IGEM/GM/7A Edition 2 Communication 1803 Electrical connections for gas metering equipment

Similar documents
Non-domestic meter installations

IGEM/GM/7B Edition 2 Communication 1804 Hazardous area classification for gas metering equipment

Commissioning of gas-fired plant on industrial and commercial premises

Design and application of interlock devices and associated systems used with gas appliance installations in commercial catering establishments

Safe working practices to ensure the integrity of gas assets and associated installations

IGEM/GL/5 Edition 3 Communication 1783 Managing new works, modifications and repairs

IGEM/SR/29 Communication 1760 Dealing with gas escapes

IGEM/SR/4 Edition 3 Communication 1752 Variable volume gasholders storing lighter than air gases

Non-domestic meter installations

IGEM/UP/11 Edition 3 Communication 1821 Gas installations for educational establishments

IGEM/TD/2 Edition 2 with amendments July 2015 Communication 1779 Assessing the risks from high pressure Natural Gas pipelines

Meter regulators of nominal diameter 32 mm (1¼ inch) and not exceeding 150 mm (6 inch) and for inlet pressures not exceeding 75 mbar

IGEM/GM/6 Edition 2 Communication 1750 Non-domestic meter installations. Standard designs

Safe working practices to ensure the integrity of gas pipelines and associated installations

Medium pressure two-stage meter regulators for gas flow rates not exceeding 6 m 3 h -1

IGEM/UP/12 Edition 2 Communication 1778 Application of burners and controls to gas fired process plant

Application of pipeline risk assessment to proposed developments in the vicinity of high pressure Natural Gas pipelines

Tightness testing and direct purging of small Liquefied Petroleum Gas/Air, Natural Gas and Liquefied Petroleum Gas installations

IGEM/SR/15 Edition 5 Communication 1746 Integrity of safety-related systems in the gas industry

Installation pipework on industrial and commercial premises

IGE/TD/12 Edition 2 Reprint with Amendments Communication 1757 Pipework stress analysis for gas industry plant

IGEM/UP/2 Edition 3 Communication 1771 Installation pipework on industrial and commercial premises

DESIGN FOR NATURAL GAS INSTALLATIONS ON INDUSTRIAL AND COMMERCIAL PREMISES WITH RESPECT TO DSEAR

Horizontal Directional Drilling and Impact Moling

GAS INDUSTRY GUIDANCE ON WORK ON METER INSTALLATIONS

BCGA GUIDANCE NOTE 17

Thames Water Utilities Limited (TWUL) Wholesale Data logger installation for revenue meters - terms, conditions and guidance

AUTHORISE THE SETTING AND SEALING OF REGULATORS AND ASSOCIATED SAFETY DEVICES. AUTHORISE THE INSTALLATION OF A METER BY- PASS

1.8 INDUSTRIAL PROCESS WEIGHING IN HAZARDOUS AREAS

SUP 15 Health & Safety Management Pressure Systems. Unified procedures for use within NHS Scotland

Edinburgh Napier University Safe Working Procedure Gas Safety, Gas Systems and Equipment

PROCEDURES FOR STANDBY

User Information Sheet 015

Network Regulator Maintenance Operatives LS (Non-Accredited)

Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant

MAINTENANCE AND SAFETY OF CNG REFUELLING STATIONS

Application of compressors to Natural Gas fuel systems

Low Voltage Electricity System Safety Rules & Associated Safety Guidance

Australian/New Zealand Standard

RISK ASSESSMENT A UNIVERSITY GUIDE TO PRACTICAL RISK ASSESSMENT UNDER THE MANAGEMENT OF HEALTH AND SAFETY AT WORK REGULATIONS 1992

Gas Safety Code of Practice

TOXIC GAS DETECTORS IN THE WORKPLACE UK REGULATIONS AND STANDARDS

SAFETY QUALITY TECHNOLOGY. Guidance on Safe Isolation Procedures

THE APPROVAL FOR THE PROVISION AND USE OF A METER BY-PASS

PECIMEN IMM6. Minor Electrical Installation Works Certificates. Amd 3: In accordance with BS 7671

Balancing and Settlement Code. Code of Practice Four

GAS TRANSPORTER S REQUIREMENTS FOR GAS MEASUREMENT SYSTEMS CONNECTED TO THE NATIONAL GRID GAS NETWORK

E PGN-11. Part of NTW (O)32 Estates Operations and Maintenance Policy Paul McCabe Head of Estates and Facilities-NTW Solution Ltd

