T-PROP RISK ASSESSMENT

Similar documents
OMNI 89 PROP RISK ASSESSMENT

RB 80 HYDRAULIC PROP RISK ASSESSMENT

PACKSETTER HAND PUMP

HS329 Risk Management Procedure

HAZARD MANAGEMENT PROCEDURE

OPERATIONL RISK ASSESSMENTS

-JHA- Job. For Science and Engineering. Hazard Assessment

SAFE WORK METHOD STATEMENT Part 1

SAFE WORK METHOD STATEMENT WORKING IN CONFINED SPACE HSE NET NAT SWMS APAND00030

Safe Work Method Statements (SWMS)

Bhadwasi Gypsum Mine, Rajasthan State Mines & Minerals Limited CHAPTER VII Additional studies

WORK METHOD STATEMENT CARPET LAYING

WORK METHOD STATEMENT STRUCTURAL STEEL

Hazard Assessment & Control. Faculty of Veterinary Medicine

Safe Work Method Statement LRB TREE SERVICES 6 Behland St, Kearneys Spring QLD, 4350 ABN

Hazard Management Making your workplace safer

Safety in Precast Erection

RISK ASSESSMENT HAZARD IDENTIFICATION AND RISK ASSESSMENT METHODOLOGY

CIRCUIT BREAKER TESTING - JOB SAFETY ANALYSIS

SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt, GEEBUNG PH M ABN

Vector to ZERO: HAZARD HUNT. 2. Mission/Task: 3. Begin Date: 4. End Date: 5. Date Prepared: 10. Develop Controls 11. Residual Risk Level

Responsibility. Qualitative measures of Likelihood. A Almost certain Daily Occurrence: Common or frequent. Qualitative Measures of Consequence

Employ The Risk Management Process During Mission Planning

RISK ASSESSMENT FORM Project / Work Description: Handling of furniture.

Klondex Midas Operations, Inc. Midas Mine Elko County, NV

??????? is committed to providing a safe work environment for its employees and preventing occupational injuries due to falls.

WORK METHOD STATEMENT TERMITE PROTECTION

Procedure: Work health and safety hazard management

COMMISSIONING TESTS FOR NEW HV CABLES (UP TO 33 KV) JOB SAFETY ANALYSIS

WORK METHOD STATEMENT ALUMINIUM WINDOWS AND DOORS

Age Concern Hounslow Manual Handling Risk Assessment PART ONE PRELIMINARY RISK ASSESSMENT

WHS OHS HAZARD REGISTER (SITE AND OFFICE OPERATIONS)

Activity Hazard Analysis (AHA) EM A.13 FIGURE 1-2 CONTRACTOR REQUIRED AHA TRAINING

This guidance note gives simple, practical advice on what can be done to eliminate or reduce the risks.

EMERGING TRENDS IN OCCUPATIONAL SAFETY AND HEALTH IN MINES : SOME ISSUES AND CONCERN

WH&S Act 2011 & Regulations 2011, Environmental Protection Act and Regulations

SAFETY MANAGEMENT SYSTEM

ESSENTIAL SAFETY RESOURCES

Manual Handling Risk Assessment In accordance with the Manual Handling Operations Regulations 1992

How severely could the risk hurt someone?

Risk Management Guide

TLILIC2001 Licence to Operate a Forklift Truck

SAFE WORK METHOD STATEMENT

SAFETY MANAGEMENT SYSTEM

SH&EWMS No.: F-C-QLD-10 Revision Date: July 2018 Revision Due: July 2019

WORK METHOD STATEMENT ELECTRICAL

RISK ASSESSMENT. White Paper.

