Isle of Man Ship Registry Casualty Report. Serious injury on board Manx-registered fishing vessel Constant Friend (PL 168)

Similar documents
Summary Report. Grounding Twofold Bay. 20 July 2006

Class B Accident Report. Melilla 201 Man Overboard

INVESTIGATION INTO AN INCIDENT ONBOARD THE FV "RÓISE CATRÍONA" OFF THE COAST OF CORK, RESULTING IN THE DEATH OF A CREWMAN, ON THE 8th MAY 2008.

Incident Report. Close Quarters Pegasus II & Distraction. 26 April 2006 Class B

REPORT OF THE INVESTIGATION INTO THE INCIDENT INVOLVING A MAN OVERBOARD FROM THE FISHING VESSEL "JOHN MICHAEL" ON 12TH FEBRUARY 2003.

Maritime and Coastguard Agency LogMARINE GUIDANCE NOTE. Safety during Transfers of Persons to and from Ships

Accident Report. Close Quarters Manutere & Ocean Monarch. 12 March 2006 Class C

WHEN YOU RE OUT THERE, WE RE WITH YOU CENTRE INFORMATION AND COURSE DIRECTORY

IRB Crew Certificate Learner Guide. v5.3 August 2016

ADMINISTRATIVE INSTRUCTION No. STCW-14 QUALIFICATION / CERTIFICATION REQUIRED FOR OPERATION OF A DOMESTIC VESSESL

Hand Safety. 1 Copyright 2014 by PEC Safety Management, Inc. PPT-SM-HNDSFTY 2014

PL 17 TETSUKO. on the. Ramsey Banks, Isle of Man

National Transportation Safety Board

Code Of Practice For Towage Operations In The Port of St Helier (Towage Guidelines)

Competency Framework for Advanced Deckhand-Fishing. Competency Framework for Advanced Deckhand-Fishing

Vessel Code of Practice as ratified at the Annual General Meeting held 15 th September 2016 Manx Registered Charity No. 325

INTERIM REPORT INTO THE FATAL INCIDENT ON-BOARD FV CU NA MARA APPROXIMATELY 130 NAUTICAL MILES WEST OF SLEA HEAD ON 30th JUNE 2016.

Accident Report. San Constanzo Flooding approximately 35 miles east of Gisborne on 18 January 2004

SHIP DESIGN AND EQUIPMENT

REPORT INTO THE SINKING OF FV LADY EILEEN ON 13th AUGUST 2012

SEVERE INJURY WITH HAND AMPUTATION AND SKULL FRACTURE

PILOTAGE DIRECTIONS REVIEWED DECEMBER 2016

Vessel Code of Practice

EQUIPMENT AND PERSONNEL

OFFICE OF THE STATE CORONER. Non Inquest Findings

Class B Accident Report. Tokerau & Kawau Kat Collision

properly applied assessment in the use.1 landmarks.1 approved in-service of ECDIS is not experience The primary method of fixing required for those

Soft Tissue Injuries

Commonwealth of Dominica. Office of the Maritime Administrator

Lifeboats: Fitting of 'Fall Preventer Devices' to reduce the danger of accidental on-load hook release

Mooring and unmooring

REPORT OF THE INVESTIGATION INTO THE RESCUE OF THE RIB "VIKING RAIDER" OFF LAMBAY ISLAND ON 18TH APRIL 2003

SECTION 11 ADVENTUROUS ACTIVITIES BOATING: SAILING

Fishing Vessel Safety Regulations

Surface Rescue Swimmer School. Primary Rescue Devices and Procedures LT 4.3

THE COMMONWEALTH OF THE BAHAMAS. M.v. Skandi Skansen IMO Number: Official Number:

IAGC Guidelines for Marine Small Boat Training and Competency Appendix 6 - Davit/Boom Competency and Enabling Objectives September 2013

BASIC SAFETY GUIDANCE FOR YACHT RACES OR OCEANIC VOYAGES BY NON-REGULATED CRAFT

REPORT OF THE INVESTIGATION INTO THE SINKING OF THE FV CARRAIG CHUIN 25 MILES EAST OF CLOGHERHEAD ON 20th MARCH 2016

National Standard for Commercial Vessels

WINCH USER GUIDE WARN 3700 Utility Winch Part Number: 93700

REPORT OF THE INVESTIGATION INTO THE GROUNDING OF FV SEAN ANTHONY AT KINSALE HARBOUR, ON 10th APRIL 2016

REPORT OF THE INVESTIGATION INTO THE FATAL INCIDENT INVOLVING THE MFV LEONORA JACINTA NEAR SALTEE ISLANDS, CO. WEXFORD ON 25th NOVEMBER 2013

Report on the investigation of. an accident involving the starboard lifeboat of. the Turkish registered bulk carrier.

