Cygnus Instruments Ltd

Similar documents
Hatch Sure MkII Inspection of Watertight Doors

Testing Procedures of Watertight Compartments

1. The SDT Sherlog Maritime Global Solutions

Periodical surveys of cargo installations on ships carrying liquefied gases in bulk

Safety at sea: a daily contribute. Gard Conference on Watertight doors Arendal, May the 29 th 2013

Testing Procedures of Watertight Compartments

Hatch cover tightness testing

THE NEW SHERLOG RANGE:

Testing Procedures of Watertight Compartments

Introduction to the new SDT-IMCS hatch cover training

Industrial Compressed Air. Ultrasonic Leak Detection Survey Guide

FIRST EVER CLASSIFICATION OF A NAVAL SUBMARINE

Flexible hoses - Non-metallic materials

Transmitter CS 21 Operation Manual

Cargo and hull damage while at anchor in heavy weather

Hatch Cover Maintenance

RULES PUBLICATION NO. 52/P UNDERWATER INSPECTION OF MOBILE OFFSHORE DRILLING UNITS IN LIEU OF DRYDOCKING

CONTENTS 1. INTRODUCTION DESCRIPTION OF TEST SAMPLE TEST RIG GENERAL ARRANGEMENT TEST SEQUENCE...7

PASSENGER SHIPS Guidelines for preparation of Hull Structural Surveys

X-03 EMERGENCY TOWING ARRANGEMENTS

Rules for Classification and Construction Ship Technology

Doors in watertight bulkheads of cargo ships and passenger ships

C&G 2395 Exam Paper June Section A-All questions carry equal marks. Answer all three questions. Show all calculations.

Hatch cover securing and tightness

ST. VINCENT AND THE GRENADINES

RULES FOR CLASSIFICATION Naval vessels. Part 1 Classification and surveys Chapter 5 Surveys for submarines. Edition January 2016 DNV GL AS

Periodic Survey of Fuel Installations on Ships other than Liquefied Gas Carriers utilizing gas or other low flash point fuels

Locator Locator-D-Lux Air-Saver G1 Air-Saver G2

Rule Change Notice For: RULES FOR CLASSIFICATION OF MOBILE OFFSHORE UNITS

GUIDELINES FOR SURVEY OF OIL FLOATING STORAGE VESSELS FIXED AT ANCHORAGE

Challenges in Ship Design to Maintain Thrusters inside Ship

PART 1 GENERAL REQUIREMENTS

SPEED LOGS & ECHO SOUNDERS

SPEED LOGS & ECHO SOUNDERS

Lifeboat accidents with on load release hooks

RESOLUTION MSC.235(82) (adopted on 1 December 2006) ADOPTION OF THE GUIDELINES FOR THE DESIGN AND CONSTRUCTION OF OFFSHORE SUPPLY VESSELS, 2006

RULES PUBLICATION NO. 119/P

Installation of Ballast Water Management Systems

Hangt de baggerindustrie aan een (zijden) draadje

Fall Protection. ANSI-What is it, Why is it important? Craig Firl. March 5 th, Company Private

REGULATION on life boats operated from land, No 123/1999 CHAPTER I. General provisions Article 1

MANUAL DIRECT PURGE OPTION. UNION Instruments GmbH CWD2005 PLUS. General information, safety standards and regulations for direct purge option

Blue Whale Spa :- Site Preparation and Delivery

Abstract. 1 Introduction

COMPRESSED AIR SAVING PRODUCTS INDEX. Useful information AIR-SAVER G1 AIR-SAVER G2 LOCATOR. Condensate Management Specialist

Best Practices for Ultrasonic Compressed Air Leak Detection

Transmitter CS 21 Operation Manual

SLOP RECEPTION AND PROCESSING FACILITIES

Diffraction of Water Waves. Pg

AIR SAVING PRODUCTS ADDING VALUE AIR-SAVER LOCATOR LOCATOR-EV

TP 11249E SHIP SAFETY STANDARD FOR IN-WATER SURVEYS

ADVANTAGES DESCRIPTION MECHANICAL FITTINGS AND DIMENSIONS

AIR-SAVER G1 AIR-SAVER G2 LOCATOR LOCATOR-EV COMPRESSED AIR CONDENSATE MANAGEMENT AND ENERGY SAVING PRODUCTS AIR SAVING PRODUCTS

How It Works. 26 steps detailing the loading process. The unloading process works in reverse

