BILL OF QUANTITIES PROJECT : Proposed Remodelling of ADB Country Office CLIENT : ADB, Liberia. LOCATION : Sofey Ice cream Junction ~Congo town DATE : May, 2017. 1 PRELIMINARY WORKS / GENERAL OBLIGATIONS 2 MOBILIZATION AND SITE PREPARATION : - Deployment of construction equipmernt & appliances L/S 1 - Provision of storage facilitly. (within existing facility) L/S 1 - Provision of site utilities : (portable water supply, electrial power, communication and sanitary facilities) L/S 1 TOTAL (Mobilization & Site Preparation Work) 3 Permits Environmental Protection Agency (EPA) L/S 1 Ministry of Public Works (MPW) L/S 1 City Corporation (- CC) L/S 1 - (sub-item A.2) TOTAL (Permits Work) TOTAL (PRELIMINARY WORKS / GENERAL OBLIGATIONS) 4 DEMOLITION & REMODELLING WORKS 5 Ground floor 6 Carefully demolish existing gypum wall, cart away mateirals arising from demolition to a predetermined location and make good structures disturbed as required Item 1.00 7 Carefully remove existing hardwood window and make good structure disturbed as required. No. 2.00 8 Demolish existing dwarf concrete wall and make good structure disturbed as designed Item 1.00 9 Carefully remove an existing door and refix in an opposite direction as shown on design No. 3.00 10 Allow a sum to Supply 24'' x 24 '' ceramic floor tiles / carpet as required L/S 1.00
10 First floor 11 Carefully remove existing hardwood door and stock- pile as required by A/E No. 4.00 12 Carefully remove an existing door and refix in and opposite direction as shown on design No. 2.00 13 Carefully remove existing ceramic floor tile, and cart- away as required. Sqy 5.67 TOTAL (Demolition Work) NEW WORKS 14 MASONRY WORKS 15 Ground floor 16 Allow lump sum to create an arch as per drawing L/S 1 17 Provide and Install 6" hollow block wall including 1:4 mix cement- sand bonding mortar as per drawigs Sqy 1.39 18 Allow sum to Provide and Install Aluminium BTS rail well to the concrete base as per drawigs Lft 38 19 Allow sum to Provide and Install Alubond with double glazing for grounded partition in building as per design (composite) Sft 757.2 20 Allow lump sum to paint internal wall as required L/S 1 21 Allow lump sum to cut / patch and make good all damaged existing ceiling. L/S 1 22 Allow lump sum to raise floor slab to a level as per design and make good structure disturbed (floor slab) L/S 1 23 Allow a sum to Supply 24'' x 24 '' ceramic floor tiles / carpet as required L/S 1.00 Allow sum to maintain apron around main buliding as require L/S 1.00
24 DOORS 25 Provide and install Aluminium composite doors @ 2' -6'' x 7' -0'' high complete with Yale cylinder lock or equivalent. No 1 26 Provide and install Sliding Aluminium composite doors @ 2' -6'' x 7' -0'' high complete with Yale cylinder lock or equno 1 (Door Work) 26 First floor 27 Provide and Install 6" hollow block wall including 1:4 mix cement- sand bonding mortar as per drawigs Sqy 1.39 28 Allow sum to Provide and Install Alubond with double glazing for partition in building as per design (composite) Sft 458.3 29 Allow lump sum to paint internal wall as required L/S 1 30 Allow lump sum to cut / patch and make good all damaged existing ceiling. L/S 1 31 Allow lump sum to raise floor slab to a level as per design and make good structure disturbed (floor slab) L/S 1 32 Allow a sum to Supply 24'' x 24 '' ceramic floor tiles / carpet as required. L/S 1.00 33 DOORS 34 Provide and installation Glazing doors @3'-6" x 7'-0" in Aluminium frame as dircted by A/E. No 1 35 Provide and installation wooden pnel doors @2'-6" x 7'-0" in wooden frame as dircted by A/E. No 1 36 Provide and install a Sliding Glaze doors @3'-6" x 7'-0" in Aluminium frame as dircted by A/E. No 1 (Door Work) Plumbing Installation 37 Allow a provisional sum to repair/replace/check existingwash fixtures and accessories including faucets, wc, basins etc. L/S 1
38 ELECTRICAL WORKS ( GROUND FLOOR & FIRST FLOOR) 39 Allow lump sum to check, test / certisfy the integrity of the existing earth mat and the general eathing including bonding to Main building, Generator house and DC /Power house by a competent Electrical contractor as required L/S 1 40 Supply and install lighting protection system/test and commisioning within the premises as required. L/S 1 41 Provide and install the following electrical gadget and its accessories as required: i) Television No 4.00 42 Allow lump sum to install, rough electrical components to include IT Data outlet, DCP Power ~clean outlet (40) etc. as required. L/S 1 Lighting fixtures and fittings 43 Allow a sum to provide lighting fitings and fixtures including Energy serving bulbs,lamp holders as shown on design for office and work areaetc. L/S 1 44 Allow sum to install cable trench to accommodate service lines including trunking system. L/S 1 Water Storage Transmission & Distribution 45 Allow sum to check/repair/ replace existing 3HP electric driven submersible pump including wiring, fittings, control swithes and other accessories complete. L/S 1 Miscellenous 46 Allow a sum to supply and install a sound proof 60KVA capacity generator complete including Automatic Transfer switch and other accessories No 1 47 Allow a sum to supply and install a sound proof 85.4KVA capacity generator complete including Automatic Transfer switch,mdb and other accessories No 1 48 Allow sum for testing and commissioning of the generator installation to the satisfaction of the Engineer including allowance for maintenance for twelve (12) months defects liability period. L/S 1.00
Fence wall 49 Allow sum to rehabilitate existing fence wall to inluding replacement/repair/check razor wire and make good structural disturbed as required. L/S 1 50 Allow sum to provide and install broken bottles ro replace L/S 1 existing razor wire as required. 51 Rehabilitate and make good / functional existing water transmission piping with fittings and accessories as required L/S 1 GENERAL SITE CLEANING & DEMOBILIZATION General site cleaning 52 Clear and Clean the entire site of all debris, heap up waste material (before and during rehabilitation works) and unwanted / surplus materials within site envelope as require L/S 1.00 53 Demobilization 54 Remove all construction and / or other equipment, as well as temporary structures from site as required. L/S 1.00 Cost of Material TOTAL PROJECT IMPLEMENTATION COST Add 10% Contingency on project cost (To be used for un- foreseen works, upon owner's approval) GRAND TOTAL ESTIMATED COST OF REMODELLING