GUARD VESSEL PRE-HIRE INSPECTION TEMPLATE

1.1 OHS Policy and Responsibilities

MARINE CIRCULAR MC-25/2012/1

REPORT OF INVESTIGATION INTO CASUALTY OFF DALKEY ISLAND CO. DUBLIN ON 12th OCTOBER 2010

IMO DEVELOPMENT OF MODEL PROCEDURES FOR EXECUTING SHIPBOARD EMERGENCY MEASURES. Abandon ship drills. Submitted by the Republic of Korea

7 MAN OVERBOARD PROCEDURES

Table of Contents. Sailology, LLC READ THIS MANUAL CAREFULLY PRIOR TO USE

This guidance is based on the Risk Assessment approved by the Management Committee under the Club s Health & Safety Policy.

SOP GEN-007X Crane and Winch Operations

QUEEN S HARBOUR MASTER

THE EMBARKATION & DISEMBARKATION OF PILOTS CODE OF SAFE PRACTICE

References: Manual Chapt. 9 ISO 9001 par.7 ISO par. 4 ISM Code par. 7; 8

"RIGGING SAFETY IN CONSTRUCTION ENVIRONMENTS"

Village Of Cache Creek Policy No. H-2 Confined Space Entry

Using a RIB for a Safety Boat Duty

E R I K A O c c u p a t i o n a l A c c i d e n t F a l l O v e r b o a r d 2 7 F e b r u a r y

REPORT OF INVESTIGATION INTO A FATAL INCIDENT INVOLVING A CAPSIZED PUNT OFF BROWNSTOWN HEAD, TRAMORE BAY, CO. WATERFORD ON 10th JANUARY 2013

OUTLINE SHEET 4.9 SAR TACTICS

DALGETY BAY SAILING CLUB RIB SAFETY BOAT RISK ASSESSMENT

Marine Personnel Regulations

Are you aware of what the National Small Vessel Safety Regulations require of you?

Operating Manual. Safety Information Guide

GUIDANCE ON SAFETY DURING ABANDON SHIP DRILLS USING LIFEBOATS

REQUIREMENTS FOR ONBOARD LIFTING APPLIANCES AND ANCHOR HANDLING WINCHES

REPORT OF THE INVESTIGATION INTO THE CAPSIZING OF THE NA BUACHAILLÍ ON 18th FEBRUARY 2011.

CONTACTS, FREQUENCIES AND TELEPHONE NUMBERS

Surface Rescue Swimmer Course. Search and Rescue (SAR) Tactics LT 4.9

Note to Shipbuilders, shipowners, ship Managers and Masters. Summary

Use of Equipment to Undertake Work Over the Side on Yachts and Other Vessels

Report on the Investigation of the. lifting appliance accident on board. BBC Atlantic. alongside in the port of Antwerp, Belgium

REPORT OF THE INVESTIGATION INTO THE SINKING OF THE IRISH FISHING VESSEL "WESTERN EXPLORER" 10 MILES NORTH OF KILKEE, CO. CLARE, ON 23RD MARCH 2003.

HOSA 105 EMERGENCY PREPAREDNESS

July 1, 2011 No. 12/2011

WORKING AND PROTECTIVE GEAR FOR FISHERMEN. Notice to all Designers, Builders, Owners, Employers, Skippers and Crew Members of Fishing Vessels

Safety Flash. IMCA Safety Flash 10/09 July Compact Fluorescent Lights Interfering with Communications Equipment

IAGC Guidelines for Marine Small Boat Training and Competency Appendix 3 - Backup Coxswain Competency and Enabling Objectives September 2013

REPORT OF THE INVESTIGATION INTO A FATAL INCIDENT INVOLVING FV SHANIE BOY, WEST OF PERCH ROCK, SKERRIES, CO. DUBLIN ON 26th MAY 2017

MA MARINE ACCIDENT INVESTIGATION REPORT

HYDRAULIC WINCH FOR AUGERS UP TO WR10 X 71 / W130 X 41 ASSEMBLY & OPERATION MANUAL

South African Maritime Safety Authority Ref: SM6/5/2/1 /1

ANY OTHER BUSINESS. Guidelines for passenger ship tender operator. Submitted by Cruise Lines International Association (CLIA) SUMMARY