Rules for Classification and Construction Additional Rules and Guidelines

Hose Management Inspection Guidelines for HP Drilling and Production Hoses

ICE LOADS MONITORING SYSTEMS

INSPECTION & NON-DESTRUCTIVE TESTING

RULES FOR THE CONSTRUCTION AND CLASSIFICATION OF SHIPS IDENTIFIED BY THEIR MISSIONS CHAPTERS SCOPE

New ANSI Fall Protection Standards

NZQA registered unit standard version 3 Page 1 of 7. Demonstrate knowledge of bitumen gangbar sprayers and operations

Manual Crane Scale PCE-CS 300

ANNEX 4 ALTERNATIVE TEXT FOR OPERATIONAL GUIDELINES FOR VERIFICATION OF DAMAGE STABILITY REQUIREMENTS FOR TANKERS

An Ocean of Possibility

Operating Instructions Part No

1960 DOUGLAS & MC LEOD THISTLE 17. Capt. Phineas T. McHenry, Ltd. Marine Surveyor 38 Oak Hill Lane Elkton, MD

CR CR Classification Society

WSN: XXXXXX 101 ROME COURT FORT COLLINS, CO, PHONE #: (970) FAX #: (970) TO-Clean Manual

250C-IG COMPRESSOR KIT 12V PART NO C-IG COMPRESSOR KIT 24V PART NO

LPG, LEG, LNG tankers & Chemical and Product tankers

Model DPC3500 Continuous Low Range Dew Point Analyzer. Operations Manual

Project: Consultant : MEP Contractor: PREPARED BY: DORMAN SMITH SWITCHGEAR - DUBAI REVIEWED BY CONSULTANT : Page 1 of 15

AIR-SAVER G1 AIR-SAVER G2 LOCATOR-EV COMPRESSED AIR CONDENSATE MANAGEMENT AND ENERGY SAVING PRODUCTS AIR SAVING PRODUCTS

PV-ECO SERIES. High velocity pressure/vacuum valves MARINE LIFE WITHOUT FOOTPRINTS

YACHT SERVICES Introducing our versatile portfolio for the yachting industry

OEM Manual MODEL 2305 ECONOMICAL DIGITAL SINGLE CYLINDER SCALE

Operating Instructions for

STABILITY AND WATERTIGHT INTEGRITY, CLOSING APPLIANCES

Swim Ontario Comprehensive Facility Rules Compliance Document

Compiled by: B Beard. Approved by: SH Carstens. Description of requirements and procedures for compact provers to be used as verification standards.

MSC Guidelines for Review of Cargo and Miscellaneous Vessel Stability (Subchapter I)

ENERGY BLADE 3K4. Energy Blade Installation Instructions

PORTS AUSTRALIA. PRINCIPLES FOR GATHERING AND PROCESSING HYDROGRAPHIC INFORMATION IN AUSTRALIAN PORTS (Version 1.5 November 2012)

HOT OILING OPERATIONS ALL HSE PRC 172. Approved By: Manager, HSE Performance Assurance. Table of Contents

GAS FILLING MACHINES PROCESS MONITORING PRESSURE BALANCE

SPH4U UNIVERSITY PHYSICS

M-14 Stern Shaft Sealing Apparatus

TECHNICAL DESCRIPTION

METROSIL CURRENT TRANSFORMER PROTECTION UNIT (CTPU) ENCLOSURES IEC COMPLIANT

ROYAL CANADIAN SEA CADETS PHASE ONE INSTRUCTIONAL GUIDE SECTION 5 EO C IDENTIFY TYPES OF CIVILIAN VESSELS PREPARATION

CABLE ENTRIES IN HAZARDOUS AREAS CORRECT SELECTION, INSTALLATION AND MAINTENANCE

Running Track Certification. ASBA Technical Meeting December 2013

M-06 Nitrogen Generator (Nitrogen Making Machine)

OVERALL SURVEY: A survey intended to report on the overall condition of the hull structure and determine the extent of additional close-up surveys.

