PSSI 1 High Voltage Switching

Similar documents
PSSI 3 High Voltage Metal-Enclosed Switchgear

PSSI 6 Demarcation of Work Areas in Substations

PSSI 10 Plant and Apparatus Containing Dielectric Gas

Energy Networks Management Safety Procedures DEFINITIONS

This Procedure details the procedures to be followed in order to achieve Safety from the System when:

PSSI 12 Low Voltage Apparatus

OPERATING CODE NO. 8 APPENDIX 2

To Loughborough University (LU) Facilities Management (FM) Health and Safety Policy

Low Voltage Electricity System Safety Rules & Associated Safety Guidance

NORTHERN POWERGRID. Distribution Safety Rules 2015 Edition

PSSI 36 General Confined Spaces, Tunnels, Culverts and Similar Spaces

HEALTH TECHNICAL MEMORANDUM Authorised persons logbook STATUS IN WALES APPLIES

PROCEDURES FOR STANDBY

The Statkraft Way. Switching Supervisor

SAFETY QUALITY TECHNOLOGY. Guidance on Safe Isolation Procedures

Document Control Summary Status: Replacement for Electricity High Voltage SOP v1.0 Version: V1.1 Date: July 2017 Author/Title: Owner/Title:

Access for Work on Low Voltage and Mechanical Apparatus

C&G 2395 Exam Paper April Section A - All questions carry equal marks. Answer all three questions. Show all calculations.

HV RUBBER GLOVE WORKING

These Instructions apply to all high-voltage installations where Statnett has operational responsibility.

These Electricity Safety Rules and associated National Safety Instructions are written to safeguard personnel working for or on behalf of National

These Instructions apply to all high-voltage installations where Statnett has operational responsibility.

STCP 01-1 Issue 005 Operational Switching

Operating Process Work on Low Voltage or Mechanical Apparatus

C&G 2395 Exam Paper June Section A-All questions carry equal marks. Answer all three questions. Show all calculations.

Electrical. Version 1.0

STCP 01-1 Issue 008 Operational Switching

STCP 08-2 Issue 004: Circuit Live Trip & DAR Tests

These Instructions apply to all low-voltage installations where Operations Manager HV in Statnett has authority as Operations Manager LV.

SSR Competency Assurance Guidance Booklet No.2 (SSR Summary for Contractors CP) Revision 0 October 2014 HSEQ Department, TRANSCO

These Electricity Safety Rules and associated National Safety Instructions are written to safeguard personnel working for or on behalf of National

TRACK CIRCUIT BLOCK REGULATIONS ISSUE 11/07

ELECTRIC OPERATING PROCEDURES Date: 11/01/06

SAFETY RULES. For the Control, Operation and Maintenance of Electricity Transmission & Distribution System of

IEC April Authorized Sole Agent : PT. Wisma Niagatama Perkasa. Phone : (031) Fax. : (031)

Power System Safety Rules. Revision

Installation, Operation and Maintenance Instructions for Electronically Controlled Pressurisation Units

Electrical Shore Connections

LOCKOUT SYSTEM AND POLICIES

Control of Energy - Isolation Process

GUIDANCE ON THE APPLICATION OF WIND TURBINE SAFETY RULES. Third Edition. Issue 2

LOCKOUT/TAGOUT PROGRAM

Handbook 16. Issue 4. AC electrified lines. GERT8000-HB16 Rule Book. September 2018 Comes into force 01 December 2018

Field Instruction. The purpose of this instruction is to inform all Horizon Power workers of the safety requirements when working from a EWP.

QPEO2/037N Credit Value: 15 QCF Level: 2 GLH: 68 Maintaining electrical equipment/systems

Inspection and Testing

DOCUMENT CONTROL. Name: Mark Van Vuuren Position: Field Practices Coordinator Date: June 2014

Inspection Recommendations

Gas Network Craftsperson

6 lockout operations every electrician MUST perform and respect

PERIODIC INSPECTION REPORT FOR AN ELECTRICAL INSTALLATION

Maintaining electrical equipment/systems

National Grid UK Electricity Transmission plc. Safety Rules and Guidance (Fifth Edition)

LOCK-OUT / TAG-OUT SYSTEM & PROCEDURE

Electrical Safety Program

Field Instruction. This instruction outlines the minimum requirements for all Horizon Power workers who undertake Vegetation Management Work.

