Introduction GUIDELINES FOR INSTALLATION PREINSULATED TUBE UNITHERM... Principal of Operation

Similar documents
Rapidmain Installation Guide

SIMPLAIR PIPING TOOL. JXT Company

TECHNICAL BULLETIN PINPOINT CONDUIT COUPLING AND SPLICING RECOMMENDATIONS

CADDY SPEED LINK MANUAL SLK LOCKING DEVICE

FLEXIBLE SHAFTING (Wet & Dry)

INSTALLATION PROCEDURE FOR OPGW FIBER OPTIC CABLES

Casing Spacer Technology Leaders

Thanks for choosing EJAI SOLAR product

MATERIAL HANDLING - FIELD RIGGING SAFETY PROGRAM

Intro: by firechim on October 3, 2013

Below are the instructions to build a roller-furling unit for under $10. Read the entire process before beginning the project.

Technical Bulletin. Parts and Service News. LPG Lock-Off valve replacement procedures for 4.2 Liter Ford V6

Flexible & Intelligent

steam service hose EATON l-1

Assembly Drawing: W-311B-A01, or as applicable Parts List: W-311B-A01-1, or as applicable Special Tools: , , &

Features. Instructions. Your IDEAL Bender has engineered features which include:

4" SIDE PORT PRESSURE VESSEL TECHNICAL MANUAL. Lenntech. Tel Fax.

INSTRUCTION MANUAL. January 23, 2003, Revision 0

Chemistry - Scale-up F.32. Lara TM - Controlled - Lab Reactor. The Concept

Assembly Instructions. -Cantilever Boat Lifts

Installation Operation Maintenance

Discussion and guidance on the definition and qualification of porous loads

FTS SUBMERSIBLE PRESSURE TRANSMITTER USER S MANUAL

ESA Elbow Sealing Adapter Kit

Side-of-Pole Mount for 1 Module (SPM1) For Module Types A & B

Flexible Metal Hose Products

DVS Technical Codes an Bulletins

INSTALLATION, OPERATION AND MAINTENANCE GUIDE

INSTALLING YOUR CLC RUDDER

Recommended Flexible Pipe Installation For Rental Chillers

Installation Instructions

LEAK TROUBLESHOOTING

tubepress press procedure

HYDRALECTRIC LIMITED,

Corrugated Hose Loop Calculations

Thank you for purchasing a Porta-Dock product! *Please read and follow these instructions step by step*

P R I M A X. The Most Advanced Shoring Devices SAFER - FASTER - DEEPER - CHEAPER THE ULTIMATE SHORING TECHNIQUES ARE NOW ON YOUR HANDS

Vented VW Pressure Transducer

MSC-P and MSC-N Manifolds for Steam Distribution and Condensate Collection

KWIKGOAL IMPORTANT SAFETY INSTRUCTIONS READ CAREFULLY

SECTION 10iS: TAILCONE

Airwalker. Installation and Safety Information. Stretch Products for Dance, Therapy, Education, and Fitness

Gas Lines. Technical Manual. Sumitomo (SHI) Cryogenics of America, Inc Vultee Street Allentown, PA U.S.A.

Installation/Care/Use Manual

i) Filtration machine, measuring equipment and other related machinery

Hansa COG 14 th century SCALE: 1/72 Length: 430mm Width: 210mm Height: 330mm

RS Pro 300mm Long EPDM 15bar Braided Stainless Steel Hose RS Stock No

HANGERS & SUPPORTS CLIP-IT CLIP-IT STUD STRAPS BAR JOIST CLIP CONDUIT HANGERS CLIP-IT

SPECIFICATION SHEET. OMEGAFLEX, Ltd. TracPipe Flexible Gas Piping Specification Sheet Specification date. ProjectName

Cleaning. Introduction Page

COMPRESSED AIR DISTRIBUTION SYSTEMS

SECTION I REGULATORS

INTERLOCKED METAL HOSE

Installation Operating Instructions for Simple Duplex Manual Manifolds PX-TSD Series

VOLUMATIC WATER REGULATOR

SPM B-Net Assembly Instructions. Installation Recommendations

FIBERGLASS MULTI-GARD MULTI-CELL RACEWAY

KC Series Gas Components and Supply Design Guide

Process Accuracy Through Heat Transfer Expertise

Trench Cable Rollers - Straight Pulling Application

Nominal Wall Thickness Steel Only in. (mm) Outside Diameter With PVC in. (mm)

Important Note: Tighten lock nuts so the support tubes still swing freely see figure 2. There must be 1 2 threads of bolt past end of lock nuts.

