ROAD OCCUPANCY PERMIT APPLICATION # Damascus Township, 60 Conklin Hill Road, Damascus, PA Tel Fax

Similar documents
Access requests to County streets and roadways are processed through one of the following methods:

Inspector MUST Sign and Date Each Inspection

Driveway Design Criteria

SECTION 14: LANDSCAPING AND BEAUTIFICATION

As temporary grade control facilities along waterways until final stabilization is established.

SECTION 3 STREET DESIGN

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS

Suitable Applications Check dams may be appropriate in the following situations: To promote sedimentation behind the dam.

Design Criteria. Design Criteria

STAKING TRAFFIC CONTROL SIGNAL SYSTEMS

Road Usage Permit Application Form

Access Management Standards

SECTION TRAFFIC REGULATIONS

Traffic Control Inspection Checklist Segment:

CHAPTER 8 STAKING SIGNALS AND LIGHTING FIELD GUIDE. 8.1 Staking Traffic Control Signal Systems

SWIMMING POOL PERMIT GUIDELINES AND APPLICATION FOR PERMIT

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

CONSTRUCTION ENCROACHMENT PERMIT APPLICATION AND PROCESSING INSTRUCTIONS

(This page left intentionally blank)

PERFORMANCE ACTIVITY 405 LIMB MANAGEMENT

GENERAL INSTRUCTIONS FOR A FENCE PERMIT

La Crescent Township Zoning Ordinance

(Revised February,2005) CULVERTS, BRIDGES, AND FORDS

Minimum Standards for Driveway Construction Village of Bear Creek

PERFORMANCE ACTIVITY 306 DRAINAGE PIPE WORK DESCRIPTION 4

0 CITY OF SANTA ANA 0

APPENDIX L. Design Criteria

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

Chapter 11. Culverts and Bridges Design Checklist for Culvert Design

RESIDENTIAL SWIMMING POOL

CONSTRUCTION SPECIFICATION

2017 Temporary traffic control guidelines for pedestrians. v.2

SECTION 1A NEW JERSEY TURNPIKE GEOMETRIC DESIGN

TRAFFIC CONTROL DEVICES FOR LOW VOLUME ROADS

Accommodating Pedestrians in the Work Zone

CITY OF ROSEVILLE DESIGN STANDARDS

Address: South Elgin, IL Phone: ( ) - Fax: ( ) - Cell: ( ) - Phone: ( ) - Fax: ( ) - Cell: ( ) - Contact Type:

City of Margate, Florida. Neighborhood Traffic Management Manual

PERFORMANCE ACTIVITY 401 MOWING WORK DESCRIPTION 5

Field Instruction. Protect Horizon Power employees and contractors from a potential hazard.

Route 47 (North Main Street) Reconstruction

SAWS QA/QC CHECKLIST WATER ADJUSTMENT/RELOCATION PROJECTS

Readington Road (C.R. 637) Construction

RULES OF TENNESSEE DEPARTMENT OF TRANSPORTATION PUBLIC TRANSPORTATION, WATERWAYS AND RAIL DIVISION CHAPTER RAILROAD GRADE CROSSING STANDARDS

City of DuBois PERMIT APPLICATION P. O. Box 408, 16 West Scribner Ave - DuBois, PA Phone: Fax:

Railroad Inspection Procedure Manual

ENFIELD BOARD OF EDUCATION ENFIELD, CONNECTICUT

ADA on Construction. Guidance for Section C Plan Preparers

GWINNETT COUNTY DEPARTMENT OF TRANSPORTATION

RESIDENTIAL SWIMMING POOLS

22. Specialty Valves.

ENGINEERING AND PUBLIC WORKS. Transportation Improvements: Santa s Village Road (MR15) Public Meeting

CHAPTER 6H. TYPICAL APPLICATIONS

CHAPTER 6H. TYPICAL APPLICATIONS

WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES

CT EXPANSION PROJECT SILT FENCE DESIGN CRITERIA AND METHODOLOGY CONNECTICUT LOOP. Submitted by:..