Infrared Thermography Inspection Guidelines. Date Issued:

ELECTRICAL SAFETY. Unsafe work practices near electricity can kill you! You are responsible for protecting yourself from electrical shock.

MISSOURI UNIVERSITY OF SCIENCE & TECHNOLOGY Procedure: 3.6

Automatic Valve Proving Control

Issue 3. Module TS11. Failure of, or work on, signalling equipment signallers regulations. GERT8000-TS11 Rule Book

Rigel 601 CHECKBOX. Instruction Manual. 348A551 Issue 2.0. April Seaward Electronic Ltd. Issue 2.0

OPERATION MANUAL. For the PARU01. Underwater Plasma Cutting. Supervisors Remote Panel

Hazard Sheet 8. Electricity. Electricity

Electrical Safety in the Food Industry

FINAL FACILITY STUDY. KV1C Transformer Addition at Badwater Substation 2009-T1. November 17, 2009

Revision 21 of Issue 3 of the Grid Code has been approved by the Authority for implementation on 16 th July 2007.

Status Date Prepared Reviewed Endorsed Approved

Energy Control. Suite 2A, 55 Frid Street Hamilton, ON L8P 4M3 office: cell:

Isolation of power supplies

Requirements for Reduced Supervision of Power Plants, Thermal Liquid Heating Systems, and Heating Plants

SEMEMI SQA Unit Code H2AP 04 Carrying out fault location on electrical equipment and circuits

HAI UPB 15A Relay Switch and Auxiliary Switch Installation and Operating Instructions

COMMISSIONING TESTS FOR NEW HV CABLES (UP TO 33 KV) JOB SAFETY ANALYSIS

DuPage County Environmental, Safety, Health & Property Loss Control Program Hazardous Energy Control (Lockout/Tagout)

ISOLATION ISSUE 2 1 AIM 2 4 REASONS FOR INCLUSION 3 6 PLANT AND EQUIPMENT REQUIREMENTS 3 7 SYSTEM & PROCEDURAL REQUIREMENTS 4 8 PEOPLE REQUIREMENTS 6

MOD JSP 375 VOLUME 3 CHAPTER 3 ELECTRICAL SYSTEMS

Original Date of Issue: 04/09

Isolation Standard - Tags

ECONORESS ELECTRONIC EPS & EPT - ENHANCED PRESSURISATION SET INSTALLATION OPERATION & MAINTENANCE DOCUMENTATION

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance

C&G Level 3 Award in the Periodic Inspection, Testing and Certification of Electrical Installations

SUBSTATION EXPLOSION BARRY GASS HIGH VOLTAGE TRAINING. Barry Gass Training Manager High Voltage Training South Africa

WEST CLUBS WOMEN S HOCKEY LEAGUE REGULATIONS SEASON

Lockout/Tagout Plan Environmental Health & Safety Office July 2017

The definition of a competent person given in the Electricity at Work Regulations 1989 (EWR) is as follows:

Status Date Prepared Reviewed Endorsed Approved

Guidelines to the standard IEC60601

Nordel GRID DISTURBANCE AND FAULT STATISTICS

ES18 Security Theory/Regulations Answer Schedule

Health & Safety Policy and Procedures Manual SECTION 6 ELECTRICAL SAFETY / CONTROL OF HAZARDOUS ENERGY

Purpose. Scope. Process flow OPERATING PROCEDURE 07: HAZARD LOG MANAGEMENT

Work Health and Safety Risk Management Procedures

Lockout/Tagout Training Overview. Safety Fest 2013

Power Unit 075. Maintain Substation Circuit Breakers

NZQA Expiring unit standard version 7 Page 1 of 8. Demonstrate knowledge of safe working practices in telecommunications.

