Washington State Fish Passage Barrier Removal Projects. Casey Kramer, PE WSDOT State Hydraulics Engineer

Similar documents
Follow this and additional works at:

Fish Passage Design Aids Wildlife Crossing in Washington State State of the Practice

HEC 26 Aquatic Organism Passage Design Manual Evolution & Application

Culvert Design for Low and High Gradient Streams in the Midwest. Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest

CALIFORNIA SALMONID STREAM HABITAT RESTORATION MANUAL APPENDIX IX-A CULVERT CRITERIA FOR FISH PASSAGE INTRODUCTION

Packwood Hydroelectric Project Barrier Analysis December 12, 2006

Simulating Streams Through Culverts in Mat-Su, Alaska

Honorable City Council i. A / Richard A. Leahy, City Manager \~v Thomas E. Hansen, P.E., Public Works Director/ ;?:?-

Newaukum Watershed Culvert Assessment

Stephens Creek Culvert Replacement. CAC April 28, 2010

(Revised February,2005) CULVERTS, BRIDGES, AND FORDS

Understanding the Impacts of Culvert Performance on Stream Health

Aquatic Organism Passage at Road-Stream Crossings CHUCK KEEPORTS FOREST HYDROLOGIST ALLEGHENY NATIONAL FOREST WARREN, PENNSYLVANIA

Fish Friendly Crossings- Examples from Nash Stream

Project Report for Marsh Creek and Albion River Instream Fish Barrier Removal Flynn Creek Road, CR 135, M.P. 8.1 and 8.3

FISH PASSAGE IMPROVEMENT in California s Watersheds. Assessments & Recommendations by the Fish Passage Forum

Packwood Lake Intake Screen Velocity Test Report for Energy Northwest's Packwood Lake Hydroelectric Project FERC No Lewis County, Washington

Quantifying Performance of Stream Simulation Culverts in the Chehalis Basin, WA

3. The qualification raised by the ISRP is addressed in #2 above and in the work area submittal and review by the ISRP as addressed in #1.

South Fork Chehalis Watershed Culvert Assessment

Assessment of Baseline Geomorphic Features at. Proposed Stream Crossings On The Proposed County Road 595. Marquette County, Michigan

Fish Passage Culvert Assessment for Cahilty Creek Watershed FIA Project #

Conserving the Forests, Lakes and Streams of Northeast Michigan

WHATCOM COUNTY FISH PASSAGE BARRIER INVENTORY FINAL REPORT

Presented by Fred Halterman, URS Jennie Agerton, URS

Fish Habitat Restoration and Monitoring in Southeast Washington. Andy Hill Eco Logical Research, Inc.

Annex E Bridge Pier Protection Plan

MCCAW REACH RESTORATION

MUCKLESHOOT INDIAN TRIBE Fisheries Division nd Avenue SE Auburn, Washington Phone: (253) Fax: (253)

Technical Report Culvert A Hydraulic Analysis

FSOC Upstream Fish Passage Guidance Document

Fish Passage Culvert Inspection (FPCI) 12 Sites on TFL 18 (FIA ) 1 Site on FL #A18688 (Thuya Creek) (FIA )

Massachusetts Stream Crossing Case Studies

Plan B Dam Breach Assessment

HY-8 Version 7.2 Build Date January 17, Federal Highway Administration.

Five Counties Salmonid Conservation Program - Fish Passage Design Workshop. February 2013

APPENDIX D: North Fork Nooksack Sub-basin Report

Klickitat County Shoreline Master Program Update. Open House March 15, 2017

OFFICE OF STRUCTURES MANUAL FOR HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 13 CULVERTS APRIL 2011

Project Completion Abstract Fish Passage Activity ( Engineering Activities)

Rock Ramp Design Guidelines. David Mooney MS Chris Holmquist-Johnson MS Drew Baird Ph.D. P.E. Kent Collins P.E.

BC Ministry of Forests. March Fish Stream Crossing Guidebook. Forest Practices Code of British Columbia.

PRE- PROPOSAL FORM - Lewis River Aquatic Fund

WRIA 59 Colville River and Tributaries Toe-Width Assessment Final Report

Chadbourne Dam Repair and Fish Barrier

WASHINGTON CONSERVATION DISTRICT STANDARD OPERATING PROCEDURE (S.O.P.)

USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY. Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1

JAP Additional Information Sheet

Discussion on the Selection of the Recommended Fish Passage Design Discharge

Culvert Design An Overview of the NYS Highway Design Manual Chapter 8

Fish Passage at Road Crossings Assessment Boise National Forest FY 2004

COLUMBIA LAKE DAM REMOVAL PROJECT

CE 535, Spring 2002 Preliminary Design Example 1 / 6

April 26, Chairman Rockefeller and members of the Fish and Wildlife Committee. Briefing from Mid-Columbia Regional Fish Enhancement Group (RFEG)

Stream Crossings I: Engineering and Design Approaches to Provide Fish Passage at Culvert Slipline Projects in Connecticut

Sub-watershed Summaries

ADDENDA B Hydrologic and Hydraulic (H&H) Study Guidance 2019

Colusa Basin Drain Watershed Fish Stranding Tour Concept Paper Mike Hendrick and Brycen Swart NMFS

CHAPTER 4 SPALDING COUNTY, GEORGIA 4.0 CULVERT DESIGN

Funding Habitat Restoration Projects for Salmon Recovery in the Snake River Region SRFB Grant Round Version: 2/19/16

OFFICE OF STRUCTURES MANUAL FOR HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 11 APPENDIX B TIDEROUT 2 USERS MANUAL

2 nd Steelhead Summit. October 27 & 28, 2016 in San Luis Obispo, CA

Management of headwater streams in the White Mountain National Forest

Information for File # SEW

PROFILE OF SACRAMENTO RIVER, FREEPORT TO VERONA, CALIFORNIA,

HYDROLOGIC AND HYDRAULIC REPORT PROPOSED CULVERT STRUCTURES SR 194, SECTION 10

Suitable Applications Check dams may be appropriate in the following situations: To promote sedimentation behind the dam.

U.S. Fish and Wildlife Service Native American Crosscut Funding

Follow this and additional works at:

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By:


APPENDIX J HYDROLOGY AND WATER QUALITY

APPENDIX B: South Fork Nooksack Sub-basin Report

Little Traverse Bay Watershed Road/Stream Crossing Inventory

Environmental Review and Permitting for Wild Trout

Design Report for Janes Creek Roughened Channel

Little Spokane River Stream Gage Report: Deadman Creek, Dragoon Creek, and the West Branch of the Little Spokane River

ST. LOUIS SECTION PROJECT OF THE YEAR AWARD

CHAPTER 5 CULVERT DESIGN

Advancing Fish Passage in the Menomonee River Watershed

SELBY CREEK SILVERADO TRAIL CULVERT FISH PASSAGE ASSESSMENT

Gales Creek Fish Passage Assessment and Prioritization

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO OVER THE STRAIGHT RIVER DISTRICT 6 - RICE COUNTY

Yale Reservoir Kokanee (Oncorhynchus nerka) Escapement Report 2016

Information for File #MVP MVM

Eastern Brook Trout Joint Venture Annual Report The Nature Conservancy 2013

Bridge Design Preliminary Bridge Design Example 1 / 6 Spring 2012 updated 1/27/2012

Columbia Lake Dam Removal Project

Mid-Columbia Fisheries Enhancement Group Annual Report Fiscal Year 06: July 1, 2005 June 30, 2006

PENNDRAIN.rep. HEC-RAS Version May 2005 U.S. Army Corp of Engineers Hydrologic Engineering Center 609 Second Street Davis, California

A THESIS M.S. CIVIL ENGINEERING UNIVERSITY OF ALASKA ANCHORAGE ALEXANDRA WEST JEFFERIES, P.E.

Sediment Basin 7E-12. Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures BENEFITS.

UNITED STATES DISTRICT COURT WESTERN DISTRICT OF WASHINGTON AT TACOMA ) ) ) ) ) ) ) ) ) STIPULATION AND NOTICE

BATTLE CREEK FISHERIES STUDIES TASK 4: SURVEYS OF BARRIERS TO THE UPSTREAM MIGRATION OF ANADROMOUS SALMONIDS

MEMORANDUM. TNC Fisher Slough Final Design and Permitting Subject: DRAFT Technical Memorandum: Levee Emergency Spillway Design

Big Spring Creek Habitat Enhancement and Fishery Management Plans

Wild Fish Conservancy Watertype Assessment Project Summary West Sound Watersheds Phase III September 2016

Great Lakes Stream Crossing Inventory Instructions

APPLICANT: Pacific Northwest National Laboratory Attention: Mr. Charles Brandt 1529 West Sequim Bay Road Sequim, Washington 98382