CONTRACTOR WHS HAZARD STANDARD HAZARDOUS CHEMICALS EXTERNAL USE ONLY

INSPECTION, TESTING AND CERTIFICATION OF GASFITTING WORK DONE UNDER SUPERVISION

Gas Network Craftsperson

BRITISH STANDARD BS 341-4: Transportable gas container valves. Part 4: Pressure relief devices ICS

In-Service Inspection and Testing of Electrical Equipment Certificate

Compliance with Health & Safety legislation

HEALTH & SAFETY GUIDANCE

Steel and PE pipelines for gas distribution

NORTHERN POWERGRID. Distribution Safety Rules 2015 Edition

Gas Network Craftsperson

Electrical Equipment Protocol

Work Equipment: LOCAL EXHAUST VENTILATION

PRESSURE SYSTEMS POLICY

15 Appendix 15 Notes on periodic inspecting and testing

Health & Safety Contractor rules

To Loughborough University (LU) Facilities Management (FM) Health and Safety Policy

Changes to the Gas. (Safety and Measurement) Regulations. effective 1 July 2013

Odorant systems for gas transmission and distribution

REQUESTING GAS SERVICE PIPE PRESSURE AND CAPACITY INFORMATION FROM GAS TRANSPORTERS.

Code of Practice for the Inspection and Testing of Portable Electrical Equipment (PAT)

Lifting Operation & Lifting Equipment Procedure

EXPLOSIVE ATMOSPHERES - CLASSIFICATION OF HAZARDOUS AREAS (ZONING) AND SELECTION OF EQUIPMENT

OPERATING CODE NO. 8 APPENDIX 2

The definition of a competent person given in the Electricity at Work Regulations 1989 (EWR) is as follows:

Measurement accessories METPOINT OCV for the measurement in systems up to 40 bar

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents

SOUTH AFRICAN NATIONAL STANDARD

IMPLEMENTATION OF EIGA CARBON DIOXIDE STANDARDS

Facilities and Estates. Natural Gas: Standard Operating Procedure. Document Control Summary. Contents

The European Athletic Association (hereinafter European Athletics) shall promote a European Race Walking Cup every uneven year.

LEGIONELLA MANAGEMENT PROCEDURE

Accreditation for In-Service Inspection of Transportable Pressure Receptacles (TPRs)

SAEMA Document No. SDN Original Issue Date: April 2017 Revision Reference: Revision Date: Not later than end of April 2019

(2) but does not include a shaft, trench or tunnel that is a mine or is part of the workings of a mine.

Contractor handbook. Purpose

CODE OF PRACTICE 42 IMPLEMENTATION OF EIGA CARBON DIOXIDE STANDARDS REVISION 2: 2018

National Occupational Standards For Measurement Processes Approved by UKCG May 2003

Code of Practice for Electrical Safety in Beer Dispense in Licensed Premises 2011 Guidance for Landlords. Fourth Edition April 2011

Examples of pressure systems and equipment are:

The Gas Industry Unsafe Situations Procedure Edition 6

Australian/New Zealand Standard

LIFT MAINTENANCE POLICY

Health & Safety Policy HSP 08 Control of Substances Hazardous to Health (COSHH) Version Status Date Title of Reviewer Purpose/Outcome

Electrical Safety (Portable Electric Equipment) Policy

Health, Safety and Environment Management System. HSE-PRO-008 HSE Responsibilities Procedure

Guidance on Using Temporary Suspended Access Equipment

ARTICLE III. CERTAIN PUBLIC PLACES* DIVISION 1. GENERALLY DIVISION 2. MUNICIPAL YACHT BASIN DIVISION 3. MANAGED MOORING FIELD

GUIDE TO LEGIONELLOSIS - Risk Assessment

Hot tubs for Business why you need the PWTAG publication. Janice Calvert MSc,CChem,FRSC,FRSPH,FPWTAG Chair PWTAG

C&G 2395 Exam Paper June Section A-All questions carry equal marks. Answer all three questions. Show all calculations.

