FMATS Transportation Improvement Program Project Nomination Form

Similar documents
FMATS Transportation Improvement Program Non-Motorized Project Nomination Form

FMATS Transportation Improvement Program Non-Motorized Project Nomination Form

Bay to Bay Boulevard Complete Streets Project

Route 7 Corridor Study

TRAFFIC IMPACT ANALYSIS

AMATS Complete Streets Policy

122 Avenue: 107 Street to Fort Road

Performance Criteria for 2035 Long Range Transportation Plan

Madison Urban Area and Dane County. Bicycle Transportation Plan Summary. September Introduction. Bicycle Plan Scope and Planning Process

Clackamas County Comprehensive Plan

Glenn Avenue Corridor Traffic Operational Evaluation

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

INTRODUCTION THOROUGHFARE SYSTEM CLASSIFICATIONS

Attachment One. Integration of Performance Measures Into the Bryan/College Station MPO FY 2019 FY 2022 Transportation Improvement Program

Pinellas County Safety Initiatives

APPENDIX C. Systems Performance Report C-1

MCTC 2018 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV13.xlsx

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Transportation Policy Manual

VIII. Project Prioritization & Implementation

Donahue Drive Corridor Traffic Operational Evaluation

Defining Purpose and Need

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

CHAPTER 4 TRANSPORTATION IMPACT STUDY TABLE OF CONTENTS

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

Arlington s Master Transportation Plan

Phone: Fax: Project Reference No. (to be filled out by MassHighway):

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

FONTAINE AVENUE STUDY Final Report

APPENDIX D: Southwest Volusia Regional Transportation Study. Evaluation Criteria FINAL

Route 29 Solutions Projects

Linking Transportation and Health in Nashville & Middle Tennessee

Frequently Asked Questions

ADOT Statewide Bicycle and Pedestrian Program Summary of Phase IV Activities APPENDIX B PEDESTRIAN DEMAND INDEX

STANLEY STREET December 19, 2017

Chapter 6: Transportation

Traffic Calming Policy

Moving Together Conference Complete Streets from the MassDOT District 5 Perspective

Albany Shaker Road Corridor Study Public Meeting # 2

Route 29 Corridor Assessment Update. Development of Possible Solutions

City of Jacksonville Mobility Fee Update

Road Diets FDOT Process

San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A

SR 693 (Pasadena Avenue) Corridor Study from Shore Drive South to 66 th Street

DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN

EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY

WELCOME TO OPEN HOUSE # 1 June 14, 2017

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

Kellen Spillman (via telephone)

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Residential Traffic Calming Program Guide. Town of Ashland, Virginia

Brian D. Hare, P.E. Bureau of Design PennDOT PA APA Annual Conference Investing in a Sustainable Future October 5, 2009

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

Parks Highway: MP Lucus Road to Big Lake Road

San Jose Transportation Policy

Preliminary Transportation Analysis

Planning Guidance in the 2012 AASHTO Bike Guide

Goodlettsville Bicycle and Pedestrian Plan Executive Summary

Access Management Regulations and Standards

Chapter 5. Complete Streets and Walkable Communities.

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

5.0 Roadway System Plan

Access Management Regulations and Standards

Basalt Creek Transportation Refinement Plan Recommendations

Rochester Downtown Bicycle Study 2009

CAPITOL DRIVE & FOND DU LAC AVENUE INTERSECTION ANALYSIS. Urban Planning 772 SARAH BREGANT, RYAN PETERSON, & MATT WERDERITCH

Staunton. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

Funding Sources Appendix I. Appendix I. Funding Sources. Virginia Beach Bikeways and Trails Plan 2011 Page I-1

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017

Maryland State Highway Mobility Report. Morteza Tadayon

PROPOSAL: Review of Alaska DOT&PF project 68471, Glacier Highway reconstruction and pedestrian improvements from

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

Living Streets Policy

2017 (FY 21,22,23) Ohio CMAQ Prioritization

Project Update May 2018

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Draft North Industrial Area-Wide Traffic Plan