Potlatch River Drainage: Salmonid Presence: Largest lower Clearwater River tributary

Transcription:

Washington State Fish Passage Barrier Removal Projects Casey Kramer, PE WSDOT State Hydraulics Engineer 2014 National Hydraulic Engineering Conference Iowa City, IA August 20 th, 2014

WSDOT Fish Passage Program Partnership with WDFW starting in 1991 Fish barrier inventory and prioritization Statewide (as of 8/14): 7,033 culverts evaluated 1,982 barriers identified (including 1,537 with significant habitat) Correction of barriers through: -stand alone prioritized projects -part of highway projects -part of some maintenance activities 282 barrier corrections have been made opening 976 miles of potential habitat (as of 8/14) SR 548 Terrell Creek Northwest of Ferndale

WSDOT Statewide Fish Barrier Culverts

Culvert Case US v WA Background 1850 s Stevens Treaties: Tribes ceded lands but reserved fishing rights 1974 Boldt Decision: Treaties entitle Tribes to a fair share of fish and a related decision raised the question of the State s responsibilities to prevent habitat degradation In 2001, Twenty-One Western WA Tribes filed suit against the State claiming culverts were blocking substantial amounts of salmon habitat and reducing the salmon available for harvest In 2007, Federal District Court Judge Martinez agreed to the claim and said the State was in breach of the Tribes treaty rights In October 2009, the court convened a trial to determine a remedy SR 112 Trib to Pysht River West of Port Angeles On March 29, 2013, Judge Martinez issued a permanent injunction for the State to fix barrier culverts in the case area

WSDOT culverts in the US v. WA Case area Who? State of Washington WSDOT, WDNR, WDFW, Parks Where? Case area Western Washington WRIA s 1-23 How many are there? Summer 2013 Summer 2014* Total Case Area barrier culverts 1,014 989 Culverts with significant habitat (>200 m upstream) 847 825 *Since summer 2013, 6 barriers were corrected, 22 determined not to be barriers, 3 new barriers identified. Numbers will be updated annually.

Culvert Injunction: Key Points Sept 2013: Develop culvert barrier list in consultation w/ Tribes Use bridge or stream simulation design for barrier corrections Oct 2016: WDFW, DNR, & Parks to fix all their culverts. March 2030: (16 years) WSDOT to fix barriers with significant habitat (> 200 meters upstream) WSDOT can defer corrections up to 10% of the total upstream habitat until end of culvert s useful life WSDOT to correct culverts with <200 meters upstream habitat at end of useful life or though larger transportation projects SR 21 Curlew Creek Near Curlew Creek State Park Ongoing effort to identify & assess barriers, monitor effectiveness & maintain culverts Notify Tribes of State s activities with time for comments

WSDOT culverts in the US v. WA Case area

Current Barrier Correction Effort Fish Passage Program funding in 13-15 $36 Million. $20 Million of that directed to ramping up scoping and design Formed 4 Specialty Fish Passage Design Teams in 3 regional offices Goals: Designing 34 projects Scoping 75 additional projects SR 112 Nelson Creek near Port Angeles

Fish Passage Project Selection Past - Projects selected based on a priority index (PI). Present - Regions assist to select projects based on some of the following criteria: Upstream habitat Location of barrier compared with other WSDOT barriers Future WSDOT safety/mobility project inclusion Future local agency project relationship Project grouping efficiencies Traffic impacts during construction Combined construction Maintenance issues and structure condition Estimated cost (High, Medium, Low) Tribal priorities Partnership opportunities ESA take allowance for listed species

Fish Passage Program HQ Hydraulics Deliverables to Region 25% Technical Memorandum - Contains supporting documentation Site Reconnaissance Hydrology Hydraulics Required Structure Span Streambed material type/size 25% Design Used for design check-in with WDFW and Permit Drawings Plan View Profile Typical Sections

Fish Passage Program HQ Hydraulics Deliverables to Region 60% Design Scour Analysis (Data received from Bridge/Geotech) Substructure elevations determined based on substructure type and scour depth Specialty Report (Stamped Basis of Design Report) Contains engineering calculations to support 100% PS&E 100% PS&E Stream Design (Plan, Profile, Section and Details) Scour Countermeasures Water Crossing Design Streambed Material Design

Fish Passage Barrier Culvert Conditions Excessive Water Surface Drop Shallow Water Depth High Velocity