Diving at Work. Managing Scientific and Archaeological Diving Projects

EUROPEAN CHAMPION CLUBS CUP CROSS COUNTRY PROMOTION AND RIGHTS

Transcription:

IGEM/GM/7A Edition 2 Communication 1803 Electrical connections for gas metering equipment Founded 1863 Royal Charter 1929 Patron: Her Majesty the Queen

IGEM/GM/7A Edition 2 Communication 1803 Electrical connections for gas metering equipment Price Code: C3H The Institution of Gas Engineers and Managers IGEM House 26-28 High Street Kegworth Derbyshire, DE74 2DA Tel: 0844 375 4436 Fax: 01509 678198 Email: general@igem.org.uk

Copyright 2018, IGEM. All rights reserved Registered charity number 214001 All content in this publication is, unless stated otherwise, the property of IGEM. Copyright laws protect this publication. Reproduction or retransmission in whole or in part, in any manner, without the prior written consent of the copyright holder, is a violation of copyright law. ISBN 978 1 905903 79 5 ISSN 0367 7850 Published by the Institution of Gas Engineers and Managers Previous Publications: Communication 1731 (2008) 1 st Edition For information on other IGEM Standards please visit our website, www.igem.org.uk

CONTENTS SECTION PAGE 1 Introduction 1 2 Scope 3 3 Legal, allied considerations and competency 5 3.1 General 5 3.2 Batteries and Accumulators (Placing on the Market) Regulations 5 3.3 Competency 5 3.4 Control of Substances Hazardous to Health Regulations (COSHH) 6 3.5 Dangerous Substances and Explosive Atmospheres Regulations 7 (DSEAR) 3.6 Electricity at Work Regulations 7 3.7 Equipment and Protective Systems Intended for Use in 7 Potentially Explosive Atmospheres Regulations (EPS) 3.8 Health and Safety at Work etc. Act (HSWA) 7 3.9 Management of Health and Safety at Work Regulations (MHSWR) 8 3.10 Provision and Use of Work Equipment Regulations (PUWER) 8 4 Inputs, outputs and interface equipment 9 4.1 General 9 4.2 Meter electrical outputs 9 4.2.1 LF outputs (pulse) 9 4.2.2 HF outputs 9 4.3 Optical outputs 10 5 Installing equipment 11 5.1 General 11 5.2 Competency 11 5.3 Equipment for use in non-hazardous and hazardous areas 11 5.3.1 Equipment for use in non-hazardous areas 11 5.3.2 Equipment for use in hazardous areas 11 5.4 Authorisation and responsibilities 13 5.5 Installation 14 5.6 Connections 18 5.7 Disconnection of other electrical equipment during installation 18 5.8 Interconnecting cable 19 5.9 Connection of equipment to a telephone line 20 5.10 Lightning protection 20 5.11 External aerials 21 5.12 Electrical isolation 22 5.13 Earthing 22 5.14 Labelling 23 5.15 Commissioning 24

6 Inspection and maintenance 25 6.1 Inspection 25 6.2 Maintenance 26 6.3 Response to failed or faulty equipment 27 6.4 Disconnection of electrical equipment 27 7 Records and reporting 28 APPENDICES 1 Glossary, acronyms, abbreviations, units and symbols 29 2 References 32 3 Peripheral equipment and meter types 35 4 Pulse input and output circuit design 36 5 Battery powered equipment 40 6 Earthing 41 7 Ensuring the integrity of installation, operation and maintenance of the pulse chain 44 8 Equipment certification 50 FIGURE 1 EX label 12 2 Pulse utilisation 14 3 Typical examples of electrical connections to gas metering equipment 17 4 Isolation device. Required safety and electrical isolation 36 5 Pipework and equipment bonding to earth with reference to CP, insulated joints (I/J) and impulse lines 41 6 Earthing arrangements for IS systems including the use of steel wire armoured (SWA) cable 42 7 Examples of permitted and prohibited arrangements of earthing if galvanic isolators are used in IS systems 43 8 Potential system involving a number of different pieces of equipment 44 9 View of typical system showing owners and power sources 46 10 Typical series connections 47 11 Typical parallel connections. Highest integrity for all units and single dependency 47 12 Example of an unacceptable parallel connection 49

13 Typical example of pre-atex equipment marking 51 14 Typical example of ATEX equipment marking, including relevant definitions 51 TABLE 1 Zone classification and typical protection methods for instrumentation 15 2 Requirements for input circuits 37 3 Requirements for output circuits 38 4 ATEX equipment category suitable for specific zones 50 5 Gas groups 52 6 Temperature classification ( T class) 52 7 Standards for methods of protection, selection, installation and maintenance 55 8 Variations of Type n protection 56 9 Variations of Type intrinsically safe ( i ) protection 56