Accident/Incident Reporting and Investigation Procedures

ERI Safety Videos Videos for Safety Meetings POWER SAW SAFETY. Leader s Guide 2001, SAFETY SOURCE PRODUCTIONS

FLYING OBJECTS MANUAL HANDLING EXCESSIVE NOISE

JOB SAFETY ENVIRONMENT ANALYSIS (JSEA) Working With In Situ Testing Rigs

EVENT SAFETY RISK ASSESSMENT - (SMALL TO MEDIUM SIZED COMMUNITY EVENTS) 1

Accident Investigation and Hazard Analysis

How severely could the risk hurt someone? Low/Insignificant First aid

Hazard and Risk Assessment Guide

Monitoring excavation in the highway

Advice On Risk Control Measures For Working In Hazy Conditions

SAFETY MANAGEMENT SYSTEM

MANUFACTURING TECHNICAL INSTRUCTIONS - SAFETY FALL HAZARD CONTROL REQUIREMENTS SERIES & NO. SMI - 157

Prevention of Falls and Working at Heights

LEADER NOTES FOR MAY 2012 STAND-DOWN

SAFE WORK METHOD STATEMENT Part 1 CONCRETE SAWING

Wheeler Cranes 6 McIntyre Rd Tomago NSW 2324

SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt St, GEEBUNG QLD 4031 ph ABN:

University of Vermont Department of Physical Plant Personal Protective Equipment Program

Worksite Analysis Techniques & Tools. Bobbi K. Samples Owner/Principal Consultant The Safety Firm, LLC. Why Analyze The Workplace?

SAFETY MANAGEMENT SYSTEM

Instructions for the Use of the Excel Spreadsheet. There are Three tabs at the bottom of this worksheet. Instructions tab is the one you are reading

FALL PROTECTION (SAF-SPI-06)

RESOLUTION OF THE BOARD OF SUPERVISORS OF ORANGE COUNTY, CALIFORNIA. August 8, 2017

Specific Safety Legislation/Codes of Practice/Australian Standards applicable to this JSA (Tick those applicable).

Purpose. Scope. Responsibility. Qualitative measures of Likelihood

Biomedical Laboratory: Its Safety and Risk Management

THE CONTROLLED COPY OF THIS DOCUMENT IS ON THE COMPUTER NETWORK PRINTED COPIES ARE ONLY CURRENT FOR THE DATE AT THE BOTTOM OF THE PAGE.

Important Safety Information Enclosed

PERSONAL PROTECTIVE EQUIPMENT

SAFE WORK METHOD STATEMENT Part 1 EXCAVATOR AUGER ATTACHMENT

FIRE HYDRANT TESTING METHOD STATEMENT.

SAFETY MANAGEMENT SYSTEM

Staff Contractors. Public. Staff Contractors

DRILLING AND BLASTING IN HARD ROCK NARROW TABULAR MINES

Safety Guidelines for Live Entertainment and Events I Part 2. Hazard Identification and Risk Management 1

Work Health and Safety Risk Management Procedures

MODULAR ALUMINUM PANEL SHIELDS MAPS

Aquatic Guidelines Safe Water Entry Information and Risk Assessments

IPLOCA. Novel Construction Spring Plenary Session Amsterdam 5-6 April 2017

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities

RulesforLaborers,Oilers, andtheplacingcrew VERSION7.0.1

TRAM Conference Keynote Quarterly Training Summit. October 2016 U.S. Department of Labor U.S.

Guidance: HSW Risk Assessment Methodology HSW-PR09-WI01. Objective. Implementation

SITE SPECIFIC SAFETY PLAN (SSSP)

Hazard Identification and Control

1 National Unit credit(s) at SCQF level 5: (1 SCQF credit points at SCQF level 5*)

Wheeler Cranes 6 McIntyre Rd Tomago NSW 2324

HAZARD IDENTIFICATION & RISK ASSESSMENT

JOB SAFETY ANALYSIS. How to use the Risk Assessment Charts. Likelihood A (Almost Certain) B (Likely) C (Possible)

Hazard & Risk Management

Proposed Sand/ Moram Mining Project at Gata No.- 17/1 Village- Sehjana, Tehsil & District- Hamirpur, U.P. RISK ASSESMENT RISK ASSESSMENT

