B S Glass Ltd Safety procedures- outsourced Workplaces

Similar documents
Contractor / Exhibitor Handbook

Contractor handbook. Purpose

Section J. How to develop safety elements for project safety management system. How to develop safety elements for project SMS

Method Statement Author

Health, Safety and Welfare Policy

Instructions for the Use of the Excel Spreadsheet. There are Three tabs at the bottom of this worksheet. Instructions tab is the one you are reading

Contractor Code of Conduct

IMMANUEL CHURCH, CHICHESTER HEALTH AND SAFETY POLICY

Working safely in an engineering environment

COMPANY HEALTH & SAFETY POLICY

Company Health & Safety Policy

Health & Safety Policy & Plan. Rightway Roofing.

Site Induction Document & Site Rules

SCOUTS AUSTRALIA NSW

Potential risk of injury to staff

EXHIBITION Guide. Roles and Responsibilities OS11. A handbook for exhibitors and contractors

COREWEST DIAMOND DRILLING LTD. * ENVIROMENT, HEALTH AND SAFETY PROGRAM* APPENDIX A GENERAL WORKSAFE PRACTICES

CONSTRUCTSAFE TIER 1 HEALTH AND SAFETY COMPETENCY TEST FRAMEWORK

Harbour Town Gold Coast Site Induction

Health & Safety Contractor rules

Waste Industry Safety & Health

SEMBIT SQA Unit Code F9JC 04 Complying with statutory regulations and organisational safety requirements

Safe Work Method Statement (SWMS)

RISK ASSESSMENT A UNIVERSITY GUIDE TO PRACTICAL RISK ASSESSMENT UNDER THE MANAGEMENT OF HEALTH AND SAFETY AT WORK REGULATIONS 1992

S31 Opening Statement Working at Height

Company Health and Safety Policy

2.0 Management Systems and Documentation

SAFE SYSTEM OF WORK PLAN (SSWP)

WHS CONTRACTOR INFORMATION PACKAGE

1. Objective of the initiative To ensure that all employees and subcontractors are aware of the risks associated with working at height.

Safe work method statements

HEALTH & SAFETY POLICY OF

Company Policy Health & safety for work performed at Customer premises

PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO HIGH LEVEL LIGHT UNITS

Contractor/Visitor Safety Orientation UNBC

TENDERER OCCUPATIONAL HEALTH AND SAFETY (OHS) MANAGEMENT SYSTEM QUESTIONNAIRE

Compliance with Health & Safety legislation

Code of Practice and Instructions to Contractors Working for Viridor

Site Induction Document & Site Rules

McKay Moore Drainage Ltd. Health and Safety Policy

Safety at Work. Rules for Staying Alive

Permit-Required Confined Spaces...29CFR

Site Induction Document & Site Rules

Contractor Control Procedures. Contractor Control Procedures. Working Together. November Borders College 24/11/2014.

Health and Safety Policy

KIERNAN ELECTRICAL SITE INDUCTION. Site Supervisors: Chris Lettice

Work Activity (e.g. Road Work): Work Location:.

Method Statement. Method Statement Details. Signatures. Emergency Contact Details 1/5

SEMMPF201 Complying with Statutory Regulations and Organisational Safety Requirements

Accident/Incident Reporting and Investigation Procedures

7 Hazard assessment 8 Worker participation 9 Hazard elimination and control

Join t Op e ra tion s CHESM Fie ld I n s p e ction Ch e cklis t

HEALTH AND SAFETY POLICY

Health and Safety Policy

Health and Safety Policy Statement ENVILLE GOLF CLUB LIMITED

1 AIM 2 4 REASONS FOR INCLUSION 3 6 PLANT AND EQUIPMENT REQUIREMENTS 4 7 SYSTEM AND PROCEDURAL REQUIREMENTS 4 8 PEOPLE REQUIREMENTS 6

Understanding Statutory Regulations and Organisational Safety Requirements within a Medical Engineering Environment

Site Induction Document & Site Rules

AWHEM RECOMMENDED PRACTICE

Safety File. Contract Avonbourne School Prepared By Steve Steel Date 20 th July 2008

Understanding health and safety in gas utilisation

SUPPLIER HEALTH AND SAFETY. Supporting a healthy and safe working environment for our people and customers

QCF Unit and Assessment Specification

A Checklist for a Health and Safety Risk Assessment

Health & Safety Policy 1

Hazard Management Making your workplace safer

To comply with the OHS Act, the responsible manager must carry out and document the following:

Safety Risk Assessment Roofing Works / Surveying / Inspections

The Sample Company Pty Ltd

EHS Workplace Inspection Checklist (Ref. SOP QMS-080; EHS-010)

SAFE WORK METHOD STATEMENT

Health, Safety & Environmental Policy

Health, Safety & Environmental Policy. Rotec Hydraulics Ltd

SCOPE OF WORK, SAFETY METHOD STATEMENT & RISK ASSESSMENT

How to plan an event. Step 1: First things first. Step 2: How to make it all happen?

