping

Genie Supreme TM Model 123HP Installation & Operation Instructions

Dieter Krenz, Linde, Germany, Manel Serra, Inprocess, Spain, and. Theron Strange, Simplot Phosphates, USA, discuss dynamic process simulation

LAKOS Waterworks. PWC Series Sand Separators. Installation & Operation Manual LS-829 (10/12)

A REVIEW OF THE 2000 REVISIONS TO ANSI 2530/API MPMS 14.3/AGA REPORT NO. 3 - PART2 Paul J. LaNasa CPL & Associates

The RCM Analyst - Beyond RCM

ScaleChem Basics. Revised 29 May This material may not be printed without the following acknowledgement page.

Journal of Applied Fluid Transients, Vol 1-1, April 2014 (3-1)

Chapter 14 Coal Boiler Flue Gas Scrubber II

GUIDANCE IN-SERVICE INSPECTION PROCEDURES

COMPAFLOW. Compressed Air. Volumetric flow. Gas. Mass flow. Steam. Net volumetric flow. Liquid

ENSURING AN ACCURATE RESULT IN AN ANALYTICAL INSTRUMENTATION SYSTEM PART 1: UNDERSTANDING AND MEASURING TIME DELAY

ANDERSON GREENWOOD. Provides reliable overpressure protection in a cost effective package. Flow Control

Reliability Assessment of the Whistler Propane Vaporizers

Effects of Delayed RCP Trip during SBLOCA in PWR

The Discussion of this exercise covers the following points:

LNG Loading Lines Surge Analysis for ESD System Application

White Paper. Solution For Compressor Anti-Surge Control The Triconex methodology. What s Inside

API th Edition Ballot Item 7.8 Work Item 4 Gas Breakthrough

FLUID POWER FLUID POWER EQUIPMENT TUTORIAL ACCUMULATORS. This work covers part of outcome 2 of the Edexcel standard module:

e d u c a t i o n NXT Solar Station

SFC. SKYLINE FLOW CONTROLS INC. The Leader of Accurate and Reliable Flow Measurement DESCRIPTION & APPLICATIONS: ADVANTAGES:

OPTIMIZATION OF SINGLE STAGE AXIAL FLOW COMPRESSOR FOR DIFFERENT ROTATIONAL SPEED USING CFD

Efficient Pigging of Gathering Lines. Energy Management Workshop for Upstream and Midstream Operations

Transcription:

How to Optimize the Disposal System With Staggered Analysis Using BLOWDOWN Technology Jump Start Guide

Problem Statement In this guide, you will be introduced to the tools in BLOWDOWN that can be used to perform staggered blowdown analysis. You will configure a simple analysis by using the Staggered Analysis tool, as well as a rigorous analysis using the Multi- Vessel Template. The process consists of three blowdown systems and the flare header has a maximum capacity of 3.200E4 m3/h (4.831E6 barrel/day). The aim of this exercise is to determine if the flare capacity will be exceeded by the three blowdown systems all opening at t=0 and, if so, whether staggering the orifice opening times can rectify the problem. A plant may contain multiple blowdown systems and relief devices that tie into a common flare header system. Emergency scenarios and plant upsets can result in several of these devices opening and discharging materials into the flare network. To ensure process safety, it is crucial to ensure that the flare header can handle the flow rates that are encountered in the worst-case scenario. Vessel depressurization is inherently a dynamic process. At the start of depressurization, higher pressures inside the vessel result in a higher driving force and thus higher mass flow though the orifice. As the pressure in the vessel decreases over time, so does mass flow. By staggering, or implementing a time delay between the opening times of multiple orifices, you can reduce the peak mass flow to the flare header and prevent the system from being overloaded. Staggered blowdown analysis is particularly useful for capital expansion and process revamp studies, where new process units may be added and tied into existing flare disposal systems. It can also be useful in front-end engineering and design to reduce the size of the flare header piping and thus save on capital expenditures. This tutorial includes the following tasks: Task 1: Determine Orifice Opening Times to Meet Flare Capacity Task 2: Connect Multiple Blowdown Systems in Parallel 2