Incident Reporting for Pilots, PEC Holders and Masters

MA MARINE ACCIDENT INVESTIGATION REPORT

REGULATION on life boats operated from land, No 123/1999 CHAPTER I. General provisions Article 1

BIG TBS-LBIP MANUAL Lifeboat Inspection Platform

Accident Report. Para 1 & Lightning One Collision on Lake Wakatipu on 14 July 2004

OPERATING INSTRUCTIONS (Translation) Rope Winch Type , , ,75

Class B Accident Report. Hamilton 141 Fatality. Woodstock, Upper Waimakariri River on 31 October 2004.

CLOSE IT UP! STAYING WATERTIGHT.

Report on Vessel Casualty of Accident (Form Casualty) Instructions:

MEASURES TO PREVENT ACCIDENTS WITH LIFEBOATS..2 inadvertent operation of on-load release mechanism;

OFFSHORE PATROL VESSEL OPERATIONS

MARINE INVESTIGATION REPORT M08C0058 CAPSIZING AND SUBSEQUENT SINKING

Whitstable Harbour Pilotage Information

LESSONS LEARNED FROM MARINE CASUALTIES. Very serious marine casualty: tug master struck by a falling stores container

How to Operate the MYC Support Boats and Equipment

Transcription:

Serious injury on board Manx-registered fishing vessel Constant Friend (PL 168) Fishing vessel particulars Date registered with Isle of 23 April 2013 Man: Registered length: 11.19m Length overall: 12.13m Official number: M201 Breadth: 5.06m Depth: 2.04m LSA maximum capacity: 3 persons Propulsion power: 127kW (stated) Gross and net tonnage: 18.37 Isle of Man Small Fishing Issued 24 April 2013, expires 8 April 2018 Vessel certificate: The vessel was last inspected by a surveyor to the Isle of Man Ship Registry on 9 April 2013. Following this (initial) inspection, the vessel was certified as compliant with the requirements of the Isle of Man Code of Practice for the Safety of Small Fishing Vessels, as applicable to vessels between 10-12m registered length. Crew members on board Skipper, with 30 years of fishing experience, around ten years having been spent as Skipper on board boats of various sizes. Deckhand 1 with experience of working almost continually on fishing boats from 2004. Deckhand 2 (the Skipper s son) with experience of working almost continually on fishing boats from around 2008.

Summary On the morning of 17 December 2013, the subject vessel was engaged in dredging for scallops in Ramsey Bay, off the Isle of Man. On board were the Skipper and two deckhands. At 0735, the skipper and Deckhand 1 were engaged in emptying the last dredge from the starboard side tow onto the deck, the frame and belly attached to the tow bar being raised to permit this using a non-wire rope wrapped around the rotating starboard winch drum end and held by Deckhand 2. Without warning, the belly the Skipper and Deckhand 1 were emptying started to rise unexpectedly. The Skipper and Deckhand 1 immediately turned to where Deckhand 2 had been standing to see him entangled by the rope he had been handling, his body wrapped around the drum end and turning with it as it rotated. The Skipper immediately went to try to free Deckhand 2 from the drum end while Deckhand 1 quickly went around to the port side of the winch machinery and stopped the drum end from turning using the control lever. Deckhand 1 then cut the hemp rope from above where this was tangled around Deckhand 2 s left arm. He and the Skipper then manoeuvred the injured man to a semireclining position on the deck. While the Skipper went to the wheelhouse to make a distress call, Deckhand 1 assessed the casualty s injuries, noting them to be serious and made efforts to stem bleeding from the left arm. The casualty remained conscious throughout. The Skipper s distress call was answered first by Belfast coastguard and shortly thereafter was transferred to Liverpool coastguard. The Ramsey lifeboat was launched, reaching the vessel by 0813. A search and rescue helicopter reached the vessel twenty minutes later. After consultation on board between helicopter crew members, lifeboat crew members and shorebased services, the casualty was winched on board the helicopter and flown to hospital in the Liverpool area. The lifeboat and fishing vessel then made for Ramsey harbour.