Temporary load-bearing support for structural alterations or repairs

Our commitment to safety

Health and Safety Inspection Procedure

Prevention of Falls and Working at Heights

DRIVER FATIGUE MANAGEMENT PLAN

Bitumen Delivery Driver Inductions Eurobitume UK

EMPLOYEE SAFETY ORIENTATION - PHYSICAL PLANT, RESIDENCE

PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO LOW LEVEL LIGHT UNITS

BELFRY PROPERTY SERVICES LIMITED

Safety Checklist for Events Held at Hillbrook

BICETSER RUFC HEALTH & SAFETY POLICY

Health &Safety Policy HS803

Contractor OHS Induction. AOHS-05-GUI September 2016

SAFETY AND OSHA GUIDELINE CURRICULUM

SAFE SYSTEM OF WORK PLAN (SSWP)

You must NOT touch any equipment unless you are authorised to work on or with that equipment and you have followed correct safety procedures.

Monash University Academy of Performing Arts Safety Induction

Working at Height - MEWPS & Ladders. Your company details Address Tel: Fax: Mobile:

A MESSAGE FROM THE MD

Health and Safety Program Inspections

SWMS No 012 Samark North Qld Pty Ltd ABN : Electrical Contractors License C37121 Page 2 of 6

Safe Work Method Statement

HEALTH AND SAFETY POLICY FOR RUSSELL ROOFING LTD

CONTRACTOR SAFETY INDUCTION HANDBOOK

Surface exploration drilling

Transcription:

B S Glass Ltd Jan 17 B S Glass Ltd Safety procedures- outsourced Workplaces

Index - - - - - - - - Page No On Site safety - - - - - - - - - - - - - - - - - - - Content 3. 1.00 Health and Safety Mission statement 2.00 Objective 4. 3.00 Safety Matters for Consideration 3.01 Pre- Site Arrival 5. 3.02 Arrival on site 6. 3.03 Feedback 7.- 17 4.00 Risk Assessments 18.- 25. 5.00 Method Statements 26.- 29. 6.00 Site Rules 30 7.00 Site Inductions 31. 8.00 Tool Box Talks

Health and Safety Mission Statement The partnership puts substantial emphasis on health and safety issues and its Risk control Programme address the safety of everyone at its work places at all times. The safety of Users, hosts, operatives, visitors and all others who may be effected by B S Glass operational activities is always of paramount importance to management and personnel. The partners, managers and supervisors continuously review health and safety procedures and vigorously monitor staff performance and system of work. Everyone connected with B S Glass is encourage to contribute towards the objective of hazard and risk free workplace operations, components, materials and plant. Regular health and safety training seminars for partners, managers, supervisors, staff and operatives are conducted by the company s health and safety consultants. Site inductions and Tool Box Talks are a regular feature of the employer s workplaces. Prospective sites are surveyed in detail. Design and installation reflects the appropriate Materials and system to be used, with total safety consideration. Substantial discussion Takes place with client representatives and the partnership puts considerable effort into Observing on site procedures as well as its own Site supervisor and operatives are trained and competent in the handling, installation and storage of B S Glass materials and plant. They have much experience in this kind of work on all sites at which the partnership operates 2.00 OBJECTIVE This document is designed to identify hazards and risks that are likely to be experienced on any site that B S Glass proposes to work on. Before operations commence. It shows how the employer manages risk by producing risk assessments and appropriate method statements to eliminate or control those risks satisfactorily. The partners will ensure that everything reasonably practicable will be undertaken to achieve this objective.

The risk control programme is constantly monitored to check compliance and to identify any hazards which may subsequently become apparent but which could not have been Identified before starting on site 3.00 Safety Matters for Consideration 3.01 Pre Site Arrival 1. Site survey will be detailed to establish the correct working procedures and materials/facilities to be employed in consultation with the customer. These will be schemed out and submitted where necessary. 2. Safety systems of work, components, materials, plant and vehicles, tools and equipment will be discussed, developed and employed at the host venue. Operatives will be competent to perform their tasks professionally and safely. 3. The primary consideration will be planning and ensuring the safety of everyone on site at all B S Glass workplace during loading, despatch and transport, unloading, effecting on site works and returning to the main workplace. 4. This will be achieved by the production of written suitable and sufficient risk assessment and subsequent method statement where appropriate. This will be an ongoing process. Operatives are familiar with the company safety policy. 5. The employer will ensure that everyone on site has received appropriate training. Site supervisor will ensure that the risk control programme is maintained and that both appropriate health and safety legislation and approved codes of practise are followed. 6. Managers will monitor safety programmes and ensure that any modifications and improvements are introduced. This process will be maintained. 7. Suitable and safe access, both vehicular and pedestrian, to the specific site will be established, together with appropriate compounds, before site operations commence site supervisors will be familiar with the location. 8. Compliant welfare facilities will be established before works start. Responsibilities will be established. 9. All personal protective equipment which employees need on site will be indentified and supplied before works start. Such equipment will be suitable to control specific hazards and be on good condition. It will be established that any sub- contractor are in possession of appropriate PPE. All operatives are instructed to wear PPE during the hazard presence, maintenance proper storage and to report any loss, damage or mal- function.