Task 1: Determine Orifice Opening Times to Meet Flare Capacity A file (StaggeredBlowdownStarter.hsc) has already been created for you that includes System 1, System 2 and System 3. The objective of this task is to identify an opening sequence for blowdown valves that discharge to a common header, such that the flare capacity is not exceeded. The Staggered Blowdown tool imports the volumetric flow rate vs. time plots of individual BLOWDOWN analyses and superimposes them on a single plot. This is to approximate the total flow to the flare header. This tool is intended for quick, preliminary design calculations. 1. On the Home tab, click on the dropdown next to BLOWDOWN and Depressuring and select Staggered BLOWDOWN (Figure 1). 2. Change the name to Simple Staggered Blowdown. 3. In the Flare Capacity field, input the maximum rated capacity of the flare header: 3.200E4 m3/h (4.831E6 barrel/day). Figure 1: Select Staggered BLOWDOWN in the drop down to use the functionality. First, let s examine whether the flare capacity is exceeded if all systems open at the same time. 4. Ensure that the Rating radial button is selected. 5. Under the BLOWDOWN Analysis column, add the three single-vessel analyses in the following order: System 2, System 1 and System 3. 6. Specify an Orifice Opening Time of 0 seconds for each of the three systems. 3

With all of the blowdown systems opening simultaneously, the flare capacity is exceeded (Figure 2). Figure 2: Easily add blowdown valve analyses. The Staggered Analysis tool provides a Design option, which can help to calculate opening times that will not exceed the flare capacity, while minimizing the flaring time (Figure 3). The order in which the analyses are added is important in Design mode. The tool always assumes that the order of the analyses represents the order in which the systems must depressurize. Determining the order in which the systems should be depressurized is outside of the scope of this tutorial. Determining the order requires engineering judgment and a good understanding of the process. 7. Select the Design radial button. Figure 3: Add the flare capacity to see if it is exceeded with the simple analysis option. 4

The calculation should complete. Assuming that System 2 must be the first system to depressurize, System 1 should open at 29 seconds and System 3 should open after 83 seconds in order to avoid overloading the flare. The tool generates a combined volumetric flow rate vs. time plot (Figure 4): Figure 4: The simple analysis superimposes the individual blowdown valve releases for a conservative result. Bear in mind that results from the Staggered Blowdown tool should be treated as preliminary results to assess the feasibility of using a staggered blowdown for your system. Converting the simple staggered analysis to a rigorous multi-vessel BLOWDOWN analysis is always recommended. 8. Save your case as StaggeredBlowdownSimple.hsc 5

Task 2: Connect Multiple Blowdown Systems in Parallel Continue using the file created in Task 1. Keep in mind that the Multi-Vessel Template can only be used for multiple vessels in parallel. It cannot be used to model blowdown in series (where the discharge of one vessel enters another vessel, etc.). Notice that there are three BLOWDOWN analyses that are present in this simulation (Figure 5). Feel free to peruse them if you wish. Figure 5: Process flow diagram. 9. From the Staggered BLOWDOWN analysis created in Task 1, click the Create Rigorous Analysis button. 10. A new BLOWDOWN analysis will automatically be created using the Multi-Vessel Template and you will automatically be taken to the Design tab (Figure 6). Figure 6: After switching to a rigorous analysis, you will have the ability to add each individual blowdown system to the current flowsheet. 6

On the Design tab, construct the following flowsheet (Figure 7). You may attempt to reference the drawing and draw the flowsheet on your own in order to get some extra practice, or you may use the detailed directions that follow: Figure 7: Flowsheet of the disposal system. 11. Click the Add Flowsheet button for System 2 @Main and observe the changes in the flowsheet (Figure 8). Figure 8: Click Add Flowsheet. 7