Fish Passage Barrier Culvert Conditions Culvert Plugged with Sediment or Debris Deteriorating Culverts

Fish Passage Crossings Statewide Design Options Stream Simulation mimics natural channel processes through the crossing Hydraulic Design hydrologic and hydraulic analysis to determine suitable conditions for fish No Slope properly sized culverts set at zero gradient Retrofit series of steps facilitate passage of fish through, over, or around an instream barrier 2013 WDFW Water Crossing Design Guidelines

Fish Passage Crossings Federal Injunction Case Area Design Options Stream Simulation mimics natural channel processes throughout the crossing Bridges bridges facilitate habitat connection for fish and wildlife 2003 WDFW Water Crossing Design Guidelines 2008 Forest Service Aquatic Road-Stream Crossing Design Guidance

Fish Passage Crossings Design Methods Size Flow Event Flow (cfs) Proposed 20 Foot Box Proposed 26 Foot Box Culvert WSE (NAVD88) Max Channel Depth At Culvert Inlet (feet) Channel Velocity At Culvert Inlet (ft/s) FP Q-Low 17.4 8.2 1.3 1.9 FP Q-High 56.8 8.9 1.9 2.7 2-year 188 9.9 3.0 4.4 FP Q-Low 17.4 8.2 1.3 1.9 FP Q-High 56.8 8.9 1.9 2.6 2-year 188 9.9 2.9 4.0 Elevation (ft) 90 85 80 75 70 65 60 CoeClem Plan: Proposed - 75 years in future 6/23/2014.06.04.06 0 50 100 150 200 Station (ft) Legend WS 100-yr Peak WS 10-yr Peak WS 2-yr Peak Ground Levee Ineff Bank Sta Modified Shields Equation τ ci = τ * D 0.3 0. 7 ( γ γ ) D D 50 s i 0.15g q cd = 50 S 1.12 1.5 50 9-03.11(2) Proposed (Percent Smaller) Approximate Size 4 6 8 10 12 12 100 10 100 70-90 8 100 70-90 6 100 70-90 5 70-90 30-60 4 100 30-60 3 70-90 30-60 2 30-60 1.5 20-50 0.75 10 Max 10 Max 10 Max 10 Max 10 Max 0.5 D 50 Critical Unit Discharge (Bathurst)

US 2 - Mill Creek US 2 near Stevens Pass Before 11 foot CMP was a velocity barrier After 37 ft arch constructed in 2006

SR 106 Twanoh Falls Creek Before 5 foot concrete box After 20 foot 3-sided strucutre constructed in 2013

SR 106 Twanoh Falls Creek under construction

SR 104 Unnamed Tributary to Squamish Harbor SR 104 near Hood Canal Floating Bridge Before 2.5 foot CMP with 2 foot drop After 12 foot 3-sided constructed in 2009

US 101 Mosquito Creek US 101 south of Aberdeen, WA Before 4 foot CMP After 16 foot Concrete Culvert constructed in 2009

US 97 Butler Creek Goldendale, WA Before 10.5 foot CMP

US 97 Butler Creek After 65 foot bridge constructed in 2012

I-90 East Fork Issaquah Creek Issaquah, WA Before 12 foot CMP with failed downstream sakrete weirs After 34 foot bridge project completed in 2012

SR 9 NPCreek Wickersham, WA Before 8 foot concrete box After 17 foot concrete box constructed in 2013

Partnership Example I-5 Squalicum Creek WSDOT partnered with the City of Bellingham, WDFW, the WA Department of Ecology, and others to restore Squalicum Cr, which flows to Bellingham Bay. In 2013, WSDOT constructed an open, fish-friendly stream crossing to open ~ 22 miles of salmon habitat upstream while also protecting the existing I-5 bridges In 2015, the stream will be rerouted by the City of Bellingham under the I-5 bridges into an old, historic channel. Before After

Partnership Example SR 11 Padden Creek WSDOT partnered with the City of Bellingham, WDFW, the WA Department of Ecology, and others to restore a 0.50 mile reach of Padden Cr along SR 11 that runs through a brick tunnel built in the 1890 s. In 2013, WSDOT constructed a small bridge on SR 11 with a new stream alignment near the existing culverts which will assist in opening ~7 miles of upstream salmon habitat In 2014, the City will reroute the stream out of the tunnel into a new stream channel. Before After

Questions? Casey Kramer State Hydraulic Engineer WSDOT Development Division (360) 705-7262 kramerc@wsdot.wa.gov