Cycling Background/Group. Transportation Officer CMBC. City Connect Advisory Group Chair

Similar documents
a CYCLING ACTION PROGRESS MEETING

ONTARIO BIKE SUMMIT 2012 Louisa Mursell Projects Director Phone: /

NOTES FROM JUNIOR COUNCIL ORIENTATION SESSION HELD ON MONDAY, JANUARY 22, 2018, AT 3:30 PM IN COUNCIL CHAMBERS, CITY HALL

BOURNEMOUTH CYCLING FORUM

Waitakere Recreational Cycling Plan NZRA Presentation

BICYCLE TOURISM: IDEAS FOR BEST PRACTICE

London Cycle Network Annual Report 2000

Active Transportation in Niagara-on-the-Lake

Matt Mallinder, Cycling UK Dick Vincent, National Towpath Ranger. Living waterways transform places and enrich lives

Middlesex North Midlands N.C.A. N.L.D. Oxfordshire Somerset Staffordshire Surrey Sussex Warwickshire

Apologies for absence Apologies received from Mike Battersby (Director of External Affairs) Louis Richards (Welsh Pathway Manager) Ratify Chairman

Cycling makes sense. Phillip Darnton Chairman, Cycling England

Cycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design

Coach Development Plan 2017

September HAWKHURST PARISH COUNCIL Page 1 of 13 SPORTS STRATEGY FINAL

a) receiving of legal advice subject to solicitor client privilege and labour relations regarding contract negotiations

The public is on our side and recent polling we have commissioned tells us that:

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

University of Leeds Travel Plan

Salt Lake County Bicycle Advisory Committee November 8, 2017

EXECUTIVE SUMMARY. Vision

UMPQUA VALLEY BICYCLE TOURISM STUDIO SOUTHERN OREGON WINE INSTITUTE APRIL 5, 2017

FAQ s Walsh Road / Ferguson Road Pilot Scheme

Minutes of Latchford Albion Unicorns 19 th March 2012

MTB National Performance Hub. Presentation to the Rotorua Lakes Council July 2016

CC SUDBURY 'FALLING LEAVES' HILLCLIMB RESULT SHEET 2017 Position No Name Club Cat Time 1 56 Calum Brown B38 / Underpin Racing S 00:39.

IBI Group November 5, 2012

Welsh Triathlon (WT) Minutes of the Annual General Meeting Held at 6pm on Monday 23 rd November 2015 at Sport Wales, Sophia Gardens, Cardiff

Baltimore Commission on Sustainability October 2014 Meeting Report

Minutes of the Bowdon Croquet Club Committee Meeting. Monday 11 September 2017 at 7.30pm

Councillor Vassilakos, Brad Hernden, Manager of Recreation and Marketing and Nancy Roulston, Manager of Development Engineering.

MAKING YOUR CITY BETTER FOR BICYCLING AND WALKING: HOW AND WHY BRENT HUGH EXECUTIVE DIRECTOR

CYCLING CHARTER ACTION PLAN EXECUTIVE SUMMARY

Toronto Police Services Board: Request for Increased Police Enforcement of Parking Regulations on Bicycle Lanes in Toronto

Nottingham, the great cycle city

Our Cycle Promise. northernrailway.co.uk. Produced in partnership with Sustrans. July 2017

Cycling Master Plan Community Engagement Session WELCOME

Queensbury Tunnel. Estimating the economic impact of reopening walking and cycling routes around Queensbury Tunnel. June 2017

John Mills Coaching, Education and Development Director

TxDOT Bicycle Tourism Trails Study Update. April 2017 BAC Meeting April 10, 2017

THE PLANNING AND. Transport and the law Integrated transport planning Strategies Responsibilities of local government and road controlling authorities

Building a Toronto that Moves

THE CITY OF TORONTO. City Clerk's Division. Minutes of the Toronto Cycling Committee

Cycling and Walking Investment Strategy & Local Cycling and Walking Infrastructure Plans

Minutes of the Annual General Meeting held at Stockport Sports Village. Heaton Moor Hockey Club, Sport

DOE Climate Change Proposals

Advisory Committee on Non-Motorized Transportation

Blyth Estuary Green Travel Project

CITY OF ALBANY TRAFFIC AND SAFETY COMMISSION

CYCLING SCOTLAND SCOTTISH CHARITY NO.SCO29760 CYCLE FRIENDLY EMPLOYER AWARD HANDBOOK

Promoting Cycle Tourism

MINUTES OF MEETING COVER SHEET. MEETING OF Nepean Minor Hockey Association Board of Directors

BUILDING THE BOILERMAKERS BIKING INFRASTRUCTURE

Callander Mountain Bike Trails Feasibility Study Executive Summary January 2015

SCOTTISH CYCLING FACILITIES STRATEGY

Our vision: Our mission: A nation swimming. Ensuring our region is a place where clubs, athletes and volunteers can flourish.

