Description: Improve I-71 corridor from I-64 to I-265. Approximately 9.1 miles.

Similar documents
Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.

Multi Modal Transit Access Plan KIPDA ID # 239. Project Type: STUDY

A: PLANNED P ROJECTS PROJECTS

Oldham County Major Thoroughfare Plan

Transportation Committee Project Priority List

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Route 29 Solutions Projects

5. RUNNINGWAY GUIDELINES

San Tomas Expressway

Golden s Plan. For the Highway 6 & 93 Corridor

FY 2005 TRANSPORTATION CAPITAL PROGRAM

TRANSPORTATION IMPROVEMENT STRATEGY

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE

1. Provide a dedicated westbound approach bus lane at the intersection;

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

183 North Mobility Project Community Survey Report

LSC TRANSPORTATION CONSULTANTS, INC. 516 North Tejon Street Colorado Springs, CO (719) FAX (719)

Figure 1: East West Connector Alignment Alternatives Concept Drawing

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017

5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION

Terwillegar Drive Expressway Draft Concept Plan

COMMUNITY WORKSHOP (CW) 3 February 21, 2015

72 Avenue Four Laning (BNSF Overpass to 120 Street) WELCOME. Public Information Meeting

VDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment. Staff Recommendations

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative

Colerain Avenue Roadway Improvements. Sponsored by Hamilton County Engineer

Clackamas County Comprehensive Plan

Access Routes from US 101 to the Richmond San Rafael Bridge

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

Environmental Assessment Findings & Recommendations. Public Hearing November 13, 2014

Regional Transportation Needs Within Southeastern Wisconsin

INTRODUCTION. The focus of this study is to reduce congestion and improve mobility for all modes of transportation. Figure ES-1 Study Corridor Map

Frequently Asked Questions

Austell Road Access Management Plan Public Meeting February 17, 2009

Joshua Jester, E.I., Florida Department of Transportation, District One

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

North Coast Corridor:

4.1 Evaluation Criteria

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway

Irondale on the Move Public Outreach Summary to Date. July 8, 2015

Tunnel Reconstruction Brooklyn CB 1 August 14, 2018

1. What is the Doran Street and Broadway/Brazil Grade Separation Project (Project)?

State Route 160 (Blue Diamond Highway)

USDOT Bicycle and Pedestrian Safety Initiative: Safer People and Safer Streets. Barbara McCann, USDOT Office of Policy

Corporate. Report COUNCIL DATE: June 26, 2006 NO: C012 COUNCIL-IN-COMMITTEE. TO: Mayor & Council DATE: June 22, 2006

Replace Bridge 51 on Blackiston Mill Dr. over Silver Creek,

SECTION 7 INVENTORY OF SELECTED INTERSECTIONS AND RECOMMENDATIONS FOR FURTHER STUDY

MOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9.

VIII. Project Prioritization & Implementation

Non-Motorized Transportation 7-1

Basalt Creek Transportation Refinement Plan Recommendations

Stakeholder Focus Group Meeting #3 January 9, 2013 Cattlemens, 2000 Taylor Road, Roseville

Simulating Street-Running LRT Terminus Station Options in Dense Urban Environments Shaumik Pal, Rajat Parashar and Michael Meyer

San Rafael School District. Task Force Meeting Notes. November 5, 2012

Santa Clara I-280 CORRIDOR STUDY

Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project. Prepared September 6, 2017

Appendix B. Environmental Resource Technical Memorandum. Assessment on Travel Pattern and Access Impacts

Tunnel Reconstruction South 5 th Street Association October 16, 2018

C C C

Session 1 23 CFR 772: Type I Project Definitions

Public Works and Infrastructure Committee. General Manager, Transportation Services

DRAFT FY 2017-FY 2021 FLORIDA-ALABAMA NON-SIS PROJECT PRIORITIES PROPOSED CHANGES BY ESCAMBIA AND SANTA ROSA COUNTIES

PRESS RELEASE San Joaquin Council of Governments

About the Wilmington Downtown Circulation Study

Freeway System Considerations

Maryland State Highway Mobility Report. Morteza Tadayon

TRANSPORTATION TRAINING TOPICS. April 6, 2010

SUMMARY OF TRANSPORTATION INVESTMENTS

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Meeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Transform I-66. Chief Engineer Garrett W. Moore, P.E. July 12, 2018

!!!!!!!!!!!!!!!!!! Metro!Denver!MTD!Governance!Committee! October!23,!2013!!9:00!AM!to!10:00!AM! Denver!Regional!Council!of!Governments!