SECTION 1 : INTRODUCTION 1.1 This Standard supersedes IGEM/GM/7A, Communication 1731, its scope covers electrical connections for gas metering equipment and is intended to be read in conjunction with IGEM/GM/7B Edition 2 Communication 1804, its scope covers hazardous area classification for gas metering equipment. 1.2 This Standard has been drafted by an Institution of Gas Engineers and Managers (IGEM) Panel, appointed by IGEM s Gas Measurement Committee, and has been approved by IGEM s Technical Co-ordinating Committee on behalf of the Council of IGEM. 1.3 This Standard has been developed for use by parties which make electrical connections to a gas meter (hereafter referred to as meter ) for a volume conversion device, automatic meter reading (AMR) facilities, data logging equipment, energy management systems (EMS), other pulse outputs, etc., irrespective of ownership of the meter or equipment. As such, the Standard will be of use to gas suppliers, end users, shippers, gas transporters (GTs), meter asset managers (MAMs), installation contractors, EMS installers, equipment manufacturers and consultants. The Standard will also be of assistance to designers and manufacturers when designing or specifying associated equipment. 1.4 This Standard includes additional and enhanced information, including that for meter pulse utilization (MPU). It is written such that it complements, the Supply Point Administration Agreement (SPAA), Meter Asset Manager s Code of Practice (MAMCoP), Code of Practice for Approved Meter Installers (CoP for AMI) and the Dangerous Substances and Explosive Atmospheres Regulations (DSEAR). 1.5 This Standard is not retrospective. However, where work needs to be undertaken on a meter installation, it is recommended that such an installation be brought into line with this Standard. 1.6 The de-regulation of the metering market has led to the need for new sets of rules and Standards. This has been addressed by the SPAA MAMCoP, developed to cover whole life management of gas meter installations. The CoP for AMI which cover the installation of the meter only, will continue to apply. Businesses installing meter installations are required to be SPAA AMI. There has also been a review and harmonisation of industry standards and CoPs to reflect the needs of the changing market. Note: SPAA-approved MAM does not have to be an AMI, but has an obligation to use an AMI to install a meter. Notwithstanding Sub-Section 1.10, total compliance with IGEM/GM/7A is necessary for installations and modules where the meter installation has to comply with the SPAA MAMCoP, relevant scope. 1.7 This Standard makes use of the terms must, shall and should when prescribing particular requirements. Notwithstanding Sub-Section 1.10: the term must identifies a requirement by law in Great Britain (GB) at the time of publication the term shall prescribes a requirement which, it is intended, will be complied with in full and without deviation the term should prescribes a requirement which, it is intended, will be complied with unless, after prior consideration, deviation is considered to be acceptable. 1

Such terms may have different meanings when used in Legislation, or Health and Safety Executive (HSE) Approved Code of Practice (ACoPs) or guidance, and reference needs to be made to such statutory legislation or official guidance for information on legal obligations. 1.8 The primary responsibility for compliance with legal duties rests with the employer. The fact that certain employees, for example responsible engineers, are allowed to exercise their professional judgement does not allow employers to abrogate their primary responsibilities. Employers must: have done everything to ensure, so far as it is reasonably practicable, that responsible engineers have the skills, training, experience and personal qualities necessary for the proper exercise of professional judgement have systems and procedures in place to ensure that the exercise of professional judgement by responsible engineers is subject to appropriate monitoring and review not require responsible engineers to undertake tasks which would necessitate the exercise of professional judgement that is not within their competence. There should be written procedures defining the extent to which responsible engineers can exercise their professional judgement. When responsible engineers are asked to undertake tasks which deviate from this, they should refer the matter for higher review. 1.9 It is now widely accepted that the majority of accidents in industry generally are in some measure attributable to human as well as technical factors in the sense that actions by people initiated or contributed to the accidents, or people might have acted in a more appropriate manner to avert them. It is therefore necessary to give proper consideration to the management of these human factors and the control of risk. To assist in this, it is recommended that due regard be paid to HSG48 and HSG65. 1.10 Notwithstanding Sub-Section 1.7, this Standard does not attempt to make the use of any method or specification obligatory against the judgement of the responsible engineer. Where new and better techniques are developed and proved, they are to be adopted without waiting for modification to this Standard. Amendments to this Standard will be issued when necessary, and their publication will be announced in the Journal of the Institution and other publications as appropriate. 1.11 Requests for interpretation of this Standard in relation to matters within its scope, but not precisely covered by the current text, are to be addressed in writing to Technical Services, The Institution of Gas Engineers and Managers, IGEM House, High Street, Kegworth, Derbyshire, DE74 2DA or by email to technical@igem.org.uk and will be submitted to the relevant Committee for consideration and advice, but in the context that the final responsibility is that of the engineer concerned. If any advice is given by or on behalf of IGEM, this does not relieve the responsible engineer of any of his or her obligations. 1.12 This Standard was published in March 2018. 2

