Transportation Committee Project Priority List

Similar documents
Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension

Description: Improve I-71 corridor from I-64 to I-265. Approximately 9.1 miles.

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

Route 29 Solutions Projects

Project Description Form 8EE

MORRISVILLE TRANSPORTATION PLAN TOWN COUNCIL WORK SESSION AUGUST 8, 2017

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Access Routes from US 101 to the Richmond San Rafael Bridge

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer

FY 2006 TRANSPORTATION CAPITAL PROGRAM

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

County of Fairfax, Virginia. Department of Transportation

Staunton. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

Route 7 Corridor Study

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

TRASBURG RANSPORTATION

DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN

Terwillegar Drive Expressway Draft Concept Plan

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway

Basalt Creek Transportation Refinement Plan Recommendations

Cincinnati Dayton Rd Widening

Legislative Update Williamsburg Residency

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative

Chapter 5 Future Transportation

State Route 160 (Blue Diamond Highway)

Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66.

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.

5 REQUEST FOR GRADE-SEPARATED PEDESTRIAN UNDERPASS CROSSINGS OF LESLIE STREET AND ST. JOHN S SIDEROAD TOWN OF AURORA

The Year Ahead: Virginia Department of Transportation Northern Virginia District

MCA Member Meeting: Tysons Update. Fairfax County Department of Transportation November 13, 2017

Bluffdale/ UDOT South High-T Intersection Project Type Operations

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

12 RECOMMENDATIONS Road Improvements. Short Term (generally the next five years)

Providing an Efficient and Multi-modal Transportation System

San Tomas Expressway

Hennepin County Bicycle and Pedestrian Planning

Project Fact Sheet. August 1,

Appendix D: Concept Screening

Washington DC Section of ITE Project Briefing

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County.

VIII. Project Prioritization & Implementation

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

ROAD PROJECTS. Primary and Interstate Roads LRTP; Southern- Western Neighborhoods MP

Dulles Area Transportation Association. October 11, Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation

Lynchburg District Update

SC 41/Joe Rouse Intersection Improvements

PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia

Giles Run Connector Road

2040 Long Range Plan Projects Draft October 2011

Transportation Investment Act Gwinnett County. Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners

CHAPTER 5 TRANSPORTATION GOAL

UPC Design / CN Locally Administered PE Phase VDOT Administered CN Phase

Northern Virginia Express Lanes Design Challenges and Solutions. IBTTA Maintenance and Roadway Operations Workshop June 25, 2018

5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION

NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association

Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I)

Annual Listing of Obligated MPO Projects

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

Transportation Corridor Studies: Summary of Recommendations

LSC TRANSPORTATION CONSULTANTS, INC. 516 North Tejon Street Colorado Springs, CO (719) FAX (719)

STREET AND HIGHWAY PLAN

Figure 1: East West Connector Alignment Alternatives Concept Drawing

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

MILEGROUND - AIRPORT ROAD. Fall 2018/ Spring Fall 2020 TBD. US 119 Monongalia County HOW WILL TRAFFIC CONTROL BE HANDLED: KNOW BEFORE YOU GO

EXHIBIT B. Bass Lake Rd US 50 to Hollow Oak Rd 2 Lanes with unimproved median and 4 foot paved shoulders. $ %

Feasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road. October 3, 2017

!!!!!!!!!!!!!!!!!! Metro!Denver!MTD!Governance!Committee! October!23,!2013!!9:00!AM!to!10:00!AM! Denver!Regional!Council!of!Governments!

Proposed Project I 35 from Denton to Cooke County Line

EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY

Route 28 Corridor Safety and Operations Study Public Information Meetings. July 20 and 22, 2015

San Pablo High Treatment applied incrementally at each N + ++

Route 28 Corridor Safety and Operations Study

3.0 PROJECT DESCRIPTION

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

Route 28 Corridor Safety and Operations Study

Viewing SMART SCALE Application

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Multi Modal Transit Access Plan KIPDA ID # 239. Project Type: STUDY

DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, Susan Shaw, P.E., VDOT, Megaprojects Director

VDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment. Staff Recommendations

SIOUX FALLS MPO 2018 OBLIGATED TRANSPORTATION IMPROVEMENT PROJECTS

PROJECT OBJECTIVES. Improve vehicle capacity for the intersection. Improve pedestrian and bicycle access

Clackamas County Comprehensive Plan

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Modal Interrelationships: A bicycle lane is proposed between Harrington Ave and Swanns Station Rd.

PERFORMANCE ACTIVITY 613 IMPACT ATTENUATOR WORK DESCRIPTION 3

Route 15 Congestion Report Findings

Meeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10

Implementation Plan. 5.1 Improvement Program

Thank you for attending the first Public Open House for the Thunder Bay Transportation Master Plan!