Electrical Safety. Hazard Awareness

MP15 Jockey Pump Controller

Withdrawn Document Uncontrolled When Printed

PECIMEN IMM6. Minor Electrical Installation Works Certificates. Amd 3: In accordance with BS 7671

Transcription:

1. SCOPE This Safety Instruction sets down the procedures to be adopted when carrying out High Voltage (HV) Switching operations on The Company s System and other System(s) operated by the Company other than under the terms of a Sanction for Test. 2. ISSUE RECORD This is a Reference document. The current version is held on the EN Document Library. It is your responsibility to ensure you work to the current version. Issue Date Issue No. Author Amendment Details September 2015 7 Phil Currie General review and update. 9.4 / 9.6: Establishment/removal of isolation and earthing on 11kV radial circuits permitted in a single group of instructions. 9.5: Procedure for isolating and earthing circuits supplied by two- or three-position disconnectors moved from PSSI 3 and updated. 10.1: Hierarchy of Switching introduced. 10.2: Various changes. 10.8: Requirement for Senior Authorised Person to confirm to Control Person the electrical state of switchgear that has been worked on. 10.12: Re-worded to reflect use of Switching hierarchy. 10.16: Reference to single phase Switching in relation to ferroresonance and making/breaking a circuit parallel. June 2016 8 John Geddes Updates to allow issue and confirmation of Switching instructions by electronic means. 9.6 reference to Earth Selected removed. 10.1 Hierarchy of Switching amended. 3. ISSUE AUTHORITY Author Owner Issue Authority Name: John Geddes Title: Operational Safety Engineer Name: Gary Evans Title: Operational Assurance Manager Name: Colin Taylor Title: Director, Engineering Services 4. REVIEW This is a Reference document which has a 5 year retention period after which a reminder will be issued to review and extend retention or archive. 5. DISTRIBUTION This Energy Networks Safety Instruction is maintained by EN Document Control and is part of the ScottishPower Safety Rules which is published to the SP Energy Networks Internet site. SP Power Systems Limited Page 1 of 6 PSSI 1

6. CONTENTS 1. SCOPE... 1 2. ISSUE RECORD... 1 3. ISSUE AUTHORITY... 1 4. REVIEW... 1 5. DISTRIBUTION... 1 6. CONTENTS... 2 7. DEFINITIONS... 3 8. PLANT AND APPARATUS IDENTIFICATION... 3 9. PREPARATION FOR SWITCHING... 3 10. HIGH VOLTAGE SWITCHING OTHER THAN FOR EMERGENCY... 4 11. HIGH VOLTAGE SWITCHING EMERGENCY CONDITIONS... 6 SP Power Systems Limited Page 2 of 6 PSSI 1

7. DEFINITIONS Terms printed in bold type are as defined in the ScottishPower Safety Rules (Electrical and Mechanical). 8. PLANT AND APPARATUS IDENTIFICATION Plant and Apparatus shall be readily identifiable. 9. PREPARATION FOR SWITCHING 9.1 All HV Switching, except for emergency Switching, shall be carried out to the instructions of the appropriate Control Person. 9.2 The Control Person may issue instructions either orally or by an Approved electronic device. 9.3 Before issuing HV Switching instructions the Control Person shall consult with the Control Person of any adjacent System(s) which may be affected by the proposed Switching. This consultation shall include persons controlling other networks which may be affected. Details of the above consultation shall be recorded in the Switching log. 9.4 Before Switching instructions are issued by the Control Person they shall be recorded, giving the name of the Location(s) at which Switching is to be carried out, the identification and nomenclature of the Apparatus involved and the operation to be carried out. 9.5 Except as detailed in section 9.5.1 and 9.6, the sequence of Switching instructions shall, where practicable, be such that all Switching causing the Apparatus to be Isolated from all points of supply, including voltage and auxiliary transformers and common neutral earthing equipment from which the Apparatus may become Live, be completed before the Control Person issues any instructions for the application of earths. 9.5.1 On 11kV radial circuits where the precautions to achieve Safety from the System comprise a single HV Point of Isolation and a single Primary Earth, the Switching to achieve isolation and earthing may, at the discretion of the Control Person, be issued as a single group of instructions. 9.6 In some switchgear designs it is not practicable to create a Point of Isolation before moving a disconnector to the Earth position. When using such switchgear to establish a Point of Isolation and, if required, to apply an earth: The Apparatus to be Isolated or Earthed shall be not Live before the disconnector/earth switch is moved to the Earth position; It is permissible to move the disconnector/earth switch to the Earth position before the disconnector/earth switch is Locked to create a Point of Isolation. 9.7 Subject to section 9.7.1 below, prior to restoring Isolated Apparatus to service after work/testing has been completed, all Earthing Devices shall, where reasonably practicable, be confirmed as having been removed, before the Control Person issues any restoration Switching instructions. 9.7.1 On 11kV radial circuits where the precautions in place to achieve Safety from the System comprise a single HV Point of Isolation and a single Primary Earth, the Switching to remove the Primary Earth and re-energise the circuit may, at the discretion of the Control Person, be issued as a single group of instructions. SP Power Systems Limited Page 3 of 6 PSSI 1