MSC Guidelines for Review of Stability for Towing Vessels (M)

PORTALEVEL MAX. The 8th Generation Ultrasonic Liquid Level Indicator from Coltraco Limited, UK

Protocol for Private Galas

Geo-Vibro Corer

Part 3 Hull Chapter 2 General arrangement design

Accreditation for In-Service Inspection of Pressure Systems/Equipment

Transcription:

Gard - Conference on Power Operated Watertight Doors 29 May 2013 Norway Paul Fahy Product Specialist Cygnus Instruments Ltd Ultrasonic Testing of Watertight Doors Cygnus Hatch Sure www.cygnus-instruments.com

Introduction Cygnus Hatch Sure is a Type Approved, ultrasonic system for rapid and thorough testing of the weather tightness of cargo hatch covers or Watertight doors The use of ultrasonic testing is not only a sure way of detecting any damage to the doors seal; It can also identify the loss of any watertight integrity that may have occurred during the installation phase of the watertight door. This can include deformation to the frame or other misalignments. Can also be used to test cable glands or any other item passing through a bulkhead.

Scope of this presentation Highlight the benefits of ultrasonic testing What are the applications Explain how it works what is ultrasound? What is hatch sure? How do we use it? FAQ 1. How long does it take? 2. When to test? 3. How does this test differ from hatch cover testing? 4. What about training?

Benefits of ultrasound testing Rapid, accurately locates defects in door seals and can be used to test doors on all deck levels. Of interest and benefit to Ship-owners/managers & marine surveyors Does not hold up other ship construction activities and allows for a speedy re-test if the door is not sealed or not watertight first time. Reduces inspection time compared to normal chalk or hose test for watertight doors. Major time savings are achievable. The Hatch Sure Mk2 and test procedure has gained Classification Society approval by one of our customers for testing new watertight doors.

Applications Water tight doors on; Bulk carriers Car Carriers Large yachts and super yachts Fishing vessels Ferries Cruise Liners Offshore support vessels Naval vessels Submarines Containers Small watertight / weathertight enclosures such as forward rope lockers and refrigeration units can now be tested.

What is Ultrasound? Ultrasound is a sound wave at a frequency beyond the range of human hearing

Frequently Asked Questions 1. How long does it take? Approximately 10 minutes per door including setup 2. When to test: During commissioning After replacement of rubber sealing On request from vessel owner or classification society. After any event that may involve damage to the door or seal Annual survey 3. How is testing a watertight door different to a Hatch Cover? There is no acceptable detection threshold for a door. (Hatch cover allow 10%) It is easier than hatch testing because any sound detected above Zero db is a leak.

Frequently Asked Questions 4. What about Training? A Certificate of training in the operation of HATCH SURE is offered by Cygnus Instruments Ltd. Cygnus Authorised Distributors, who have been trained and certified to deliver this course. The certificate of training is accredited by International Institute of Marine Surveyors Offers consistent and repeatable standard of training throughout an organisation in terms of the operation of the instrument. Carries CPD points

What is Hatch Sure? microphone Airborne Ultrasound Ultrasound transmitter Ultrasound receiver

How do we use it? Headphones Hatch Sure Receiver Transmitter Remote Control to Transmitter Telescopic Extension Inspection Microphone watertight door

Test Method Safety Note: The operation of watertight doors must only be carried out by a competent person familiar and trained in the operation of the specific door type under test and with the permission of the person in charge. Never step through a moving door! 1. Position the transmitter at a distance not less than the maximum dimension of the door, e.g., if the door is 2.2 m x 1.1 m, then the distance x (Fig. 1) is not less than 2.2 m* 1 Note: Some doors are of greater width than height, so the width (W) will become the distance x (Fig. 1). If W<H then x = H If W>H then x = W * 1 Cygnus guideline x can be reduced by proven procedure

Test Method Diagram courtesy of IMS

Test Method 2. Switch the Transmitter on and set the power level Note: Once the power setting for a particular type and size of door has been established, then this setting can always be used * 1 3. Calibrate the receiver using the set OH key (see page 31 of the operating manual). 4. Record the open door db level (possibly including photograph) in the report. 5. Observing ALL relevant safety procedures, Close the door. The receiver should now read zero db. * 1 Providing the door size, type, manufacturer and distance setting is always the same.

Test Method 6. Check the seal around the door frame by moving the inspection microphone along the rubber seal. The microphone should be as close as possible to the rubber seal, without actually making contact. 7. If any leaks are found, record, report to the relevant third parties and take appropriate corrective actions. 8. When re-tested, ensure steps 1 to 6 are repeated exactly as before.

summary STEEL DOOR LEAK Ultrasound Receiver Ultrasound transmitter DOOR SEAL DOOR FRAME Thank you