Vessel s working arrangement When fishing for scallops, the vessel s dredging gear consists of two tow bars, one on each side of the vessel with five steel frames/bellies attached to each bar. Port tow bar attached to five frames/bellies Port forward belly raised for emptying onto deck Tow bars are raised and lowered using the wires of the forward winch gear, one side at a time. Following a tow across the dredging grounds, the tow bar is raised to deck level and bellies lifted one by one using a hook attached to a rope which is manually wrapped, using one or two turns, around the rotating port or starboard winch drum end, the loose end of the rope being held by a crew member normally standing on the working deck forward of the drum end. A full belly weighs approximately 20-30kg. Tension on the rope provided by the crew member s hands permits the drum to fully or partially grip the rope thus hauling the belly up. Once elevated, the crew member handling the rope relaxes his grip slightly allowing the drum end to rotate within the rope turn(s) while maintaining a degree of tension sufficient to support, but not further raise, the belly. Bellies are then shaken and emptied of their contents onto the vessel s deck by one or two crew members. The catch is shovelled into the fish hold, either at intervals or when dredging is completed. Starboard steel wire winch drum Winch drum end Winch operation lever position Forward main deck Entrance to crew accommodation

Forward main deck, port side Position where Deckhand 2 was standing when accident took place Crew member s typical working position (on port side), handily adjacent to winch operation handle. Accident took place on starboard side. Forward main deck, port side

Crew member simulating working with starboard drum end, unable to reach winch operating handle A riding turn, resulting in the drum end pulling both ends of the rope onto the winch at the same time. Unless the tangle can be flicked out quickly, further rope handling is impossible without stopping the winch and manually untangling the rope. Port winch drum end

Narrative The following narrative is based upon interviews and a written statement of the events given by the Skipper and Deckhand 1. Further information was provided by the Ramsey lifeboat coxswain, Douglas Harbour division members, Seafish UK and Deckhand 2 s own doctor. All times are GMT (UTC) and are approximate. At 0345 on the morning of 17 December 2013, the subject vessel s Skipper and Deckhand 2 (the Skipper s son) departed their home in Peel and boarded the vessel in Douglas. Deckhand 1 had slept on board, having joined the vessel the previous evening. Crew members were all experienced fishermen. All three crew members prepared the vessel for sea, departing the berth around 0410 and made directly for Ramsey Bay. Initially, Deckhand 2 was helmsman while the Skipper took a short rest below deck. After around an hour, the Skipper relieved Deckhand 2 at the wheel while both deckhands took around an hour s rest. On reaching the fishing grounds around 0600, the deckhands rose and all three crew began dredging for scallops. The weather was dry, wind south-westerly at Beaufort 5-6 with a light to moderate swell. All crew members were wearing overalls, rubber safety boots and robust rubber gloves into which their sleeves were tucked in order to avoid snagging while handling ropes, winches and other deck machinery. None was wearing a lifejacket. At around 0735, with the vessel s engine idling, the Skipper and Deckhand 1 were engaged in emptying the last belly from the starboard side tow onto the deck, the belly s lower end being raised up using a rope turned around the rotating starboard winch drum end and held by Deckhand 2. Without warning, the belly the Skipper and Deckhand 1 were emptying started to rise unexpectedly. The Skipper and Deckhand 1 immediately turned to where Deckhand 2 had been standing to see him entangled by the rope he had been handling, his body physically wrapped around the drum end and turning with it as it rotated, his head knocking against the deck with each turn of the drum end. The Skipper immediately went to try to extract Deckhand 2 from the entanglement while Deckhand 1 quickly went around to the port side of the winch machinery and stopped the drum end from turning using the control lever. Deckhand 1 then cut the hemp rope above where this was tangled around Deckhand 2 s left arm. He and the Skipper then manoeuvred the injured man to a semi-reclining position on the deck. While the Skipper went to the wheelhouse to make a distress call using the vessel s VHF radio, Deckhand 1 assessed the casualty s injuries. Noticing through a rent in the sleeve that the left arm was nearly severed above the elbow and that there was heavy bleeding, he took a piece of thin polypropylene rope and used it as a tourniquet, twisting it with his fingers until the flow of blood slowed. He noticed that the casualty s right arm also appeared to be broken at the wrist but saw no bleeding from the right arm nor from any other part of the body. The casualty remained conscious throughout. The Skipper s distress call was answered first by Belfast Coast Guard and shortly thereafter was transferred to Liverpool Coast Guard. In addition, Douglas Marine Operations Centre (Harbour s Division) coordinated and assisted. While awaiting the arrival of rescue services,

