OPERATION MANUAL DMI 16-LIGHT LIGHT TOWER ALSO AVAILABLE ONLINE AT DMI-LT.COM

Similar documents
MODEL SWH10 1,000 LB CAPACITY SWIVEL HOIST

AC1810 / AC1810-A TECHNICAL SPECIFICATIONS. Operating Pressure psi ( kgs/cm²) [AC1810] Displacement. Net Weight

USE AND MAINTENANCE LIGHT TOWER

Operator s Manual Series 2400 Material Lift

LITERIDER 2&3 IMPORTANT WARNING. 2Bike (1x) Bolt (1x) Nut (1x) Small Hex Wrench (1x)

Chapter 2 Rigging. Cutting Wire Rope. Anchoring Wire Rope to Drum. Winding Wire Rope Onto Drum

PDY TON HYDRAULIC CRIMPING TOOL WARNING

Operator s Manual. 2010, 2015, 2020, 2025 Material Lifts

Operator s Manual. Series 2100 Contractor Lifts

1.0 - OPENING AND CLOSING THE DOOR

Fiber Cable Puller with Tuf-Lugger lite

AIR/OVER HYDRAULIC JACK 20 TON

SPECIFICATIONS Type: Twin stack, single phase Tank: 4 gallon Air Output: PSI; PSI Max PSI: 125 PSI HP: 1.

Pressure Dump Valve Service Kit for Series 3000 Units

Parts: Included in the parts box: Inner Rear Tire Tray. Inner Front Tire Tray. Trail Doc Clamp. Pivot Assembly. Trail Doc Post.

Owners Manual Courtesy of ElectricScooterParts.com

MODEL 200 KNIFE GATE VALVES INSTALLATION & MAINTENANCE MANUAL

35 TON HYDRAULIC PUNCH WARNING

Pressure Dump Valve Service Kit for Series 2300 Units

Booster Pump PB4-60 Replacement Kits

USER MANUAL

1 HP / 1.6 GALLON AIR COMPRESSOR OPERATING MANUAL

PROPORTIONING VALVE. Model 150 INSTRUCTION MANUAL. March 2017 IMS Company Stafford Road

Gerber Sabre 404 and 408 Installation Instructions

310 SERIES TILT-TO-LOAD ROTATOR. The Specialist In Drum Handling Equipment

I.H.S INSTALLATION INSTRUCTIONS

2 HP / 4 GALLON AIR COMPRESSOR OPERATING MANUAL

Grounds Equipment Operation Contest Guidelines

DK ton, Double-acting, Die-type Crimping Tool

MANITOWOC MODEL TON CAPACITY

2 GALLON TWIN STACK AIR COMPRESSOR W/ HOSE REEL

Q-POWER 106 SERIES HYDRAULIC SQUEEZE CHUTE PRODUCT MANUAL arrowquip.com

SAFE WORK PROCEDURE. Location of Equipment Written By: Approved By: Date Created Last Revision

The owner and all operators must be familiar with all of the operational guidelines laid out within this manual.

OPERATION MANUAL RTI RHS650 RTI TECHNOLOGIES, INC East Market Street York, PA Manual P/N

Read Before Operating!

Installation Instructions

Installation Instructions

HYDRAULIC PALLET TRUCKS. MODEL Nos: PT550BC, PT685BC, PT550NC, PT685NC OPERATION & MAINTENANCE INSTRUCTIONS

100L AIR COMPRESSOR MODEL NO: TIGER 16/1010 PART NO: OPERATION & MAINTENANCE INSTRUCTIONS LS01/13

2000 lb manual winch

Setup Guide for your HVO Naked Drone

2,500/4,000 LB Easy Riser Vertical Cable Feighner Lift

RIDE Inc. Rigscape Drilling Rig Procedures

Flexfence Swaging Unit. Product Manual. Release 02/16.

Read Before Operating!

Santa Fe Cycles Assembly Guide Introduction

MODEL NUMBER: PSI AIR SOURCE KIT 200 PSI Compressor on 2.0 Gallon 200 PSI Air Tank

NOTE: Parts are no longer available for this tool. The manual will continue on the next page.

Wildcat LB Winch Kit. Operator s Manual Installation Instructions Replacement Parts List. With Wireless Control System.

24L AIR COMPRESSOR MODEL NO: TIGER 11/250 PART NO: OPERATION & MAINTENANCE INSTRUCTIONS LS01/13

Operator s Manual. with Maintenance Schedule. Fourth Edition Second Printing Part No

Document How to Set Single Stage Press Pressures

HPB25 Hydraulic Paving Breaker

3/8" Dr. Air Butterfly Impact Wrench

Congratulations, once again, on buying an E RIDER Model 18!!!!