WORK ZONE TRAFFIC CONTROL PROCEDURES

LARIMER COUNTY: ENGINEERING DOUGLAS ROAD (CR 54)

Return to: Engineering Department Water Quality Administrator COUNTY OF HENDERSON 100 N. King Street Suite 118 Hendersonville, NC 28792

Address: South Elgin, IL Phone: ( ) - Fax: ( ) - Cell: ( ) - Phone: ( ) - Fax: ( ) - Cell: ( ) - Contact Type:

This Chapter sets forth the minimum design, technical criteria and specifications to be used in the preparation of all roadway plans.

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS

Low Volume Roads: Rural and Urban

l Civil Engineering Group of PSRA Techn ical Plan Review Team. '\J \

Shoulders. Chapter 4: chapter contents

TABLE OF CONTENTS 1.0 INTRODUCTION PLAN CERTIFICATION (B)(4) 1

PLACEMENT OF SIGNS RECOMMENDED PRACTICES SUB-SECTION

ADA Operations Contact Info

County of Greenville South Carolina. Traffic Calming Program Neighborhood Traffic Education Program and Speed Hump Program

Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA

PART 5. TRAFFIC CONTROL DEVICES FOR LOW-VOLUME ROADS TABLE OF CONTENTS

TEMPORARY TRAFFIC CONTROL GUIDELINES FOR HIGHWAY-RAIL GRADE CROSSINGS

Roadway Design Manual

PERFORMANCE ACTIVITY 613 IMPACT ATTENUATOR WORK DESCRIPTION 3

Outlet Structures T-12

B741 TEMPORARY CONCRETE BARRIERS - OPSS 741

STATEMENT of POLICY and PROCEDURE

RIIWMG203D Drain and Dewater Civil Construction Site Learner Guide

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

REVOCABLE PERMIT FOR STREET BANNER APPLICATION PACKAGE

1.1 This by-law shall be known as "the pool by-law"; In this by law;

TRAFFIC ACCOMMODATION IN WORK AREAS

Regional School District #19 Transportation Policy

Special education/504 students shall be adjudged on an individual basis, in accordance with their Individual Education Plans (IEPs)/504 Plans.

Right-of-Way Standards

MISSOURI HIGHWAYS AND TRANSPORTATION PLANS FOR PROPOSED STATE HIGHWAY DESIGN DESIGNATION INDEX OF SHEETS LENGTH OF PROJECT SHEET NUMBER

Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS. RESOLUTION No

Hydrant Flow Testing for Hydraulic Model Calibration. Doug Lane, PE City of Bellevue, WA

2010 STANDARD SPECIFICATIONS STANDARD DRAWINGS

Project Update #2. Cedar Springs Road Minor Reconstruction and Culvert Replacement (Britannia Road to Kilbride St)

Mecklenburg County Health Ordinance Rules Governing Residential Swimming Pools

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By:

Meeting Notes. PIM Meeting #1 CTH D Reconstruction Nenno Road to Canadian National Railroad Town of Wayne Washington County

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

11 CHECKLISTS Master Checklists All Stages CHECKLIST 1 FEASIBILITY STAGE AUDIT

APPENDIX B1. CROSS-REFERENCE GUIDE TO THE OHIO REVISED CODE

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF MANITOWOC, WISCONSIN SECTION 900 TRAFFIC CONTROL

Geometric Design Tables

PART A: IDENTIFICATION/LOCATION

Transcription:

Instructions: For a driveway access permit, fill in sections 1, 2, 3 and 4, and the appropriate drawings and sign. For a Utility access, fill in sections 1, 2, 3 and 5, and figures 1 and 3. Prepare a detailed drawing of the proposed driveway construction, or fill in the attached drawings NOTES: 1) Property owner and contractor shall assume responsibility for repair of any damage to a Township Road during construction or damage resulting from improper driveway construction. 2) Property owner and contractor shall be responsible for vehicular and pedestrian traffic safety during construction. 3) Failure to comply with the provisions set forth in this permit may result in revocation of the permit and the property owner and contractor may be subject to legal action, penalties, and fines, and the closure of the driveway. 4) Work within a Township Right of Way without a current and valid permit is a crime and will be prosecuted. 5) Work must be started and completed within the issued permit dates. SECTION 1 APPLICANT, CONTRACTOR, AND LOCATION TOWNSHIP ROAD NAME ROAD NO. 9-1-1 ADDRESS OF SITE: APPLICANT NAME PROPERTY OWNER OWNER ADDRESS OWNER PHONE NO. EXCAVATION CONTRACTOR: CONTRACTOR ADDRESS: CONTRACTOR PHONE NO.: NEAREST INTERSECTING ROAD DISTANCE TO NEAREST ROAD FEET DIRECTION TO NEAREST INTERSECTING ROAD (N, S, E, W) DISTANCE TO NEAREST INTERSECTING DRIVEWAY FEET DIRECTION TO NEAREST INTERSECTING DRIVEWAY (N, S, E, W) NEAREST INTERSECTING DRIVEWAY IS ON THE SAME SIDE OPPOSITE SIDE DISTANCE TO NEAREST PROPERTY LINE OR LANDMARK FEET IDENTIFY LANDMARK IF USED (UTILITY POLE NUMBER, MAILBOX NAME OR NUMBER, SIGNIFICANT TOPOGRAPHICAL FEATURE) DIRECTION TO PROPERTY LINE OR LANDMARK (N, S, E, W) MARK THE LOCATION AT THE SITE WITH FLAGGING OR PAINTED STAKES SECTION 2 ROADWAY AND TRAFFIC OBSTRUCTION INFORMATION NOTE: Unloading and loading of equipment, parking of trucks or machinery in the roadway, ditching and trenching across roadway, etc. are all obstructions to the roadway and vehicular traffic. The property owner and the contractor are responsible for the protection of the public. Closing of 1 lane of traffic for unloading of equipment and parking requires warning signs, traffic cones and a flagger, at a minimum. Page 1 of 11

A TRAFFIC CONTROL PLAN IS REQUIRED. ATTACH THE TRAFFIC CONTROL PLAN TO THIS APPLICATION. PROPOSED OBSTRUCTION START DATE: TIME: PROPOSED OBSTRUCTION COMPLETION DATE: TIME: WILL AT LEAST ONE LANE OF TRAFFIC BE CLOSED? YES NO WILL ROADWAY BE COMPLETELY CLOSED AT ANY TIME DURING CONSTRUCTION? YES NO IF YES, EMERGENCY SERVICES MUST BE NOTIFIED: CONTACT WAYNE COUNTY 9-1-1 AT 570-253-3109 BEFORE CLOSING THE ROAD AND WHEN THE ROAD IS OPENED. Owner/contractor is/are required to notify emergency services and the Township of the road closure. An emergency contact person and contact information is required for any roadway obstruction. EMERGENCY CONTACT PERSON: EMERGENCY CONTACT PHONE NUMBER: LIST THE BEST WAYS TO CONTACT THE JOB FORMAN AT THE CONSTRUCTION SITE: FOR ROADWAY OBSTRUCTION OR CLOSURE, THE FOLLOWING WILL BE PROVIDED BY THE CONTRACTOR: ROADWORK AHEAD SIGNS TRAFFIC CONES FLAGGERS NUMBER OF FLAGGERS ROAD CLOSED SIGNS DETOUR SIGNS CONSTRUCTION BARRIERS PEDESTRIAN BARRIERS ACROSS ROADWAY) CROSSOVER PLATING (TO ALLOW TRAFFIC OVER TRENCHING All road closure and detour plans must be approved by the Township prior to implementation. SECTION 3 EXISTING TOWNSHIP ROADWAY INFORMATION TOWNSHIP ROAD SURFACE: PAVED DIRT/GRAVEL TOWNSHIP ROAD IMPROVED WIDTH FEET R.O.W. WIDTH FEET SHOULDER / BERM WIDTH FEET ROADSIDE DITCH OR SWALE FEET FROM ROAD CENTERLINE APPROXIMATE SIGHT DIST: LEFT FEET RIGHT FEET POSTED SPEED LIMIT MPH NO POSTED SPEED LIMIT Page 2 of 11