the Skipper and Deckhand 1 made what use was possible of the contents of the vessel s category C medical stores. They gave the injured man two Paracetamol tablets for the pain and made use of the bandages. Both took turns at holding the tourniquet tightly in place and maintaining radio contact with rescue services. Efforts were made to keep the casualty warm with any cloth and towels available. They continued talking to the casualty throughout. Further to communication with shore-based emergency services, the Ramsey lifeboat was launched, reaching the vessel by 0813. Lifeboat crew members boarded the vessel and took over treatment of the injured man, the Skipper and Deckhand 1 giving assistance as necessary, at one point providing two pieces of a broken broom handle for use as a makeshift splint for the nearly severed left arm. Oxygen was administered when the casualty became drowsy. A search and rescue helicopter (RAF R122) reached the vessel at 0827 and a member of its crew was winched down to the vessel. After consultation on board between helicopter crew members, lifeboat crew members and shore-based services, the decision was taken to move the casualty to a hospital in the UK where treatment could most speedily and best be given. The casualty was loaded with some difficulty onto a stretcher which was then winched on board the helicopter. At 0922, the helicopter finally departed, the injured man being taken to Aintree Hospital where he immediately received medical attention. The lifeboat and fishing vessel then made for Ramsey harbour. All SAR units were stood down at 1112.

Location of vessel at time accident took place Fishing begins at approximately this position Copy of chart showing position of Constant Friend at time of distress transmissionn

Analysis The vessel was certified by the Isle of Man Ship Registry in accordance with the applicable Code of Practice for the Safety of Small Fishing Vessels (less than 15m LOA) following inspection by an Isle of Man Ship Registry surveyor on 9 April 2013. The inspection resulted in deficiencies which were closed out on 10 April 2013 and the vessel registered with this administration on 23 April 2013. As seen on board on 18 December 2013, the condition of the vessel s equipment and the standard of maintenance were not considered to be contributory factors to the accident other than as noted below. The Skipper had completed all relevant (and recommended) Seafish training courses, including the following: Basic Sea Survival Basic Fire Fighting and Prevention Basic First Aid Safety Awareness (including accident prevention and risk assessment) Intermediate Fishing Vessel Stability Awareness Radio operation resulting in the issue of an MCA short range radio operator certificate Deckhand 1 had not completed relevant (recommended but not required) Seafish training courses or the equivalent. It was noted that Deckhand 1 had previous experience of working with Peel lifeboat crew during which he had received extensive, although uncertified, training in various aspects of safe working practices including first aid. Deckhand 2 Seafish training courses completed (in 2011): Sea Survival First Aid Deckhand 2 had not completed recommended training course in Fire-fighting nor in Health and Safety. The vessel s forward winches are controlled from a single non-spring-loaded handle provided adjacent to the port winch drum end. This handle can be left in the forward or aft position and needs no hand pressure to maintain powered winch rotation. While a crew member engaged in rope handling duties on the port side is easily able to reach the operation handle, and hence able to maintain one hand on the handle and another on the rope, this handle cannot be easily reached from the starboard side. A crew member handling the rope on the starboard side needs to move frequently between handle and rope-holding position. In the event of a problem, such as the occurrence of a riding turn in way of the starboard drum end (see example photograph), the crew member handling the rope around the drum end will not be able to stop the winch machinery from turning without making a long step to port. The temptation will therefore not be to immediately release the rope, reach for the handle and stop the winch but to attempt to manually rectify the problem, particularly in view of the potential danger were the raised belly to drop on the heads of the crew member(s) engaged in emptying it. There is no evidence to suggest that fatigue was a significant contributory cause of the accident.

