OPERATION MANUAL DMI 16-LIGHT LIGHT TOWER ALSO AVAILABLE ONLINE AT DMI-LT.COM 1
You have purchased a very high quality piece of equipment that should provide years of useful life. Following the instructions below and the manufacturer s generator operating instructions should provide years of safe and reliable service. UNLOADING THE TOWER/LIFTING THE TRAILER When unloading the tower from the trailer, make sure lifting equipment and rigging is sufficient. Note that the weight of the unit with fuel is 14,000 lbs./6350 kg. Attach rigging to the points marked sling here only. Failure to do so could cause severe damage to the unit and injury/death to bystanders. ATTACHING LIGHT FIXTURES The 16 light fixtures will be shipped in a separate container. Carefully unwrap and with the use of a stable platform or ladder, bolt the fixtures securely to the mast. Note that they can be mounted in various directions, forward or rear-facing, to light different areas. Tighten the bolts carefully and tightly, placing an included washer between the nut and the fixture. 2
Next, tighten the vertical adjustment lever on each fixture by pulling down on the lever on each side of the fixture until snug. The tower may be towed with the fixtures attached for short distances on smooth roads. Bumpier roads may cause damage to the fixtures and the bulbs. Make sure 3-prong wires from lights are firmly plugged into junction boxes on the light mast. 3
OPERATING THE UNIT Inspect all electrical connections and wires and cables for damage that may have been caused in transit. Do not operate the unit if damage to wiring or electrical components is detected. Repairs should only be attempted by qualified electrical personnel. Leveling- Make sure the unit is on hard, level ground with the wheels chocked from the front and the rear. Extend outriggers fully, which will be eleven feet/3.5 meters. The pins for the middle section of the outrigger will be stowed in the forward tool compartment at the front of the trailer. Replace pins in both locations and lower pad with crank handle until pads are firmly on the ground. 4
When all six pads have been lowered, make adjustments to each according to the two horizontal leveling indicators mounted near the mast. Insure the trailer is securely level. DANGER- FAILING TO LEVEL UNIT CORRECTLY COULD CAUSE TIPPAGE RESULTING IN DEATH! Always disconnect trailer from towing vehicle before use. Remove mast traveling pin, which secures the mast in the horizontal position, located above generator. Remove mast locking pin at base of mast.. See pin locations in picture, below. CHOCK TRAILER WHEELS! 5
6
COLD WEATHER- Low-temp gear oil is available for the winch. Low temp (-60F) Shell Tellus S4VX32 or Petro Canada Hydrex Arctic 15 hydraulic oil is available for the hydraulic pump. If arctic operation is desired, insure unit was shipped with low temp gear oil in the winch and low temp hydraulic oil in the hydraulic pump. Open Louvers on Ballast Box- Louvers are designed to keep ice and mud from entering vents in ballast box. Close units during transport but open during use to ventilate ballast box. 7
Start generator according to manufacturer s instructions, attached. Do not operate lights until boom is at desired height. Never operate generator unless in a well ventilated outdoor space as carbon monoxide death will occur. Carbon Monoxide is colorless and odorless. 8
Generator will shut off after 10 seconds if fuel level is below 15%. See engine selfdiagnostics on generator control panel. The generator selector switch should be pre-set to 240/120v 1-Phase Turn main switch on generator panel to on. MAST OPERATION Plug 110 v cord from hydraulic pump into 110 outlet on generator control panel and turn 20 amp outlet breaker to on position. This will allow the hydraulic pump to operate. You should hear the pump activate when the power is turned on to the receptacle. The other breakers are for use of the 220 or other 110 outlet for 9
other applications such as tools, if desired. UNPLUG HYDRAULIC UNIT PUMP OR TURN OFF BREAKER WHEN NOT OPERATING HYDRAULICS TO PREVENT UNECESSARY USAGE OF HYDRAULIC MOTOR Gently pull closest hydraulic lever (Mast Tilting Lever) towards the front of the trailer to move mast from travelling position into its vertical position. If levers will not activate the winch, the cap next to the levers may be removed to adjust the lever sensitivity with an allen wrench. Always adjust lever sensitivity to lowest pressure that will operate pump. When mast is vertical, replace mast locking pin. Danger- Failure to replace mast locking pin could cause injury and damage to the machine! Never try to move the tower unless mast is in horizontal and secured position. 10
Once mast is vertical, the top of the lights will be 25 feet or 7.6 meters off the ground. This may be sufficient for certain lighting applications or when higher wind conditions are present. To Telescope the Mast- Again, make sure mast locking pin is in place, and check cables and electric wires for fraying or signs of wear. If any fraying or signs of wear are detected, discontinue use and contact a qualified repairman. Make sure unit is leveled and all outriggers are down, including front jack stand. Lowering the front jack stand will result in smoother winch operation, especially on descent. Pull handle farthest from operator towards the front of the trailer. This will tighten the two cables and pull the three boom sections upward. Raise to desired height. Stop operation if frayed cables are observed or in the event of irregular 11