Integrated Corridor Approach to Urban Transport. O.P. Agarwal World Bank Presentation at CODATU XV Addis Ababa, 25 th October 2012

2017 (FY 21,22,23) Ohio CMAQ Project Selection

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

CONNECTING PEOPLE TO PLACES

Operational Comparison of Transit Signal Priority Strategies

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

CDOT s Transportation Plan for the Obama Presidential Center in Jackson Park

TRAFFIC IMPACT ANALYSIS OF PROPOSED CHESTNUT HILL COLLEGE MASTER PLAN DEVELOPMENT

We believe the following comments and suggestions can help the department meet those goals.

Public Information Centre

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY

TRASBURG RANSPORTATION

5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION

MOBILITY RESULTS AREA. Budgeting For Outcomes Council Presentation January 12, 2007

3.7 TRAFFIC Introduction/Region of Influence Resource Overview O ahu

Transcription:

FMATS 2015 2018 Transportation Improvement Program Project Nomination Form Project nominations are accepted from the public and are scored based on the adopted Project Scoring Criteria. These criteria assign weight based on the project s impact on the following: 1. Health and Quality of Life 2. Safety Improvements 3. Public Support 4. Project Cost/ Project Length ($/miles) 5. Road Functional Class 6. Road Maintenance and Condition 7. Other Considerations (economic development, security, utility conflict resolution, etc.) The score the project receives will be used to determine the project s eligibility for funding in the Transportation Improvement Program, or TIP. The TIP identifies, prioritizes and allocates anticipated funding for transportation improvements over a 4 year period. NAME: Donna Gardino ADDRESS: Attn: FMATS City of Fairbanks, City Hall 800 Cushman St. Fairbanks, 99701 PHONE: 907 459 6786 EMAIL: donna.gardino@fmats.us Name of Proposed Project: College Road Bus Pullouts Project Scope/ Description: Investigate the feasibility of installing bus pullouts at select, high-use locations along College Road in coordination with the MACS Transit System. Determine the locations, acquire right-ofway, and construct the pullouts and bus shelters, The College Road Corridor Study identified the following potential locations based on high transit user demand: Hess Avenue eastbound, Hayes Avenue westbound, Westwood Way westbound and Kathryn Avenue eastbound and westbound. Bus pullouts should also be considered on the east approach to the College/Margaret/Antoinette intersection. Is there a commitment from a public organization to maintain this project if built? If so please identify that organization below. The Fairbanks North Star Borough will maintain the bus shelters and the DOT&PF will maintain the roadway. Page 1 of 4

FMATS 2015 2018 Transportation Improvement Program Project Nomination Form Has an organization agreed to pay the non-federal funding match for this project? If so please identify the organization that has committed to pay the non-federal share. The DOT&PF will fund the non-federal share of the project. Does this project support all or some of the four goals of FMATS? The four goals are listed below please explain the relationship between these goals and this project. 1. Coordinate planning efforts to provide an integrated transportation and land use system that embodies smart growth principles and stimulates the economy to grow. 2. Provide a safe, efficient, secure, and interconnected multi-modal transportation system for all users. 3. Protect the environment, improve air quality, promote energy efficiency, and enhance regional quality of life. 4. Optimize the utility and lifespan of the existing transportation system. Goal 1: This project lines up with many of the Smart Growth Principles including, create walkable neighborhoods and provide a variety of transportation choices. This project focuses its efforts on an important east/west corridor that is a very popular transit route. The land use around College Road has some general commercial but it is particularly heavy on two-family and multifamily housing to the south. Goal 2: This project directly creates a safe, efficient, secure, and interconnected multi-modal transportation system for all users. Safety is increased by widening the roadway and providing a safe place for transit busses to move out of the traveled way. It is also safer for pedestrians to load the bus and to place bicycles on the front of the bus outside of the travel lane. Goal 3: This project enhances the regional quality of life by improving the safety of the public transportation system. Goal 4: This project optimizes the utility and lifespan of the existing transportation system. It optimizes the utility by offering all users a corridor that supports their needs. 1) Does this project improve community health and/or quality of life? For example: improve air and water quality, enhance intermodal connectedness, reduce congestion, etc. This project enhances intermodal connectedness by improving the transit riding experience through the use of shelters and bus pullouts. 2) Is safety a factor? For example, is there a history of accidents or safety complaints? There is a history of accidents along this corridor. Several intersection, the Steese Highway, the Old Steese Highway, Illinois Street/Bentley Trust Road and University Avenue exceed the Page 2 of 4