There was no evidence to suggest that the concentration or co-ordination of Deckhand 2 was unduly influenced by any medication at the time of the accident. No record of any written risk assessment was available on board nor was one available at the owner s offices. The vessel s skipper confirmed that verbal assessment of risk takes place at frequent intervals. No Seafish brochure concerning safety awareness and risk assessment was provided on board. No records of safety drills were available on board. It may be noted that the Code recommends, but does not require, the provision of written assessments of risk. Records of course completion certificates for the basic four safety courses recommended by this administration through the Code were not available in the owner s offices for any crew member nor were records available on board for crew members other than the Skipper. It is considered good practice for fishing vessel owners to maintain records of crew members training, especially training recommended by vessels administrations and specified or recommended in applicable codes of practice. The actions of both uninjured crew members immediately following the accident were considered exemplary. Both did their utmost to aid the injured man. Lifejackets and safety harnesses were on board but not worn during fishing operations. PFDs are not provided. Appropriate working clothing is provided and appeared to be in good condition. The reported positioning and actions of all crew members immediately prior to the accident are entirely common fishing vessel practice. The dangers inherent to such common working practices the proximity of the winch operator to the drum end and his need to manually handle the rope - were clearly contributory factors to the accident. There is a case therefore for suggesting changes to working practices, although whether such suggested changes are practically applicable to the industry is unknown. The provision of self-tailing winches, which require a much reduced level of manual operation and which permit the winch operator to maintain a greater degree of physical separation from rotating machinery, may, depending upon the arrangement, mitigate risks associated with winch operation considerably. It is recognised that any such changes will require significant investment in vessels machinery as well as additional training of crew members. The provision of additional crew members on board fishing vessels, such that manual control of any lifting operation can be maintained at all times by a single stationary crew member not involved in any other aspect of the operations underway, will enhance safety. It bears reiterating that the Constant Friend is normally crewed, during scallop fishing, with only two crew members. On this occasion, had no second deckhand been on board to provide continuing care, including the maintenance of tension to the improvised tourniquet, and noting the need for the Skipper to make radio communications to SAR personnel, it appears much more likely that the injured crew member would have lost his life.

Conclusion Further to the foregoing analysis of evidence obtained, it is concluded that Deckhand 2 became entangled in the port winch drum end due to a moment of inattention while handling a rope. There is no evidence to suggest additional contributory factors to this serious accident.

Recommendations 1. The vessel s forward winches are controlled from a single non-spring-loaded handle provided adjacent to the port winch drum end. This handle can be left in the forward or aft position and needs no hand pressure to maintain powered winch rotation. It is recommended that, as a minimum, the winch control lever be repositioned such that it is operable from adjacent to both the port and starboard winch drum ends. To permit this, it may be necessary for dual controls to be provided. Alternatively, the provision of roller leads, or another means to run a rope from either side to a common operating position adjacent to the winch control lever, may be an option. Another possibility is the provision of an extension bar to the operating lever suitably supported and arranged to permit operation from two different locations. 2. Operators of fishing vessels of this size should consider working arrangements carefully with a view to making risk mitigation measures as necessary, through education, training and the modification of rotating machinery where considered practicable. The provision of an automatic kill switch, common on open motor boats and arranged such that in the event of the boat s helmsman moving away from the controls, the engine is switched off, may enhance safety during winching operations. It is recognised that the multi-facetted nature of many fishing-related operations may make the provision of such a kill switch impractical. Potentially, the provision of a foot-operated switch or spring-loaded foot pedal (commonly provided on lathes and other workshop machinery) arranged to shut down the winch motor in the event the operator moves from his position, may be a more practical, and safer, arrangement and would permit the winch operator to maintain both hands free for handling a rope. 3. While the Skipper and Deckhand 2 had sailed together on fishing vessels on numerous occasions in the recent past, Deckhand 1 had not sailed with the pair in the recent past, hence a combined drill, or as a minimum a familiarisation session with the Skipper related to fire, evacuation, and manoverboard would have been recommended. 4. The Isle of Man Code of Practice for the Safety of Small Fishing Vessels, section 4, requires that a vessel s owner must complete or arrange completion of an assessment of the health and safety risks arising in the normal course of work activities or duties on the vessel. Section 9 of the Code further confirms that employers are required to make a suitable and sufficient assessment of the risks to the health and safety of workers arising in the normal course of their activities or duties. The Isle of Man Ship Registry strongly recommends, but does not require, that such risk assessments be written. It is recommended that the boat s owner complete a documented risk assessment on board with respect to all aspects of fishing operations and discusses the results with all crew routinely. 5. Good practice should be actively promoted on board any vessel. In support of this, records of safety awareness training and risk assessment should be present on board and in owner s offices. Throughout this incident, however, it was apparent that the two uninjured crew members reacted quickly and appropriately to the accident in caring for Deckhand 2 until this was taken over by SAR services, hence it is arguable that the completion of formal documented safety drills would have been ineffective in this instance in either

mitigating the risks to fishing operations or in improving the uninjured crew members response to this specific accident. 6. The facts of this serious casualty should be imparted to the local fishing industry as a salutary lesson in exercising constant vigilance when operating potentially dangerous machinery. In this instance, a common practice resulted in the serious injury of a crew member due to what appears to have been a moment of inattention while handling a rope and winch.