pump operation. Do not raise boom past red 55 feet indicator when indicator shows on mast. That means the boom is fully extended. Attempting to over extend the boom can result in serious unit damage and injury. Note: The hydraulic pressure is set by the adjustment screw by the levers and by the gold safety valves on the boom tilting piston, to intentionally only allow the minimum pressure required to activate the piston and winch. To fully raise the winch to 55 feet (16.8 meters) should take 5-8 minutes. If the levers do not activate the piston and/or the winch, or the boom will not telescope to the 55 Feet mark, the pump pressure adjustments will have to be changed. Turn breaker for hydraulic pump off or unplug pump after unit is in operation to avoid wear on pump. Lower unit if windy or severe weather is forecast or if lightning is possible. TURNING ON LIGHTS Throw main disconnect switch to on. 12
Open glass cabinet door of ballast box to access 16 individual light switches. Turn on four circuits in sequence and wait until those four lights are fully illuminated. Then turn on the next 4 and wait until lit, until all 16 lamps are illuminated or until desired number of lights are in use. Turning on more than four lights without waiting for them to fully illuminate will shut down the 13
generator on a safety override and the starting sequence will have to be repeated. LOWERING MAST Turn off individual lamp switches in glass cabinet Plug in hydraulic pump into 110 outlet in the generator cabinet and/or turn breaker for the outlet back on. You should be able to hear the hydraulic pump whirring. Push lever farthest from operator towards rear of trailer to lower mast. The lever is adjusted to cause the winch to lower the mast very slowly. It should take 5 minutes to fully lower the mast. If cable is frayed, discontinue use and contact a properly credentialed repair technician. Mast is designed to be held in place by one of the two cables should one break. However, if one does break, discontinue use immediately, move personnel away from trailer and contact a properly trained repair technician. 14
Mast fully lowered when all mast sections are retracted and cables on both pulleys show slack. Mast should lower smoothly. If for some reason the mast hangs up, contact a repair technician. Do not continue to attempt to lower mast. When it is desired to stow the mast, such as when towing or in severe weather, and the mast is fully retracted, then and only then, remove the mast locking pin (see photo on page 9) near bottom of mast. Move hydraulic lever closest to operator towards the rear of the trailer until boom is resting in the cradle. It will be necessary to move the electric wiring out of the cradle before fully lowering to avoid damaging the cables. 15
Do not attempt to continue to lower the mast once it is sitting in the cradle as damage will occur. Replace mast travelling pin. 16
SHUTTING UNIT OFF Turn off main disconnect, let generator run 1 minute without a load and shut down generator according to generator directions, attached. Never shut the generator down with a load as damage to generator and/or ballast box may occur. The metal halide floodlights require 5 minutes to reach full intensity and 15 minutes to fully cool. WHEN REFUELING GENERATOR MAKE SURE UNIT IS OFF AND THE TWO FUEL VALVES TO AUXILLARY TANK ARE TURNED OFF OR OVERFLOW WILL OCCUR TOWING Always pull trailer with a proper vehicle at a very safe speed. Never pull faster than 50 mph/80kph, much slower when towing down a hill. Never pull a trailer utilizing vehicle cruise control as that allows slack and swerving to occur, especially downhill. Towing vehicle must have a pintle ring receiver and electric trailer break connector. Always use anti-telescoping cable to prevent boom from sliding out during transport. 17
WIND INSTABILITY AND DANGER OF UNIT FALLING OVER The following is a chart of when the unit becomes aerodynamically unstable. The data assumes the wind is coming from the most vulnerable direction, which is calculated to be a side wind with all of the bulbs turned to face in that direction. The danger of flying debris from the light fixtures should also be considered in high winds and appropriate safety precautions should always be considered in light of predicted or anticipated weather conditions. These precautions could include: Lowering the mast to an appropriate height for the weather condition Stowing the mast in its travelling position 18
Removing the fixtures from the mast and stowing it to its travelling position. Never erecting mast in proximity of electric wires Tower Height in Feet Toppling Wind Speed in miles per hour 55 Feet 70 mph 45 Feet 90 mph 35 Feet 100 mph 25 Feet 120 mph DAILY INSPECTION Tires are inflated to manufacturer s recommended pressure and lug bolts secure All trailer running light fixtures working and undamaged Dual safety chains securely attached to towing vehicle Check all wiring and breakers for damage Check all fluid levels: radiator, hydraulics, engine oils Check cables for evidence of fraying Make sure mast securing pin is properly installed Check outriggers are undamaged and in the correct position with all pins securing the jacks and outriggers. All Rights Reserved Copyright 2012 DMI Pipe Fabrication, LLC d/b/a DMI-LT 19