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

PRESENTATION WILL BEGIN AT APPROXIMATELY 6:05 P.M. I-90 EXIT 406 INTERCHANGE MODIFICATION STUDY AND ENVIRONMENTAL ASSESSMENT MARKET

Crystal City Citizen Review Council Meeting. July 10, 2013

Hard Shoulder Running is a valuable tool July 14, Dean H. Gustafson, PE, PTOE State Operations Engineer VDOT Operations Division

MOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9.

Duwamish Way-finding and CTR Report

Transcription:

Transportation Committee Project Priority List Funded Priorities PRIORITY 1 - Interstate 81, Exit 310 Improvements Description: Construct improvements to Exit 310 interchange. Capital Cost: $54,200,000 Justification: This is a regional transportation improvement that will address congestion in many areas of the County and address coming development to the surrounding areas. PRIORITY 2 - Route 277 Widening and Safety Improvements (Ph 1) Description: Construct a 4-lane divided roadway beginning at I-81 and continuing to Double Church Road. Project would include realignment of Aylor Road to align with Stickley Drive. Capital Cost: $35,944,878 Justification: This is a regional transportation improvement that will address congestion in the Southern Frederick area and address development to the surrounding areas. PRIORITY 3 -Airport Road Extension, East Tevis Street Extension and Bridge over I-81 Description: Construct a 4-lane divided roadway beginning at Route 522 and going west approximately 0.2 miles to connect to the road network being constructed by the Russell 150 Development. Construct Airport Road from Route 522 to a roundabout intersection with the Tevis Extension on the east side of I-81. Project includes bridge over Interstate 81. Capital Cost: $24,703,788 Justification: This is a regional transportation improvement that will address congestion in many areas of the County and address development to the surrounding area. The location is as identified by joint planning efforts between the County, VDOT, and the developer. 36

PRIORITY 4 - Renaissance Drive, Phase 2 Description: Construct a connector road and Railroad Crossing between Route 11 and Shady Elm Drive. Capital Cost: $5,791,500 Justification: This is a transportation improvement that will address congestion at key points along Route 11 and Apple Valley Drive. This project is identified in Secondary Road Improvements Plan. PRIORITY 5 - Sulphur Springs Road Intersection Improvement and Widening from Route 50 to the Landfill Description: Widen Sulphur Spring Road from the intersection with Route 50 to the regional landfill, add paved shoulders for pedestrians and bicycles, improve the intersection at Route 50. Capital Cost: $11,956,091 Justification: This project will address capacity and safety improvements to the corridor. This project is identified in Secondary Road Improvements Plan. Construction Schedule: Entering design and right-of- way underway. PRIORITY 6 - Fox Drive Description: Add additional turning lane(s) to Fox Drive where it intersects with Route 522 North. Capital Cost: $650,996 Justification: This is a transportation improvement that will address congestion at this intersection. PRIORITY 7 - Route 277 Right Turn Lane Extension at Warrior Drive Description: Extend right turn lane for eastbound 277 at the intersection of Route 277 and Warrior Drive. Installation of sidewalk for pedestrian safety and installation of pedestrian pedestal. Capital Cost: $476,644 Justification: This improvement would be a significant safety upgrade to this intersection. 37

PRIORITY 8- Papermill Road Right Turn Lane Extension at Route 522 Description: Extend right turn bay of Papermill Road (Route 644) where it intersects with Route 522 to alleviate turn bay spillover that is taking place. Capital Cost: $507,262 Justification: This improvement would be a significant safety upgrade to this intersection. Unfunded Priorities PRIORITY 9 - Planning, Engineering, Right-of-Way and Construction Work for Route 37 Description: This project would be to continue work on the Eastern Route 37 extension. More specifically, to update the Environmental Impact Statement to the point of a new Record of Decision and to update the 1992 design plans to address the current alignment, engineering guidelines, and possible interchange improvements. In addition, this allows for advanced engineering, right-of-way purchase and construction. Capital Cost: $750,000,000 Justification: This project moves the County closer to completion of a transportation improvement that would benefit the entire County and surrounding localities. PRIORITY 10- Interstate 81, Exit 307 Relocation Description: Construct a relocated Exit 307 interchange. Capital Cost: $234,255,469 Justification: This is a regional transportation improvement that will address congestion in many areas of the County and address coming development to the surrounding areas. 38