FMATS 2015 2018 Transportation Improvement Program Project Nomination Form statewide average crash rate but are lower that the critical crash rate. The safety indices at the Steese Highway and Illinois Street/Bentley Trust Road exceed the.9 safety index. The Aurora Drive and Danby intersections to not have center turn lanes which may result in a higher number of rear-end crashes due to vehicles stopped in the travel lane waiting to turn left. Total intersection crashes along the corridor from 2006 2010 totaled 407. Roadway segment crashes totaled 108. The roadway section between Margaret Avenue and Danby Street exceeded the average DOT&PF crash rate for similar roadways and the primary types of crashes are rear-end crashes between the Johansen and University Avenue. 3) Would you describe the public support for this project as broad-based, localized, or limited? Please provide a justification for this level of public support. This was identified as a need in the College Road Corridor Study which was completed in July 2014. While future transit operations were not evaluated, the use of the existing bus pullouts will be more critical as traffic volumes increase. 4) Please provide a cost estimate for each phase of this project if available. For example: design, right-of-way, utilities, and construction The FMATS 2040 MTP spending plan lists $1.2 million for this project. AADT on College Road varies from 16,720 at Illinois Street to 8,690 at Westwood Way. 5) If this is a road project please provide the functional classification of the road or roads. For example: arterial, urban collector, or local road. The functional classification of this road is urban arterial. 6) Will this project improve drainage, decrease operating cost, promote efficient system management or improve overall facility condition? Please explain: This project will need to be cognizant of the drainage and accommodate it accordingly. 7) Are there other benefits of this project? For example: national security, community development or otherwise economic benefits. The use of bus pullouts can be controversial because of the difficulty they can create for buses trying to merge back into the traffic stream. One way to encourage vehicles to allow the buses to merge, short of a law requiring motorists to yield to buses attempting to merge back into traffic, is the use of a flashing yield sign on the back of the bus. This should be considered if buses have difficulty utilizing bus pullouts. 8) Please address other issues that have not been addressed concerning this project. (Attach additional pages and/or photos as necessary) This project addresses the following performance measures: air quality, congestion mitigation, and safety, Page 3 of 4

FMATS 2015 2018 Transportation Improvement Program Project Nomination Form For more information, please contact: Donna Gardino FMATS MPO Coordinator 800 Cushman Street Fairbanks, AK 99701 Phone: (907) 459-6786 Fax: (907) 459-6783 donna.gardino@fmats.us Vacant FMATS MPO Transportation Planner 800 Cushman Street Fairbanks, AK 99701 Phone: (907) 459-6805 Fax: (907) 459-6783 Margaret Carpenter DOT&PF Fairbanks Area Planner 2301 Peger Road Fairbanks, Alaska 99709 Phone: (907) 451-2388 Fax: (907) 451-2313 margaret.carpenter@alaska.gov Vacant FNSB Community Transportation Planner P.O. Box 71267 Fairbanks, Alaska 99707 Phone: (907) 459-1266 Fax: (907) 459-1255 Please submit completed form and attachments to the MPO Coordinator via mail, fax or email. Page 4 of 4

SaveMapImage http://gis.co.fairbanks.ak.us/servlet/com.esri.esrimap.esrimap?servicen... 1 of 1 3/2/2015 3:47 PM

feet km 3000 1

Westwood Way Hess Ave, Hayes Ave.

SaveMapImage http://gis.co.fairbanks.ak.us/servlet/com.esri.esrimap.esrimap?servicen... 1 of 1 3/2/2015 3:46 PM