10. Operatives are aware that they must report all accidents, whether injury takes place or not, to their site supervisor who will ensure that any reporting procedure are observed {RIDDOR}. First Aiders will be provided were necessary. Safety Matters for consideration Cont 3.02 ARRIVE ON SITE 1. The site supervisor will take charge and ensure that all vehicles, personnel, plant equipment and materials have arrived safely at the specific site and are positioned correctly and safely in location areas. All security arrangements will be observed. 2. Both B S Glass Risk control programme and Host policies and procedures will be observed at all times. 3. on satisfactory completion of 1. And 2., the site supervisor will immediately assemble all operatives and complete a site induction, before work starts. 4. The site induction procedure and rules are appended to this document but will be amended accordingly to accommodate Host Policies and procedures. The site supervisor will invite questions and ensure that all the detail is in place and understood. Any irregularities will be corrected before works start. Records of those who have attended the induction procedure will be kept. 5. Any personnel who arrived for work subsequently, must receive a site induction before they start work. 6. The site supervisor will maintain compliance by managing the whole operation and conducting regular Tool Box talks. Visiting management will ensure that all operatives have undergone the induction procedure by checking the on- site records. Managers will also check that TOOL Box talks are taking place. 7. After 4. Has been completed satisfactorily, site operations will begin. 8. It will be established that access, site and compound are satisfactory and secure site layout will be established. Any drawings developed will be referred to. 9. Good Housekeeping will be maintained at all times. 10. Procedures will maintain safety compliance at all times. [Risk Assessments and Method Statements attached]

11. At the end of a day s s work the site will be left suitably secure with hazard warning signage in place, when appropriate. Site security arrangements will be followed and relevant site personnel informed. They will be advised of any specific site hazards. 12. Where reasonably practicable incomplete works will be suitably identified with appropriate signage and hazard warning tape placed across all ingress and egress points. 13. On completion of works and handover, the site will be left clean and tidy. Safety Matters for Consideration Cont 3.03 Feedback 1. A review of the operation will be conducted- its success and any shortcomings. Site managers will collect Feedback and ensure that any workplace improvements that may be necessary are installed subsequently. 2. The Accident Book will be examined to establish incident Rates and to identify any accidents trend that may be apparent. This process will be collated from all sites at least annually to establish total trends. 3. Safe systems of work have been designed and produced wherever work may be taking place. The partnership invests substantially in research and development and reviews its working systems regularly, as a matter of routine 4. Views, opinions and professional advice are taken and considered from all parties involved with company operations- host, clients, operatives and safety consultants. 5. Such Feedback is conveyed to retained designers for consideration and potential integration into future contracts. In this manner the company operates and maintains its monitoring system. 6. There is particular reference to health and safety issues and complying with appropriate health and safety legislation and approved codes of practice

B S Glass Jan 15 B S Glass ON SITE RISK ASSESSMENT

B S Glass Jan 15 B S Glass ON SITE METHOD STATEMENT

Site Rules B S Glass Security Suitable site fencing/hoarding and security will be arranged. Operatives must not interfere with site fencing/hoarding. They must ensure that they observe correct security procedures at all times. Accidents All accidents must be reported to B S Glass site management. Operative must know the location of the first Aider/Appointed person and ensure that any injury which they sustain receives proper medical attention. In an emergency, contact the emergency service immediately and ask for help from a First Aider/Responsible person. All accidents must be reported to the Main/Principal contractor. The Main/Principal Contractor will adopt the correct procedure in the event of reportable accidents. Fire Site managers will develop a site fire management policy. Procedure will include the provisions of fire extinguisher and escape routes. Assembly point will be established. These instructions must be followed by those on site in the event of a fire. All personnel must understand site emergency procedures including the use of different fire extinguishers and their locations, different escape routes and assembly points. Care must be taken with flammable liquids, pressurised containers and materials- operatives must know the precautions to take in order to prevent fire developing. Personnel protective equipment (PPE) All B S Glass employees are provided with suitable protective equipment. Self employed operatives must provide their own.ppe must be worn at all times during the hazard presence. Hard hats and safety foot wear are mandatory on B S Glass sites as per requirements. On site personnel will face a fine or dismissal from site if they are found on site not wearing these items during hazard presence.