SECTION 4 PROPOSED USE AND CONSTRUCTION OF DRIVEWAY / REASON FOR REQUESTING PERMIT DRIVEWAY USE: RESIDENTIAL AGRICULTURAL COMMERCIAL PERMIT IS FOR: SUBDIVISION REQUIREMENT NEW DRIVEWAY REPAIR OR RESURFACING OF EXISTING DRIVEWAY REPAIR OR REPLACEMENT OF DRAINAGE FACILITIES RELOCATION OF DRIVEWAY FOR RECORD OF EXISTING DRIVEWAY UTILITY INSTALLATION PROPOSED DRIVEWAY SURFACE: PAVED DIRT / GRAVEL AVERAGE NUMBER OF TRIPS PER DAY NUMBER OF OFF-STREET PARKING SPACES TO BE MADE AVAILABLE PROPOSED DRIVEWAY LENGTH FEET PROPOSED TRAVEL SURFACE WIDTH FEET LONG DRIVEWAY PROPOSED NAME * * Township approval IS required for all driveway names, and, after approval, posting of driveway name signs is required. SECTION 5 UTILITY INSTALLATION FOR UTILITY INSTALLATION UNDERGROUND: PIPELINES AND CONDUITS OPENING OF ROAD SURFACE (ANYWHERE WITHIN ROAD RIGHT-OF-WAY): PARALLEL TO ROADWAY CROSSING OF ROADWAY LENGTH OF TRENCH FEET WIDTH OF TRENCH FEET DEPTH OF TRENCH FEET FILL MATERIAL: COMPACTED DEPTH OF FILL: FEET/INCHES FILL MATERIAL: COMPACTED DEPTH OF WEARING SURFACE : FEET/INCHES WEARING SURFACE MATERIAL: * ATTACH A CROSS-SECTION DRAWING OF THE TRENCH AND FILL MATERIAL. FOR UTILITY INSTALLATION OVERHEAD POLES AND TOWERS PARALLEL TO ROADWAY CROSSING OF ROADWAY UTILITY POLES AND TOWERS: NUMBER OF POLES OR TOWERS TO BE ERECTED NEAREST DISTANCE FROM CENTER OF ROAD TO STRUCTURE FEET MINIMUM HEIGHT OF LOWEST WIRE CROSSING TRAVEL LANES FEET * ATTACH A DRAWING OF THE UTILITY INSTALLATION LOCATION Page 3 of 11

SECTION 6 DRIVEWAY DETAIL DRAWINGS Attach additional drawings and specifications to this application if necessary. FIGURE 1 On the following drawing indicate the location of the proposed driveway, nearest intersecting roads and driveways and distances to the nearest intersecting roads and driveways. Page 4 of 11

FIGURE 2 If the proposed driveway leads downhill from the roadway, on the following drawing indicate the dimensions from the center of the road the dimensions of the travel lane and the proposed distance to the downhill change in grade. Notes: 1. A-B: Driveway must run downhill with 6% slope maximum from edge of roadway at least 10 feet. 2. Maximum grade 14% for next ten feet. (8% change). This grading provides area for safe stopping and clear sight area. Provide proposed dimensions: Road Center to A : Feet at max. 6% downslope A to B : Feet at max 14% downslope Page 5 of 11

FIGURE 3 If the proposed driveway leads uphill or is level with the roadway, on the following drawing indicate the dimensions from the center of the road the dimensions of the travel lane and the distance to the existing roadside ditch or swale; indicate the distance of the proposed pipe from the center of the road. Generally, placing a pipe in an existing ditch does not meet the requirements for proper drainage, driveway geometry, and protective cover over the pipe. Notes: 1. A-B: Driveway must be graded at -6% for minimum of 6 feet. 2. B-C: Uphill grade must not exceed 8% slope for minimum of 8 feet. 3. Pipe must be set back (offset) as specified in permit. Generally, a pipe shall not be installed in existing roadside ditch. 4. Pipe size shall not be smaller than the minimum diameter as specified in the permit. 5. Pipe shall be covered with min. 12 inches of material. 6. Tail ditches must be cut to provide flow of stormwater to and from the roadside ditch. 7. Stormwater Runoff from driveway must not reach roadway. Provide proposed dimensions: Road Center to A : Feet A to B : Feet at 6% downslope B to C : Feet at % upslope Road Center to Exist Ditch : Feet Road Center to Proposed Pipe: Feet Page 6 of 11