SECTION 2 : SCOPE 2.1 This Standard covers electrical equipment and connections for gas metering equipment. For the purposes of this Standard, electrical equipment and connections includes optical equipment and connections, unless otherwise stated. 2.2 This Standard applies to meter installations of maximum operating pressure (MOP) not exceeding 100 bar. Additional requirements may need to be applied for installations having extensive communications systems, flow computers, etc. 2.3 This Standard applies to meter installations containing Natural Gas (NG) (a 2 nd family gas as defined by BS EN 437) in a gaseous state. Note: This Standard does not apply to either compressed or liquefied Natural Gas (CNG or LNG) vehicle filling station installations. Guidance on the latter is provided by IGEM/UP/20 and IGEM/UP/21 respectively or the Energy Institute (see A2.6). Ambient temperatures are assumed to be in the range 25 o C to 55 o C. 2.4 This Standard applies to primary and secondary meter installations and associated volume conversion equipment in industrial, commercial and domestic premises, installed in accordance with IGE/GM/4 (see Note 4), IGEM/GM/5, IGEM/GM/6, IGEM/GM/8, BS 6400-1 or BS 6400-2, respectively and, where applicable, a hazardous area classification has been carried out in accordance with IGEM/GM/7B or IGEM/SR/25, as appropriate. For an existing meter installation, this Standard applies only to new equipment being fitted for the first time or replacing existing electrical equipment i.e. it does not apply for existing equipment not being replaced. Note 1: Note 2: Note 3: Note 4: A meter installation in domestic premises is an installation within, or near to, a domestic dwelling into which the installation supplies gas and where it is reasonable to expect that the householder will be in the vicinity of the installation on a regular basis. A meter installation in industrial or commercial premises is an installation within the boundary of the industrial and commercial premises within which the gas load is located and where it is reasonable to expect that passers by will be in the vicinity of the gas installation on a regular basis. This is to distinguish this type of installation from a remote site, for example a National Transmission System above-ground installation, where it is reasonable to expect that persons will not be present for long periods of time. Many of the principles of IGEM/GM/7A will apply to other gas meter installations having an unlimited installation pressure, for example at transmission boundary interfaces where gas measurement may take place. However, consideration would need to be given to the special circumstances affecting such installations, for example the remoteness of the site, high gas pressures and large gas volumes. For equipment installed in accordance with IGE/GM/4, an additional assessment will be required to ensure suitability. 3

2.5 This Standard considers: DSEAR and ATEX Directives competency pulse ownership equipment certification and suitability equipment connections details of electrical connections labelling records and reporting. 2.6 Advice is provided on: legal requirements authorisation procedures electrical low frequency (LF) and high frequency (HF) outputs design of electronic interface equipment ensuring integrity of installation, operation and maintenance of a pulse chain procedures for telephone connections equipment location and installation equipment connection, protection and isolation earthing inspection and maintenance. 2.7 This Standard applies to the connection of any electrical equipment to a gas meter, including: a volume conversion device AMR facilities add-on pulse modules a data logger an EMS radio transmitting devices a tamper circuit. 2.8 This Standard does not address any requirements relating to gas work under the Gas Safety (Installation and Use) Regulations (GS(I&U)R). 2.9 All pressures quoted are gauge pressures unless otherwise stated. 2.10 Italicised text is informative and does not represent formal requirements. 2.11 Appendices are informative and do not represent formal requirements unless specifically referenced in the main sections via the prescriptive terms must, shall or should. 4