ANNEX1 The investment required to achieve the Government s ambition to double cycling activity by 2025

SOUTHWOLD SWIMMING CLUB

COUNCIL POLICY NAME: COUNCIL REFERENCE: 06/119 06/377 09/1C 10llC 12/1C INDEX REFERENCE: POLICY BACKGROUND

Birmingham Connected. Edmund Salt. Transportation Policy Birmingham City Council

Training for a Cycling challenge

Bike/Multipurpose Trail Study for Glynn County, Georgia MAY 16, 2016

The Spoke: Extended Hours & Mobile Shop. Project Proposal

GETTING WHERE WE WANT TO BE

Good to Great. Conversation with Alistair. 22 July 2008

Overview. Mission: Santa Cruz Open Streets fosters individual and community health through creative use of public space.

The One Path Initiative

TOWARDS A BIKE-FRIENDLY CANADA A National Cycling Strategy Overview

Nottingham Cycle City Frequently Asked Questions

Developing a Safer Cycling Strategy for the ACT ACRS Conference August 2012

UCI PARA-CYCLING ROAD WORLD CHAMPIONSHIPS INFORMATION FOR ORGANISERS

Paper submitted to the Scottish Transport Studies Group (STSG) April 2004

TOUR DE FRANCE GRAND DÉPART YORKSHIRE

COUNT ME IN PEDESTRIAN COUNTERS CASE STUDY ABOUT THIS CASE STUDY:

Annual General Meeting Meeting Notes

Sitka Advisory Committee Minutes November 15, 2017 Harrigan Centennial Hall

WORTHINGTON BIKE AND PEDESTRIAN ADVISORY BOARD

Shifting Gears for a Healthier City

Wednesday 13th August 2014 Teleconference MINUTES

Equality, Diversity & Inclusion Newsletter

T LKIT APPENDIX S E Wales

Mississauga Cycling Advisory Committee

Central Oregon Intergovernmental Council

G I R L S G O L F A U S T R A L I A

COMOX VALLEY CYCLING COALITION MINUTES. Monthly Cycling Coalition Meeting Comox Recreation Centre Monday, April 27th, 2015 at 7:00 p.m.

Redevelopment Principles & Sports Proposals Conflict With Local Needs

Making Cycling for Everyone: Training for Cycling & Driving

Bike Libraries. Getting involved. More people cycling more often.

2017 Ontario Bike Summit Overview

Bicycle Master Plan Zürich invites to cycling. Urs Walter, City of Zurich Velocity Vienna 13. November 2012

POSITIVE IMPACT TENNIS THE DISABILITY

MINISTERIAL WRITTEN STATEMENT. Tuesday 5 November 2013 SPORTING LEGACY

Interaction with the audience: expert, citizens, bike communities

Brockville Cycling Advisory Committee Thursday, January 12, 2017, 5:00 pm City Hall, Boardroom

Contents Location Map Welcome and Introduction Travel Plan Management Science Park Accessibility Walking Cycling Bus Rail Car Sharing Contact Details


Stepping up a gear. Our vision for cycling in Cardiff

Director of Football (Designate) Apologies: Rachel Mooney Events and Fundraising Manager. U10B Assistant Coach and Parent

Case study. Bostin Bikes. Dotmailer campaigns which enabled intelligence to be gathered regarding open and click-through rates.

Sixth Avenue. Fifth Avenue. Fifth and Sixth Avenue Bicycle and Traffic Study

Transcription:

Calderdale Cycling Strategy External Advisory Group Meeting 15 th Jan 2018 Halifax Fire Station Community Meeting Attended: Name Andy Geall Tom Brabbin Matthew Cockeram Gavin Wood Katie Edmondson Paul Hughes Corinne Kielty Steve Priestley Andrew Sykes John Kaye Lee Thompson Adrian Lee Jon West Tom Jones Lynnette Evans John Dennis Helen Simpson Norah McWilliam Celia Way Anthony De Heveninghan Reid Anderson Robert Bialek Peter Howells Rob Denby David Power Graham Joyce Cllr Dot Foster Sam Ackroyd Alex Lush Cycling Background/Group Transportation Officer CMBC Halifax Imps WYCA WYCA Pedalsport CC Pedalsport CC/RVG Group RVG Group Cycling Author Sustrans CMBC Upper Valley Renaissance City Connect Advisory Group Chair Queensbury Queens CC Queensbury Tunnel Local Trails Group Cycling UK CTC CTC Calderdale Cycling Champion NHS Local Cyclist Agenda: 1. Introductions 2. Welcome and Background 3. Building the Advisory 4. Inclusive Cycling 5. Women s Cycling 6. Why Don t People Cycle? 7. AOB 8. Date of next meeting