9.8 HV Switching instructions shall be given directly to the Authorised Person who is to carry out the operation except for the application of Portable Earths when the operation may be carried out by the Authorised Person who has been given the instruction or by a Person acting under his Personal Supervision. 9.9 Where the Switching is to be carried out by an Authorised Person under training, he shall be under the Personal Supervision of an Authorised Person who has also received the Switching instructions direct from the Control Person. The Control Person shall record the name of the Authorised Person receiving the Switching instructions and also the name of the Authorised Person under training receiving the same Switching instructions. 9.10 If the Authorised Person has any objections or queries at any stage of the instructions or operation he shall raise them with the Control Person immediately. 9.11 The instructions shall where reasonably practicable be given in two parts as detailed below: 9.11.1 An explanation of the purpose of the proposed operations including the identity and Location of the Apparatus involved, to the Authorised Person who is about to carry out the instructions and also to any supervising Authorised Person. It is not necessary to record this part of the instruction. 9.11.2 The formal precise instructions shall follow a standard pattern and include: (i) (ii) (iii) (iv) The name of the Control Person giving the instructions; The Location and identity of the Apparatus to be operated; The actual operation requirement (including check synchronism where appropriate); The time and date of the instructions. 9.12 The Authorised Person receiving the Switching instructions shall, unless in possession of a prepared paper Switching schedule or instruction(s) received on an Approved electronic device, write the instructions down in accordance with OPSAF-11-010 (MSP 1.8), reading the instructions back phrase by phrase as received. At the termination of the message the instructions shall be read back in full. 10. HIGH VOLTAGE SWITCHING OTHER THAN FOR EMERGENCY 10.1 Hierarchy of Switching All switchgear operations shall, where reasonably practicable, be planned and completed in accordance with the following hierarchy: (i) (ii) (iii) (iv) Remotely via remote control facilities or remotely on site via control panels in a different room to the switchgear being operated; Remotely via an Approved umbilical device or delayed Switching device. Remotely via a control panel, manual protection operation or similar in the same room as the switchgear being operated; Via the operating facilities on the switchgear. 10.2 When carrying out the Switching instructions, the Authorised Person shall observe the following requirements: (i) He shall be deliberate, neither rushing nor causing undue delay and shall take nothing for granted; SP Power Systems Limited Page 4 of 6 PSSI 1

(ii) (iii) (iv) (v) (vi) (vii) (viii) (ix) (x) He shall visually inspect switchgear (including associated equipment) to confirm its condition is satisfactory before it is operated locally. He shall visually check the switch to ensure that it is in the expected position prior to operating; He shall take with him the Switching instruction, consulting it and checking that he is on the correct Apparatus before taking any action; He shall then pause and recheck his proposed action before carrying it out; After carrying out each operation he shall record that operation on the Switching log, schedule or device and check to ensure the anticipated operation has been achieved and that it has operated fully and correctly; When a switch or similar piece of Apparatus shows any sign of distress its condition shall be reported immediately to the Control Person. All persons shall be kept clear of such Apparatus until a decision is made about further operation; When operating pole-mounted air break switchgear by a low level handle, the operator shall wear Approved rubber gloves; When an overhead line earth switch is closed the Authorised Person shall, where reasonably practicable, check the Circuit Identification and add this to the Switching instruction; Where the operational features of a switch (including an earth switch), circuit breaker or isolator are Locked they shall only be unlocked immediately before being operated and shall be Locked in position immediately after it has been operated; The Authorised Person shall endorse his Switching instructions with the time of completion of each operation. 10.3 Following HV Switching the Authorised Person shall confirm to the Control Person, as soon as is reasonably practicable, the operations carried out and any Circuit Identification involved. The confirmation may be either oral or by an Approved electronic device 10.4 When switching has been recorded using a paper Switching schedule or log the Control Person shall record the time of completion of the Switching and any Circuit Identification and shall give the Authorised Person the time of receipt (confirmed time), which shall be recorded along with the name of the Control Person. He shall also acknowledge by repeating to the Authorised Person, the details of any completed Switching operations reported to him by the Authorised Person and any other relevant information.. 10.5 All recorded entries shall be legible and indelible. Records, together with copies of paper Switching instructions, shall be retained in accordance with OPSAF-11-010 (MSP 1.8). 10.6 Where isolation is effected by the opening of Isolating Devices, the integrity of which is dependent on the presence of gas at the design pressure, the pressure shall be monitored throughout the period of work to ensure that the integrity of the isolation is maintained. The relevant gas zones shall be quoted on the Safety Document. Any material change in pressure shall be reported immediately to the Control Person who shall take the following action: 10.6.1 Where a Safety Document has been issued, the recipient shall be informed by the Control Person and the work stopped until the change in pressure has been investigated by a Senior Authorised Person. Work shall not be resumed until normal conditions are re-established, or a Senior Authorised Person deems it safe. The Control Person shall, where reasonably practicable, also notify the Senior Authorised Person who issued the Safety Document. 10.6.2 Where no Safety Document has been issued, any work or proposed work shall be stopped until normal conditions have been re-established as in 10.6.1 above. SP Power Systems Limited Page 5 of 6 PSSI 1