MODEL NUMBER: M20005 AIR SOURCE KIT. 30% Duty Compressor on. 2.0 Gallon Air Tank SAVE THIS MANUAL FOR FUTURE REFERENCE

Puyuan. QUY 160 Crawler Crane Technical Manual

Shoreline Cantilever Lift 2500lb Capacity Models: (108" inside width) - Part # (120" inside width) - Part #

REL-510H WARNING NOTICE 12 TON SINGLE ACTING REMOTE HYDRAULIC CRIMPING HEAD

200 PSI FAST-FILL AIR SOURCE KIT

222 Schwinn Recumbent Exercise Bike Parts List Full Size Hardware Chart Product Illustration Assembly Instructions

75 Ton SD Shop Press Operating Instructions

Aerial Lift Safety Program

Key. counterweight. Lifting capacities on outriggers 360. Superlift

AES Raptor, LLC Raptor R1000 Instruction Manual

accidents which arise due to non-observance of these instructions and the safety information herein.

KTM OM-2 SPLIT BODY FLOATING BALL VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

HYDRAULIC WINCH FOR AUGERS UP TO WR10 X 71 / W130 X 41 ASSEMBLY & OPERATION MANUAL

24L AIR COMPRESSOR OPERATION & MAINTENANCE INSTRUCTIONS MODEL NO: RANGER 7/240 PART NO: LS0913

MAGNETIC INDOOR CYCLING BIKE

20 Ton SD Shop Press Operating Instructions

TrekMill USER'S MANUAL MM5050

QUALITY ALUMINUM BOAT LIFTS, INC. INSTRUCTIONS. Dominator Lake Lift

Charmborough Bells Risk Assessment and Method Statement

Installation Instructions

This section provides general information and recommendations required prior to installing, operating or maintaining your KAT Master Hitch.

Dual Electronic Basketball System Owners Manual

TTX-1 PORTABLE TRUCK ACCESS FALL PROTECTION PLATFORM

Operation Manual Guillotine Cutter RC-5

Concentrate Distribution System (Stand Mounted) A-CDS-70-X & A-CDS-TANK-X-ST Industrial Drive, Orlinda, TN 37141

Installation Instructions

Parts List. 7. Handlebars 8. Grips 9. Handlebar Stem 10. Front Brake 11. Front Wheel 12. Crank 13. Chain

Specifications Testing & Adjusting Disassembly & Assembly

Operator: Save these instructions for future use!

TECHNICAL MANUAL OPERATOR S MANUAL FOR THE M1083A1 SERIES 5 TON, 6 X 6 MEDIUM TACTICAL VEHICLES (MTV) VOLUME NO. 1 OF 2

200 PSI HIGH-FLOW AIR SOURCE KIT

7130 Lancer Rear Drive Magnetic Commercial Indoor Cycling Bike

Section 4: Sequence valve adjustments

MUELLER GAS. No-Blo Operations Using D-5. Drilling Machine. Reliable Connections. General Information 2

RIDE Inc. Rigscape Service Rig Procedures

Cranes and Hoists. Elevating Work Platforms ASSESSMENT

INSTRUCTION MANUAL. January 23, 2003, Revision 0

DBML-60/80 Squeeze Tool

3 GALLON, OILLESS PANCAKE COMPRESSOR INSTRUCTIONS. Item #31289

REL-46 WARNING NOTICE 15 TON SINGLE ACTING REMOTE HYDRAULIC CRIMPING HEAD. Compatible with RELIABLE R15 and P Style dies. REL-46 Manual

1 DRIVE INDUSTRIAL IMPACT WRENCH

BRAKE WINCH RUP 503-[T/BT] EQUIPMENT FOR LIFTING LOADS. AT 053-[T/BT] xx

HATFIELD. Continuing the Tradition SEMI-AUTOMATIC SHOTGUN INSTRUCTION MANUAL

EC 10SB (SL) EC 12 EC 10SB(SL) EC 12 WARNING

Transcription:

OPERATION MANUAL DMI 16-LIGHT LIGHT TOWER ALSO AVAILABLE ONLINE AT DMI-LT.COM 1

You have purchased a very high quality piece of equipment that should provide years of useful life. Following the instructions below and the manufacturer s generator operating instructions should provide years of safe and reliable service. UNLOADING THE TOWER/LIFTING THE TRAILER When unloading the tower from the trailer, make sure lifting equipment and rigging is sufficient. Note that the weight of the unit with fuel is 14,000 lbs./6350 kg. Attach rigging to the points marked sling here only. Failure to do so could cause severe damage to the unit and injury/death to bystanders. ATTACHING LIGHT FIXTURES The 16 light fixtures will be shipped in a separate container. Carefully unwrap and with the use of a stable platform or ladder, bolt the fixtures securely to the mast. Note that they can be mounted in various directions, forward or rear-facing, to light different areas. Tighten the bolts carefully and tightly, placing an included washer between the nut and the fixture. 2