Subject Introductions Welcome & Background Building the Advisory Group Action/Comments Members of the group introduced themselves and spoke a little about their background in cycling. It was positive to see a broad range of cycling representatives from professionals, cycling groups and local cyclists. Andy Geall spoke about the launch of the Cycling Strategy and how an Internal Steering Group and an External Advisory Group had been formed. The strategy contains 71 objectives that focus on people, place and activity and link into areas of cycling that include Transportation, Sport, Recreation, Tourism, Public Health and Road Safety. This item sparked an interesting reaction from the group as many different people tried to impact their concerns and issues regarding cycling. The meeting did become quite heated and people became frustrated. Although there was some fall out I think this needed to happen so people understood the broad reach cycling has across Calderdale and where people s views and opinions stand. The aim of this item was to identify and attract new members to the group to focus on the 71 objectives relating to people place and activity. The group identified the meeting required more structure to achieve this and the following actions were identified. 1.1 Elect a new chair, Andy Geall to contact the group and post information on the new post available. Interested candidates to present a 5 minute pitch at the next meeting 16 th April 2018. Options of a rotating chair were also discussed so more than one member could be elected. 1.2 Member to take minutes. 1.3 City Connect on the Rochdale Canal seemed to be a recurring theme throughout the meeting. Andy Geall has contacted WYCA City Communications for an update on the project. 1.4 It was agreed that members would send their top 5 objectives to cycling@calderdale.gov.uk From the 71 objectives the most popular 5 would be chosen and discussed relating to projects that are ongoing, being developed or are new ideas. 1.5 Link to cycling strategy objectives Inclusive Cycling 2.1 Corrine Kielty spoke about the need for a container at Brooksbank Cycling Circuit. The idea is supported by the school and Pedalsport CC. Funding the container is the only issue preventing this project moving forward. The container would be used to home inclusive bikes to encourage new people to cycling.

2.2 Both Brooksbank Cycling Circuit and Spring Hall Track were suggested as Disability Cycling Hubs. Andy Geall to speak to Martin Moorman at Ravenscliffe as this idea links directly to new school at the athletics track. 2.3 Paul Hughes (BC Coach) spoke about cycling sessions being delivered by Pedalsport. There will be family sessions 12pm-1pm every third Saturday in the month and ladies sessions once Pedalsport start this activity on Saturday mornings. 2.4 PH also provided info on Para Hub, could this be an area of development in Calderdale? 2.5 Cycling without Age is a worldwide project that provides trishaw electric bikes that are rear piloted and can carry two adults. CMBC, Happy Days Cycles and Theresa Robertshaw have met and tested one of the bikes. To develop this project 8.5k is required per bike. 2.6 Calderdale Sport England funding was discussed, at this stage it is unclear on how this money will be spent or the structure to it. A potential opportunity for cycling. 2.7 Wheels 4 All Action Lynette Evans to provide update at next meeting. 2.8 Steve Priestley is keen to setup an electric bikes working group to try and bring electric bike fleets to Calderdale. Andy Geall to contact Steve on how this can be taken forward. Women s Cycling Why Don t People Cycle? 3.1 Pedalsort to provide sessions see Inclusive Cycling 3.2 Celia Way spoke about previously setting up a ladies MTB group. Is this a project to develop in Calderdale? Item for next meeting. 3.3 Pedalsport in general are keen and supportive of developing women s cycling. 3.4 Helen Simpson spoke about the success of Queensbury Queens CC and how they have encouraged more ladies to cycle. Could the knowledge and setup of this club be used to develop ladies cycling clubs across Calderdale? Item for next meeting. 4.1 Specifics of why people don t cycle were discussed through the other agenda items. This is also identified on Page 10 of the Cycling Strategy under challenges to cycling. 4.2 From comments of the group why people don t cycle there s seems to be a broad range of views based on cycling confidence and ability, lack of infrastructure and external factors such as road safety (actual and perception) Other contributing factors including cycling with others especially family and children.

AOB 5.1 Sam Ackroyd spoke about various cycling topics including Old Lane, Halifax and its development. Action: Andy Geall and Sam to site visit Old Lane. He also spoke about the network and cycling with his children being difficult as safe routes were hard to find with lack of connectivity. Sam also expressed his interest regarding the position of Chair to the Advisory Group. 5.2 Reid Anderson was keen to find out more regarding the financial investment on page 13 of the strategy relating to a figure exceeding 10 per head invested in walking and cycling by 2021. ACTION: Andy Geall to look at spend and future projects across the developing areas of cycling that include Transportation, Sport, Recreation, Tourism, Public Health and Road Safety. 5.3 Peter Howells expressed an interest in the Hebble Trail relating to small changes to improve user experience and the bigger picture of the route. Andy Geall and Peter have agreed a site visit. Note item 1.4 all comments and top 5 objectives to cycling@calderdale.gov.uk must be received by 9 th April before 5pm Next Meeting Agenda (items carried and new) Ends. 1. Previous Meeting Minutes 2. Women s Cycling including a) Update Corrine Kielty b) Developing a ladies MTB Group Related objective codes PP0103, PP0205, PP0302, PP0304, AC0302. 3. Presentations for position of chair (5 mins per candidate). 4. Group to vote and appoint new chair. 5. Working through the top 5 objectives, in smaller groups identify specific issues, existing projects, solutions to problem and new projects. 10 min focus group on each objective followed by an update of findings. 6. Identify other objectives through work, projects and initiatives that link to item 4. 7. www.cyclecalderdale.co.uk share events, write cycling blogs, Content Management Training available.