Tasks which have particular hazards will require the use of specific PPE. Operatives should wear suitably clothing to suite site conditions. It is not considered acceptable to remove shirts/tee shirts etc during hot weather. Electrically Operated Tools All electrically power tools use 110v supply. Tools must be used by persons who have been trained to use them properly and safely. Such equipment must be regularly maintained and tested (annually) to observe regulations. Mains electrically operated power tools should carry a label or tag to confirm their compliance. Working with plant Drivers must be suitably trained and certificated to drive mobile plant and heavy machinery. Drivers and operatives must be over the age of 18.Cranes may require Banksman and Slingers. All plant must be regularly maintained, serviced and certificated as required under regulation. Vehicular Plant and Pedestrians Separate vehicular plant and pedestrian s site access will be provided as far As reasonably practicable. Suitable warning signage will be provided where this not possible Drivers must take great care whilst driving on site. Operatives must be observant and alert at all times Scaffolding, Ladders and Edge Protection Suitable standing scaffolding will be erected as appropriate. This must be inspected weekly. Ladders must be properly tied or footed at all times. Harnesses will be worn where suitable edge protection is not in place Operatives must never remove parts of the scaffold such as guard s rails, boards and ladders or block working platforms or throw materials and plant from heights. Faults must be reported to the appropriate supervisor or site management. When working at height above two metres operatives must ensure that suitable guard rails are in place to prevent falls of both operatives and materials.

Radios and Stereo Equipment These are not permitted on site. Hazardous Work All hazardous work areas must be suitable corned off with barriers or hazard warning tape during the presents of the hazard. Permits to work may be necessary. Suitable hazards warnings signage should be on display Hazardous Substances B S Glass will obtain Safety Data Sheets from its suppliers. These will be available for inspection by the site management along with the COSHH Assessment which must be presented. Hazard warning labels on containers should be read and understood. Operatives must wear the correct PPE, and ensure that any necessary precautions for others on site are in place.substances must be safely and securely stored whilst not in use. Lighting General artificial lighting will be provided where appropriate. Task lighting will also be provided for employees. It is not acceptable to rig up unsatisfactory temporary lighting. Task lighting must be assembled by a competent person. Awareness Training Site inductions Training courses will be arranged and all personnel who are to work on site must have attended such a course before they are allowed to start work, where appropriate All site operatives should have received site safety Awareness training Waste Disposal All on site must ensure that waste is disposed of properly, separating controlled waste from special (hazardous) waste. Unsafe Working Practices

Besides ensuring good working practice on their own behalf operatives should report any unsafe working practices that come to their notice to the site supervisor or site management. Welfare Suitable toilets, drinking water, wash facilities and a mess room will be provided for all site staff and lawful visitors These facilities must be respected and not abused or damaged in any way. Alcohol and Drugs The presence and use of alcohol and drugs will not be permitted on site. Housekeeping All operatives on site should adopt a Good Housekeeping Policy at all times Workplace areas, in particular corridors and escape routes should be kept clear of plant and materials at all times Waste and packaging must be cleared regularly so that ingress and egress is maintained and emergency evacuation can take place satisfactorily. NB B S Glass reserves the right to dismiss anyone from site who disobeys these rules breaches health and safety legislation and codes of practise or commits any act of theft violence or undue harassment. 29

SITE INDUCTION - B S GLASS Site Access/Security Good Housekeeping Scaffolding and Ladders Edge Protection and Working on Roofs Excavation PPE FIRE Hand and Power Tools LPG s Hoists and Lifting Machinery and Plant Vehicular Machinery and Plant COSHH/Asbestos Electricity First Aid, Emergency and Reporting Procedures Site Safety Awareness Training Clothing on site Personal Hygiene and Welfare General and Tasking Lighting Waste Disposal Hot Work Permits to Work Confined Spaces

Tool Box Talks - B S Glass Short, ongoing talks (15 minutes) to all operatives or special groups/trades about particular matters. They are less formal than site inductions but order must be kept. Participation is encourage. Main Contractors site management are invited to attend. Tool Box Talks may relate to particular on site hazards or as the result of an accident or general matters to test operative s awareness. E.g. Manual Handling Lifting Equipment Overhead Services Correct of Welfare Responsibilities Electricity Scaffolding and Working at Height Noise and Vibration Housekeeping Dust and Fumes Power Tools Accidents Reporting Procedures Fire Management Accident Reporting Fire Managements Accidents, Diseases, Dangerous Occurrences Site Access- Vehicular and Pedestrian

Storage and Stacking Protection of All on site Note Keep records of talks- site type. Date and note participants