Codex Seven HACCP Principles. (Hazard Identification, Risk Assessment & Management)

The Best Use of Lockout/Tagout and Control Reliable Circuits

Transcription:

T-PROP RISK ASSESSMENT 13/02/2012 ELBROC RA T-PROP

CONTENTS Introduction 3 1. Product Description 3 2. Design Criteria 3 3. Risk Assessment Team 3 4. Objectives 4 5. Hazard Classification 4 Risk matrix 5 FACTOR/INDEX TABLE 5 6. Conclusion 6 Appendix 1 T-Prop performance graphs 7-18 Appendix 2 Tabulated Hazards and Control Measures 19-21 INSTALLATION AND REMOVAL PROCEDURE 22 13/02/2012 ELBROC RA T-PROP

Introduction This document has been compiled as a risk assessment for the T-Prop mechanical prop designed and manufactured by ELBROC MINING PRODUCTS (PTY) LTD. This assessment preempts any potential application and trials that will be conducted underground. A comprehensive assessment will be carried out in accordance with the guidelines (QSP 111 Issue 1) The aim of this assessment is to identify the potential hazards associated with the use of these temporary support units in underground stoping operations and to list control measures to eliminate or reduce that potential. 1. Product Description The manufacturers of the T-Prop mechanical prop have developed the unit to perform in accordance with the COMRO guidelines for rock-burst and rock-fall conditions. The T-Prop can be re-used several times provided the prop is inspected for damage after each use. The primary purpose of the T-Prop is to be used as a temporary active support in an underground environment where such needs are identified by the mine and is not a blast on prop. 2. Design Criteria The T-Prop is a mechanical prop designed as a temporary support that can be reused 1. Installed at a load of 30kN 2. Safely operates at 50kN 3. Covers stopping width of 0.9m to 4.8m 4. Modular design Jack unit can be separated from extensions 5. Remote release mechanism 3. Risk Assessment Team The team that compiled this provisional assessment consisted of: Trevor Clements Director Operations Groundwork Consulting (Pty) Ltd 13/02/2012 ELBROC RA T-PROP

4. Objectives In order to effectively identify the hazards associated with this product, a process as set out below facilitates a logical approach to formulating the risk indices. 1. Utilize a task procedure for installing and transporting the prop to identify probable hazards. 2. Apply a risk rating for each hazard. 3. List preventative measures. All the above are tabulated in Appendix 1. 5. Hazard Classification The following definitions are appropriate to this risk assessment and will be referred to in this document: HAZARD RISK SEVERITY PROBABILITY CONSEQUENCE -something that has potential to cause harm. -the likelihood that harm from a particular hazard will occur. -extent of the risk associated with the harm that a person might suffer as well as the number of persons likely to be harmed. -the chance that a person or persons will be harmed during the exposure period. -the degree of harm; the potential severity of injuries. The matrix below has been adopted from the Anglogold policy and procedure (QSP 111 Issue 1 dated 1999 02-15) and appropriately incorporated into the risk rating of this product. Allocating a value for the consequence and probability from the index column and row does the process of attaching the risk. 13/02/2012 ELBROC RA T-PROP

Probability Expected result Quite possible Unusual but possible Remotely possible Very unlikely Practically impossible Consequence Index 1 2 3 4 5 6 Catastrophic 1 Disaster (few 2 fatalities) Very serious 3 (single fatal) Serious (serious 4 injury) Important 5 (temporary disability) Of concern (minor 6 injury) No incident 7 Near miss 8 48 47 45 42 38 33 46 44 41 37 32 27 43 40 36 31 26 21 39 35 30 25 20 15 34 29 24 19 14 10 28 23 18 13 9 6 22 17 12 8 5 3 16 11 7 4 2 1 Consequences FACTOR INDEX 1. Catastrophic (many fatalities) 2. Disaster (a few fatalities). 3. Very serious (one fatality). 4. Serious (serious injury). 5. Important (temporary disability). 6. Of concern (minor injury). 7. No incident 8. Near miss Probability 1 2 3 4 5 6 7 8 1. Is the most likely and expected result if event occurs. 2. Quite possible (50/50). 3. Unusual but possible. 4. Only remotely possible (has happened somewhere). 5. Conceivable but very unlikely (hasn t happened yet). 6. Practically impossible (one in a million). 1 2 3 4 5 6 13/02/2012 ELBROC RA T-PROP