Capital Beltway HOT Lanes Project

University Hill Transportation Study Technical Memorandum Alternatives Modeling and Analysis May 2007

I-290 Phase I Study Village of Forest Park November 9, of 25

Construct weigh station on I-65 near the Kentucky state line, northbound only. Port of Entry near Kentucky state line.

Giles Run Connector Road

Public Meeting #1 Comment Summary

YELLOWHEAD TRAIL / 149 STREET INTERCHANGE

COUNTY ROAD 22 HORSESHOE VALLEY ROAD. Municipal Class Environmental Assessment. simcoe.ca

Congestion Management Report

Legislative Update Williamsburg Residency

Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I)

DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, Susan Shaw, P.E., VDOT, Megaprojects Director

I-10 Bypass Project Banning to Cabazon

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

Mandan Commission Meeting August 2, 2016 Mandan City Hall

SAFE ROUTES TO SCHOOL (SR2S)

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A

Northern Virginia Express Lanes Design Challenges and Solutions. IBTTA Maintenance and Roadway Operations Workshop June 25, 2018

DES MOINES AREA MPO. Presentation to Iowa Commercial Real Estate Association. April 6, 2017

Nevada s Transportation Infrastructure and Future Transportation Needs

STATION #3 INITIAL ALTERNATIVES

PRESENTATION WILL BEGIN AT APPROXIMATELY 6:05 P.M. I-90 EXIT 406 INTERCHANGE MODIFICATION STUDY AND ENVIRONMENTAL ASSESSMENT MARKET

Transcription:

I-71 KIPDA ID # 130 Project Type: ROADWAY CAPACITY Description: Improve I-71 corridor from I-64 to I-265. Approximately 9.1 miles. Purpose: Improve capacity and level of service along I-71 in the project limits. County: Jefferson State ID #: 48.01 Project Cost: $86,000,000 Estimated Open to Public Year: 2012 Regional Priority: NO Included in AQ Analysis/Regionally Significant: YES Subject to CMS Review: YES Within 1/4 Mile or on a Bicycle & Pedestrian Priority Corridor: YES 10-168

KIPDA ID # 396 I-71 Project Type: OPERATIONS Description: Reconstruct interchange at I-71 and KY 329. Purpose: This project will improve access to I-71 and improve safety. County: Oldham State ID #: Project Cost: $13,100,000 Estimated Open to Public Year: 2025 10-169

I-71 KIPDA ID # 952 Project Type: ROADWAY CAPACITY Description: New interchange & connector road from KY 1447 to US 42 with interchange on I-71 near Jefferson/Oldham County border. Purpose: Provide access to I-71 between I-265 and Crestwood to alleviate congestion on KY 22, US 42, and KY 1694. County: Jefferson & Oldham State ID #: Project Cost: $18,100,000 Estimated Open to Public Year: 2013 Included in AQ Analysis/Regionally Significant: YES Subject to CMS Review: YES Within 1/4 Mile or on a Bicycle & Pedestrian Priority Corridor: YES 10-170

KIPDA ID # 1019 I-71 Project Type: STRUCTURE Description: I-71 northbound Port of Entry for a commercial vehicle monitoring station located between Mile Point 23.62 & Mile Point 24.75 near the Henry County line. Purpose: To weigh trucks to levy taxes and ensure compliance with weight limits. County: Oldham State ID #: 350 Project Cost: $7,750,000 Estimated Open to Public Year: 2010 Regional Priority: NO 10-171

I-71 KIPDA ID # 1279 Project Type: STUDY Description: I-71 interchange justification study at the Oldham/Jefferson County line. Purpose: County: Jefferson & Oldham State ID #: Project Cost: $70,000 Estimated Open to Public Year: 2006 Regional Priority: NO Includes Bicycle Facilities: N/A Includes Pedestrian Facilities: N/A I-71 Improvement Plan: HOV/HOT Addendum KIPDA ID # 1341 Project Type: STUDY Description: In conjunction with Louisville Metro and KYTC, administer a feasibility study for implementing HOV, HOT, or other transit ways lanes on I-71 as part of the I-71 Improvement Plan. Purpose: This project will reduce traffic congestion on I-264, provide new interchange to KY 1447, and help alleviate congestion on US 42. Primary Contact Agency: Transit Authority of River City County: Jefferson & Oldham State ID #: Project Cost: $75,000 Estimated Open to Public Year: 2006 Regional Priority: NO Includes Bicycle Facilities: N/A Includes Pedestrian Facilities: N/A 10-172