PRIORITY 11 - Route 277 Widening and Safety Improvements (Ph 2) Description: Construct a 4-lane divided roadway beginning at I-81 and continuing to Sherando Park. Project would include realignment of Aylor Road to align with Stickley Drive. Capital Cost: $25,428,550 Justification: This is a regional transportation improvement that will address congestion in the Southern Frederick area and address development to the surrounding areas. PRIORITY 12- Redbud Road Realignment and Exit 317 Ramp Realignment Description: Realign Redbud Road from its current location through development land in the vicinity of Route 11 North and Snowden Bridge Boulevard and Relocate the I-81 Exit 317 NB ramp to the current location of the Redbud Road/Route 11 intersection. Capital Cost: $11,239,132 Justification: This is a transportation improvement that will have significant impact on Eastern Frederick County. This project is identified in the adopted Eastern Road Plan. PRIORITY 13 - Route 11 North Widening to 6 Lanes from Snowden Bridge Boulevard to Old Charlestown Road Description: Route 11 North of Snowden Bridge Boulevard is currently primarily a two-lane roadway. This project would widen that facility to a 6-lane divided roadway with turn lanes where appropriate. Capital Cost: $28,346,120 Justification: This is a transportation improvement that will provide a significant capacity upgrade to address congestion on the Route 11 Corridor. This project is identified in the adopted Eastern Road Plan. 39

PRIORITY 14- Warrior Drive Extension Description: Construct a 4-lane divided roadway beginning at Route 277 where Warrior Drive intersects from the north and continuing that roadway south and west to intersect with I-81 at the location of the relocated Exit 307 interchange. Capital Cost: $47,000,000 Justification: This is a regional transportation improvement that will address congestion in the Southern Frederick area and address development to the surrounding areas. PRIORITY 15 - Channing Drive Extension Description: Construct a 4-lane divided roadway beginning at Senseny Road where Channing Drive intersects from the north and continuing that roadway south to intersect with Route 50 East at Independence Drive. Capital Cost: $45,000,000 Justification: This project has been identified in the Eastern Road Plan, and will address congestion in Eastern Frederick County and address development to the surrounding areas. PRIORITY 16 - Brucetown Road/Hopewell Road Alignment and Intersection Improvements Description: Realign Brucetown Road to meet Hopewell Road at Route 11. Improvements to this intersection will address comprehensive planned development s traffic generation in the area. Capital Cost: $3,800,000 Justification: This is a transportation improvement that will have significant impact on the Route 11 corridor. The location is identified by joint planning efforts between the County and VDOT. PRIORITY 17- Widening of Route 11 North to the West Virginia State Line Description: Improve Route 11 to a divided 4 and 6-lane facility as detailed in the Eastern Road Plan. Capital Cost: $192,000,000 40

Justification: This is a regional transportation improvement that will address congestion over a large area of the County and address development to the surrounding area. This project improves the safety for the traveling public by reducing congestion and improving the flow of traffic. PRIORITY 18 - Senseny Road Widening Description: Widen Senseny Road to a 4-lane divided roadway. This project is not dependent upon, but is being coordinated with the implementation of Route 37, Channing Drive, and development in the area. Capital Cost: $67,000,000 Justification: This is a transportation improvement that will have significant impact on Eastern Frederick County. This project is identified in the adopted Eastern Road Plan. PRIORITY 19 - Inverlee Way Description: Construct a 4-lane divided roadway beginning at Senseny Road and going south to Route 50 East. This project is being planned in conjunction with improvements to Senseny Road and surrounding development. Capital Cost: $27,300,000 Justification: This is a regional transportation improvement that will address congestion and provide an additional needed link between Senseny Road and Route 50 East. PRIORITY 20 - Warrior Drive Extension from Route 37 Crosspointe South to Existing Terminus Description: 4-lane roadway from the Route 37 extension in the Crosspointe Development south to the existing terminus of Warrior Drive. Capital Cost: $33,500,000 Justification: This improvement would be concurrent with a Route 37 extension and would provide significant congestion relief at Exit 307 as well as Tasker Road at Exit 310 41

PRIORITY 21 - Senseny Road Turn lanes at the Intersection of Senseny Road and Crestleigh Drive Description: Improvements to the intersection of Senseny Road (657) and Crestleigh Drive to include turn lanes and potential signalization. This project would add left and right turn lanes to Senseny Road at the intersection of Crestleigh and potentially a full signalization of the intersection. Capital Cost: $2,548,579 Justification: This improvement would be a significant safety upgrade to this intersection. PRIORITY 22 - Frederick County Eastern Road Plan Description: This project is intended to address all of the planned transportation improvements in the County Comprehensive Plan, Eastern Road Plan that are not noted individually above. Capital Cost: TBD Justification: This project prepares the County for future development by addressing the projects needed to support that development in a manner consistent with the Comprehensive Plan. Construction Schedule: N/A 42