12. For System 1 @Main, select 1:Sys2- Tail Pipe_Boundary as the downstream connection. Click the Add Flowsheet button and observe the changes in the flowsheet (Figure 9). Figure 9: Select the downstream connection. 13. Locate PIPE-100 on the flowsheet (it should be yellow). Double-click on it and rename it Header 1 (Figure 10). Figure 10: Open the header pipe. 8

14. For System 3 @Main, select Header 1 as the downstream connection. Click the Add Flowsheet button and observe the changes in the flowsheet (Figure 11). Figure 11: Select the header as the downstream connection. 15. Locate PIPE-100 on the flowsheet (it should be yellow). Double-click on it and rename it Header 2. Your flowsheet should now resemble the drawing found in Figure 6. Notice that two new pipes were added: Header 1 and Header 2. These are downstream piping elements and will be yellow due to missing inputs. All other inputs are complete because they are imported from the pre-existing BLOWDOWN analyses. Move to the Orifice Sequence tab (Figure 12). This is where you can define the time after the start of depressurization when each orifice will open. Notice that the orifice opening times were imported from the calculated times in the Staggered BLOWDOWN analysis. Figure 12: Orifice opening times imported from simple Staggered analysis. 9

The Configure Discharge tab can be used to add additional piping elements downstream of each orifice (Figure 13). If you would like to add additional piping elements upstream of an orifice, you must do so on each individual BLOWDOWN analysis, before importing it into the Multi-Vessel Template. Recall the best practices regarding additional piping. Try using as few piping segments as possible and only add additional piping segments if there is a significant change in piping diameter or metallurgy along the line. Also, recall that BLOWDOWN calculates pressure drop in pipes that are downstream of the orifice. This applies to the additional piping elements that you add here and the ones that are created by the Multi-Vessel Template. Figure 13: Add pipelines downstream of the orifice. The System, Mapping and Run Controls tabs are very similar to the ones found on the Single-Vessel Template. You should be familiar with navigating the forms on these tabs. Most of the information on the System tab has been filled out with what was on the pre-existing BLOWDOWN analyses. However, since two additional downstream pipe segments were added when you constructed the flowsheet, you must define inputs for these pipes. 16. Navigate to the System tab. Select Pipes from the left-hand pane. On the Geometry tab, input the following information for the headers: Header 1 Header 2 Pipe Schedule 40 40 Nominal Diameter 550 mm (22 inch) 550 mm (22 inch) Length 55.78 m (183 ft) 68.28 m (224 ft) Table 1: Geometry data for newly added header pipe segments Elevation Change 0 m (0 ft) 0 m (0 ft) 10

17. Move to the Heat Transfer tab and specify 25 C (77 F) for the Ambient Temperatures and 0 for the Ambient Fluid Speeds (Figure 14). Figure 14: The heat transfer tab. 18. Move to the Initial Condition tab and specify 25 C (77 F) for the Temperature and 101.3 kpa (14.69 psia) for the Pressure (Figure 15). Figure 15: The initial conditions tab. 11

19. Move to the Run Controls tab and select the Halt Conditions. Specify 900 seconds (or 15 minutes) for the Time and 0 kpa (0 psia) for the Pressure (Figure 16). Figure 16: The run controls tab. 20. Run the simulation. After it solves, move to the Result Summary tab and analyze the results (Figure 17). Figure 17: The view of the results summary tab 21. Save your case as StaggeredBlowdownRigorous.hsc 12

AspenTech is a leading software supplier for optimizing asset performance. Our products thrive in complex, industrial environments where it is critical to optimize the asset design, operation and maintenance lifecycle. AspenTech uniquely combines decades of process modeling expertise with big data machine learning. Our purpose-built software platform automates knowledge work and builds sustainable competitive advantage by delivering high returns over the entire asset lifecycle. As a result, companies in capital-intensive industries can maximize uptime and push the limits of performance, running their assets faster, safer, longer and greener. www.aspentech.com 2017 Aspen Technology, Inc. AspenTech, aspenone, the Aspen leaf logo, the aspenone logo and OPTIMIZE are trademarks of Aspen Technology, Inc. All rights reserved. AT-03400-1017