KIPDA ID # 1286 I-71/KY 393 Park & Ride Lot Project Type: TRANSIT Description: Park & Ride facility at the I-71 & KY 393 interchange. Purpose: County: Oldham State ID #: Project Cost: $90,000 Estimated Open to Public Year: 2006 Within 1/4 Mile or on a Bicycle & Pedestrian Priority Corridor: YES 10-173

I-264 KIPDA ID # 131 Project Type: ROADWAY CAPACITY Description: Construct new I-264 interchange at KY 1447 (Westport Road) adding an additional lane in each direction in the interchange area. Purpose: This project will reduce traffic congestion on I-264, provide new interchange to KY 1447, and help alleviate congestion on US 42. County: Jefferson State ID #: 28.00 Project Cost: $32,000,000 Estimated Open to Public Year: 2007 Included in AQ Analysis/Regionally Significant: YES Within 1/4 Mile or on a Bicycle & Pedestrian Priority Corridor: YES 10-174

KIPDA ID # 400 I-264 Project Type: ROADWAY CAPACITY Description: Add 1 lane in each direction on I-264 from KY 1447 (Westport Road) to I-71. Approximately 3.0 miles. Purpose: This project will reduce traffic congestion. County: Jefferson State ID #: Project Cost: $40,000,000 Estimated Open to Public Year: 2020 Included in AQ Analysis/Regionally Significant: YES Subject to CMS Review: YES Within 1/4 Mile or on a Bicycle & Pedestrian Priority Corridor: YES 10-175

I-264 KIPDA ID # 404 Project Type: OPERATIONS Description: Reconstruct I-264 interchange at US 42 (Brownsboro Road). Purpose: This project will reduce traffic congestion. County: Jefferson State ID #: Project Cost: $40,000,000 Estimated Open to Public Year: 2020 Included in AQ Analysis/Regionally Significant: YES Subject to CMS Review: YES 10-176

KIPDA ID # 405 I-264 Project Type: OPERATIONS Description: Reconstruct I-264 intersections from Muhammad Ali Boulevard to River Park Drive. Purpose: This project will improve traffic flow. Primary Contact Agency: Louisville Metro Public Works County: Jefferson State ID #: Project Cost: $1,500,000 Estimated Open to Public Year: 2010 10-177

I-264 KIPDA ID # 969 Project Type: STUDY Description: Conduct a feasibility study to determine whether or not to construct a partial or full interchange at Manslick Road & I-264. Full interchange would involve reconstruction of the Dixie Highway ramp to provide collector/distributor. Purpose: This study will examine the interchange issue and how to best increase access in this corridor and serve as an alternate truck route to the 7th Street corridor. County: Jefferson State ID #: 436.00 Project Cost: $200,000 Estimated Open to Public Year: 2010 Regional Priority: NO Includes Bicycle Facilities: N/A Includes Pedestrian Facilities: N/A 10-178

KIPDA ID # 962 I-264/Cliff Avenue Pedestrian Bridge Project Type: BICYCLE/PEDESTRIAN Description: Extend Cliff Avenue Pedestrian Bridge beyond noise barrier wall on south side of I-264 in vicinity of Cliff Avenue. Purpose: Existing pedestrian bridge goes between two noise walls. This area has been a safety/ security issue. Extending the bridge would keep pedestrians in view of area residents and would make would-be assailants visible. County: Jefferson State ID #: Project Cost: $250,000 Estimated Open to Public Year: 2006 Includes Pedestrian Facilities: YES 10-179

I-264/I-64 KIPDA ID # 397 Project Type: OPERATIONS Description: Widen ramp from westbound I-64 to westbound I-264 from 1 to 2 lanes. Purpose: This project will improve safety and reduce traffic congestion by adding a lane to exit ramp. County: Jefferson State ID #: 159 Project Cost: $5,600,000 Estimated Open to Public Year: 2008 Included in AQ Analysis/Regionally Significant: YES Subject to CMS Review: YES 10-180

KIPDA ID # 1375 I-264/I-64 Project Type: STREETSCAPE Description: Construct noise walls along I-264 and I-64 in the vicinity of the communities of Avondale and St. Regis Park. Purpose: Noise abatement County: Jefferson State ID #: Project Cost: $248,000 Estimated Open to Public Year: 2008 Regional Priority: NO Within 1/4 Mile or on a Bicycle & Pedestrian Priority Corridor: YES 10-181