DBML-60/80 Squeeze Tool

Baron Oxygen STC Installation Instructions (Front Baggage Installation) GAMI/Tornado Alley Turbo 2009

Remeha Quinta Cascade guide

Dry Hydrants. The installation of a non-pressurized pipe system into local water sources provides a ready means of supplying water to fire engines.

TDUX Inflatable Duct Sealing System 1.0 General Product Information

A A A T E C H N O L O G Y

Chlorine Supply Containers And Piping

Safety System Installation Guide for ARE Wind Poles

Instant Garage 20' x 12' 3" x 8' 3"

Hose Assembly Live Length Calculation Guide

by Master Halco ANCHOR GATE SYSTEMS Swing Gates Overhead Slide Gates Cantilever Slide Gates Vertical Lift Gates Fencing Without Boundaries.

SECURITY AND CONFIDENCE AT HEIGHT

CABLE PULLING GUIDELINES

Air Tractor Preventative Maintenance Manual And Troubleshooting

Installation Instructions

Chapter 2 Rigging. Cutting Wire Rope. Anchoring Wire Rope to Drum. Winding Wire Rope Onto Drum

SASK-A-POLE OWNERS AND USERS MANUAL

Butler Parachute Systems, Inc

INSERT FITTINGS INSERT FITTINGS

MV-105 MEDIUM VOLTAGE CABLE. 5kV, 8kV, 15kV, 25kV & 35kV

Section 9 COYOTE Closures & Splice Cases for OPGW & ADSS

Synchronised Swimming Skill Level 4

PAGE (Rev. A - 06/17)

SERVICE MANUAL SALAMANDER BROILERS RADIANT AND INFRARED 36RB 36IRB VULCAN C36RB C36IRB WOLF

Guide for Evaluating Your Hose Assembly Supplier

Halsey Taylor Owners Manual 4410 Freeze Resistant Tubular Fountain STOP!

MODEL TRIPEX PULLEY SYSTEM

COMMON PRECAUTIONS Data Sheet - Be Sure To Read Before Handling Page 1 of 6

INDUSTRIAL HOSES - steam

Model 10E Enviro-Line Environmental Pressurization System Installation & Operation Manual

REPORT OF INITIAL SURVEY OF AN UNKNOWN BARGE OFF OF CEDAR POINT, SANDUSKY, OHIO. July 26-27, Submitted to Cleveland Underwater Explorers, Inc.

Quality Plastic Pipe Fittings. Technical Data. Fabricated PVC Fittings IPS Class 100, 125, 160, 200 SCH 40 & SCH 80 Solvent Weld & Gasketed

OFS LT1B Instruction Sheet Splice Organizer Comcode: D02AK0025 Installation

Integral type Differential pressure flowmeter VNT Series

POWER FLUSH KIT INSTRUCTIONS

SECTION SHOWER AND BATH ENCLOSURES. Display hidden notes to specifier by using Tools / Options / View / Hidden Text.

Bike Rack and Tire Carrier

Plok. Rapid Mating Multi-Pin Industrial Connector. Amphenol Industrial Sine Systems * Pyle Connectors Corporation

Transcription:

GUIDELINES FOR INSTALLATION PREINSULATED TUBE UNITHERM... Introduction Principal of Operation The use of DEKORON/UNITHERM pre-insulated steam supply and condensate return lines offers cost savings features in both installation and energy conservation. Pre-insulated supply lines come in long lengths, making storage, handling and installation simple. The prefabricated construction with its thermal insulation, weather and chemical resistant jacket provides protection and energy efficiency. Pre-insulated lines have a comparatively small overall diameter and are semi-flexible which allows for ease of handling and supporting. These guidelines and recommendations will allow the steam supply system to be installed in the most economical manner while maintaining the design integrity of the total system.