10.7 The operation of HV fuse access covers or fuse carriages on HV Apparatus is a Switching activity and shall only be carried out by appropriately Authorised Persons. 10.8 Before HV switchgear which has been worked on is returned to service, the Authorised Person responsible for carrying out the work shall confirm with the Senior Authorised Person cancelling the Safety Document, the operational condition of the switchgear. The Senior Authorised Person shall confirm the operational condition of the switchgear to the Control Person. This shall include a declaration of its electrical state, e.g. Open or Closed. 10.9 Following testing, the Apparatus which has been tested shall, where reasonably practicable, be energised from the point at which the testing was carried out. 10.10 Any failure of supply to or from any part of the HV System or operation of a switch under fault conditions shall be reported immediately to the Control Person together with any available relay indications and other relevant information. These details shall be recorded by the Control Person. Any relay or other visual indications shall be recorded in accordance with OPSAF-11-010 (MSP 1.8) before resetting the relays. 10.11 When the Control Person gives instructions to restore a circuit which has opened under fault conditions, the Authorised Person receiving the instruction shall ensure that the relays requiring manual resetting are reset before attempting to close any circuit breaker. The position of a fault thrower switch (where fitted) shall always be checked before re-energising a transformer which has been tripped on transformer protection. 10.12 When sectioning a network (22kV & below) for fault isolation, manual Switching in secondary substations shall, where reasonably practicable, be done with the System de-energised, providing disconnection and restoration can be achieved through remote operation of switchgear, by one of the methods listed above in 10.1 (i) (iv) inclusive. 10.13 In the event that a Switching instruction issued by the Control Person cannot be completed, then all related uncompleted Switching instructions shall be cancelled before any remedial action is initiated. The time of withdrawal of the Switching instruction, together with the names of both the Control Person and Authorised Person, shall be recorded in the same manner as any other Switching instruction. 10.14 The Control Person shall at all times update and maintain the appropriate control diagram. 10.15 When the Control Person is aware that work or testing involves the rearrangement of conductors, he shall ensure that, when the System is being restored, sufficient checks are carried out to prove that the System phases out. 10.16 Single phase HV Switching (e.g. using HV Hot Stick or HV Rubber Glove techniques) shall not be used to make or break a circuit parallel. When using single phase Switching to make or break load on a radial circuit the causes of ferroresonance shall, where reasonably practicable, be eliminated. 11. HIGH VOLTAGE SWITCHING EMERGENCY CONDITIONS 11.1 Where HV Switching has taken place under emergency conditions without an instruction from the Control Person, the Authorised Person shall inform the Control Person as soon as practicable after the operation. All relevant details shall be recorded by the Control Person. 11.2 When a switch or other piece of Apparatus in its normal operating mode is showing signs of distress it shall not be operated and all persons shall be kept clear of such Apparatus. HV Switching shall be carried out as soon as practicable such that the Apparatus concerned will be removed from service without it being subject to further operation. SP Power Systems Limited Page 6 of 6 PSSI 1