Next, tighten the vertical adjustment lever on each fixture by pulling down on the lever on each side of the fixture until snug. The tower may be towed with the fixtures attached for short distances on smooth roads. Bumpier roads may cause damage to the fixtures and the bulbs. Make sure 3-prong wires from lights are firmly plugged into junction boxes on the light mast. 3

OPERATING THE UNIT Inspect all electrical connections and wires and cables for damage that may have been caused in transit. Do not operate the unit if damage to wiring or electrical components is detected. Repairs should only be attempted by qualified electrical personnel. Leveling- Make sure the unit is on hard, level ground with the wheels chocked from the front and the rear. Extend outriggers fully, which will be eleven feet/3.5 meters. The pins for the middle section of the outrigger will be stowed in the forward tool compartment at the front of the trailer. Replace pins in both locations and lower pad with crank handle until pads are firmly on the ground. 4

When all six pads have been lowered, make adjustments to each according to the two horizontal leveling indicators mounted near the mast. Insure the trailer is securely level. DANGER- FAILING TO LEVEL UNIT CORRECTLY COULD CAUSE TIPPAGE RESULTING IN DEATH! Always disconnect trailer from towing vehicle before use. Remove mast traveling pin, which secures the mast in the horizontal position, located above generator. Remove mast locking pin at base of mast.. See pin locations in picture, below. CHOCK TRAILER WHEELS! 5

6

COLD WEATHER- Low-temp gear oil is available for the winch. Low temp (-60F) Shell Tellus S4VX32 or Petro Canada Hydrex Arctic 15 hydraulic oil is available for the hydraulic pump. If arctic operation is desired, insure unit was shipped with low temp gear oil in the winch and low temp hydraulic oil in the hydraulic pump. Open Louvers on Ballast Box- Louvers are designed to keep ice and mud from entering vents in ballast box. Close units during transport but open during use to ventilate ballast box. 7

Start generator according to manufacturer s instructions, attached. Do not operate lights until boom is at desired height. Never operate generator unless in a well ventilated outdoor space as carbon monoxide death will occur. Carbon Monoxide is colorless and odorless. 8

Generator will shut off after 10 seconds if fuel level is below 15%. See engine selfdiagnostics on generator control panel. The generator selector switch should be pre-set to 240/120v 1-Phase Turn main switch on generator panel to on. MAST OPERATION Plug 110 v cord from hydraulic pump into 110 outlet on generator control panel and turn 20 amp outlet breaker to on position. This will allow the hydraulic pump to operate. You should hear the pump activate when the power is turned on to the receptacle. The other breakers are for use of the 220 or other 110 outlet for 9

other applications such as tools, if desired. UNPLUG HYDRAULIC UNIT PUMP OR TURN OFF BREAKER WHEN NOT OPERATING HYDRAULICS TO PREVENT UNECESSARY USAGE OF HYDRAULIC MOTOR Gently pull closest hydraulic lever (Mast Tilting Lever) towards the front of the trailer to move mast from travelling position into its vertical position. If levers will not activate the winch, the cap next to the levers may be removed to adjust the lever sensitivity with an allen wrench. Always adjust lever sensitivity to lowest pressure that will operate pump. When mast is vertical, replace mast locking pin. Danger- Failure to replace mast locking pin could cause injury and damage to the machine! Never try to move the tower unless mast is in horizontal and secured position. 10

Once mast is vertical, the top of the lights will be 25 feet or 7.6 meters off the ground. This may be sufficient for certain lighting applications or when higher wind conditions are present. To Telescope the Mast- Again, make sure mast locking pin is in place, and check cables and electric wires for fraying or signs of wear. If any fraying or signs of wear are detected, discontinue use and contact a qualified repairman. Make sure unit is leveled and all outriggers are down, including front jack stand. Lowering the front jack stand will result in smoother winch operation, especially on descent. Pull handle farthest from operator towards the front of the trailer. This will tighten the two cables and pull the three boom sections upward. Raise to desired height. Stop operation if frayed cables are observed or in the event of irregular 11