The Manifold System Steam tracing systems, at one time high-energy consumers, are now critically engineered and designed for efficiency. The increasingly high cost of energy has dictated its efficient use. Manifold systems such as illustrated in Figure I thru VII are a major part of an efficient, well-designed system. They simplify the design engineering, installation, check out, and provide for an easily maintained system. These manifolds can be fabricated in many configurations to meet steam capacity requirements as well as space on these and subsequent pages illustrate the many types of manifold systems, which may be employed.

Steam Supply and Condensate Return Lines Running To assure a neat, orderly installation, begin running the pre-insulated lines supply or return from the manifold to the traced piping or other process equipment. These lines can then be grounded and supported as they leave the manifold. The support requirements then become self-evident, note the multiple line supports in the illustrations and photographs on this and subsequent pages. The long length coil should be placed at the manifold supported on a freewheeling A frame (see photo Fig. VIII) and runs then pulled to the tracer connections. These runs may then be grouped and firmly supported using existing framework and piping wherever possible. Multiple groupings must allow space for heat dissipation. A 1/2 or more spacing between the pre-insulated lines is recommended. Layered horizontal runs can be made by providing a wooden or insulating block spacer between layers at the recommended support centers. Supporting Cable tray may be efficiently used in horizontal support systems where runs are long enough, space allows and support members are distant such as along pipe alleys (Fig. IX, X and XI). When running pre-insulated steam lines in cable tray, allow minimum 1/2 spacing between lines and when layered, provide an insulating spacer at the recommended support center. Lines should be secured in the tray every 10- feet and within 18 inches of any directional change. Do not firmly support within a bend, as this will limit line movement due to thermal expansion. Support clips or clamps should have a wide bearing surface. Securing hardware should not be the type, which exerts point pressure or can be over tightened. Support clamps should be sized one size less than bundle O.D. Existing structure may often be used to simplify the support requirements and further reduce the installation cost. The photo and illustrations on the adjacent page (Fig. XII, XIII, XIV, XV and XVI) show the use of existing structural members for support. Individual lines, where existing structure is not available, may be supported in channel or angle and secured with tiewrap fasteners. Continued on Page 5

*See Page 3 for previous Figures

Installation Dos and Don ts Provide long radius, sweeping bends where possible. Wide bearing clamps Seal all exposed insulation with UNITHERM End Sealant. TYPICAL BUNDLE Seal fittings and splice with UNITHERM Seal patch. FIG 1 Existing Pipe Run NOT NOT Strip jacket to make tight 90º bends use a union elbow where tight bends are necessary and seal insulation. Use a properly-sized conduit bender or mandrel to assure constant radius bend where possible. Allow 1 per foot slope to steam trap on condensate return lines. exceed minimum bend radius. exceed recommended support centers. TRACED BUNDLE PIPE STRAPS ANGLE IRON (FIG ) CABLE TRAY INSTALLATION NOT NOT over tighten support clamps jackets should not be pinched. severely crimp jacket as this may affect insulation properties. Some slight crimping can be expected with hand-formed bends. WIDE BEARING PIPE STRAPS Figure 7 STRUT CLAMP IN TRAY NOT remove excessive amounts of jacket and insulation at fitting. NOT tie multiple runs together to form one bundle proper spacing (1/2 minimum) is required for heat dissipation. Installation Recommendations Tube Size Inches 1/4 3/8 1/2 5/8 Support Centers (FT.) Horizontal Vertical Min. Bend Radius (Inches) 8 10 12 14 OK CHANNEL TYPE STRUT OVERHEAD SUPPORT (FIG 4) HORIZONTAL OR VERTICAL WALL SUPPORT Form Guidelines for Pre-Insulated 2200-040903 DEKORON/UNITHERM 31 Commerce Creek Blvd., Cape Coral, Florida 33909 Phone: 239-995-8111 Fax: 239-995-8027 NO