FIGURE 4 On the following drawing indicate the width of the proposed driveway and the sight distances left and right (after brush and tree removal and bank grading, if necessary to obtain and maintain safe sight distances.) ALL driveways must be full width (12 feet minimum) at right angles (90 degrees) for a minimum of 10 feet from the edge of the Township Road before turning. Township Roadway Width: Feet Sight distance Feet Sight distance Feet Flare end of driveway to accommodate turns in and out of driveway Driveway Width Feet Show proposed culvert pipe location with offset distance from the road centerline. Page 7 of 11

Date Damascus Township 60 Conklin Hill Road Damascus, PA 18415 Re: NPDES permit determination (self-certification) I hereby certify that my project described below does not disturb one (1) acre or more during the life of my project. It is therefore understood that my project does not meet the requirements for a National Pollution Discharge Elimination System (NPDES) for Stormwater Discharges Associated with Construction Activities. If the scope and size of my project changes and the amount of earth disturbance is equal to or greater than one (1) acre, I will contact the Wayne Conservation District for a determination of NPDES permit needs. However, my project still requires a written Erosion and Sedimentation Control Plan be developed. This plan outlines how I am going to prevent sediment from leaving my site during construction. Items to consider in the plan are: Sequence of Construction, Temporary Measures (silt fence, mulch, etc.) and Permanent Measures (seeding and mulch with soil supplements, gravel coverage, etc.). This plan does not have to be reviewed by the Wayne Conservation District unless the municipality or another permit requires a review and approval. This letter cannot be considered a waiver of any other federal, state or local permits. Signed Print Name & Address Project location and description (with proposed amount of earth disturbance): Page 8 of 11

In the space below, draw the earth disturbance area and indicate proposed Erosion & Sedimentation Controls. In the drawing, include the Road, Proposed Driveway, any Existing Ditch, Swale or Stream, Slope, Rock Construction Entrance, Culvert, Straw Bale Barrier, Filter Fabric Fence, Silt Sock, Rock Filter Berm and Limit of Disturbance as they apply to this project. Also, indicate erosion protection controls for any steep slopes. Attach additional information as required. Page 9 of 11

NOTICE: in addition to obtaining a permit, you are hereby notified that you are required by law to contact the Pennsylvania One Call System at least three working days before starting construction. IMPORTANT: 1) The terms and conditions embodied in this permit require the permittee to complete this work by the date specified in the permit. Where permittee fails to comply with the condition as to the completion of work by the time specified, the following rules will govern: a) Failure to start work by date specified for completion, the permit will be cancelled unless the permittee desires an extension of time, in which case a supplemental permit may be issued. b) Work started and not completed by specified date, permittee will notify the Township, prior to expiration of the allotted time, of inability to complete the work on or before the date specified and request an extension of time. Such request shall be accompanied by the prescribed fee. c) Permittee not desirous of carrying out proposed work on account of change in conditions affecting it. Permittee will notify the Township prior to the date specified for completion that work will not be carried forward, returning the permit with such notice. The fee for inspection of the work will be refunded by the Township, provided that they have been notified of cancellation prior to the expiration date, but other administrative costs will not be refunded. 2) The fees to be paid under the conditions in a), b), and c) apply only to permits for which fees are collected in accordance with the fixed schedule. 3) All notices relative to time extensions or cancellations shall be forwarded to the Township which issued the original permit. CORPORATE SEAL THE APPLICANT IS (AN INDIVIDUAL) (A PARTNERSHIP) (A CORPORATION INCORPORATED UNDER THE LAWS OF ) APPLICANT SIGNATURE DATE APPLICANT TITLE Page 10 of 11

FOR TOWNSHIP USE SITE VISIT REPORT Applicant: Location: Site visit date: Travel Lane Width: Number of access points: Road Right of Way Width: Existing Roadway Surface Material: Proposed Driveway: Uphill Level Downhill Culvert Pipe Required: Yes No Diameter: Length Min. Offset from Road Center: # of Endwalls Required: 0 1 2 Drop Box Required: Yes No Grate Required: Yes No Sight distance Left: Sight Distance Right: Sight Distance Improvement Required: Yes No Required: Brush / trees removal Earth / Rocks removal Warning Sign For Utility: Parallel Offset from Center Crossing Overhead Underground Fill & Restoration Plan Adequate: Yes No Reason: Traffic Control Plan Adequate: Yes No Reason: Notes: Application Approval: Yes No By Date Page 11 of 11