pump operation. Do not raise boom past red 55 feet indicator when indicator shows on mast. That means the boom is fully extended. Attempting to over extend the boom can result in serious unit damage and injury. Note: The hydraulic pressure is set by the adjustment screw by the levers and by the gold safety valves on the boom tilting piston, to intentionally only allow the minimum pressure required to activate the piston and winch. To fully raise the winch to 55 feet (16.8 meters) should take 5-8 minutes. If the levers do not activate the piston and/or the winch, or the boom will not telescope to the 55 Feet mark, the pump pressure adjustments will have to be changed. Turn breaker for hydraulic pump off or unplug pump after unit is in operation to avoid wear on pump. Lower unit if windy or severe weather is forecast or if lightning is possible. TURNING ON LIGHTS Throw main disconnect switch to on. 12

Open glass cabinet door of ballast box to access 16 individual light switches. Turn on four circuits in sequence and wait until those four lights are fully illuminated. Then turn on the next 4 and wait until lit, until all 16 lamps are illuminated or until desired number of lights are in use. Turning on more than four lights without waiting for them to fully illuminate will shut down the 13

generator on a safety override and the starting sequence will have to be repeated. LOWERING MAST Turn off individual lamp switches in glass cabinet Plug in hydraulic pump into 110 outlet in the generator cabinet and/or turn breaker for the outlet back on. You should be able to hear the hydraulic pump whirring. Push lever farthest from operator towards rear of trailer to lower mast. The lever is adjusted to cause the winch to lower the mast very slowly. It should take 5 minutes to fully lower the mast. If cable is frayed, discontinue use and contact a properly credentialed repair technician. Mast is designed to be held in place by one of the two cables should one break. However, if one does break, discontinue use immediately, move personnel away from trailer and contact a properly trained repair technician. 14

Mast fully lowered when all mast sections are retracted and cables on both pulleys show slack. Mast should lower smoothly. If for some reason the mast hangs up, contact a repair technician. Do not continue to attempt to lower mast. When it is desired to stow the mast, such as when towing or in severe weather, and the mast is fully retracted, then and only then, remove the mast locking pin (see photo on page 9) near bottom of mast. Move hydraulic lever closest to operator towards the rear of the trailer until boom is resting in the cradle. It will be necessary to move the electric wiring out of the cradle before fully lowering to avoid damaging the cables. 15

Do not attempt to continue to lower the mast once it is sitting in the cradle as damage will occur. Replace mast travelling pin. 16

SHUTTING UNIT OFF Turn off main disconnect, let generator run 1 minute without a load and shut down generator according to generator directions, attached. Never shut the generator down with a load as damage to generator and/or ballast box may occur. The metal halide floodlights require 5 minutes to reach full intensity and 15 minutes to fully cool. WHEN REFUELING GENERATOR MAKE SURE UNIT IS OFF AND THE TWO FUEL VALVES TO AUXILLARY TANK ARE TURNED OFF OR OVERFLOW WILL OCCUR TOWING Always pull trailer with a proper vehicle at a very safe speed. Never pull faster than 50 mph/80kph, much slower when towing down a hill. Never pull a trailer utilizing vehicle cruise control as that allows slack and swerving to occur, especially downhill. Towing vehicle must have a pintle ring receiver and electric trailer break connector. Always use anti-telescoping cable to prevent boom from sliding out during transport. 17

WIND INSTABILITY AND DANGER OF UNIT FALLING OVER The following is a chart of when the unit becomes aerodynamically unstable. The data assumes the wind is coming from the most vulnerable direction, which is calculated to be a side wind with all of the bulbs turned to face in that direction. The danger of flying debris from the light fixtures should also be considered in high winds and appropriate safety precautions should always be considered in light of predicted or anticipated weather conditions. These precautions could include: Lowering the mast to an appropriate height for the weather condition Stowing the mast in its travelling position 18

Removing the fixtures from the mast and stowing it to its travelling position. Never erecting mast in proximity of electric wires Tower Height in Feet Toppling Wind Speed in miles per hour 55 Feet 70 mph 45 Feet 90 mph 35 Feet 100 mph 25 Feet 120 mph DAILY INSPECTION Tires are inflated to manufacturer s recommended pressure and lug bolts secure All trailer running light fixtures working and undamaged Dual safety chains securely attached to towing vehicle Check all wiring and breakers for damage Check all fluid levels: radiator, hydraulics, engine oils Check cables for evidence of fraying Make sure mast securing pin is properly installed Check outriggers are undamaged and in the correct position with all pins securing the jacks and outriggers. All Rights Reserved Copyright 2012 DMI Pipe Fabrication, LLC d/b/a DMI-LT 19