6. Conclusion Primary hazards associated with the direct use of these products within the designed specifications and controls will be minimized if the correct installation and transport procedures are applied. This provisional risk assessment is restricted to the application of these products for underground permanent stope support only. 13/02/2012 ELBROC RA T-PROP

APPENDIX 1

APPENDIX 2

ELBROC T-Prop PROCESS ACTIVITY HAZARD CONS PROB RISK PREVENTATIVE MEASURES Installation Making work and support Falls of ground resulting in injuries Employ mine standard / procedure for barring down the area safe to persons 3 2 40 hanging wall and creating a stable footwall Determining and installing the temporary prop in accordance to the mine standard Decrease in areal coverage - increased area of possible instability (FOG) 4 3 30 Demarcation of installation pattern Prop support to be positioned at right angles to the dip of the strata Uneven load distribution - uneven load distribution on temporary prop support and increased risk of being dislodged by mining operations 5 3 24 Training on installation of support Correct sizing of the unit for the applicable stope width Undersized units would lead to ineffective support resistance and possible dislodging resulting in hanging wall collapses and injuries to persons 3 3 36 Order the correct size of the unit for the relevant working place. Positioning the sized prop support in place Injury to extended bodily limbs and toppling of the prop before pre-stressing has taken place. 6 2 23 Wear protective clothing and ensure that hands are not sited between the temporary prop and hanging- or footwall Removing Removing of temporary support at end of shift Falls of ground resulting in injuries to persons 3 2 40 Use of remote release mechanism to remove temporary support Positioned at 45 degrees above temporary support next to last permanent support 3 5 meters from temporary support 13/02/2012 ELBROC RA T-PROP

ELBROC T-Prop PROCESS ACTIVITY HAZARD CONS PROB RISK PREVENTATIVE MEASURES Loading - Stacking of props in Surface store 5 4 19 Toppling of bundles thereby creating obstructions and injuries to passers by. Do not stack more than two bundles on top of one another Ensure correct placement in store to prevent obstructions Off loading from transport vehicle Bundles falling off and injuring persons 5 4 19 Make use of hyster and /or crane operations Ensure correct procedural training for operators. Stacking in material car If not stacked properly, the units may dislodge and disrupt rolling stock. 7 3 12 Pack units flat in material cars Transport In Stope To be secured on both ends to the mono winch rope Physical transport Prevent damage of props by dragging 6 2 23 Bodily injuries due to weight of the unit. 6 3 18 Apply mine standard for mono rope procedures for securing objects Ensure that two persons carry the unit simultaneously Make use of two carrying straps where provided on the unit. 13/02/2012 ELBROC RA T-PROP

TOPIC Entry examination Make safe of stope face according to entry examination standard procedure Ensure all required PPE are used: Overall Gumboots Hard hat Gloves Goggles Ear plugs Temporary support Install temporary support as per mine standard procedure Installation procedure Ensure footwall is clean and solid Select most suitable spot on the hanging and footwall, place the prop in position Install prop at right angles to the dip Headboard towards the face Hold the prop in position and pre-load with loading handle Start new installation Make use of the of the remote release tool Attach remote release tool Clear all workers from face Stand in safe position under last permanent support Pull remote release tool and remove prop To remove T - Prop OCCUPATION Miner and Team Leader Stope Team Stope Team Miner 13/02/2012 ELBROC RA T-PROP